{{#Wiki_filter:TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-1 Owners'ata Report for Inservice Inspections 9902i20290 990i20 PDR ADOCK 05000250 8 PDR li 0 TURKEY POINT PLANT UNIT 3 1998 REFUELING OUTAGE INSERVICE INSPECTION REPORT This Inservice Inspection report is for the 1998 Turkey Point Unit 3 refueling outage.This was the second outage of the second period in the third ten-year interval.The attached Inservice Inspection summary tables detail the Inservice examinations performed during the outage.The attached NIS-2 forms list the repairs and replacement activities which have taken place since the previous Unit 3 submittal, as well as those performed during the 1998 refueling outage.The Examinations performed included: Primary nozzle inner radius UT examinations were performed on the"C" Steam Generator.
{{#Wiki_filter:TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-1 Owners'ata Report for Inservice Inspections 9902i20290 990i20 PDR   ADOCK 05000250 8               PDR
t Augmented Feedwater Ultrasonic examinations were performed on the A, B and C Steam Generator FW nozzles, adjacent piping, and fittings.Accessible Reactor Vessel internal surfaces were visually examined along, with the Reactor Vessel flange surface.Also examined were selected components from the Reactor Coolant, Residual Heat Removal, Safety Injection, Waste Disposal, and Chemical and Volume Control systems.100-.of the A, B, and C Steam Generator tubes were Eddy Current tested.Visual examination and functional testing, of snubbers was performed in accordance with ASM'ection XI, as modified by Relief Request No.4, and Plant Technical Specifications.
 
li 0
 
TURKEY POINT PLANT UNIT 3 1998 REFUELING OUTAGE INSERVICE INSPECTION REPORT This Inservice Inspection report is for the 1998 Turkey Point Unit 3 refueling outage. This was the second outage of the second period in the third ten-year interval.
The attached Inservice Inspection summary tables detail the Inservice examinations performed during the outage.
The attached NIS-2 forms list the repairs and replacement activities which have taken place since the previous     Unit 3 submittal, as well   as those performed during the 1998 refueling outage.
The Examinations performed included:
t Primary nozzle inner radius UT examinations were performed on the "C" Steam Generator.
Augmented Feedwater Ultrasonic examinations were performed on the A, B and C Steam Generator FW nozzles, adjacent piping, and fittings.
Accessible Reactor Vessel internal surfaces were visually examined along, with the Reactor Vessel flange surface.
Also examined were selected components from the Reactor Coolant, Residual Heat Removal, Safety Injection, Waste Disposal, and Chemical and Volume Control systems.
100-. of the A, B, and C Steam Generator tubes were Eddy Current tested.
Visual examination and functional testing, of snubbers was performed in accordance with ASM'ection XI, as modified by Relief Request No. 4, and Plant Technical Specifications.
System Pressure testing was performed'n Quality, Group A, B, and C piping and components.
System Pressure testing was performed'n Quality, Group A, B, and C piping and components.
The examinations performed exceed the minimum requirements for ISI examinations for this period.
The examinations performed exceed the minimum requirements     for ISI examinations for this period.
Ii FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 7 1.Owner: 2.Plant: Florida Power and Light Company 700 Universe Blvd.Juno Beach, Florida 33408 Florida Power&Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street.Florida City, Florida 33035 3.Plant Vnit:~4~5.6.Owner Certificate of Authorization (if required)~Commercial Service Date National Board Number for Vnit: 7 Components Inspected:
 
Component or A urtenance Reactor Pressure Vessel Steam Generator C Manufacturer or Installer Babcock and Wilcox Westinghouse Manufacturer State or or Installer Province Serial No.No.610-0116 j N/A 3PSRV1 16A-5885-3
Ii FORM NIS-1 OWNERS'ATA     REPORT FOR INSERVICE INSPECTIONS Page 1   of 7
'/A FSGT-3003 3E210C Nat'l Board No.N-160 N-776 Reactor Coolant Pump'C Regenerative Heat Exchan er Reactor Coolant S stem Safety Injection S stem Chemical and Volume Control S stem RHR S stem Main Feedwater S stem Westinghouse.Westinghouse Bechtel Bechtel Bechtel Bechtel'Bechtel 3P200C 3E200 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A:N/A'/A o Il 0 NIS-1 Report (continued)
: 1.     Owner:     Florida Power and   Light Company 700 Universe Blvd.
Page 2 of 7 2.3.4, 5.6.Owner: Florida Power 8 Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required)Comnercial Service Date: National Board Nwher for Unit: 8.Examination Dates: From to 9.Inspection Period Identification
Juno Beach, Florida 33408
: Second Period 10.Inspection Interval Identification:
: 2.      Plant:    Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street
Third Interval, from 11.Applicable Edition of Section XI~39 Addenda~a~
                    .Florida City, Florida 33035
12.Date/Revision of Inspection.Plan: 13.Abstract of examinations and tests.Inservice Examinations of selected Class 1 and 2 components and piping systems of Florida Power and Light's (FPL)Turkey Point Unit 3 were performed during the 1998 Refueling Outage.This outage was the second outage of the second period in the third ten year interval.The 1998 outage began on September 21, 1998 and ended on October 28, 1998.The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the American Society of Mechanical Engineers (ASME)Section XI, 1989 Edition.Manual Ultrasonic, Visual, and Liquid Penetrant non-destructive methods were utilized to examine components, piping, and their supports.The examinations were performed in accordance with FPL NDE procedures, and supported by examiners supplied by Raytheon Engineers 2 Constructors.
: 3.     Plant Vnit:~
See the attached lnservice Inspection Summary for details of the examination scope and examination results.Eddy Current examinations on Steam Generators A, B, and C were conducted by ABB personnel from October 5, 1998 through October 8, 1998.A total of 9560 tubes were examined.One tube in the"B" Steam Generator,was preventively plugged during this outage due to mechanical wear at the adjacent anti-vibration bar.See the attached NIS-BB Report for examination scope and results.  
4 ~   Owner Certificate of Authorization     (if required) ~
~lb Ik e 2.3.4.5.6.NIS-1 Report (continued)
: 5.      Commercial Service Date
Page 3 of 7 Owner: Florida Power 8 Light Company, 700 Universe:Blvd.
: 6.      National Board Number for Vnit:
Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (H required)Conmercial Service Date: National Board Number for Unit: Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4..Visual examination and functional testing services were supplied by'asic-PSA, Inc.One non-safety related snubber failed a hand strok'e during a visual examination, and also failed a subsequent functional test before being replaced.There were no snubber failures in the safety related visual, or functional test sample..See the attached Snubber Examination Report for examination scope and results.System Pressure testing was conducted by Turkey Point plant personnel and supported by Raytheon Visual examiners to ASME Section XI and applicable plant procedures.
7       Components Inspected:
See the attached System Pressure Test Report for test boundaries and results.Approximately two-thirds of the scheduled examinations for the second period have been performed.
Manufacturer State or      Nat'l Component   or          Manufacturer or Installer Province        Board A   urtenance           or Installer Serial   No. No.         No.
The remainder of the second period examinations are scheduled for the next refueling outage.This meets or exceeds the requirements of Program B of ASME Section XI and applicable relief requests.14.,Abstract of Results of Examinations and Tests.C1a:~A-RPV B-N-1 Vessel Interior Visual examination was performed.
Reactor Pressure        Babcock and    610-0116     j N/A         N-160 Vessel                  Wilcox        3PSRV1 Steam Generator    C    Westinghouse  16A-5885-3 FSGT-3003
There were no reportable indications noted.An Ultrasonic examination was performed on the"C" Steam Generator inlet and outlet nozzle inside radius sections."Also examined were the support structure, including the S/G integral attachments by VT-3, and the manway bolting by VT-1 method.There were no reportable indications noted.Eddy Current examinations were.performed on the tubing of the three Steam Generators.
                                                          '/A           N-776 3E210C Reactor Coolant   Pump Westinghouse  3P200C          N/A        N/A
One tube in"B" Steam Generator was preventively plugged during this outage due to mechanical wear at the anti-vibration bar.The results of the examinations are detailed in the attached NIS-BB report.
  'C Regenerative Heat       .Westinghouse  3E200          N/A        N/A Exchan   er Reactor Coolant         Bechtel        N/A            N/A        N/A S stem Safety Injection         Bechtel        N/A            N/A        N/A S stem Chemical and Volume Bechtel            N/A            N/A        N/A Control S stem RHR S stem               Bechtel       N/A             N/A       :N/A'/A Main Feedwater          'Bechtel        N/A             N/A S stem o
0 0  
 
, 2.3.4~5.6.NIS-1 Report (continued)
Il 0
Page 4 of 7 Owner: Florida Power&Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S'N 344 Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required>Comnercial Service Date: National Board Number for Unit: An integral attachment on"C" RCP was examined with surface and visual methods.Rejectable linear indications, were recorded during the PT exam on the.3-RCP-C-L2-IA RCP"C" integral attachment (See section 15,"Abstract of Corrective Measures").There were no further reportable indications noted.A VT-3 visual examination was performed near the.beginning of the outage to examine the Regenerative HX for boric acid crystal accumulation and evidence of leakage.A VT-2 visual,,examination was performed during the system leakage test prior to startup to examine for evidence of leakage.There were no reportable indications noted.Reactor Coolant piping welds and one support were examined using surface, volumetric.'c, and visual, techniques.
 
There were no reportable indications noted..Waste Disposal piping welds were examined using surface methods.There were no reportable indications noted..Safety Injection piping welds and supports were examined with volumetric, surface and visual methods.There were no reportable indications noted.
NIS-1 Report (continued)                               Page 2 of 7 Owner:   Florida Power 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408
0 II 4I  
: 2. Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035
, 2.3.4.5.6.NIS-1 Report (continued)
: 3. Plant Unit:~
Page 5 of 7 Owner: Florida Power&Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear'Power Plant, 9760 SW 344 Street,, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required)Comnercial Service Date: National Board Number for Unit: Residual Heat Removal piping welds and supports were examined using surface, volumetric and visual methods.A loose clamp bolt was recorded during the VT-3 exam of a support.In addition, arc strikes were found outside of the exam area during a piping PT exam (See section 15,"Abstract of Corrective Measures").There were no further reportable indications noted.Chemical and Volume Control piping welds were examined using surface techniques.
4,    Owner Certificate of Authorization (if required)
Piping supports, components and pressure retaining bolting were examined visually.Two of the supports examined had rejectable conditions, and one of those resulted in a sample expansion (See section 15,"Abstract of Corrective Measures").Boric acid was observed during a visual exam of pressure retaining flange bolting (See section 15,"Abstract of Corrective Measures").There were no further reportable indications noted.Augmented ultrasonic examinations were performed.on areas from the nozzle ramp out to a point one pipe diameter on the upstream elbow on all three Feedwater lines inside containment.
: 5. Comnercial Service Date :
Previously recorded acceptable slag inclusions were noted during the exams.There were no reportable indications noted.
: 6. National Board Nwher for Unit:
0 4l NIS-1 Report (continued)
: 8. Examination Dates               :   From                     to
Page 6 of 7 2.Plant: Turkey Point Nuclear Power Plant, 9760 SW 344St 3.Plant Unit:~4.Owner Certificate of Authoritation (if required)6.Owner: Florida Power&Light Company, 700 Universe Blvd.Juno Beach, Florida 3340B rect, Florida City, Florida 33035 Cormercial Service Date: National'Board Number for Unit: 15.Abstract of Corrective Measures Boric acid accumulation was found at the flange gasket during a VT-1 examination of CVCS flange bolting.The flange gasket and bolting were replaced per Condition Report I 98-1406.Rejectable linear indications were found during a PT exam on the"C" RCP integral attachment.
: 9. Inspection Period Identification                       : Second Period
The indications were characterized as manufacturing flaws.The indications were then removed.and re-examined by PT per Condition Report I 98-1517.A bent rod was discovered during a VT-3 examination of a CVCS pipe support and was replaced per Condition Report I 98-1358.A sheared U-bolt was discovered during a VT-3 examination of a CVCS restraint and was replaced'ith a restraint of a different design per Condition Report I 98-1357.A sample expansion of seven additional supports was performed as part of the corrective actions within Condition Report I 98-1357 and in accordance with ASME Sect.XI, Para.IWF-2430.No further reportable conditions resulted from the examinations of the expansion selections.
: 10. Inspection Interval Identification: Third Interval, from
Two arc strikes were discovered outside of the examination area during the PT exam of a RHR piping weld.The,arc strikes were removed and re-examined per Condition Report g98-1437.A loose clamp bolt was found during a VT-3 examination, of a RHR system spring hanger.The clamp bolting of the spring hanger was replaced per Condition Report I 98-1405.One tube in"B" Steam Generator was preventively plugged during this outage due to mechanical wear at the adjacent anti-vibration bar.One non-safety related snubber failed a hand stroke during a visual examination, and also failed a subsequent functional test before being replaced.There were no snubber failures in the safety related visual, or functional test sample.Indications which exceeded the acceptance criteria were evaluated by FPL Engineering to determine acceptability for continued service.There were no conditions that were determined to be unacceptable for continued service, however as good practice, FPL chose to correct all indications that exceeded the Code acceptance criteria.
: 11. Applicable Edition of Section XI ~39 Addenda~a~
41 0 0 NIS-1 Report, (continued)
: 12. Date/Revision of Inspection .Plan:
Page 7 of 7 2.3.4.5.6.Owner: Florida'Power 8 Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unct:~Owner Certificate of Authorization (if required)Comnercial Service Date: National Board Number for Unit: We certify that a)the statements made in this report are correct, b)the examinations and tests meet the Inspection Plan as required by the ASHE Code, Section XI, and c)corrective measures taken conform to the rules of the ASHE Code, Section XI.Certificate of Authorization No.Expiration Date A/A Date: Signed: By C~WW CERTIFICATE
: 13. Abstract of examinations and tests.
'OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors, and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 9/21/98 to 10/28/98, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.National Board, State, Province, and Endorsements By signing this certificate, neither the inspector nor his employer makes any warranty,, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Inservice Examinations of selected Class 1 and 2 components and piping systems of Florida Power and Light's (FPL) Turkey Point Unit 3 were performed during the 1998 Refueling Outage. This outage was the second outage of the second period in the third ten year interval. The 1998 outage began on September 21, 1998 and ended on October 28, 1998.
8'ZSa 8)nspector's
The components         and   piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Section XI, 1989 Edition.
'S'ature Date:
Manual Ultrasonic, Visual, and Liquid Penetrant non-destructive methods were utilized to examine components, piping, and their supports. The examinations were performed in accordance with FPL NDE procedures,         and supported by examiners supplied by Raytheon Engineers 2 Constructors. See the attached lnservice Inspection Summary for details of the examination scope and examination results.
0 TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements lpga il Abstract The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3.These repairs or replacements were performed prior to and during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October 28, 1998 Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code"Rules for Inservice Inspection of Nuclear Power Components," 1989 Edition with no addenda.  
Eddy Current examinations               on Steam Generators A, B, and C were conducted by       ABB   personnel from October 5, 1998 through October"B" 8, 1998. A total of 9560 tubes were examined. One tube in the Steam Generator,was preventively plugged during this outage due to mechanical wear at the adjacent anti-vibration bar. See the attached NIS-BB Report for examination scope and results.
 
~lb Ik
 
e 2.
3.
Owner:
NIS-1 Report (continued)                               Page 3 Florida Power 8 Light Company, 700 Universe:Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit:~
of 7
: 4. Owner Certificate of Authorization (H required)
: 5. Conmercial Service Date :
: 6. National Board Number for Unit:
Snubber functional             testing       and visual examinations were conducted in accordance with             ASME   Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.. Visual examination and functional testing services were supplied by Inc. One non-safety related snubber failed a hand                             'asic-PSA, strok'e during a visual examination, and also failed a subsequent functional test before being replaced. There were no snubber failures in the safety related visual, or functional test sample.. See the attached Snubber Examination Report for examination scope and results.
System Pressure testing was conducted by Turkey Point plant personnel and supported by Raytheon Visual examiners to ASME Section XI and applicable plant procedures. See the attached System Pressure Test Report for test boundaries and results.
Approximately two-thirds of the scheduled examinations for the second period have been performed. The remainder of the second period examinations are scheduled for the next refueling outage.
This meets or exceeds the requirements of Program B of ASME Section XI and applicable relief requests.
: 14.   ,Abstract of Results of Examinations and Tests.
C1a:~
A -RPV B-N-1       Vessel Interior Visual examination was performed.
There were no reportable indications noted.
An Ultrasonic examination               was   performed on the "C" Steam Generator inlet and outlet nozzle inside radius sections."Also examined were the support structure, including the S/G integral attachments by VT-3, and the manway bolting by VT-1 method. There were no reportable indications noted.
Eddy Current examinations were .performed                           on the tubing of the three Steam Generators. One tube in "B" Steam Generator was preventively plugged during this outage due to mechanical wear at the anti-vibration bar.
The results of the examinations are detailed in the attached NIS-BB     report.
 
