ML17285A850: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED /ISTRIBUTION DEMETPWTION                                       SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
/ISTRIBUTION DEMETPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8911220038 DOC.DATE: 89/11/14 NOTARIZED:
ACCESSION NBR:8911220038               DOC.DATE: 89/11/14   NOTARIZED: NO         DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public Powe           05000397 AUTH. NAME           AUTHOR AFFILIATION SORENSEN,G.C.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Confirms info re fire protection insp provided to NRC on 891109,per 891103 request.DISTRIBDTION CODE: IEOID COPIES RECEIVED:LTR j ENCL 0 SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 0 DOBERMAN,J KG~LE~02 RGN5 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME SAMWORTH,R AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB 10 NRR/DRIS/DIR NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
Confirms info re fire protection insp provided to NRC on 891109,per 891103 request.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM e P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 November 14, 1989 Docket 50-397 G02-89-207 U.S.Nuclear Regulatory Commission Document Control Uesk Mail Station Pl-137 Washington, DC 20555 Gentlemen:
DISTRIBDTION CODE: IEOID TITLE: General     (50 COPIES RECEIVED:LTR Dkt)-Insp Rept/Notice j ENCL  0 SIZE:
of Violation Response NOTES:
RECIPIENT              COPIES            RECIPIENT         COPIES ID CODE/NAME           LTTR ENCL        ID CODE/NAME      LTTR ENCL PD5 PD                                   SAMWORTH,R INTERNAL: ACRS                                       AEOD AEOD/DEIIB                               AEOD/TPAD DEDRO                                   NRR SHANKMAN,S NRR/DEST DIR                             NRR/DLPQ/PEB NRR/DOEA DIR 11                         NRR/DREP/EPB 10 NRR/DREP/RPB 10                         NRR/DRIS/DIR NRR/PMAS/ILRB12                         NUDOCS-ABSTRACT 0   DOBERMAN,J                         OGC/HDS2 KG~LE~         02                     RES MORISSEAU,D RGN5     FILE   01 EXTERNAL: LPDR                                       NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               26 ENCL
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM e
P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 November 14, 1989 Docket 50-397 G02-89-207 U.S. Nuclear Regulatory Commission Document     Control Uesk Mail Station Pl-137 Washington, DC 20555 Gentlemen:


==SUBJECT:==
==SUBJECT:==
RESPONSE TO RE/VEST FOR INFORMATION Ref: Letter R.P.Zimmerman to=A.L.Oxsen, Fire Protection Inspection, dated November 3, 1989 The referenced letter requested that Region V be informed by November 10, 1989, as to actions taken by the Supply System in response to questions raised by Mr.C.Ramsey and Ms.M.Miller.The purpose of this letter is to confirm that the following information was provided to the Senior NRC Resident Inspector on Thursday, November 9, 1989: 1)All remedial actions, that would have been required by the LCO's in the deleted Technical Specification are currently in place.2)An interim change to plant procedure 1.3.10 to specifically incorporate all the fire protection surveillances, remedial actions, and LCOs which were removed from the Tech Specs by Amendment 67 to the WNP-2 operating license has been completed.
RESPONSE     TO RE/VEST FOR INFORMATION Ref:   Letter R.P.       Zimmerman to= A.L. Oxsen,       Fire Protection Inspection, dated         November 3, 1989 The   referenced       letter requested that Region V be               informed by November 10, 1989,     as to actions taken by the Supply System                     in response     to questions raised     by Mr. C. Ramsey and Ms. M. Miller.
All future changes to this procedure will be conducted in accordance with 10 CFR 50.59.8911220038 891114 PDR ADOCK 0 000'5'7 IQ PbC NRC-DOCUMENT CON OL DESK NOVEMBER 14, 1989 PAGE TMO 3)Permanent plant procedures implementing the fire protection program, remedial actions and operational conditions, as discussed in 2 above, will be in place by November 29, 1989.4)By November 22, 1989, the Supply System will submit an amendment to the FSAR which discusses the fire protection surveillances, remedial actions and LCOs discussed in 2.Should you have any questions regarding this response, please contact me.Very truly yours, G.C.So ensen, Manager Regulatory Programs (M.D.280)GCS:lrn cc: JB Martin, NRC Region V PH Johnson, NRC Region V RB Samwor th, NRC NS Reynolds, BCP&R CJ Bosted, Resident Inspector}}
The purpose         of this letter is to confirm that the following information                   was provided to the Senior           NRC Resident Inspector on Thursday, November 9, 1989:
: 1)   All remedial actions, that           would have been required by the LCO's     in the deleted Technical Specification are currently in place.
: 2)   An   interim change to plant procedure 1.3.10 to specifically incorporate all the fire protection surveillances, remedial actions, and LCOs which were removed from the Tech Specs by Amendment 67 to the WNP-2 operating license has been completed.
All future changes to this procedure will be conducted in accordance with 10 CFR 50.59.
8911220038 891114 PDR     ADOCK 0 000 '5'7 IQ                         PbC
 
