ML17285A079: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-:~A,~CELERATED D BU'EON DEMONST~P4.TION SYFI'EM REGULAT.INFORMATION DISTRIBUTIO ZSTEM (RIDS)ACCESSION NBR:8812010001 DOC.DATE: 88/ll/22 NOTARIZED:
{{#Wiki_filter:-:~ A,~ CELERATED           D       BU'EON       DEMONST~P4.TION           SYFI'EM REGULAT   . INFORMATION DISTRIBUTIO       ZSTEM (RIDS)
NO DOCKET FAC1L:50-397 WPPSS Nuclear Project, Unit.2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
ACCESSION NBR:8812010001           DOC.DATE:   88/ll/22 NOTARIZED: NO               DOCKET FAC1L:50-397     WPPSS Nuclear Project,     Unit.2, Washington Public   Powe   05000397 AUTH. NAME           AUTHOR   AFFILIATION SORENSEN,G.C.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Informs of selling of capability of" facility to BPA&DOE to guarantee payment of deferred premium.DISTRIBUTION CODE: M001D COPIES RECEIVED:LTR
Informs of selling of capability of" facility to         BPA & DOE   to guarantee payment of deferred premium.
/ENCL C7 SIZE: TITLE: Insurance:
DISTRIBUTION CODE: M001D         COPIES RECEIVED:LTR     / ENCL   C7 SIZE:
Indemnity/Endorsement Agreements NOTES: RECIPIENT ID CODE/NAME INTERNAL:~N 8/~MAS/PTSB12 EG FIL 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME NUDOCS-ABSTRACT COPIES LTTR ENCL h EXTERNAL: LPDR NRC PDR R 1 S h NOIR M ALL"RIDS" RECIPIENTS:
TITLE: Insurance:     Indemnity/Endorsement     Agreements NOTES:
PIZASE HELP US IO REDUCElCRTB!CXRKLCT'IHE DOCUMERZ CCNXBDL DESK ROCN P1-37 (EXT.20079)I ElLDGZKR YOUR NAME PKH DISTRIBUTION LISTS KR DOCUMENTS YOU DON'T NEZDf 5 TOTAL NUMBER OF COPIES REQUIRED:.
RECIPIENT          COPIES            RECIPIENT           COPIES ID  CODE/NAME        LTTR ENCL      ID CODE/NAME         LTTR ENCL INTERNAL:   ~N 8/~MAS/PTSB12                     NUDOCS-ABSTRACT                             h EG  FIL        01 EXTERNAL: LPDR                                     NRC PDR R
LTTR 5 ENCL n~II WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 November 22, 1988 G02-88-247 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk P1-137 Washington, D.C.20555  
1 S
h NOIR M ALL "RIDS" RECIPIENTS:
ROCN P1-37 (EXT. 20079) I PIZASE HELP US IO REDUCE lCRTB! CXRKLCT 'IHE DOCUMERZ CCNXBDL DESK ElLDGZKR YOUR NAME PKH DISTRIBUTION LISTS KR DOCUMENTS YOU DON'T NEZDf 5
TOTAL NUMBER OF COPIES REQUIRED:. LTTR             5 ENCL
 
II n
    ~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 November 22, 1988 G02-88-247 U.S. Nuclear Regulatory Commission ATTN: Document     Control Desk P1-137 Washington, D. C.         20555


==Subject:==
==Subject:==
SUPPLY SYSTEM PLANT NO.2 OPERATING LICENSE NPF-21 GUARANTEE OF PAYMENT OF DEFERRED PREMIUM  
SUPPLY SYSTEM PLANT NO. 2 OPERATING LICENSE NPF-21 GUARANTEE OF PAYMENT OF DEFERRED PREMIUM


==Reference:==
==Reference:==
Letter,    GC  Sorensen    (Supply System) to        A Schwencer    (NRC),
same  subject, dated        December  19, 1984 This    transmittal is provided in compliance with 10CFR 140.21 which requires annual filing of a guar antee of payment of deferred premiums in the amount of $ 10 million for each licensed reactor.
The  Supply System obtains revenue from Plant No. 2 by selling the capability of the Plant. The Bonneville Power Administration (BPA), an agency of the Department of Energy, has purchased the entire capability of Plant No. 2 from certain of its statutory preference customers who, in turn, purchased such capability from the Supply System, all under the Net Billing Agreements. A copy of the Net Billing Agreements was included as an attachment to the referenced                letter . Under the terms of the Net Billing Agreements, BPA is obligated to pay the total annual costs of Plant  No. 2  to the Supply System.
                                                                                                      'h It  is the opinion of        BPA's General      Counsel    that "Bonneville is obligated to  pay costs of ownership, operation, and maintenance, including costs of insurance, and specifically, the insur ance obligation provided through the Price Anderson Act" (see referenced letter).
The  opinion of Bonneville regarding their obligation to pay satisfies the requirements of 10CFR 140.21(f). If you require additional documentation,
      " please contact Mr. R. A. Bresnahan at (509) 372-5352.
Very  truly yours, G. C. S  rensen, Manager Regulatory Programs cc:  RB  Samworth/NRC PDR    ADDeK JB  Martin/Region      V    i                    05000397 I. Dinitz/NRC                                            PNU NS  Reynolds/BCP&R C  Bosted/NRC Site