0 0
 
, 2.
3.
4~
Owner:
NIS-1 Report (continued)                               Page 4 Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S'N 344 Street, Florida City, Florida 33035 Plant Unit:~
Owner Certificate of Authorization (if required>
of 7
: 5. Comnercial Service Date :
: 6. National Board Number for Unit:
An integral attachment on "C" RCP was examined with surface and visual methods. Rejectable linear indications,"C"were recorded during the PT exam on the. 3-RCP-C-L2-IA RCP                                 integral attachment (See section 15, "Abstract of Corrective Measures" ).
There were no further reportable indications noted.
A VT-3   visual examination was performed near the .beginning of the outage to examine the Regenerative HX for boric acid crystal accumulation and evidence of leakage. A VT-2 visual,,examination was performed during the system leakage test prior to startup to examine for evidence of leakage.                       There were no reportable indications noted.
Reactor Coolant piping welds and one support were examined using surface, volumetric.'c, and visual, techniques. There were no reportable indications noted..
Waste Disposal         piping welds were examined using surface methods.
There were no         reportable indications noted..
Safety Injection piping welds and supports were examined with volumetric, surface and visual methods. There were no reportable indications noted.
 
0 II 4I
 
, 2.
3.
4.
Owner:
NIS-1 Report (continued)                               Page 5 Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear'Power Plant, 9760 SW 344 Street,, Florida City, Florida 33035 Plant Unit:~
Owner Certificate of Authorization (if required) of 7
: 5. Comnercial Service Date :
: 6. National Board Number for Unit:
Residual Heat Removal piping welds and supports were examined using surface, volumetric and visual methods. A loose clamp bolt was recorded during the VT-3 exam of a support. In addition, arc strikes were found outside of the exam area during a piping PT exam (See section 15, "Abstract of Corrective Measures" ) . There were no further reportable indications noted.
Chemical and Volume Control piping welds were examined using surface techniques. Piping supports, components and pressure retaining bolting were examined visually. Two of the supports examined had rejectable conditions, and one of those resulted in a sample expansion (See section 15, "Abstract of Corrective Measures" ). Boric acid was observed during a visual exam of pressure retaining flange bolting (See section 15, "Abstract of Corrective Measures" ). There were no further reportable indications noted.
Augmented     ultrasonic examinations were performed .on areas from the nozzle ramp out to a point one pipe diameter on the upstream elbow on all three Feedwater lines inside containment.
Previously recorded acceptable slag inclusions were noted during the exams. There were no reportable indications noted.
 
0 4l
 
NIS-1 Report (continued)                                 Page   6 of 7 Owner:   Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 3340B
: 2. Plant:  Turkey Point Nuclear Power Plant, 9760 SW 344St rect, Florida City, Florida 33035
: 3. Plant Unit:~
: 4. Owner Certificate of Authoritation (if required)
Cormercial Service Date  :
: 6. National'Board  Number for Unit:
15 . Abstract of Corrective Measures Boric acid accumulation was found at the flange gasket during a VT-1 examination of CVCS flange bolting. The flange gasket and bolting were replaced per Condition Report I 98-1406.
Rejectable linear indications were found during a PT exam on the "C" RCP integral attachment. The indications were characterized as manufacturing flaws. The indications were then removed. and re-examined by PT per Condition Report I 98-1517.
A bent rod was discovered during a VT-3 examination of a CVCS pipe support and was replaced per Condition Report I 98-1358.
A sheared U-bolt was discovered during a VT-3 examination of a CVCS restraint and was replaced'ith a restraint of a different design per Condition Report I 98-1357. A sample expansion of seven additional supports was performed as part of the corrective actions within Condition Report I 98-1357 and in accordance with ASME Sect. XI, Para. IWF-2430. No further reportable conditions resulted from the examinations of the expansion selections.
Two arc strikes were discovered outside of the examination area during the PT exam of a RHR piping weld. The,arc strikes were removed and re-examined per Condition Report g98-1437.
A loose clamp bolt was found during a VT-3 examination, of a RHR system spring hanger. The clamp bolting of the spring hanger was replaced per Condition Report I 98-1405.
One tube in "B" Steam Generator was preventively plugged during this outage due to mechanical wear at the adjacent anti-vibration bar.
One non-safety related snubber failed a hand stroke during a visual examination, and also failed a subsequent functional test before being replaced. There were no snubber failures in the safety related visual, or functional test sample.
Indications which exceeded the acceptance criteria were evaluated by FPL Engineering to determine acceptability for continued service. There were no conditions that were determined to be unacceptable for continued service, however as good practice, FPL chose to correct all indications that exceeded the Code acceptance       criteria.
 
41 0
0
 
NIS-1 Report, (continued)                             Page 7     of   7 Owner:  Florida'Power 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408
: 2.      Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035
: 3.      Plant Unct:~
: 4.      Owner Certificate of Authorization (if required)
: 5.      Comnercial Service Date :
: 6.      National Board Number for Unit:
We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASHE Code, Section XI, and c) corrective measures taken conform to the rules of the ASHE Code, Section XI.
Certificate of Authorization   No.                                     Expiration Date     A/A Date:                         Signed:                                   By   C~WW CERTIFICATE 'OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors, and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 9/21/98 to 10/28/98, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.
By signing this certificate, neither the inspector nor his employer makes any warranty,, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
8'ZSa             8   )
nspector's         'S'ature                             National Board, State, Province, and Endorsements Date:
 
0 TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements
 
lpga il
 
Abstract The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3. These repairs or replacements were performed prior to and during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October 28, 1998 Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for Inservice Inspection of Nuclear Power Components," 1989 Edition with no addenda.
 
Report No.              Date 97-032-3            ,07/29/97 97-033'-3          11/12/97 97-034-3            11/19/97 97-035;3            11/i9/97 97-036-3            11/19/97 97-037-3        Number not used 97-038-3'7-039-3 ii/19/97 12/08/97 98-001-3            02/02/98 98-002-3            02/23/98 98-003-3            02/23/98 98-004-3            02/23/98 98-005-3            02/27/98 98-006-3            02/23/98 98-007-3            04/20/98 98-008-3            08/25/98 98-009-3            10/06/98 98-010-3            10/10/98 98-011-3            10/23/98 98'-012-3          10/20/98 98-013-3            10/13/98 98-014-3            10/20/98 98-015-3            10/29/98 98-016-3            10/20/98 98-017-3            10'/20/98
'8-018-3            10/18/98 98-01'9-3          11/05/98 98-020-3            10/20/98 98-021-3            10/20/98 98-022-3            10/22/98
 
0 Report No.  ~
Date 98-023-3      10/30/98 98-024-3      10/20/98 98-025-3      10/24/98 98-026-3      10/22/98 98-027'-3    10/22/98 98-028-3      11/17/98 98-029-3      10/21/98 98-030-3      10/22/98 98-031-3      10/29/98 98-032-3      3.0/24/98 98-033-3      10/29/98 98-034-3  ~
10/29/98 98-035-3      10/29/98 98-036-3      10/29/98 98-037-3      10/29/98 98-038-3      11/02/98 98-039-,3    10/29/98 98-040-3      10/29/98 98-041-3      10/29/98 98-042-3      10/29/98 98-043-3      10/30/98 98-044-3      11/17/98
 
iCI 0
f 4l J
 
FORK  NIS-2  OMIERS REPORT FOR REPAIRS OR REPLACEMENTS As 'Required  by the Provisi'ons of the    ASKE Code Section        XI
: 1. Owner          Florida  Power 8 Li  ht                                        Date                          07 29 97 700 Universe Blvd. Jwm Beach        Fl. 33COB                          Sheet                              of    2 Address
: 2. 'Plant        Turke    Point Plant                                            Unit PNO  ¹:63/8811          QO ¹:  96022774 9760  SM 34C  Street    Florida Cit      Fl. 33035 Address                                                Repair'Organization P.O. No.,Job Ko.,etc
: 3. Nork Performed by        Florida  Power  8Li ht                                Type Code Symbol Stamp                      N A Name                                              Authorization Ko.                            N A Expiration Date                              N A P.O. Box C332    Princeton    Fl. 33032 Address.
: 4. Identification of System:        COMPONENT COOLING llATER                    System  ¹:        30          Quality Group:          C 5~  (a) Applicable Construction      Code                      B31.1                          1955  Edition,    'NA    Addenda,~NA      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                1989  Edition,~NA        Addenda,~NA      Code Case
: 6. Identification of Conyonents Repaired or Replaced, and Replacement Conponents Name of                    Name of      IManufacturerI Kational      I              Other                IYear  I  Repaired      I  ASKE I
          ~
Component              Nanufacturer      I. Serial  Mo.        Board            Ident I f i cat i on      IguiltI Replaced or      I Code  I I Replacement    ISteny  I I      I                /~Yes Se IHEAVY HEX NUTS 320    3  4" IN/A                IN/A            IN/A        IUTC¹ 409358                        IUMK  I Replacement      I No I
IHEAVY HEX HUTS                  IM/A                IN/A            IN/A        IUTC¹'409356                        IUHK  IReplacement      IMo I 100    1-1 8 ITHREADED ROO      3/4"          ,IN/A                IN/A            'IM/A      'IUTC¹ 409357                        IUNK  IReplaccttlcAt    IMo I160  STUDS FABRICATEO IBOLTP SOUARE HEAD                                    IM/A            ,IK/A        IUTC¹ 406543                        IUMK  IReplacement      INo I 20    1 1 8N ITHREADED RCO      1-1/8"        IN/A                IN/A            IN/A        IUTC¹ 409288    .
IUNK  IReplacement      INo I20  STUDS FABRICATED 7..Description of Nork:        REPLACED BOLTIMG ON COMPONENT COOLING MATER HEAT EXCHANGER PTC4.                  3E207C
: 8. Tests Conducted:        Hydrostatic:                  Pnaznet  ic:                Kcminal Operating Pressure pressure~s s          ts    Test Tsessersture                u e        ~
F 97-032-3
 
Sheet 2 of 2 FORK  NIS-2 (Baclk)
: 9. Remarks:    KECHANICAL CONNECTION        NO QELOING REOUIRED CFRT IF,I CATE OF COKPLIANCE lie  certify that    the statceents    made  in the report are cokrec't aM this replacement conforms to      <<he  rules of the ASKE Code,    Section XI.
Type Code Syahoi Steep I
Certificate        Authoripat'ion  Noi ~          ~NA                              Expiration Date Signed Owner c/I/              D or IhsM/r's Oesignee,
                                                  $  Q~~jj~Q~,
Title Date @Q',                          19 I
CERTIFICATE OF INSERVICE INSPECTION I
I, the undersignLM, holding a valid ccxanission issued by the National Board of Boiler and Presaura Veasel inspectors and the state or Province of Dade County and eeployed by Arkwright Kutual Insurance Company of Norwood, Ka. have inspected the components described in this Owners R'eport during the period              ~
Q/15~/97~ tb 07/28/97        and state that to the; best of my 4mwledge and belief, the Owner has perform< examilnations and taken corrective measures describexl in this owners Report in a'ccor'dance with the requirements of lhe hsKL code, Section XI ~                                                                                                                        I By signing this certificate neither the Inspector nor his e'mpioyer makes any warranty, expr'essk ok implied, concerning the examinations and corrective measures described in this Owner,'s Report.'ur'the'rmor'e, neither the Inspector nor his eayloyer shall be liable 'in c'>ny imanrmr for any personal InJury o'r pr'ope'rty
      .damage or a loss of any kird arising from or connected with th'is inspection.
Comni ssi ons,,    NB 823~0~NI~
Ins  ctors  igna'ture                                        Natiorel Board, State, Providerx:e,  and E+5orsements Oa                                  19 97-032-3
 
FORM    NIS-2  OWNERS REPORT      FOR REPAIRS OR REPL'ACEMENTS As Required. by.~&revisions of            the  ASME Code  Section XI
: 1. Owner        Florida  Power 8  Li ht                                                Date                      11 12  97 700 Universe Blvd. Juno Beach Fl'. '33408 Address Sheet    '1                    of    2
: 2. Plant        Turke    Point Plant                                                    Unit                              3 PWO  &#xb9;:63/1924      lJO &#xb9;:  97003235 9760 Su'3C4  Street    Florida Cit        Fl'. 33035 Address                                                        Repair Organization P;O. Ho.,Job Ho.,etc
: 3. Uork Performed by      Florida  Power 8  Li ht                                        Type Code Symbol Stamp                    N A Name                                                      Authorization No.
s Expiration Date                          N A P.O. Box 4332    Princeton    Fl. 33032 Address
: 4. Identification of System:      Intake Coolin Hater          S  stem              System  &#xb9;:      19        Quality Group:        C
: 5. (a) Applicable Construction      Code                          831.1                          '955 Edition, NA Addenda,~N          A    Code Case (b) Applicable Edition'of Section XI Utilized for Repairs or Replacements                      1989  Edition,~NA      Addenda,~NA      Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name  of                  Name  of        (Manufacturer( National                          Other              (Year  (  Repaired / ASME Component              ,Manufacturer      J Serial  No.        Board              Identification          ]guilt/  Replaced or /'ode      /
I                                                                            / Replacement (Stamp    /
I      I              /~res se
)GATE VALVE                  IJEHKINS              IN/A              ,IH/A          I3-50-354                        (1991  ]Replaced      (Ho e
I IGATE VALVE                  iJEHKINS              [N/A                IH/A        $
                                                                                      .I3-50-354                        (1997 )Replacement      [No
: 7. Description of Uork:      REPLACE VALVE    3-50-35C - DRAIN VALVE TO            CCU HX  "C" INLET  IIATER BOX 03-ICU-1965-L-03
: 8. Tests Conducted:    Hydrostatic:                      Pneunatic:                      Nominal Operating Pressure          X Other VT-2                        Pressure~5                ig    Test Teaperature              78          oF 97-033-3
 
Sheet 2 of 2 l!i IFORHI  NIS 2 (Back)
: 9. Remarks:  HECNANICAL CONNECTION    NO IVELDING PER,FORHED.
CERT I IF I CATE OF GDHPLIANCE Me  certify that thc    statements  made  in the report are correct      and  this  replacement conforms to the rul,es bf the Code,  Section XI.                                                                                                        'SHE Type Code Symbol Stamp Cert ificate  o  Authorizatibn  No.          ~NA                                    Expiration Date            A Signed Owner  or Own&I's  D~esi!ynce,  TitLe l)ate    4~/'            I  I 1p P'7 CERTIFICATE OF Ih!SERVICE INSPECTIOl'I I, the undersigned, holding a valid comnisslon issued Iby the Ii!ational Board of Boiier and Pressure Vessel inspectors and the state or province of Dad'e County.and ovytoyed by Arkwright Hutuat !insurance Ckxnpany bf Norwood, Ha. have InsFected the components described in this Owners Report durilng the period                D2/C4/97    to 11/12/97        and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures descril~ in this Owners Report in accordance with the requirements of the ASHE Code Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or inpiied, concerning the e,i<aminations and corrective measures described in this Owner's Report. Furtheraere, neither the Inspector nor his ecpioyer shall be liable-in~ any manner for any personat injury or property damage or a loss of any kind arising from or connected with t'his'ns'pection'.
Commissionk        it!B Hl230,~N,~I Inspect rs  Si+gr ture                                        National Board, State, Providence, ahd I!ndoI'secjcnts I
D  e 97-033-3
 
FORH  NIS-2  OWNERS REPORT    FOR REPAIRS OR REPLACEHEHTS As  Roquirod~~e.Provisions          of, the          ASHE Code    Section XI
: 1. OMner          Florida    Power &  Li ht                                          Date                                11 19  97 700 Universe Blvd. Jum Beach          Fl. 33408                          Sheet                ..1                  of    2 Address
: 2. Plant          Turke    Point Plant                                                Unit PWO          &#xb9;:63/6488        WO &#xb9;:    94030848 9760  SW  344  Street    Florida Cit        Fl. 33035
                            'A        Address                                                          Repair Organization P.O. Ho.,Job No.,etc 3; Work Performed by        'Florida Pouer    & Li ht                                  Type Code Symbol Stamp                              N A Name                                                Authorization.Ho.                                  H A Expiration Date                                    N A 9760  SW 344  Street    Florida Cit      FL. 33035 Address
: 4. Identification of System:        S  nt Fuel Pit Cooli        S stem          System            &#xb9;:        33        Quality Group:          C
: 5. (a) Applicable Construction        Code                      ,831.1                                  1955  Edition,  NA    Addenda,~N A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989'Edition,~NA                                    Addenda,~NA      Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name  of                      Name  of        (Kanufacturer) National                              Other              lYear  I    Repaired I ASNE    I Component                  Nanufacturer        ]  Serial  No.      Board                      Identif ication          )Built)  Replaced or ) Code    f
                                                                                                                                        ) Replacement ']Stamp    f I      I                Yes No iHEAVY HEX NUT  (1),              N/A                  IN/A            IH/A        ISTOCK CODE 278221                          JUNK    (Replacement      No e
: 7. Description of Work:        Re  laced        to bonnet nut    on valve 3-798A.
                                                                                            'nesetic:
Nominal Operating Pressure pressure    Nrrs    sts              Test Turpereture                u A          'F 97-034-3
 