NRC DOCUMENT CON     OL DESK NOVEMBER 14, 1989 PAGE TMO
: 3)   Permanent plant procedures implementing the fire protection program, remedial actions and operational conditions, as discussed in 2 above, will be in place by November 29, 1989.
: 4)   By November 22,   1989, the Supply System will submit an amendment to the FSAR   which discusses the fire protection surveillances, remedial actions and LCOs discussed in 2.
Should you have any questions regarding     this response, please contact   me.
Very truly yours, G.C. So ensen, Manager Regulatory Programs (M.D. 280)
GCS:lrn cc: JB Martin, NRC Region V PH Johnson,   NRC Region V RB Samwor th, NRC NS Reynolds, BCP&R CJ Bosted, Resident Inspector}}

Latest revision as of 14:31, 29 October 2019

Confirms That Listed Info Provided to NRC Resident Inspector on 891109 Re Fire Protection Insp,Per RP Zimmerman 891103 Ltr
ML17285A850
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/14/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-207, NUDOCS 8911220038
Download: ML17285A850 (3)


Text

ACCELERATED /ISTRIBUTION DEMETPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8911220038 DOC.DATE: 89/11/14 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Confirms info re fire protection insp provided to NRC on 891109,per 891103 request.

DISTRIBDTION CODE: IEOID TITLE: General (50 COPIES RECEIVED:LTR Dkt)-Insp Rept/Notice j ENCL 0 SIZE:

of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD SAMWORTH,R INTERNAL: ACRS AEOD AEOD/DEIIB AEOD/TPAD DEDRO NRR SHANKMAN,S NRR/DEST DIR NRR/DLPQ/PEB NRR/DOEA DIR 11 NRR/DREP/EPB 10 NRR/DREP/RPB 10 NRR/DRIS/DIR NRR/PMAS/ILRB12 NUDOCS-ABSTRACT 0 DOBERMAN,J OGC/HDS2 KG~LE~ 02 RES MORISSEAU,D RGN5 FILE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM e

P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 November 14, 1989 Docket 50-397 G02-89-207 U.S. Nuclear Regulatory Commission Document Control Uesk Mail Station Pl-137 Washington, DC 20555 Gentlemen:

SUBJECT:

RESPONSE TO RE/VEST FOR INFORMATION Ref: Letter R.P. Zimmerman to= A.L. Oxsen, Fire Protection Inspection, dated November 3, 1989 The referenced letter requested that Region V be informed by November 10, 1989, as to actions taken by the Supply System in response to questions raised by Mr. C. Ramsey and Ms. M. Miller.

The purpose of this letter is to confirm that the following information was provided to the Senior NRC Resident Inspector on Thursday, November 9, 1989:

1) All remedial actions, that would have been required by the LCO's in the deleted Technical Specification are currently in place.
2) An interim change to plant procedure 1.3.10 to specifically incorporate all the fire protection surveillances, remedial actions, and LCOs which were removed from the Tech Specs by Amendment 67 to the WNP-2 operating license has been completed.

All future changes to this procedure will be conducted in accordance with 10 CFR 50.59.

8911220038 891114 PDR ADOCK 0 000 '5'7 IQ PbC

NRC DOCUMENT CON OL DESK NOVEMBER 14, 1989 PAGE TMO

3) Permanent plant procedures implementing the fire protection program, remedial actions and operational conditions, as discussed in 2 above, will be in place by November 29, 1989.
4) By November 22, 1989, the Supply System will submit an amendment to the FSAR which discusses the fire protection surveillances, remedial actions and LCOs discussed in 2.

Should you have any questions regarding this response, please contact me.

Very truly yours, G.C. So ensen, Manager Regulatory Programs (M.D. 280)

GCS:lrn cc: JB Martin, NRC Region V PH Johnson, NRC Region V RB Samwor th, NRC NS Reynolds, BCP&R CJ Bosted, Resident Inspector