Letter, GC Sorensen (Supply System)to A Schwencer (NRC), same subject, dated December 19, 1984 This transmittal is provided in compliance with 10CFR 140.21 which requires annual filing of a guar antee of payment of deferred premiums in the amount of$10 million for each licensed reactor.The Supply System obtains revenue from Plant No.2 by selling the capability of the Plant.The Bonneville Power Administration (BPA), an agency of the Department of Energy, has purchased the entire capability of Plant No.2 from certain of its statutory preference customers who, in turn, purchased such capability from the Supply System, all under the Net Billing Agreements.
I r 4 ~,Jl 0
A copy of the Net Billing Agreements was included as an attachment to the referenced letter.Under the terms of the Net Billing Agreements, BPA is obligated to pay the total annual costs of Plant No.2 to the Supply System.'h It is the opinion of BPA's General Counsel that"Bonneville is obligated to pay costs of ownership, operation, and maintenance, including costs of insurance, and specifically, the insur ance obligation provided through the Price Anderson Act" (see referenced letter).The opinion of Bonneville regarding their obligation to pay satisfies the requirements of 10CFR 140.21(f).
d'}}
If you require additional documentation," please contact Mr.R.A.Bresnahan at (509)372-5352.Very truly yours, G.C.S rensen, Manager Regulatory Programs cc: RB Samworth/NRC JB Martin/Region V I.Dinitz/NRC NS Reynolds/BCP&R C Bosted/NRC Site i PDR ADDeK 05000397 PNU I r 4~,J l 0 d'}}

Latest revision as of 14:49, 29 October 2019

Submits Guarantee of Payment of Deferred Premium,Per 10CFR140.21 Requirements
ML17285A079
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/22/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-247, NUDOCS 8812010001
Download: ML17285A079 (3)


Text

-:~ A,~ CELERATED D BU'EON DEMONST~P4.TION SYFI'EM REGULAT . INFORMATION DISTRIBUTIO ZSTEM (RIDS)

ACCESSION NBR:8812010001 DOC.DATE: 88/ll/22 NOTARIZED: NO DOCKET FAC1L:50-397 WPPSS Nuclear Project, Unit.2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs of selling of capability of" facility to BPA & DOE to guarantee payment of deferred premium.

DISTRIBUTION CODE: M001D COPIES RECEIVED:LTR / ENCL C7 SIZE:

TITLE: Insurance: Indemnity/Endorsement Agreements NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL INTERNAL: ~N 8/~MAS/PTSB12 NUDOCS-ABSTRACT h EG FIL 01 EXTERNAL: LPDR NRC PDR R

1 S

h NOIR M ALL "RIDS" RECIPIENTS:

ROCN P1-37 (EXT. 20079) I PIZASE HELP US IO REDUCE lCRTB! CXRKLCT 'IHE DOCUMERZ CCNXBDL DESK ElLDGZKR YOUR NAME PKH DISTRIBUTION LISTS KR DOCUMENTS YOU DON'T NEZDf 5

TOTAL NUMBER OF COPIES REQUIRED:. LTTR 5 ENCL

II n

~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 November 22, 1988 G02-88-247 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk P1-137 Washington, D. C. 20555

Subject:

SUPPLY SYSTEM PLANT NO. 2 OPERATING LICENSE NPF-21 GUARANTEE OF PAYMENT OF DEFERRED PREMIUM

Reference:

Letter, GC Sorensen (Supply System) to A Schwencer (NRC),

same subject, dated December 19, 1984 This transmittal is provided in compliance with 10CFR 140.21 which requires annual filing of a guar antee of payment of deferred premiums in the amount of $ 10 million for each licensed reactor.

The Supply System obtains revenue from Plant No. 2 by selling the capability of the Plant. The Bonneville Power Administration (BPA), an agency of the Department of Energy, has purchased the entire capability of Plant No. 2 from certain of its statutory preference customers who, in turn, purchased such capability from the Supply System, all under the Net Billing Agreements. A copy of the Net Billing Agreements was included as an attachment to the referenced letter . Under the terms of the Net Billing Agreements, BPA is obligated to pay the total annual costs of Plant No. 2 to the Supply System.

'h It is the opinion of BPA's General Counsel that "Bonneville is obligated to pay costs of ownership, operation, and maintenance, including costs of insurance, and specifically, the insur ance obligation provided through the Price Anderson Act" (see referenced letter).

The opinion of Bonneville regarding their obligation to pay satisfies the requirements of 10CFR 140.21(f). If you require additional documentation,

" please contact Mr. R. A. Bresnahan at (509) 372-5352.

Very truly yours, G. C. S rensen, Manager Regulatory Programs cc: RB Samworth/NRC PDR ADDeK JB Martin/Region V i 05000397 I. Dinitz/NRC PNU NS Reynolds/BCP&R C Bosted/NRC Site

I r 4 ~,Jl 0

d'