Sheet 2 of 2 0
FORH  NIS-2 (Back) 9..Remarks:    HECNANICAL CONNECTION      NO uELOING".REOUIRED.
CERTIFICATE'OF COHPLIANCE I
    'Me  certify that the  statements    made in the report are correct    and this  replacement conforms to the rules of''the ASHE Code,    Section XI.
      ~Type Code Symbol Stamp                                            N 8
      .Certificate, of uthorization
      -$ ]gned OMner o No.
                                    ~cKrp~~p thawer's OFsigree,
                                                        ~N A a~R,g, Tit(e
                                                                +&i f~      ~s    ~
                                                                                      '- Expiration Date Date      ~+V      8', N A
                                                                                                                        '19 p7, CERTIFICATE OF INSERVI CE INSPECTION I, the undersigned, holding a valid coamission issued by the National Board of Boiler and.pressureiVessei            i inspectors and the state or Province of Dade County and employed by Arksiright Hutual Insurance Compariy of~
NorMood, Ha. have inspected the cccpawnts described in this,ONneds R~rt 4>ring the period                12'/08/94  i to 11/19/97      and state that to the best of my knowledge and belief, the OMner has performed examinstiions~ and taken corrective measures described in this Ihners;Report in aecordanee Nith the requirements of the ASHE~ Code, Section XI.
By signing this;certificate neither the Inspector norihis capt'ayers',makes any uarranty, expressed or Ispiied, concerning the examinaticns and corrective measures described in this Ovner's Report..fur~thermore, neither the Inspector rer his,employer shall be, liable in;any manrier for any personal injury or property          ~
        'damage or a .loss of any kird aiiising fred or connected with this i~nspection.
Camniisslons      HII82'$0  N Inspectors Sipyr ure                                        National Board, State, Providence, and'ndorsenerits Date                              19  Qp 97.-034-3
 
FORM  NIS-2  OMNERS REPORT FOR REPAIRS OR REPLACEMEHI'S As  Required~ the Provisions of the          ASME    Code  Section XI
: 1. Owner        Florida  Power & Li  ht                                          Date                      11  19 97 700 Universe  Blvd. Juno Beach Fl. 33408                                Sheet        >1                  of    2 Address
: 2. Plant        Turke  Point Plant                                              Uni t PMO  &#xb9;:63/1762          &#xb9;:  95017287 PCM  &#xb9;: '97-002'O 9760 SM  344  Street  Florida Cit      Fl. 33035 Address                                                  Repair Organization P.O. No.,Job Ho.,etc
: 3. Mork Performed by      Florida  Power &  Li ht                                  Type Code Symbol Stan@                      N A Hane                                                Authorization No.                            N A Expiration Date                              N A 9760  SM 34C  Street    Florida Cit    FL. 33035 Address
: 4. Identification of System:      Intake Cooli        Mater    stem            System    &#xb9;:      19        Quail ty Group:          C
: 5. (a) Applicable Construction    Code                      B31.1                            1955  Edition,  NA    Addenda,~NA        Code Case (b) Applicable, Edition of Section XI Utilized for Repairs or Replacements                  1989  Edition,~NA      Addenda,~NA        Code Case
: 6. Identification of Components Repaired or Replaced and Replacement, Components, Name  of                  Name  of      )Manufacturer      National )
Other            [Year  f    Repaired    f ASME f Component              Manufacturer      [  Serial  Ho.      Board              Identification          (Builtf Replaced'or        /  Code /
                                                                                                                            /  Replacement    )Stamp    /
                                                                                                                                                  ~esrese ITHREADED ROO                  H/A                  iN/A            [H/A        ] STK CODE 204C361      2044361. UHK    Replacement        No F40 STUDS FABRICATED                                                              & 295031 IHEAVY HEX NUT  (80)          H/A                  [H/A            IH/A        I  TK 'CODE 220689        414058    I UNK  ]Replacement      ]Ho STK CODE 027842        413848
: 7. Description of Mork:      ADDED VALVE  3-50-382    MODIFIED SUPPORT  8045-H-172-11        REMOVED THE INTERNALS OF VALVE  3-50-360.AND  ABONDONED THE VALVE BODY      IN PLACE.
LEAKAGE TEST PERFORMED UNDER      03-ICMe1995-L-OI.
: 8. Tests Conducted:      Hydrostatic:                  Pneunatic:                    Nominal Operating Pressure              X
                                                                                                                                        ~
Other VT-2                    Pressure~5            'ig    Test Temperature                78            F 97-035-3
 
Sheet 2                  of 2 FOIRH  NIIS-2 (Back)
: 9. Remarks:  HECNANICAL CONNECTION'O llELDING REOUI RED.
CERTI F I CATE OF COHPLIANCE Me  certify that  the ststersents    made in the report sre correct snd this repiscerrent conforrtrs to the rules of the ASHE  Code, Section XI ~
Type Code Symbol Stamp Certificate of Authorization'No.                IN~A Own  r or Ownerls De. ignee,    f itis CERTIFICATE OF INSERVICE IliSPIECTION I, the undersigned, holding s vslicl cormission issued by their National Board of Boiler and PressUre 'Vesael and the state or province of Dade Crxx>ty and empioyrxi by Arkwright Hutusl Insurance Company of                      'nspectors Ha. have inspected the corporents descriibed in this Owners Report during the period              06/24/97  'orwood, to 11/19/97      and state that to the best of my'nowledge and balief, the Owner hss performed eXaminsti'ons'and taken corrective measures. described in this Owners Report in ar!cordsnde with the requirements of the A'SHE'Code, Section XI.
By signing this certiificste neither the Inspector nor hi's errylo'yer makes any warranty, expressed or Implied, concerning the exatrrinstions and correctiive,measurea described in this Ihrner's Report. Furtherrsora, neither the Inspector nor his employer shall be liable in alny msnnar for any personal Injury or property damage or a loss of any kind arising from or conrw.cted with'his -inspection.
Comnissions          NB 823~ON~I~
Inspe  6rs    gnature                                        I NatIionhi'oard, State, Providence, and Endorsrments 19  Z 97-035-3
 
FORH  NIS-2  OMHERS REPORT    FOR REPAIRS OR REPLACEHENTS As Required by the      Provisions of the    ASHE Code      Section XI
: 1. Owner        Florida Po~er  &  Li ht                                        Date                        11 19 97 Name 700 Universe. Blvd. Juno Beach    Fl. 33408-                          Sheet        -.1                of    2 Address
: 2. Plant        Turks  Point Plant                                              Unit PMO  &#xb9;:63/0160        MO &#xb9;:  96025230 9760 SM  344 Street  Florida Cit      .Fl. 33035 Address                                                  Repair Organization P.O. No.,Job Ho.,etc
: 3. Mork Performed by      Florida  Power 8  Li ht                              Type Code Symbol Stsap                      N A Name                                              Authorization No.                            N A Expiration Date                              N A 9760  SM 344  Street  Florida Cit      FL. 33035 Address 4~ Identification of  System:    C        t  Cooli    Mater  S stem        System    &#xb9;:        30        Duality  Group:      C
: 5. (a) Applicable Construction      Code                    831.1                          1955  Edition,  NA    Addenda,~N A    Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                1989  Edition,~NA      Addenda,~NA      Code Case
: 6. Identification of Conponcnts Repaired or Replaced and Replacement Cceponcnts Name  of                  Name  of      )Hsnufsctureri National                      Other              iyear      Repaired    I ASHE I Component              Hanufacturer      i Serial Ho.        Board              Identification          iBui lt Replaced or      i Code  i Replacement    ]Steep  )
JYesreu HEAVY HEX HEAD CAP SCREM      N/A                  iH/A            IN/A        STK CODE 992553                    iUHK    Replacement      iHo 4
: 7. Description of Mork:    REPLACED 4 NUTS ON IHLET DOOR OF COHPOHENT COOLING MATER HEAT EXCHANGER                  >>8>>.
: 8. Tests Conducted:      Hydrostatic:                  Pneunatic:                  Nominal Operating Pressure preeeure~MA          TN    Teat Teetetreture              N A          'F 97.036-3
 
Sheet 2 of 2 iO FORH NIS-2 (Back)
: 9. Remarks:    HECNANICAL CONNECTION      NO MELDINB REOUIRED.
CERTIFICATE OF COHPLIANCE lie  certify that  the statements    made in the report are correct  and  this replacerent              conforms to the rules of the ASHE  Code, Section    XI.
Type Code Symbol Stamp Certificate of Authorization      No.,          N~l A                                        Expiration Date Signed                                                                                                                                              19          ~+
Owne    or Own(&s Designfe, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned,.holding a valid corrmission issued by'ha Nation'al Board of Boiler and pressure Vessel and the state or Province of Dade County,and employed by Arkwriight Hutual Insurance Company                                                                'nspectors Ha. have inspected the ceqxments descriibed in this Owners Report during the period                                              09/26/96 of'orwood, and state that to the best of my knowledge and belief, the (hawr has performe9                        examinati'ons'and'aken
                                                                                                                                                                      'o'1/19/97 corrective measures described in this Owners Report in accorcfance with the recpirements of the ASHE Code, Section XI ~
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or~
iapiied, concerning 'the examinatiam and corrective measures described in this Owner's Report. Furthenmore, neither the Inspector nor h'is employer shall be liable in ai~ manner for any personal inJury or pr*perty damage or a loss of any kind arising from or conrected with this inspectice.
Ccamissions,,
rs NB,B23D~N~I'ational Inspec        S nature                                                            Board, State, Providence,                    and Endorsements 119 97-036-3
 
FORH  NIS-2  OMMERS REPORT    FOR REPAIRS    OR'EPLACEHENTS As  Required~-the-Provisions        of the    ASHE Code            Section XI
: 1. Owner        Florida  Power &  Li ht                                          Date                              11            19 97 700 Universe  Blvd. Juno  Beach  Fl. 33408                            Sheet                                                of    2 Address
: 2. Plant        Turke  Point Plant                                              Unit PWO  &#xb9;:63/1350'CH WO &#xb9;:  9C003086
                                                                                              &#xb9;:            94-096 9760 Su 344  Street  Florida Cit      Fl. 33035 Address                                                  Repair Organization P.O. No.,Job No.,etc
: 3. Mark.Performed by      Florida  Power &  Li ht                                  Type Code Symbol Stamp                                          N A Name                                                Authorization Ho.
Expiration Date                                                  N A 9760  SM 34C  Street    Florida Cit      FL. 33035 Address
: 4. Identification of System:      Intake Coolin Hater      S  stem              System            &#xb9;:      19        Quality Group:                      C
: 5. (a) Applicable Construction Code                          831. 1                                  1955  Edition,  MA                Addenda,'~N A      Code Case (b) Applicable Edition of Section XI Utilized, for Repairs or Replacements                          19S9  Edition,~MA                  Addenda,~HA        Code Case
: 6. Identification of Cceyonents Repaired or Replaced and Replacement Components Name  of                  Meme  of.      (Hanufacturer( National                                Other            '(Year              (    Repaired    (
ASHE Component                Hanufacturer Serial  No.        'Board            Identification                                        Replaced or    (  Code  ('Built(
(
                                                                                                                                                '( Replacement    (Sesame    (
                                                                                                                                                                      ~rue  e PIPE SPOOL                    (N/A                (N/A            (N/A          STK CODE 1951271                          (UNK              (Replacement        No ITHREADEO ROD                  IH/A                IN/A            IH/A          (STOCK CODE 295071                          (UMK              (Replacement      (No I  80  STUDS FABRICATEO (HEAVY HEX NUT                  IN/A                (N/A            IH/A          (STOCK CODE 278611                          (UMK              (Replacement      (No
(
40 (PIPE PLUG                      IH/A                IH/A            IN/A          (STK CODE 337661, 349691                    (UNK              (Replacement      (No 2
: 7. Description of Mork:      VALVE CV-3-2202 REHOVED AND REPLACED. WITH PIPE SPOOL PIECE PER PCH 94-096.'EAKAGE TEST PERFORHED'UNDER    03-IClJ-1921-L-03.
S. Tests Conducted:    'ydrostatic:                    Pneunstic:                    Hominal Operating Pressure                                X
                                                                                                                                                            ~
Preeeure~a              ig    Test Temperature                                                  F 97-038-3
 
Sheet 2 of 2 FORM  NIS-2 (Back) 0
: 9. Remarks:  HECNANICAL CONNECTION    NO  llELDING REOUIRED.
CERTIFICATE OF COHPLIANCE Me  certify that  the statements  made  in the report are correct~and~ this rLpiacement conforms to the rules of the ASHE  Code, Section  XI.
Type Code Symbol Stamp                                      .~ll  A Certificate f Authorization      No.            N~A                            'Expiration Date Signed                                    d A/A S
                                  's Designee, Title r~dAA      P k          AAAA    mA~A+~A Owne  or Owns CERTIFICATE lOF  INSERVICE INSPECTION I, the'ndersigned, holding a valid commission issued by the Nakiodl Board of Boiiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by'rkwright Hutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report dur ing the period            09/16/95 and state that to the best of my knowledge and beiiief, the Owner has performed examiriatikns and    'o'1/19/9/
taken corrective measures descr,ibed in this Osrners Report in accordance with the requirements of the ASHE Coda, Section XI.
By signing this certificate neither the Inspector nor hisI ~loyier rakes any warranty, eXpreased or implied, concerning the examinations and corrective measureS deacribed'in this Owner's Report. Furthermore, neither the, inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any Icind ariising from or connected with ~thik irIspedtion.
Conaissium,,NB 8230~M~I Ins  ctors  ignature                                      Natiionai Board, State, Providence, and ErxkIrsehenIIs 97-038-3
 
0 FORM    NIS-2  OHHERS REPORT FOR REPAIRS'OR REPLACEMENTS As  Required~ the&rovisions of the            ASME    Code  Section XI
: 1. Owner        Florida  Power &  Li ht                                          Date                      12 08 97 700 Universe  Blvd. Juno Beach Fl. 33408                                  Sheet        ~ 1                  of    2 Address
: 2. Plant        Turke    Point Plant                                                Uni t                              3 PHO  &#xb9;:63/4845      lJO &#xb9;:  97018298 9760 SM  344 Street    Florida Cit      Fl. 33035 Address                                                    Repair Organization P.O. No.,Job No.,etc
: 3. Nork Performed, by      Florida  Power &  Li ht                                  Type Code Symbol Stamp                      H A Name                                                Authorization No.                            H A Expiration Date                              N A 9760 SN 344  Street    Florida Cit      FL. 33035 Address
: 4. Identification of System:        Intake Cooli        Hater  S  tern          System    &#xb9;:        19        Quality Group:          C
: 5. (a) Applicable Construction Code                              831.1                          1955  Edition,  NA    Addenda,~HA        Code Case (b) Applicable Edition of Section      XI. Utilized for Repairs or        Replacements    1989  Edition,~HA      Addenda,~NA        Code*Case
: 6. Identification of Components Repaired or Replaced and Replacement Coaponents Name  of                  Name  of      ]Manufacturer( National        [              Other              [Year  [    Repaired      f ASME (
Component                Manufacturer      )
Serial    No.        Board            Identification          ]Built( Replaced or        (  Code  J J. Replacement    ]Stamp    f I                    V~es Vo AGATE VALVE                    IJENKINS VALVE        IN/A              IN/A        (3-50-367                          1991. [Replaced            No I
AGATE VALVE                    IJENKINS VALVE        IN/A'N/A                      I3-50-367                          (1997 )Replacement        [No
: 7. Description of Norkt      REPLACE VALVE  3-50-367    DUE TO EXCESSIVE SEAT LEAKAGE.
LEAKAGE TEST PERFORMED UNDER PRESSURE        TEST  03-1N-1903-L-02.
: 8. Tests Conducted:      Hydrostatic:                    Pneunatic:                  Nominal Operating Pressure              X Other VT-2                      Pressure    14    ~ig      Test Temperature                67          ~
F 97-039-3
 
Sheet 2 of  2
                                                                                                                                        ~O FORM HIS-2 (Back)
: 9. Remarks:  MECHANICAL CONNECTION    No uELDIHG REauIRED.
CERTIFICATE OF COMPLIANCE Me  certify that  the statements  made  in the report are correct  and this  replacement conforms to the rules of the ASME  Code,  Section XI.
Type Code Symbol Stamp                                        H A Certificate of Authorization    No.          ~N A                            Expiration Date            N            'A Signed                              5i+/dn.- d~p~.wr AA~~                    Dat Owner  or Owner'a~Des~inca, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by. the National Board of Boiler and pressure~ vessel~
inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have .inspected the ccapoi~ts described in this 04neds Rapport during the period 12/08/97      and state that to the best of my knowi.edge and belief, the      ~ir 08/07/97 has performed examinations and
                                                                                                                                  'o taken corrective measures clescribed in this (owners Report in accordance with the requirements of the AsME code,                  ~
(
Section XI.
By signing this certificate neither the Inspector nor his ehyldyer~ makes any warranty, expressed-or Implied, concerning the examinations and corrective measures described in this owner 's Report. Furthermore, neither the Inspector nor his enpioyer shall be liable in any manner for any personal injury or or a loss of any kirxi arising from or connected. with this inspection.
property'amage Conmiissions,    H '2'      N  I In      ors    nature                                  National Board, State, Providerice, and Endoraements Date 97-039-3
 
FORM  r HIS-2 OWNERS REPORT FOR REPAIRS. OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner          Florida  Power  8  Li ht                                                  Date                      02 02 98 700 Universe    'Blvd. Juno Beach Fl.                                                Sheet      ~  1                  of    2 33408'ddress
: 2. Plant          Turke    Point Plant                                                        Unit Nate                                                        PWO'&#xb9;:69/6167        WO  &#xb9;:  97026548        CR  &#xb9;:    96-1374 9760  SW  344  Street    Florida Cit        Fl.        33035 Address                                                            Repair Organization P.O. Ko.,Job No.,etc
: 3. Work Performed by        Florida  Power 8  Li ht                                            Type Code. Symbol Stamp                    N A Name                                                        Authorization No.                          N A Expiration Date                            K A 9760 SW  344  Street    Florida Cit      FL. 33035 Address
: 4. Identification of Systemt        Intake Coolin Water                S  stem            System  &#xb9;:        19        Quality Group:        C r
: 5. (a) 'Applicable Construction      Code                                831. 1                        1955  Edition,  NA    Addenda,~H A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                            1989  Edition,~N    A  Addenda,~N A      Code Case
: 6. Identification of Cotponents Repaired or Replaced and Replacement Components
          ,Name of                    Name  of      IManufactureri'National                                Other              IYear  I  Repaired      I ASME I
~ /      Component                Manufacturer          Serial'No.                  Board          Identification          IBuilti Replaced or        Code I I                                                    I                                                                                                  I I Replacement    Istamp I      I                iYesrege IM 196 6                        N/A                ,IN/A                      'iN/A        ilCW PIPE SUPPORT                  IN/A IRepaired            INo
: 7. Description of Work:      MODIFY SUPPORT    &#xb9;  M-196-6          TO EXCLUDE WATER INTRUSION.
: 8. Tests Conducted:        Hydrostatic:                            Pnetgtatic:                  Hominal Operating Pressure Other VT-3                              pressure~u      S      tg    Tese resgerseure                HA          oF 98-001-3
 
Sheet 2    of  2 IFORMI  NIS-2 (Back)
: 9. Remarks:  ALL WELDING PERFORHED IN ACCORDANCE LIITH APPROVED PlLANT PR6CE6UREC.~
                                                                                                  'ERTII-ICATE OF COHPLIANICE Me  certify that      the statements    made ini the report are correct and this        repair          conforms to the'ui.cs bf the Code, Section      XI.                                                                                                              'SHE Type Code Symbol Starry                                              ~NA Certificate of Authorization          No.          ~N  A Signed                                              3 c~/~~        < ~~~~~ ~iiace ~~~                          ~~            n <P Owner    r  Owncrrs    esignee,  Tiltle CERTIFICATE  OIF INSERVICE INSPECTION I, the undersigned, holding a.valid comnissfon issued by the katfonal, Board of Boiler and Pressure Vessel inspectors and the state or Provfnce of Dade County and erploycd'by Arkwright'Hutuol Insurance Company of Norwood, Ha. have inspcctrxf tlhe components dcscribM in this Owners Report during the period                          12/02/9P'to          (
02/02/98          and state that to the host of my knowledge nnd belief,'he Owner has performed examinations ahd taken corrective measures descrfked in this Owners Report'in bcc6rdhhce with the requirements of the ASHE Code, Section  XI'y signing this certificate neither the Inspector nor his empf,oyer makes any warranty, expressed 'or fmplied, concerning the examinations and corrective. measures described in this Owner's Report. Fr'rrth'crore, neither the Inspector nor his employer shall be liable in'any'anner'for any personal injury or property damage or a loss of any kind arising from or connected with tlhis inspection.
Corrmissfonk        I)8 8530 ~N~I pec    rs S~i  rrture                                      NIrtidnal Borfrd,'tate, Providence, and Endor scmcnts Da        gC~              2>        19 Q<P 98-001-:3
 
FORM  NIS-2  OMHERS REPORT  FOR REPAIRS OR REPLACEMENTS As  Required~~he Provisions of the          ASME Code  Section'XI 1; Ih<<M.r              Florida  Power  & Li ht                                          Date                    02 23 98 700  Universe'Blvd. Juno      Beach  Fl. 33408                            Sheet    i    1              of      2 Address
: 2. Plant              Turke    Point Plant                                                Uni t                          0
                                                                                        'PMO.&#xb9;: 69/6551  MO  &#xb9;  98003962 01    CR  &#xb9;:98.0276 9760  SM  344  Street    Florida Cit      Fl. 33035 Address                                                  Repair Organization P.O. No.,Job Ho.,etc
. Mork Performed by            Florida  Power &  Li ht                                Type 'Code Symbol Stamp                  N A Authorization No.                        N A Expiration Date                          N A 9760 SM  344  Street    Florida Cit      FL. 33035 Address
: 4. Identification of System:      Emer enc    Feedbfater  S  tom            System  &#xb9;:      75        Quality Group:            C
: 5. (a) Applicable Construction      Code                        B31.1                      T955  Edftfon,~NA Addenda,~uA            cade case 8
(b) Applicable Edition of section xi Utilized for Repairs or Replsceaents              1989  Edftfon,~HA" Addenda,~HA            coda case Identification of  Components Repaired      or Replaced and Replacement Components Name of                    Name  of      iManufacturer      National                Other              iYear i    Repaired    i ASHE i Corponent                Manufacturer      i  Serial  No. Board            Identification          iBuilti Replaced or    i Code i i Replacement    )Staap i I      I                  Yes No 80117-H-334-11                IN/A                    H/A                        AFM PIPING SUPPORT              JN/A  iReplaced          No Description of Mork:    REPLACE CLAMP BOLTING        NUT  UTC&#xb9; 396923 AHD ALL THREAD UTC&#xb9; 415246        ON  PIPE SUPPORT 80117-K-334-11.
i Tests Conducted:      Hydrostatic:                  Pneunst  i c:              Nominal Operating Pressure
                                                                                                                              ~
Other        VT-3              Pressure~@    A      ig    Test Tecpersture              N A          F 98-002-3
 
Sheet 2 o)f 2 FORH  NIS.2 (Back)
: 9. Remarks:  HECHANICAL -CONNECTION    NO M=LDING REQUIRED CERTIF I CATE OF MiPLIANCE Me  certify that  the statements    amde in the report are correct  and this  ~replacement conforms to <<he rules of tHe ASHE Code,  Section XI.
Type Code Symbol Staap Certificate    f Authorization    No.          ~NA                                Expiration Date          N A Signed Owner  or Owre 4rA~ ~pihM~
                                    's Designe, Title  ~                  ~        . Date ~+~                      '9'+
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure Vesseb inspectors and the state or Province of Dade Cumty and eqployed'by Arkwright Kutual Insurance Company,-of Norwood, Ha. have inspected the ccayonents described in this C~rs Report during the period                02/17/98~    to 02/19/98        and'state that to the best <>f my knowledge and belief, the Owner has performed examinations an'd taken corrective measures describxl in this Owners Report in accordance with the requirements of the iASHE Code, Section'Xl.                                                                                                                I By  signing this certificate nowhither the Inspector.nor hfs eeployer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described'is this (amer's Report. Ful thdrmoie, neither the Inspector nor his eapioyer shall be liable in any ma+mr for any personal Injury or property damage or a loss of any kind arising from or corrected with thiis inspection.
Comnissions,      NB 82~30  'N  ~I Ins    ors  S  nature                                    National Board, State, Providence, and Endoraements Dst      ~HZ                      19  FP 98-002-3i
 
FORM  NIS-2  OMNERS REPORT  FOR REPAIRS OR REPLACEMENTS As Required by the.      Provisions of the    ASNE Code    Section XI
: 1. Owner              Florida  Power  & Li ht                                          Date                    02 23 98 700 Universe Blvd. Jwm Beach      Fl. 33408                            Sheet      n    1              of.      2 Address
: 2. Plant              Turke    Point Plant                                              Unit                            3 PMO  &#xb9;:  69/6555  MO &#xb9;:  98003962 02    CR  &#xb9;:98-0276 9760 Su 344  Street    Florida Cit      Fl. 33035 Address                                                  Repair Organization P.O. No.,Job'No.,etc
  . Mork Performed by            Florida  Power &  Li ht                                  Type Code Symbol Stamp                      M  A Authorization Mo.                          N  A Expiration Date                            M  A 9760  SM  344  Street  Florida Cit    FL. 33035 Address
: 4. Identification, of System:      Emer enc    Feedwater    S  stem            System  &#xb9;:        75        Quality Group:            C
: 5. (a) Applicable Construction Code                            B31. 1                        '1955  Edition,~ua    Addenda,~ua          code casa lu> Applfcaule Editian of section xi      utillted for      Repairs or Replacements      1989  Edftfan,~ll A  Addenda,~ll  A        code case Identification of    Components Repaired    or Replaced and Replacement Coaponents Name  of                    Name of      (Manufacturer      National,  (
Other            (Year  I  Repaired ( ASNE        (
Carpcfnent              Manufacturer      (
Serial    No. Board              Identification        (Built(  Replaced or ( Code        (
( Replacement (Stamp        (
I      I                  Y~es Eo (80117-H-334-12                IN/A                (H/A                          (AFll PIPING'SUPPORT              (N/A    (Replaced          Mo I
(80117  H 334 13                (N/A (N/A'N/A        (N/A        (AFM PIPING SUPPORT              (N/A    (Replaced          (No Descriptionfof Mark:    REPLACED PIPE CL'ANP BOLTING        NUTS UTC&#xb9; 370708 & ALL    THREAD    UTC&#xb9; 415246  ON SUPPORT    80117-H-334-12.
REPLACED PIPE CLAMP    UTC&#xb9; 334081    PIPE CLAMP BOLTIMG NUT UTC&#xb9; 370708 & ALL THREAD UTC&#xb9; 415246                  AND'SPHERICAL BEARING UTC&#xb9; 406950    ON SUPPORT  80117-H-334-13.
Tests Conducted:      Hydrostatic:                  Pneunat i c:                Nominal Operating Pressure
                                                                                                                                ~
Other        VT-3            Pressure~u    A      iE    Test Teaperature              E A            F 98.003-3
 
Sheet 2 of 2 FORN HIS"2 (IBack)
: 9. Remarks:  NECNANI CAL CONNECT IOlk  hIO MIELDING'ZEOUIIRED.
CERTIFICATE OF COI4PLIAHCIE Ne  certify that  the statenents  nlade  in the report are correct  and this    replacement confotans to the irules of th' ASNE  Code, Section  XI.
Type Code Symbol Stamp Certificate of Authorization sisnat          dW        +g No.
                                              +~~4 Title'xpiration
                                                      ~NA DgA'l~
Date          N A Owner o  Owre~r s DeYignee, CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, hofidfng a valid cimnfssfon issued by the NatieMl Board of Boiler and Pressure Vesseb inspectors and the state or Province of Dade Cax)ty and employed by 'Arkwt ight Nutual Insurance Company of Norwood, Na. have inspected the compceents dlescribed in th'is Owners s Report during the perfod            02/Iy/98''o 02/17/98        and state that to the best of my knowledge and belief, the OwIer has Iperformwf examfnationn and taken corrective measures described in this Owners: Report 'in accordance with the requirements of the ASNE Code, Section XI ~
By signing this certfffcate neither the Inspector nor his enployer malkes any warranty, expressed or inplied, concerning the examfretfons and corrective measures clescrfbed in this Ctwner's Report. Furthermore, neither the Inspector nor his etployer shall be liable in any~manner ~for any personal injury or property damage or a loss of any kind arising fran or cemected wftIh this inspection.
um Inspect rs  S iturie'onmissions,                            N  8 '
N  I National Board, State, Providence, and Endorsements    '
Date          o2.
PF'8-083-3 0
 
FORM  NIS-2  ONHERS REPORT FOR REPAIRS OR REPLACEMENTS As  Required~ the. Provisions of the          ASME  Code  Section XI
: 1. Owner                Florida Po~er    & LI ht                                            Date                      02 23 98 700 Universe    Blvd. Juno Beach Fl. 33408                                  Sheet                            of' Address
: 2. Plant              Turke    Point Plant                                                Unit                            3 PMO  &#xb9;:  69/6563  IJO &#xb9;:  98003962 03    CR  &#xb9;:98-0276 9760  SM  344  Street    Florida Cit        Fl. 33035 Address                                                  Repair Organization P.O. No.,Job Ho.,etc
  . Mork Performed by            Florida Power    & Li ht                                Type Code Syffhol Stomp                    N  A Name                                                Authorization No.                          N A Expiration Date                            N A 9760 SM  344  Street    Florida Cit      FL. 33035 Address
: 4. Identification of System:        Emer enc    Feedwater    S  stem            System  &#xb9;:        75'Juality          Group:        C
: 5. (a) Applicable Construction        Code                        831.1                        1955  Editicn,~NA      Addenfs,~@A        Code Csee (8>  Applicable Edition of Rection      Rl  utillted for      Rcpeirs or Rcplecenents    1989  Edition,~gs      Adfendo,~HA        code csee J
Identif ication of  CJJJponents  Repaired or Replaced and Replacement Components Name of                    Name  of        (Manufacturer) National                      Other              IYear      Repaired      )  ASME )
Component                Manufacturer      [  Serial    No. Board            Identification          [Built  Replaced or    )  Code [
I                                                                      ( Replacement    )StaJJJp [
I                Jt~es Eo
[80>>7- H-334-07                  N/A                  IH/A            IH/A        IAFM PIPING SUPPORT                K/A  )Replaced        )No I
(80>>7-H-334-08                  IN/A                                    fN/A        )AFll PIPING    SUPPORT            JK/A  )Replaced        iNo I
)80>>7-H-334-09                  IN/A                  (H/A            )N/A    'AFN PIPING        SUPPORT            /H/A  )Replaced        )Ho Description of Morkt    REPLACED PIPE CLAMP        UTC&#xb9; 334081      AHD PIPE CLAMP BOLTING NUTS UTC&#xb9; 370708          &  ALL THREAD UTC&#xb9; 415246 ON  SUPPORT'0>>7-H-334-07.        REPLACED PIPE CLAMP        UTC&#xb9; 334081  AND  PIPE CLAMP BOLTING NUTS UTC&#xb9; 370708 & ALL THREAD O'IC&#xb9; 415246  ON SUPPORT  80>>7-H-334-08.      REPLACED PIPE CLAMP BOLTING          NUTS  UTC&#xb9; 370708 & ALL THREAD UTC&#xb9; 415246            AND SPHERICAL BEARING  UTC&#xb9; 406590    ON SUPPORT  80>>7-H-334-09.
Tests Conducted:      Hydrostatic:                    Pnemmt    ic:                Nominal Operating Pressure Other        VT-3              pressure~g    A      ig    Test Tespersture              H A          F 98-004-3
 
Sheet 2 of 2 Cl FORH 14IS-2 (Back)
: 9. Remarks:  HECNANICAL CONNECTION    NO MELDING REQUIRED.
CERTIFICATE OF COMPLIANCE Ne  certify that  the statements  made  in the report are correct  and  this replacement conforms <<o the rules of the ASHE  Code,  Section XI.
Type Code Symbol Stamp                                        N A Certificate of uthorization      Ko.          ~NA                            Expiraticn Date          N 'A gf                                                              c'5 2 >
Signed Owner o    Owrer's Designee, Jg/cd~
Title CQ~          0'kir ~ a~~~
                                                                                                                  '9'ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccemission issued by the National Board of Boiler and Pres! ure Vessel inspectors and the state or Province of Dade Ccxnty and eapioyed by Arkwr igh't Mutual Insurance Catpany of Norwood, Ha. have inspected the components descr ibex'n this Owners Report during the period          02/17'/98'o 02/19/98        and state that to the best of my knowledge and belief, the'Owner has pcrforaxxl examiinations and taken corrective measures descrihxi in this iDwners Report in accordance with the reluirements of the ASHE Code, Section XI.
By signing this certificate neiither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures desc< ibed in this Owner's Report. Fukthe!rmoke, neither the Inspector nor his empl!oyer shall be liable in any manrwr for any persormi injury or property damage or a loss of any kind arising from or corrected with this !inspection.
                                    /7 Cannissions'      NB 825~0~4 Inspec ors  S    ture                                  Ma'tional Board, State, Providence, and Endorsemeats Dat                              p,p 98.004-3
 
FORH>NIS-2    OWNERS REPORT  FOR REPAIRS OR REPLACEHENTS As  Required~ the. Provisions of the        ASHE Code    Section XI
: 1. Owner                Florida  Power 8  Li ht                                          Date                    02 27 98 700 Universe Bl'vd. Juno Beach      Fl. 33408                            Sheet      ~    1              of      2 Address
~ 2. Plant                Turke  Point Plant                                              Unit                            3 PWO  &#xb9;:  69/6539 WO'&#xb9;: 98003759 01        CR    &#xb9;:98.0276 9760  SW  344  Street  Florida Cit      Fl. 33035 Address                                                Repair Organization P.O. No.,Job Ho.,etc Work Performed by            Florida  Power 8  Li ht                                Type Code Syahol Stamp                      N  A Name                                              Authorization No.                          N  A Expiration Date                            N  A 9760 SW  344  Street    Florida Cit      FL. 33035 Address
: 4. Identification of System:        Emer enc    Feedwater    S  tern            System  &#xb9;:      75        Quality Group:            C
: 5. (a) Applicable Construction Code                            B31.1                        1055  Edition,~NA      Addenda,~NA          code case (b) Applicable Edition of Section XI Utilized for Repairs. or Replacements              1989  Edition,~NA Addenda,N416-1            Code Case Identification of'omponents      Repaired or Replaced and Replacement Components Name of                    Name  of        iHanufactureri National                    Other            iYear        Repaired i ASHE i Component                Hanufacturer      i Serial No.        Board            Identification        iBuilt    Replaced or i Code i I                                                                                                                  I          Replacement iStamp i I                          iYesreao iAFll PIPING.8 SUPPORTS,        iN/A                  IN/A            N/A        i N/A                            IN/A      Replaced          iHo Description of Work:    REPLACED 90 SECTION OF      2" PIPING UTC&#xb9; 376381        30'ECTION      OF  2" PIPING    'l  ELBOW    UTC&#xb9; 409259 ELBOW  UTC&#xb9; 410531    'VALVE AFSS-016    UTC&#xb9; 405485        2  COUPLINGS  UTC&#xb9; 378120        2  COUPLINGS  UTC&#xb9; 413702        AND  5 HANGER STRAPS    UTC&#xb9; 414393    FOR  H-01    H-02  H-03    H-04 8 H-05.
PRESSURE  TEST PERFORHED UNDER PRESSURE        TEST PACKAGE    &#xb9; 03-AFW-7557-L-01.
    'Tests Conducted:      Hydrostatic:                  Pneunatic:                  Hominal Operating Pressure
                                                                                                                                  ~
Other        VT-2 3            Sressore~glg          ig    Test Temperature              467            F 98-005-3
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarks:  ALL WELDING PERFC)RHED IN ACCORDANCE WITH THE FPL  WEL C NTR  L  NUAL~.
CERTIFICATE OF COMPLIANCE We  certify that  the statenents  made  in the report are correct arKI this  replacement confonas to the rules of the ASHE  Code, Section  XI.
Type Code Symbol Stamp Certificate of uthori a)ion    No.~        ~N A                            Expiration Date          N A
                                          ~
Signed Owner  or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by tHe National'oard of Boiler and pressure Vessels inspectors and the state or province of Dade C~)nty and employed by A'rkwright Hutual Insurance Company of Norwood, Ha. have inspected the compaeents d'escribed in this Owners. Report during the period      02/18/98~    t~o 02/19/98      and state that to the best of my knowledge.and belief, the owner has performed examinations and taken corrective measures describ< in this owners Report in accordance with the requirements of the iASHE Code,~
Section XI.                                                                                                            I By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examirw)tions and corrective measures described in this ()wner's Report. Fui'thdrmoi'e, neither the Inspector r)or his employer shall be liable in any ~manner 'for any personal injury or property damage or a Loss-of any kind'arisfng from or coax)ected with thiis inspect'ion.
rP Cermisslons      NB  8230 ~M~I Inspect rs  S  iture                                  National Board, State, Providence, and Endorsementsi 98-OD5-3


Report No.97-032-3 97-033'-3 97-034-3 97-035;3 97-036-3 97-037-3 97-038-3'7-039-3 98-001-3 98-002-3 98-003-3 98-004-3 98-005-3 98-006-3 98-007-3 98-008-3 98-009-3 98-010-3 98-011-3 98'-012-3 98-013-3 98-014-3 98-015-3 98-016-3 98-017-3'8-018-3 98-01'9-3 98-020-3 98-021-3 98-022-3 Date ,07/29/97 11/12/97 11/19/97 11/i9/97 11/19/97 Number not used ii/19/97 12/08/97 02/02/98 02/23/98 02/23/98 02/23/98 02/27/98 02/23/98 04/20/98 08/25/98 10/06/98 10/10/98 10/23/98 10/20/98 10/13/98 10/20/98 10/29/98 10/20/9810'/20/98 10/18/98 11/05/98 10/20/98 10/20/98 10/22/98 0
FORH'NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS 0
Report No.98-023-3 98-024-3 98-025-3 98-026-3 98-027'-3 98-028-3 98-029-3 98-030-3 98-031-3 98-032-3 98-033-3 98-034-3 98-035-3 98-036-3 98-037-3 98-038-3 98-039
: 1. Owner                Florida  Power 8 As Required by the Provisions of the ASHE Code Section XI Li ht                                        Date                    02 23 98 Name 700 Universe-Blvd. Juno Beach    Fl. 33408                            Sheet      ~    1              of      2 Address 2~  Plant              Turke    Point Plant                                            Uni t PMO  &#xb9;:  69/6553  MO &#xb9;:  98003759 02    CR    &#xb9;:98-0276 9760 SM  344  Street  Florida Cit    Fl. 33035 Address                                              Repair Organization P.O. No.,Job Ho.,etc
  ~ 'Work Performed by          Florida  Power 8  Li ht                                Type Code Syshol Stnap                    N A Authorization No.                          N A Expiration Date                          'N A 9760  SM 34C  Street    Florida Cit    FL. 33035 Address
: 4. Identification of System:      Emer enc    Feedwnter  S  stem            System  &#xb9;:        75        Quality Group:          C'e (a) Applicable Construction    Code                    B31.1                      1555    gdrttee,~HA Address,~HA              cede case (b) Applicable Edition'of Section XI Utilized for Repairs or Replacements            1989    Edition,~HA Addenda,NC16-1            Code Case Identification of  Components Repaired    or Replaced and Replacement      Components Name  of                  'Name of        Hanufnctureri Hational                    Other            I Year  I  Repaired        I ASHE Component              Hanufacturer        Serial Ko.        Board            Identification          iguiiti, Replaced or,i        Code i Replacenent      (Stamp I'                          Yes Ho IST-49                          H/A                  N/A            iN/A        )AFSS-015, PIPING,      SUPPORT  iH/A )Replacement            No STRAP OH H-04 Description of Mork:    REPLACE  6'ECTION    OF  2" PIPING    UTC&#xb9; 407118  UPSTREAH AND DOMHSTREAH OF AFSS-015          VALVE AFSS-015 UTC&#xb9; 405485    1  FLAT HANGER STRAP    UTC&#xb9; 414393    ON  H-04  AHD  1  COUPLING    UTC&#xb9; 413702 .
PRESSURE  TEST PERFORHED UNDER PRESSURE TEST PACKAGE        &#xb9; 03-AFM-7557-L-01.
Tests Conducted:      Hydrostatic:                Pneunat i c:                Nominal Operating Pressure Other        VT-2 3          eressere~atg          15    Test Teaperature              467        ~
F 98-006-3
 
Sheet  ',2 of  2
                                                                                                                                      ~li FORH NIS-2 (Back)
: 9. Remarks:  ALL WELDING PERFORHED IN ACCORDANCE WITH THE FPL WELD CO TR L HANUAL~
CERTIFICATE OF COHPLIANCE We  certify that the        statejjjents  made in the report are correct  and this  replacement conforms to the rules of the ASHE Code,  Section XI'ype Code Symbol Stamp Certificate    o  Authori        tion  Noe          N~A                            Expiration Date          N 'A Signed                                        . ~@.~ d~~ ~~            .'~''~      'ate    <<X      ~~              '9 '7P" Owner        r Ownerrs    Designee,'Title CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, holding a valid cajjljji!sion issued by'he'Natiojwji Board of Boiler and Presaure'easel' inspectors and the state or province of Dade County and.employed by Arkwright Hutual, Insurance Cospany of Norwood, Ha. have inspected the cojjjporjents described in this Oknerjs Rhjport during the period            02/17/98    to 02/19/98        and state that to the be. t of my knowledge and belief, the Owner has perforjjxd examinationS and taken corrective measures described in this Owners. Report in accordance with the requirements of <<he ASHG Code, Section XI.
By signing this certificate neither the Inspector nor his ejljpldyer makes any Warranty, expressod ot implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the .inspeotor mr his erptoyer shall be liable in any raanner for any personal injury or property              I damage or a 'toss of any kind arising fran or connected with'his inspection.
Conmi ssions,,  NB, 823~ON~I Inspec          Signature                                    National Hoard, State, Providence, and Endordemejjjts    '
Dot~ W 98-006-3
 
FORM NIS 2 OWNERS REPORI'OR REPAIRS OR REPLACEHENTS As
neither the Inspector nor his employer shall, be liable in, any, manner, for any personal injury or property damage or a loss of any kind arising fram or connected with this inspection.
neither the Inspector nor his employer shall, be liable in, any, manner, for any personal injury or property damage or a loss of any kind arising fram or connected with this inspection.
Ins ors S nature Comnissions',,-
Comnissions',,-   'B   8230 I
'B 8230'I National',Board, State, Providence, and Endorsements Date 19.+P 98-Oi44-3 TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations  
Ins    ors  S  nature                                          National',Board, State, Providence, and Endorsements Date                               19.+P 98-Oi44-3
~O Page 1 of1 FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by the provisions of the ASME Code Rules EDDY CURRENT EXANINATION RESULTS PLANT: Turkey Point Unit 3 EXAMINATION DATE: October 5 1998 through October 8, 1998 Steam Total Generator Tubes Inspected 3E210A 3194 3E210B 3187 3E210C 3179 20%-39%6 0)40 27 (()Total Tubes Tubes Plugged as Preventative Maintenance Tubes Plugged This Outage Total Plugged Tubes in S/G 20 35 LOCATION OF INDICATIONS (3)(20%-100%)Steam Generator AVB Bars Support Locations 1 thru 6 Cold Leg Support Locations 1 thru 6 Hot Leg Freespan 06H-06C U-Bend Top of Top of Total Tubesheet Tubesheet Indications to t1 TSP to P1 TSP 20%-39%Cold Leg Hot Leg Total Indications
 
)40%3E210A 11 (()3E210B 22 (()(2)3E210C 43 (i)'0 22 (()g)43 (i)Remarks: (1)Mechanical wear damage at anti-vibration bars (AVB)was depth sized using qualified bobbin coil sizing technique.
TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations
(2)One tube was preventatively plugged in SG 3B for AVB wear progression.
 
(3)Some tubes may have more than one AVB wear indication reported.Date:~~~~9'repared by: CSI S/G Eddy Current oordinator Date: 2.(J9 Reviewed by: I Inspections Supe isor Date: o I Reviewed by: 2 8 CSI S/G echnical S ecialist  
~O Page 1 of1 FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATIONRESULTS As required by the provisions of the ASME Code Rules EDDY CURRENT EXANINATIONRESULTS PLANT: Turkey Point Unit 3 EXAMINATIONDATE: October 5 1998 through October 8, 1998 Tubes Steam       Total              Total Tubes          Plugged as          Tubes Plugged            Total Plugged Generator     Tubes                                  Preventative          This Outage                Tubes in S/G Inspected   20%-39%             40      Maintenance 3E210A      3194          6 0)                                                                         20 3E210B      3187 3E210C      3179        27 (()                                                                       35 LOCATION OF INDICATIONS(3)
~Ci 0 COMPONENT: S/G'CUMULATIVE DISTRIBUTION
(20% - 100%)
Support          Support                    Top of        Top of        Total      Total Steam       AVB      Locations        Locations    Freespan    Tubesheet    Tubesheet    Indications Indications Generator       Bars     1 thru 6         1 thru 6   06H -06C     to t1 TSP     to P1 TSP     20%-39%       )40%
Cold Leg         Hot Leg      U-Bend      Cold Leg      Hot Leg 3E210A       11 (()                                                                 '0 3E210B       22 (()(2)                                                                           22 (()g) 3E210C        43 (i)                                                                             43 (i)
Remarks:
(1) Mechanical wear damage at anti-vibration bars (AVB) was depth sized using qualified bobbin coil sizing technique.
(2) One tube was preventatively plugged in SG 3B for AVB wear progression.
(3) Some tubes may have more than one AVB wear indication reported.
Date:   ~~ ~~   9'repared                                     by:
CSI S/G Eddy Current     oordinator Date:     2.(J9                                     Reviewed by:
I Inspections Supe   isor Date:   o   I                                     Reviewed by:                 28 CSI S/G   echnical S ecialist
 
~Ci 0
 
CUMULATIVE DISTRIBUTION  


==SUMMARY==
==SUMMARY==
TURKEY POINT UNIT g 3'09/98 Page: 1 Date: 10/13/98 Examination
 
'Dates.: 10/05/98 thru 10/08/98 Total Number of Tubes Inspected.....: 3194 Total Indications Betveen 20<and 394 Greater than or equal to 404 Total'orrosion type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged 11 0 0 0 0 Location Of Indications 208 to 100$&"VOL'" Hot Leg TSH-.5 01H-2.0 to 01H-2.1 to'06H+2.0 0~0 06H+2.1 to AV1-3.1,: 0 AV1-3,.0 to AV4-3'.0: 11 Cold Leg TSC-.5 to 01C-2.1: 0 01C-2.0 to 06C+2,.0: 0 06C+2.1 to AV4-3.1: 0
TURKEY POINT UNIT g 3
~O~~il OHPONENT: S/G A DESCRIPTION
                                        '09/98 COMPONENT : S/G'                                            Page   : 1 Date   : 10/13/98 Examination 'Dates.: 10/05/98 thru 10/08/98 Total Number of Tubes Inspected .....:           3194 Total Indications Betveen 20< and 394                             11 Greater than or equal to 404                     0 Total'orrosion type Indications     "VOL"           0 Total Tubes Plugged   as Preventive Maint               0 Total Tubes Plugged                                     0 Location Of Indications   208   to 100$ & "VOL'"
: ALL 20K TO 39K'INDICATIONS INDICATIONS/TRENDING REPORT PTN-3 OUTAGE: 09/98 ,Page: 1 Date: 10/13/98 Time:.15:55:32+I I'xtent I-I[Roe[Col[Leg[*
Hot Leg                                  Cold Leg TSH .5   to  01H -2.1      0         TSC .5    to   01C -2.1  :  0 01H -2.0 to '06H +2.0 ~
*ITst/Note[
0          01C  -2.0 to    06C +2,.0 0 06H +2.1 to AV1 -3.1,:     0         06C  +2.1 to   AV4 -3.1 :   0 AV1 -3,.0 to AV4 -3'.0:   11
Reel I Probe I Location+---I-I I"I----I-I-I: I 33[41[C'I ITEKTECPS[AC025,'IA-720-H/ULC
 
[AV1.0:I.C I'ITEKTECPSIAC025
    ~O
'IA-720-M/ULC.IAV2.0 I I I C I ITEHTECPSIAC025 ,IA-720-H/ULC IAV3;.0 I;I'C I ITEKTECI.R[AC025 IA-720-H/ULC IAV4.0 I 31[44[K I IT cTEM IAK025[A-720-H/ULC IAV3.0 I 38[45[-C I[TEKTECPSIAC024 IA-.720-H/ULC IAV2.0 I C I.ITEKTECPSIAC024 IA-720-H/ULC IAV3.0 I 37[47[C I ITEKTEC IAC027'IA-720-H/ULC IAV3.'0 I 30[52[C I ITEHTECPCIAC030 IA-720..H/ULC IAV3.0;I 28[59[C I ITEKTEc IAc034 IA-720.M/ULc IAV2;0 I I.I C I ,ITEKTEC IAC034 IA-720-M/ULC IAV3.0'---I---I---I---I--------I-I I'--Number of RECORDS Selected from Current Outage: '11 Number of TUBES Selected from Current Outage: 6 , 09/98 I I~N/A I IVolts[Dcg[Ch I'/,[Diff[
~
Location IVolts[Dcg[Ch I g I-I---'I--I-I--I----I-------------I-----I---I---I---.
  ~
I.9I'P 2[26[I I I I I I I'4l IP 2['>>I.I I I'I I I 1.41 I>>I 29[.I I I I I I I-4[I>>I>>I I I I I I I I~4[I>>l, 29I I I I I I I 1.8[;IP 2[.35[I I I I I.8['P 2[28[I I I I I 1.0[[P 2[28[I I[I I.4[IP 2[29,[I I I I'I I-7l I>>[25I I I I I I'I I.5[I>>I>>l I I I I I I--I----I---I---I---I----I------.----
il
I----.I---I---I---.
 
0 il COMPONENT: S/G'B'UMULATIVE DISTRIBUTION
INDICATIONS/TRENDING REPORT PTN-3 OUTAGE   : 09/98 OHPONENT    : S/G  A                                                                                            ,Page:     1 DESCRIPTION : ALL 20K TO 39K'INDICATIONS                                                                            Date: 10/13/98 Time: .15:55:32 I'xtent
+
[Roe[Col[Leg[* *ITst/Note[ Reel I
I I
Probe I
I    Location
                                                                          ,  09/98 IVolts[Dcg[Ch I  I
                                                                                                          ~    N/A I'/,[Diff[ Location IVolts[Dcg[Ch I g I I
+---I-     I     I "I- --- I-         I-           I:               -I-    --'I --I -I-- I----I-------------I-----I---I---I---.
I 33[ 41[   C 'I   ITEKTECPS[AC025, 'IA-720-H/ULC [AV1         .0     I
                                                                                .9I'P 2[ 26[          I          I      I  I  I      I
:I. C   I   'ITEKTECPSIAC025 'IA-720-M/ULC .IAV2       .0     I    '4l IP 2['>>I        .I          I I'
I     I I     I    I  C   I   ITEHTECPSIAC025 ,IA-720-H/ULC IAV3;       .0     I  1.41    I>>I 29[.      I          I      I  I  I      I I    ;I'     C I     ITEKTECI.R[AC025 IA-720-H/ULC IAV4         .0     I    -4[    I>>I >>I        I          I      I   I  I    I I  31[ 44[   K I     IT cTEM IAK025   [A-720-H/ULC IAV3         .0     I    ~ 4[    I>>l, 29I      I          I      I  I  I    I 38[ 45[-   C I     [TEKTECPSIAC024   IA-.720-H/ULC IAV2       .0         1.8[    ;IP 2[. 35[                I      I  I  I    I I C I     .ITEKTECPSIAC024   IA-720-H/ULC IAV3         .0           .8['P      2[ 28[                I     I  I  I    I I  37[ 47[   C   I   ITEKTEC IAC027   'IA-720-H/ULC IAV3         .'0         1.0[    [P 2[ 28[                I      I  [  I    I I 30[ 52[   C   I   ITEHTECPCIAC030   IA-720..H/ULC IAV3       .0           .4[    IP 2[ 29,[                I      I  I  I
                                                                                                                                      'I
;I 28[ 59[   C I     ITEKTEc   IAc034 IA-720.M/ULc IAV2         ;0     I   -7l    I>>[ 25I      I           I     I   I   I   'I I     I. I C I     ,ITEKTEC
'---I---I---I---I--------I-IAC034  IA-720-M/ULC IAV3 I'--
                                                                    .0     I   .5[     I>>I>>l         I           I     I   I
                                                                        --I ----I---I---I---I----I------.---- I----.I---I---I---.
I    I I
Number    of  RECORDS    Selected from Current Outage:        '11 Number    of  TUBES  Selected from Current Outage:          6
 
0 il
 
DISTRIBUTION  


==SUMMARY==
==SUMMARY==
TURKEY POINT UNIT if 3 09/98 Page: 1 Date: 10/13/98 Examination Dates: 10/05/98 thru 10/08/98 Total Number of Tubes Inspected.....: 3187 Total Indications Between 20>and 39~Greater than or equal to 40%Total Corrosion type Indications"VOL" Total Tubes Plugged as Preventive.
 
Maint Total Tubes Plugged 22 0 0 1 0 Location Of Indications 20>to 100>&"VOL" Hot Leg.TSH-.5 to 01H-2.1:
                  'B'UMULATIVE  TURKEY  POINT UNIT if 3 09/98 COMPONENT :  S/G                                          Page  :  1 Date  : 10/13/98 Examination Dates  : 10/05/98 thru    10/08/98 Total Number of Tubes Inspected  .....:      3187 Total Indications Between 20> and 39~                          22 Greater than or equal to 40%                  0 Total Corrosion type Indications "VOL"            0 Total Tubes Plugged as Preventive. Maint              1 Total Tubes Plugged                                    0 Location Of Indications  20>  to 100>  &  "VOL" Hot Leg                                Cold Leg
.TSH .5  to 01H -2. 1:      0        TSC .5  to  01C -2.1  :  0 01H -2.0 to 06H +2.0 :      0        01C -2.0 to    06C +2.0  :  0 06H +2.1 to AVl -3.1 .:    0        06C +2.1 to    AV4 -3.1  :  0 AV1  -3.0 to AV4 -3.0 :    22
 
~O 0
 
INDICATIOHS/TREHDIHG REPORT PTH-3 OUTAGE : 09/98 OHPOHENT : S/G B
          ~                                                                                              Page  :    1 DESCRIPTIOH:t ALL 40X TO 100K, VOL 8:PTP INDICATIONS                                                      Date: 10/13/98 Time: 15:58:21.
+
I


==SUMMARY==
==SUMMARY==
THIRD INTBRVAL, SECOND PBRZOD, SBCOND OUTAGE (98RP)Class 1 PCBBA STATUS Components Page: 1 Zone Number: 3-001 Summary Bxamination Area Number Identification SBC.XZ Catgy Bxam Item No Method Procedure N I 0 S 0NGT T RSBH A B I 0 B Remarks T C G H, R, ee Calibration Block ee RRP.DWG.NO.5613 M 4000 001900 VBSSBL ZNTBRZOR ACCBSSIBLB ARBAS'B-N-1 VT-3 B13.10 NDB 4.3 20 C-X--10/11/1998
 
-VT-3 complete, slight erosion observed on core barrel nettles.RBP.DWG.NO.3 V01 013090 VBSSBL TO CLOSURB HBAD HATING B-N;1 VT-3 SURPACB ON VBSSBL B13~10 NDB 4.3-20 C-X--10/11/1998
THIRD INTBRVAL, SECOND PBRZOD, SBCOND OUTAGE (98RP)
-VT-3 complete, pitting observed on flange.
Class 1 PCBBA STATUS Components CIOR PRESSURE VESSEL N I    0 Zone Number: 3-001                                                           S  0NGT SBC. XZ                                T  RSBH Summary Bxamination Area             Catgy    Bxam                          A  B I0  B  Remarks Number Identification               Item   No Method       Procedure       T   C G H, R, ee Calibration Block ee RRP. DWG. NO. 5613 M 4000 001900 VBSSBL ZNTBRZOR               'B-N-1 VT-3           NDB 4.3 20     C   - X - - 10/11/1998 - VT-3 complete, slight ACCBSSIBLB ARBAS                B13. 10                                            erosion observed on core barrel nettles.
II Date: 12/29/1998 AM GENERATOR C PRIMARY SIDE TURKBY POINT NUCLBAR PLANT UNIT 3 ZNSERVICB ZNSPECTZON
RBP. DWG. NO. 3 V01 013090 VBSSBL TO CLOSURB HBAD HATING   B-N;1 VT-3           NDB 4.3-20     C   - X - -   10/11/1998 - VT-3 complete,   pitting SURPACB ON VBSSBL              B13 10
                                          ~                                                observed on flange.
 
II Date: 12/29/1998                               TURKBY POINT NUCLBAR PLANT UNIT 3                                     Page: 2 ZNSERVICB ZNSPECTZON  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SBCOND PERIOD, SECOND OUTAGB (98RP)Claus 1 PCBEA'STATUS Componento N I 0 Page: 2 Zone Number: 3-005 Summary.Examination Area Number Identification ASMB SBC.'XZ iCatgy Bxam Item No Method Procedure S ON G'T T RSBH A B I 0 B Remarke T C G M R ee Calibration Block ee RBP.DWG, NO.5613 M 4005 041100 3-SGC-I-IRS INLBT NOZZLE INNER RADIUS SECTION B-D UT, B3~140 NDB 5.13-1 C X---10/4/1998-UT complete NRZ.STEAM GENERATOR'MOCK UP**041200 3-SGC-0-IRS OUTLBT NOZZLE INNER.RADIUS SECTION B-D UT B3.140 NDB 5.13-1 C X---10/4/1998-UT complete NRZ.**STEAM GENERATOR MOCK UP**041300 3-SGC-I BOLTING STEAM GENERATOR ZNLBT'MANWAY.
 
BOLTING B-G-2 VT-1 B7~30 NDB 4.1 5 C X---10/08/1998 VT-1 complete NRI.041400 3 SGC-0 BOLTING B-G-2 VT-1 NDE 4.1-4 C X---10/08/1998
THIRD INTERVAL, SBCOND PERIOD, SECOND OUTAGB (98RP)
-VT-1 complete NRZ.STEAM GBNERATOR OUTLBT MANWAY B7.30 BOLTING 041510 3-SGC SUPPORT SUPPORT LEGS 1 THRU 4 P-A VT-3 F1'0V NDB 4.3-11 C'---10/02/1998
Claus 1 PCBEA 'STATUS Componento AM GENERATOR C PRIMARY  SIDE N I   0 Zone Number: 3-005                     ASMB                                     S   ON G'T SBC. 'XZ                                  T   RSBH Summary.Examination Area              iCatgy    Bxam                            A   B I0  B Remarke Number  Identification                Item  No Method        Procedure        T   C G M R ee Calibration Block ee RBP. DWG, NO. 5613 M 4005 041100 3-SGC-I-IRS                     B-D     UT,           NDB 5. 13-1     C   X - - - 10/4/1998 - UT complete NRZ.
-VT-3 complete NRZ.
INLBT NOZZLE INNER RADIUS      B3 140
el 45'J Date:, 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 ZNSBRVZCB INSPBC1'ZON SUHHARY THIRD INTERVAL, SBCOND PBRIOD, SECOND OUTAGE (98RP)Class 1 PCBBA STATUS Components Page: 3 CK>R COOLANT SYSTEM LOOP C INTERMEDIATE LEG N I 0 Zone Number: 3-013 Summary Bxamination Area Number'Identification ASH B SEC.XZ Catgy Bxam Item No Hethod Procedure S ONGT T RSBH A B Z 0 B Remarks T C G H R ee Calibration Black**REP.DWG.NO.5613 P 766-S SH.3 048800 32i-RCS-2303-5 STBAH GBNERATOR NOZZLE TO BLBOW B-P PT B5.70 UI'DB 3.3 15 NDB 5.4-12 C X-X 10/02/1998
                                          ~
-PT complete-2 acceptable rounded indicatians.
SECTION STEAM GENERATOR 'MOCK UP **
10/03/1998
041200 3-SGC-0-IRS                     B-D     UT             NDB 5.13-1     C   X - - - 10/4/1998 - UT complete NRZ.
-UT complete, geometry.ee UT-26R ee 049000 32%-RCS-2303-7 PIPB TO BLBOW B-J PT'B9.11 UT NDB 3.3 12 NDB 5.4-6 C X-X 10/02/1998
OUTLBT NOZZLE INNER. RADIUS    B3. 140 SECTION
-PT complete-1 acceptable linear indicatian.
                                                                                            ** STEAM GENERATOR MOCK UP **
10/03/1998
041300 3-SGC-I BOLTING                 B-G-2   VT-1           NDB 4.1 5     C   X - - - 10/08/1998   VT-1 complete NRI.
-UT complete geometry.e*UT-12, UT-26R, UT-46**049500 31 RCS 1303 10 BLBOW TO PUHP CASING 0 B-J PT.B9.11 UT NDB 3.3-21 NDB 5.4-6 C-X-X-20/02/1998
STEAM GENERATOR ZNLBT'MANWAY. B7 ~ 30 BOLTING 041400 3 SGC-0 BOLTING                 B-G-2   VT-1           NDE 4.1-4       C   X - - - 10/08/1998 - VT-1 complete   NRZ.
-PT complete-3 acceptable rounded indications.
STEAM GBNERATOR OUTLBT MANWAY   B7.30 BOLTING 041510 3-SGC SUPPORT                   P-A     VT-3           NDB 4.3-11     C'   - - - 10/02/1998 - VT-3 complete   NRZ.
10/03/1998
SUPPORT LEGS 1 THRU 4          F1 '0V
-UT complete NRZ.UT-26R  
 
~ll 0 Date: 12/29/1998 CIOR COOLANT SYSTEM I~P C HOT LEG TURKEY POINT NUCLEAR PLANT UNIT 3 INSBRVICB INSPECTION
el 45
  'J
 
Date:, 12/29/1998                               TURKEY POINT NUCLBAR PLANT UNIT 3                                    Page:      3 ZNSBRVZCB INSPBC1'ZON SUHHARY THIRD INTERVAL, SBCOND PBRIOD, SECOND OUTAGE (98RP)
Class 1 PCBBA STATUS Components CK>R COOLANT SYSTEM LOOP C INTERMEDIATE LEG N I   0 Zone Number: 3-013                     ASH B                                     S  ONGT SEC. XZ                                   T  RSBH Summary  Bxamination Area              Catgy     Bxam                           A B Z 0 B Remarks Number  'Identification                Item  No Hethod        Procedure        T C G H R ee Calibration Black **
REP. DWG. NO. 5613 P 766-S SH. 3 048800   32i-RCS-2303-5 STBAH GBNERATOR NOZZLE TO B-P B5. 70 UI'DB PT NDB 3.3 15 5.4-12 C   X
                                                                                        - X 10/02/1998 - PT complete - 2 acceptable rounded indicatians. 10/03/1998 - UT BLBOW                                                                              complete, geometry.
ee UT-26R ee 049000   32%-RCS-2303-7                   B-J     PT             NDB 3.3 12       C   X     10/02/1998 - PT complete - 1 acceptable PIPB TO BLBOW                  'B9. 11  UT            NDB 5.4-6            - X  linear indicatian. 10/03/1998 -   UT complete geometry.
e* UT-12, UT-26R, UT-46 **
049500   31   RCS 1303 10                 B-J     PT             NDB 3.3-21       C -X-     20/02/1998 - PT complete- 3 acceptable
                                          .B9.11                      5.4-6          X-      rounded indications. 10/03/1998 - UT 0
BLBOW TO PUHP CASING                    UT             NDB complete NRZ.
UT-26R
 
~ll 0
 
Date: 12/29/1998                               TURKEY POINT NUCLEAR PLANT UNIT 3                                     Paget    4 INSBRVICB INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVALED SBCOND PERIODS SECOND OUTAGB (98RP)Class 1 PCBBA STATUS Components N I 0 Paget 4 ,Zone Number: 3-014 Summary Bxamination Area Number Identification SBC.XZ Catgy Bxam Item No Method Procedure S ONGT T RSBH A B I 0 B Remarks T C G H R<<<<Calibration Block<<<<RBP.DWG.NO.5613 P 766 S SH.3 050200 29<<-RCS-1308-4 ELBOW TO STBAM GENERATOR NOZZLE B-F PT B5.70 UT NDB 3~3-14 NDB 5.4-9 C-X-X-10/02/1998
 
-PT complete-3 acceptable rounded indications.
THIRD INTERVALED SBCOND PERIODS   SECOND OUTAGB (98RP)
10/03/1998
Class 1 PCBBA STATUS Components CIOR COOLANT SYSTEM I~P  C HOT LEG N I   0
-UT complete, geometry.<<*UT 26R**  
,Zone Number: 3-014                                                               S  ONGT SBC. XZ                                    T  RSBH Summary Bxamination Area               Catgy     Bxam                             A B I 0 B Remarks Number  Identification                Item  No Method          Procedure        T C G H R <<<<Calibration Block <<<<
~ll 0 0  
RBP. DWG. NO. 5613 P 766 S SH. 3 050200 29<<-RCS-1308-4                 B-F     PT             NDB 3 ~ 3-14     C - X     10/02/1998 - PT complete - 3 acceptable ELBOW TO STBAM GENERATOR        B5.70  UT              NDB 5.4-9              -X-    rounded indications. 10/03/1998 - UT NOZZLE                                                                                complete, geometry.
'Date:,12/29/1998 TURKBY POINT'NUCLEAR PLANT UNIT 3 Page: 5 INSBRVICB'NSPEC1'ZON
                                                                                              <<* UT 26R **
 
~ll 0
0
 
'Date:,12/29/1998                                     TURKBY POINT'NUCLEAR PLANT UNIT 3                                     Page:             5 INSBRVICB'NSPEC1'ZON  


==SUMMARY==
==SUMMARY==
THZRD INTERVAL, SECOND PBRZOD, SBCQND OUTAGE (98RP)Class 1 PCBBA STATUS Components ACIOR COOLANT SYSTEM LOOP C COLD LEG N I 0 Zone.Number: 3-015 SummarY Examination Area Number Identification ASMB'BC.XZ Catgy Exam Item No Method Procedure S 0NGT T RSBH I A B I 0'B Remarks T C G'M R:ee Calibration Block ee REP.DWG.NO.5613 P 766 S SH.3>050500,27.
 
5"-RCS-1309-11
THZRD INTERVAL, SECOND PBRZOD, SBCQND OUTAGE (98RP)
>PUMP CASING TO PIPE B J~'PT B9~11 UT NDB 3.3-24 NDB 5.4 10 C-X--X-10/06/1998
Class 1 PCBBA STATUS Components ACIOR COOLANT SYSTEM LOOP C COLD LEG N I   0 Zone. Number: 3-015 ASMB'BC.
-PT complete, 3 acceptable rounded indications.
S   0NGT XZ                                  T   RSBH             I SummarY  Examination Area              Catgy        Exam                          A   B I 0 'B Remarks Number    Identification                Item    No Method          Procedure      T   C G'M R:ee Calibration Block ee REP. DWG. NO. 5613 P 766 S SH. 3
10/07/1998
>050500,27. 5" -RCS-1309-11               B   J   ~ 'PT             NDB 3.3-24     C   -X-       10/06/1998 - PT complete, 3 acceptable
-UZ'omplete, geometry.UT-12, UT-46 e*
        >PUMP CASING TO PIPE            B9 11
Cl 0 41 Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 6 ZNSBRVICE ZNSPBCI'ZON SUNHARY THIRD INTERVAL, SECOND PBRIOD, SECOND OUTAGE (98RP)Class 1 PCBBA STATUS Components CTOR COOLANT SYSTEM PRESSURIZER SPRAY LINE'NZ 0 Zone Number: 3-021 Summary Bxamination Area ,Number Identification SBC.XZ Catgy Bxam Item No Hethod Procedure S ONGT T RSBH A B I 0 B Remarks T C G H R'*Calibration Block**REP.DWG.NO~5613 P 661 S SH.4 062300 45-RC-1305-2 BRANCH CONNECI'ZON'TO ELBOW'-J PT B9.11 UT NDB 3.3-20 NDB 5.4-7 C-X-X 10/03/1998
                                              ~      UT            NDB 5.4 10            -X-    rounded indications. 10/07/1998 -
-PT complete, acceptable linear indication.
geometry.              UZ'omplete, UT-12, UT-46 e*
10/06/1998
 
-UT complete, geometry.~*UT 45N ee 062400 4'-RC 1305-2 ELBOW TO PIPE B J.PT.B9.11 UT NDB 3'-20 NDB 5.4 7 C X---10/03/1998
Cl 0
-PT complete, NRZ.X 10/06/1998' UT complete, NRZ.**UT-45N ee 063300 3 RCH 13 SPRING HANGBR P1.10C VT-3 NDB 4.3-2 C X---09/22/1998
41
-VT-3 complete, NRZ.e 0 ll Date: 12/29/1998 TB DISPOSAL SYSTBM LI UID TURKBY POZNI'UCLBAR PLANT UNZT 3 INSBRVICB ZNSPBCTZON
 
Date: 12/29/1998                                 TURKEY POINT NUCLBAR PLANT UNIT 3                                       Page:     6 ZNSBRVICE ZNSPBCI'ZON SUNHARY THIRD INTERVAL, SECOND PBRIOD, SECOND OUTAGE (98RP)
Class 1 PCBBA STATUS Components CTOR COOLANT SYSTEM PRESSURIZER SPRAY LINE
                                                                                        'NZ   0 Zone Number: 3-021                                                                 S  ONGT SBC. XZ                                    T  RSBH Summary Bxamination Area               Catgy      Bxam                            A  B I0  B Remarks
,Number Identification                 Item No Hethod           Procedure       T   C G H R'* Calibration     Block **
REP. DWG. NO ~ 5613 P 661 S SH. 4 062300 45-RC-1305-2                               PT            NDB 3.3-20      C  - X    10/03/1998 -  PT  complete, acceptable BRANCH CONNECI'ZON'TO ELBOW'-J   B9. 11   UT             NDB 5.4-7             - X   linear indication. 10/06/1998 - UT complete, geometry.
                                                                                                ~* UT 45N ee 062400 4'-RC 1305-2                     B J     .PT             NDB 3 '-20       C   X - - - 10/03/1998 -   PT complete, NRZ.
ELBOW TO  PIPE                  .B9.11    UT            NDB 5.4  7          X       10/06/1998'   UT complete, NRZ.
                                                                                                ** UT-45N   ee 063300 3 RCH 13                                   VT-3           NDB 4.3-2       C   X - - - 09/22/1998 - VT-3 complete,     NRZ.
SPRING HANGBR                    P1. 10C e
 
0 ll
 
Date: 12/29/1998                               TURKBY POZNI'UCLBAR PLANT UNZT 3                                         Page: 7 INSBRVICB ZNSPBCTZON  


==SUMMARY==
==SUMMARY==
THIRD ZNTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RP)Class 1 PCBBA STATUS Components RC LOOP C DRAIN N I 0 Page: 7 Zone Number: 3-028 Summary Bxamination Area Number Identification ASMB SBC.XZ Catgy Exam Item No Method Procedure S 0 N G T T R S B H A B I 0 B Remarks T C G H R ee Calibration Block++RRP.DWG.NO.5613 P 671 S SH.5 079600 2%-RC-1303-1 BRANCH CONNBCI'ZON TO PZPB B-J PT B9.40 NDB 3~3-2 C X---09/29/1998
 
-PT complete, NRZ.080100 2w-RC-1303-5 VALVB 3 505A TO PZPB B-J PT B9.40 NDB 3.3 6 C X---9/30/1998-PT complete, NRZ.
THIRD ZNTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RP)
0 0 Cl' Date: 12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 INSBRVICB'NSPECTION
Class 1 PCBBA STATUS   Components TB DISPOSAL SYSTBM    LI UID  RC LOOP C DRAIN N I   0 Zone Number: 3-028                     ASMB                                       S   0 N G T SBC. XZ                                    T R   S B H Summary Bxamination Area                Catgy    Exam                              A B   I0  B Remarks Number  Identification                  Item  No Method        Procedure          T C   G H R ee Calibration Block   ++
RRP. DWG. NO. 5613 P 671 S   SH. 5 079600 2%-RC-1303-1                     B-J     PT             NDB 3 ~ 3-2       C   X - - - 09/29/1998 - PT complete, NRZ.
BRANCH CONNBCI'ZON TO PZPB      B9.40 080100 2w-RC-1303-5                     B-J     PT             NDB 3.3   6       C   X - - - 9/30/1998 - PT complete, NRZ.
VALVB 3 505A TO PZPB            B9.40
 
0 0
Cl
 
Date: 12/29/1998                                 TURKEY POINT NUCLEAR PLANT UNIT 3                                     Page:    8 INSBRVICB'NSPECTION  


==SUMMARY==
==SUMMARY==
Page: 8 T HIRD INTBRVAL, SBCOND PBRZOD,'SBCOND OUTAGB Claes 1 PCBBA STATUS Componente IDUAL HEAT REMOVAL FROM RC LOOP'C HOT LEG (98RP)Zone Number: 3-036 Summary Bxamination Area Number Identification ASMB SBC.XZ Catgy Bxam Ztem No Method Procedure N I 0 S ONGT'T R S B H A B I 0 B Remarke T C G H R**Calibration Block ee RBP.DWG.NO.5613-P-669-S SH.1 121600 3 RCH-12 SPRZNG HANGBR F-A VT-3 R1~10C VT-3 NDB 4.3-6 NDB 4.3-21 C---X 9/30/1998-VT-3 complete, RZ'(CR()X---98-1405)'.
 
10/11/1998
THIRD INTBRVAL, SBCOND PBRZOD, 'SBCOND OUTAGB (98RP)
-VT-3 following corrective actione per CR B 98-1405,'NRZ.121800 14'-RHR-1301-6 PZPB TO VALVB"MOV-3 750 B-J PT B9.11 UT NDB 3.3-3 NDB 5.4-8'X-X 9/30/1998-PT complete, acceptable rounded indication.
Claes 1 PCBBA STATUS Componente IDUAL HEAT REMOVAL FROM RC LOOP'C HOT LEG N I  0 Zone Number: 3-036                       ASMB                                     S  ONGT SBC. XZ                                 'T   R S B H Summary Bxamination Area                Catgy    Bxam                          A   B I0  B Remarke Number  Identification                  Ztem No Method          Procedure      T   C G H R ** Calibration Block ee RBP. DWG. NO. 5613-P-669-S   SH. 1 121600 3 RCH-12                         F-A     VT-3           NDB 4.3-6       C   - - - X 9/30/1998 - VT-3 complete, RZ '(CR()
10/2/98-UT complete, geometry.<<*UT 30 ee 122000 VALVB HOV-3 750 BOLTING VALVB BOLTING B G-2 VT-1 B7.70 NDB'.1-3'C X---10/01/1998
SPRZNG HANGBR                    R1 ~ 10C VT-3          NDB 4.3-21          X - - - 98-1405)'. 10/11/1998 - VT-3 following corrective actione per CR B 98-1405,
-VT-1 bolting exam complete, NRZ~200 3-RCH-11 DOUBLB ACTING RBSTRAZNT P-A F1~10B VT 3:NDB'.3-7 C X---9/30/1998-VT-3 complete, NRZ.
                                                                                              'NRZ.
0 Cl 4l Date: 12/29/1998 SIDUAL HEAT REMOVAL TO TURKEY POINT NUCLBAR PLANT'UNIT 3 INSBRVICB INSPECTION
121800 14'-RHR-1301-6                   B-J      PT            NDB 3.3-3            X      9/30/1998 - PT complete, acceptable PZPB TO VALVB"MOV-3 750           B9. 11   UT             NDB 5.4-8'           - X   rounded indication. 10/2/98 - UT complete, geometry.
                                                                                              <<* UT 30 ee 122000 VALVB HOV-3 750 BOLTING           B G-2   VT-1           NDB'. 1-3     'C   X - - - 10/01/1998 - VT-1 bolting   exam complete, VALVB BOLTING                    B7.70                                                NRZ ~
200 3-RCH-11                         P-A     VT 3         :NDB'.3-7       C   X - - - 9/30/1998 - VT-3 complete,   NRZ.
DOUBLB ACTING RBSTRAZNT          F1 ~ 10B
 
0 Cl 4l
 
Date: 12/29/1998                                 TURKEY POINT NUCLBAR PLANT'UNIT 3                                     Page:    9 INSBRVICB INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVALED SBCOND PERIOD, SBCOND OUTAGB (98RF)Class 1 PCBBA STATUS Components RC LOOP A COLD LEG Page: 9 Zona Number: 3-037 Summary Examination Area Number Identification SBC.XZ Catgy Exam Item No Method Procedure N I 0 S ONGT T RSBH A B Z 0 B Remarks T C G:M R**Calibration Block tt RBP DWG NO~5613 P 585 S SH 1 123500 10'Z 1301-2 PZPB TO ELBOWB J PT B9.11 UT NDB 3.3-18 NDB 5.4-16 C X---<0/02/1998
 
-PT complete, NRZ.-X-10/08/1998
THIRD INTERVALED SBCOND PERIOD, SBCOND OUTAGB (98RF)
-UT complete, geometry.27 tt 126100 8t RHR 1301 2 PIPE TO BLBOW B-J PT B9.11 UT NDB 3.3-18 NDB 5'-5 C X---10/02/1998
Class 1 PCBBA STATUS Components SIDUAL HEAT REMOVAL TO RC LOOP A COLD LEG N I  0 Zona Number: 3-037                                                               S  ONGT SBC. XZ                                  T  RSBH Summary Examination Area                 Catgy   Exam                           A   B Z 0 B Remarks Number  Identification                  Item  No Method        Procedure        T   C G:M R ** Calibration Block tt RBP   DWG NO ~ 5613 P 585 S SH 1 123500 10'Z   1301-2                   B J     PT             NDB 3.3-18       C   X - - - <0/02/1998 - PT complete, NRZ.
-PT complete, NRZ.X---10/03/1998
PZPB TO ELBOW                    B9. 11  UT            NDB 5. 4-16            - X - 10/08/1998 - UT complete, geometry.
-UT complete, NRI.126200 8'HR 1301-3 ELBOW TO VALVE 3-876A B J PT B9.11 UT NDB 3.3-18 NDB 5.4-5 C X---10/02/1998
27 tt 126100 8t RHR 1301 2                   B-J     PT             NDB 3.3-18       C   X - - - 10/02/1998 - PT complete, NRZ.
-PT complete, NRZ.X--10/03/1998
PIPE TO BLBOW                    B9. 11  UT            NDB 5 '-5            X - - - 10/03/1998 - UT complete, NRI.
-UT complete/NRZ~tt UT 41 tt  
126200 8'HR   1301-3                   B J     PT             NDB 3.3-18       C   X - - - 10/02/1998 - PT complete, NRZ.
~I!~lk 0 Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 10'HZR IDUAL HEAT REMOVAL TO RC LOOP C COLD LBG N I 0 ZNSBRVZCB INSPBCTION SUMHARY D INTBRVAL, SECOND PERIOD, SECOND OUTAGE (98RP)Class 1 PCBBA STATUS Components Zone Number: 3-039 Summary Bxamination Area Number Identification SBC.XZ Catgy Bxam Item No Hethod Procedure S ONGT T RS,BH A B I 0 B Remarks T C G H R<<e Calibration Block ee RBP.DWG.NO.5613 P 587 S SH.1 130400 8'-RHR-1305 2A PZPB TO PIPE B-J B9~11 UT NDB 3.3"7 NDE 5.4-15 C X X 9/30/1998-PT complete, 2 arc strikes noted outside of exam area (CR 98-1437)10/01/1998
ELBOW TO  VALVE 3-876A            B9. 11  UT            NDB 5.4-5            X - -   10/03/1998 - UT complete/ NRZ ~
-UT complete, geometry.et UT 4]130500 8'-RHR-1305-3 PZPB TO TBB B-J PT B9~11 UT NDB 3~3-7 NDB 5~4-15'X 09/30/1998 PT complete, NRZ.-X-10/01/1998
tt UT 41 tt
-UT complete, geometry.131600 8i-RHR-1304-8 PZPB TO TBB B-J PT B9~11 UT NDB 3.3-23 NDB 5.4-13 ,C X-10/06/1998
 
-PT complete, NRI.-X-10/07/1998' UT complete, geometry.et UT 41 te RBP.DWG.NO.5613-P-587-S SH.2 132300 10 SI-1303 16 BLBOW TO PIPE B-J B9~11 UT NDB 3.3-13 NDB F 4-14 C-X-X 10/03/1998
~I!
-PT complete, acceptable rounded indication.
~lk 0
10/04/1998
 
-UT complete, NRZ.tt UT 27'e 132600 10;SZ 1303 5 PIPE TO ELBOW B-J PT 89.11 UT NDB 3.3-13 NDB 5.4-18 C-X 10/03/1998
Date: 12/29/1998                               TURKEY POINT NUCLBAR PLANT UNIT 3                                           Page:
-PT complete, acceptable rounded indication.
ZNSBRVZCB INSPBCTION SUMHARY                                                      10'HZR D INTBRVAL, SECOND PERIOD,     SECOND OUTAGE (98RP)
10/4/1998-UT complete, geometry.te UT 27 tt 132900 3-SZH-116A DOUBLB ACTING RBSTRAINT P-A F1.10B VT-3 NDB 4.3-10 C X---10/01/1998
Class 1 PCBBA STATUS Components IDUAL HEAT REMOVAL TO RC LOOP C COLD LBG N I  0 Zone Number: 3-039                                                                   S ONGT SBC. XZ                                       T RS,BH Summary Bxamination Area              Catgy    Bxam                                A B I 0 B   Remarks Number  Identification                Item No Hethod          Procedure            T C G H R   <<e Calibration Block   ee RBP. DWG. NO. 5613 P 587 S SH. 1 130400 8'-RHR-1305 2A                 B-J                     NDB 3.3 "7           C X         9/30/1998 - PT complete, 2 arc strikes PZPB TO PIPE                    B9 ~ 11  UT            NDE 5.4-15                X    noted outside of exam area (CR 98-1437) 10/01/1998 - UT complete, geometry.
-VT-3 complete, NRZ.133000 10"-SI-1303-8 PIPB TO BLBOW B J PT B9.11 UT NDB 3.3-10 NDB 5.'4 4 , C X---9/30/1998-PT complete,NRI.
et UT 4]
10/1/1998--X-o UT complete, geometry.ee UT-27 I Ol Date: 12/29/1998
130500 8'-RHR-1305-3                   B-J     PT             NDB 3 ~ 3-7           X         09/30/1998     PT complete, NRZ.
'TURKEY, POINT NUCLBAR PLANT UNIT 3 Page: 11 INSBRVICB INSPECTION,  
PZPB TO TBB                    B9 ~ 11  UT            NDB 5 ~ 4-15'            - X -   10/01/1998 -   UT complete, geometry.
131600 8i-RHR-1304-8                   B-J     PT             NDB 3.3-23         ,C X     -   10/06/1998 -   PT complete, NRI.
PZPB TO TBB                    B9 11
                                          ~    UT            NDB 5.4-13              - X -   10/07/1998'     UT complete, geometry.
et UT 41   te RBP. DWG. NO. 5613-P-587-S SH. 2 132300 10 SI-1303 16                 B-J                     NDB 3.3-13           C -X-       10/03/1998 - PT complete, acceptable BLBOW TO  PIPE                  B9 ~ 11  UT            NDB F  4-14          X        rounded indication. 10/04/1998 - UT complete, NRZ.
tt UT 27   '
e 132600 10; SZ 1303 5                   B-J     PT             NDB 3.3-13           C - X       10/03/1998 - PT complete, acceptable PIPE TO ELBOW                  89.11    UT            NDB 5.4-18                      rounded indication. 10/4/1998 - UT complete, geometry.
te UT 27   tt 132900 3-SZH-116A                     P-A     VT-3           NDB 4.3-10           C X - - -   10/01/1998 - VT-3 complete, NRZ.
DOUBLB ACTING RBSTRAINT        F1.10B 133000 10"-SI-1303-8                   B J     PT             NDB 3.3-10       , C X - - - 9/30/1998 - PT complete,NRI. 10/1/1998 PIPB TO BLBOW                  B9. 11  UT            NDB 5.'4 4            - - X - o UT complete, geometry.
ee UT-27
 
I Ol
 
Date:   12/29/1998                                     'TURKEY, POINT NUCLBAR PLANT UNIT 3                                     Page:     11 INSBRVICB INSPECTION,  


==SUMMARY==
==SUMMARY==
THIRD INTBRVAL, SECOND PERIOD, SBCOND OUTAGB (98RP)Claes 1 PCBBA STATUS Componente srnvar.HEAT RRMovan To Rc Loop.c corD rRG Zone Number: 3-039 Summary Bxamination Area Number Identification ASMB SBC.XZ Catgy Bxam Item No Method Procedure N I 0 S ON'GT T.RSBH A B Z 0 B Remarko T'C G H R ee Calibration Block ee RBP'.DWG.No.5613 P 587 S SH.'133900: 10'-SI-1303 11 BLBOW TO VALVE 3-875C B-J PT B9~11 UT NDB 3.3-27 NDB 5" 4-17 C-X X-10/07/1998
 
-PT complete, acceptable linear indication.
THIRD INTBRVAL, SECOND PERIOD, SBCOND OUTAGB (98RP)
10/8/1998-UT complete,'NRZ.**UT 27**134300 10 SZ71303-13 ELBOW To BLBOW B-J PT B9.11 UT NDB 3.3-28'NDB 5.4-17 C-X--X-10/07/1998
Claes 1 PCBBA STATUS Componente srnvar. HEAT RRMovan To Rc   Loop.c corD rRG N I  0 Zone Number: 3-039                           ASMB                                       S   ON'GT SBC. XZ                                    T   .RSBH Summary  Bxamination Area                  Catgy      Bxam                            A   B Z 0 B Remarko Number    Identification                    Item    No Method          Procedure      T 'C   G H R ee Calibration Block ee RBP'. DWG. No. 5613 P 587 S   SH.'
-PT complete, 2 acceptable indicationo.
133900:   10'-SI-1303   11                     B-J     PT             NDB 3.3-27     C   - X     10/07/1998 - PT complete, acceptable BLBOW TO VALVE  3-875C              B9 ~ 11  UT              NDB 5" 4-17          X-      linear indication. 10/8/1998 -   UT complete, 'NRZ.
10/8/98-UT complete, geometry.27 134400 10-SZ-1303-14 BLBOW To PIPE 8-J PT B9.11 UT NDB 3.3-26 C X---10/07/1998
                                                                                                    ** UT 27 **
-PT complete, NRZ.NDB 5.4-17-X-10/08/1998
134300   10   SZ71303-13                     B-J     PT             NDB 3.3-28     C   -X-     10/07/1998 - PT complete, 2 acceptable ELBOW  To BLBOW                      B9. 11  UT            'NDB 5.4-17            -X-  indicationo. 10/8/98 -   UT complete, geometry.
-'UT complete, geometry.27 134500 10-SZ-1303 15 PIPE TO BRANCH CONNBCTION.B-J PT B9~11 UI'DE 3.3-29 NDB 5.4-17 C-X--10/07/1998
27 134400   10 -SZ-1303-14                       8-J     PT             NDB 3.3-26     C   X - - - 10/07/1998 - PT complete, NRZ.
-PT complete, acceptable
BLBOW To PIPE                        B9. 11  UT              NDB 5.4-17             - X - 10/08/1998 -'UT complete, geometry.
--X-rounded indication.
27 134500   10 -SZ-1303 15 PIPE TO BRANCH CONNBCTION
10/08/1998
                                              .B- J B9 ~ 11 UI'DE PT NDB 3.3-29 5.4-17 C   - X
-UT complete, geometry.UT 27<<*  
                                                                                                - - 10/07/1998 - PT complete, acceptable X - rounded indication. 10/08/1998 - UT complete, geometry.
~O Ci Date: 12/29/1998 GH HEAD SAPETY INJECTION TURKEY POINT NUCLEAR PLANT UNIT 3 INSBRVICB INSPBCTION
UT 27 <<*
 
~O Ci
 
Date:   12/29/1998                                 TURKEY POINT NUCLEAR PLANT UNIT 3                                   Page:  12 INSBRVICB INSPBCTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL,*SBCOND PERIOD, SECOND OUTAGB (98RP)Claee 1 PCBBA STATUS Componente LOOP B INSIDE CTM N I 0 Page: 12 Zone Number: 3-041 Summary, Bxamination Area Number Identification SBC.XZ Catgy Exam Item No Method Procedure S ONGT T RSBH A B I 0 B Remarko T C G H R*e Calibration Block ee REP.DWG.NO.5613 P 584 S SH, 1 140700 8051-R-528-01 DOUBLE ACTING RBSTRAINT F1~10B VT-3 NDB 4.3-8 C X--10/01/1998
 
-VT 3 completed, NRZ i(chipped concrete noted).142100 2" SZ 1302 14 PZPB TO BLBOW B-J PT B9~40 NDB 3.3-22 C X---10/04/1998>
THIRD INTERVAL, *SBCOND PERIOD, SECOND OUTAGB (98RP)
-PT complete, NRZ.  
Claee 1 PCBBA STATUS Componente GH HEAD SAPETY  INJECTION LOOP B INSIDE CTM N I   0 Zone Number: 3-041                                                               S  ONGT SBC. XZ                                  T  RSBH Summary, Bxamination Area               Catgy    Exam                          A  B I0  B Remarko Number   Identification                 Item   No Method         Procedure       T   C G H R *e Calibration Block ee REP. DWG. NO. 5613 P 584 S   SH, 1 140700   8051-R-528-01                             VT-3           NDB 4.3-8       C   X -   - 10/01/1998 - VT 3 completed, NRZ DOUBLE ACTING RBSTRAINT          F1 ~ 10B                                            i(chipped concrete noted).
~li 0 Cl Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 INSBRVICB INSPECTION
142100   2" SZ 1302 14                   B-J     PT             NDB 3.3-22     C   X - - - 10/04/1998> - PT complete, NRZ.
PZPB TO BLBOW                    B9 ~ 40
 
~li 0
Cl
 
Date: 12/29/1998                                 TURKEY POINT NUCLBAR PLANT UNIT 3                                   Page: 13 INSBRVICB INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SBCOND PERIOD, SBCOND OUTAGB (98RP)Class 1 PCBBA STATUS Components Page: 13 H MEAD SAFETY INJECX'ION LOOP C INSIDE CZMT N I 0 Zone Number: 3-042 Summary Bxamination Area Number Identification SBC.XZ Catgy Bxam Item No Method Procedure S ONGT T RSBH A B Z 0 B Remarks T C G M R ee Calibration Block ee RBP.DWG.NO.5613 P 648 S SH.1 147400 2i SZ-1303-21 BLBOW TO PIPB B J 89.40 NDB 3.3 1 C X---09/29/1998
 
-'PT complete, NRZ.147900 2%-SZ-1303-26 PZPB TO BLBOW B-J PT B9~40 NDB 3.3 1 C X---09/29/1998
THIRD INTERVAL, SBCOND PERIOD, SBCOND OUTAGB (98RP)
-PT complete, NRZ.
Class 1 PCBBA STATUS Components H MEAD SAFETY INJECX'ION LOOP C INSIDE CZMT N I   0 Zone Number: 3-042                                                               S  ONGT SBC. XZ                                  T  RSBH Summary Bxamination Area               Catgy     Bxam                           A B   Z 0 B Remarks Number  Identification                  Item  No Method        Procedure      T C   G M R ee Calibration Block ee RBP. DWG. NO. 5613 P 648 S   SH. 1 147400 2i SZ-1303-21                   B J                     NDB 3.3 1     C   X - - - 09/29/1998 - 'PT complete, NRZ.
1 0 Date: 12/29/1998 TURKBY POINT'NUCLBAR PLANT UNIT 3 INSBRVZCB INSPBCTION SUHHARY THIRD INTBRVAL~SBCOND PBRIODg SBOOND OUTAGB (98RF)Claen 1 PCBBA STATUS Components Page: 14 H HBAD SAFBTY INJBCTION LOOP A INSIDB CTHT N I 0 Zone Number: 3-043 SummarY Bxamination Area'umber Identification SBC.XZ Catgy Bxam Item No Hethod Procedure S 0NGT T RSBH A B I 0 B Remarke T C G H'**Calibration Block ee RBF.DWG.NO.5613 P 764 S SH;2 148900 8080-H-010 01 DOUBLB'ACTING RBSTRAZNI'-A VT-3 F1.10B NDB 4.3-9 C X---10/01/1998
BLBOW TO  PIPB                  89.40 147900 2%-SZ-1303-26                   B-J     PT             NDB 3.3 1     C   X - - - 09/29/1998 - PT complete, NRZ.
-VT-3 complete, NRZ (chipped'oncrete noted).150000 2-SZ-1305-5 BLBOW'TO PZPB'J PT B9.40 ,NDB 3.3-5 C X---9/30/1998-PT complete, NRI.150100 2i-SZ-1305-6 PZPB'TO BLBOW B-J PT B9.40'DB 3.3-4"C X---9/30/1998-PT complete, NRZ.00 2-SZ-1305-7 BLBOW TO PZPB B-J PT B9.40 NDB 3.3-4 C X---9/30/1998-PT complete, NRZ.150300 2i-S1-1305-8 PZPB TO ELBOW B-J PT B9.40 NDB 3.3-4 C X---9/30/1998-PT complete, NRZ.150400 2'-SZ-1305-9 BLBOW TO PIPE B-J:, PT B9.40 NDB 3.3-4 C X--9/30/1998-PT complete, NRZ~  
PZPB TO BLBOW                    B9 ~ 40
~!!1 4!
 
Date: 12/29/1998 TURKBY POINT.NUCLBAR PLANT UNIT 3 Page: 15 INSBRVICB ZNSPBCl'ZON SUMHARY THIRD ZNTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RP)Claee 1 PCBBA STATUS Componenta HIOAL 8 voLUHB coNTRQL To Rc Loop c HoT LBG N'I 0 Zone Number: 3-045 Summary Bxamination Area Number Identification SBC.XZ Catgy Bxam Item No Hethod Procedure S ON GT T RS B'H A B Z 0 B Remarko T C G H R*e Calibration Block e~RBP.DWG.NO.5613 P 661 S SH.2 165400 3-VCH-132 SINGLB AC1'ZNG RBSTRAINT P-A VT-3 F1'.10A NDB 4.3-5 C X---09/27/1998
1 0
-VT-3 complete, NRZ.
 
i 4i Date: 12/29/1998 MICAL AND VOLUME TURKEY POINT NUCLBAR PLANT UNIT 3 INSBRVICB INSPBCTION
Date: 12/29/1998                                 TURKBY POINT'NUCLBAR PLANT UNIT 3                                     Page:                  14 INSBRVZCB INSPBCTION SUHHARY THIRD INTBRVAL~ SBCOND PBRIODg SBOOND OUTAGB (98RF)
Claen 1 PCBBA STATUS Components H HBAD SAFBTY INJBCTION LOOP A INSIDB CTHT N I   0 Zone Number: 3-043                                                               S  0NGT SBC. XZ                                T  RSBH SummarY Bxamination                       Catgy    Bxam                          A  B I0  B Remarke Identification Area'umber Item No Hethod         Procedure     T   C G H'   ** Calibration Block   ee RBF. DWG. NO. 5613 P 764 S     SH; 2 148900 8080-H-010 01                             VT-3           NDB 4.3-9     C   X - - - 10/01/1998 - VT-3 complete,   NRZ DOUBLB 'ACTING          RBSTRAZNI'-A F1. 10B                                                      noted) .
(chipped'oncrete 150000 2 -SZ-1305-5                       J     PT             ,NDB 3.3-5     C   X - - - 9/30/1998 -   PT complete, NRI.
BLBOW'TO PZPB'                    B9.40 150100 2i-SZ-1305-6 PZPB'TO BLBOW B-J B9.
40'DB PT                  3.3-4     "C   X - - - 9/30/1998 -   PT complete, NRZ.
00 2 -SZ-1305-7                     B-J     PT             NDB 3.3-4     C   X - - - 9/30/1998 -   PT complete, NRZ.
BLBOW TO PZPB                      B9.40 150300 2i-S1-1305-8                       B-J     PT             NDB 3.3-4     C   X - - - 9/30/1998 - PT complete, NRZ.
PZPB TO ELBOW                      B9.40 150400 2'-SZ-1305-9                       B-J:,   PT             NDB 3.3-4     C   X - -   9/30/1998 - PT complete, NRZ ~
BLBOW TO  PIPE                    B9.40
 
  ~!!
1 4!
 
Date: 12/29/1998                               TURKBY POINT.NUCLBAR PLANT UNIT 3                                 Page:   15 INSBRVICB ZNSPBCl'ZON SUMHARY THIRD ZNTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RP)
Claee 1 PCBBA STATUS Componenta HIOAL 8 voLUHB coNTRQL To Rc Loop c HoT LBG N'I   0 Zone Number: 3-045                                                             S  ON GT SBC. XZ                                 T RS B'H Summary Bxamination Area              Catgy    Bxam                          A B Z 0 B Remarko Number  Identification                Item  No Hethod        Procedure      T C G H R *e Calibration Block e~
RBP. DWG. NO. 5613 P 661 S SH. 2 165400 3-VCH-132                       P-A     VT-3         NDB 4.3-5       C X - - - 09/27/1998 - VT-3 complete, NRZ.
SINGLB AC1'ZNG RBSTRAINT        F1'. 10A
 
i 4i
 
Date: 12/29/1998                               TURKEY POINT NUCLBAR PLANT UNIT 3                                   Page:  16 INSBRVICB INSPBCTION  


==SUMMARY==
==SUMMARY==
THIRD INTBRVAI, SECOND PBRIOD, SBCOND OUTAGB (98RP)Claeo 1 PCBBA STATUS Componente CONTROL TO REGENERATIVE HX I N I 0 Page: 16 Zone Number: 3-047, Summary Examination Area Number Identification SBC.XZ Catgy Exam Item No Method Procedure S O'NGT T R'SBH'B I O B Remarko T C G M R<<e Calibration Block e>>RRP.DWG.NO.5613 P 594 S SH, 1 172500 3-VCH-129 SZNGLB ACI'ING'BSTRAZNT P-A VT-3 P1.10A VT-3 NDB 4.3-3 C X T9.9-3.1/4.3-23 X 09/27/1998
 
-VT-3 complete-RI
THIRD INTBRVAI, SECOND PBRIOD, SBCOND OUTAGB (98RP)
-CRB 98-1358.10/10/1998
Claeo 1 PCBBA STATUS Componente MICAL AND VOLUME CONTROL TO REGENERATIVE HX                             I N I   0 Zone Number: 3-047,                                                           S   O'NGT SBC. XZ                                T   R'SBH' Summary Examination Area              Catgy    Exam                              B IO  B Remarko Number  Identification                Item  No Method        Procedure      T   C G M R <<e Calibration Block e>>
-VT-3 by QC following corrective meaoureo per CR 5 98-1358, NRZ.  
RRP. DWG. NO. 5613 P 594 S SH, 1 172500 3-VCH-129                       P-A     VT-3         NDB 4.3-3       C         X 09/27/1998 - VT-3 complete-RI - CRB SZNGLB ACI'ING'BSTRAZNT        P1.10A VT-3          T9.9-3.1/4.3-23     X       98-1358. 10/10/1998 - VT-3 by QC following corrective meaoureo per CR 5 98-1358, NRZ.
~O 0 0 Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT UNIT 3 Page: 17 INSBRVZCB INSPBCTZON SUHHARY THIRD ZNIBRVAL, SBCOND.PBRZOD, SECOND OUTAGB (98RP)'laeo 1 PCBBA'STATUS Componento HICAL&VOLUHB CONTROL PRON THB RBGBNBRATIVB HX N I 0 Zone:Number:
 
3-049 Summary Bxamination Area Number Identification SBC.XZ Catgy Bxam Item No~Hethod Procedure S ONG'T TR S B H A B I 0 B Remarko T C G H R e>>Calibration Block*+RBP.DWG.NO.5613 P-644 S SH.3 177700 2-CH-1302-10'ZPB TO BLBOW B J PT B9.40 NDB 3'.3-19 C X---10/05/1998
~O 0
-PT complete, NRI.177800 2i-CH-2302-11 BLBOW TO PIPS B-J PT B9.40 NDB 3.3-19 C X---10/05/1998
0
-PT complete, NRZ.178200 2i-CH-1302-24 PZPB'TO TBB B-J PT B9.40 NDB 3.3-19C X---10/05/1998
 
-PT complete, NRI.
Date: 12/29/1998                                       TURKBY POINT NUCLBAR PLANT UNIT 3                                             Page: 17 INSBRVZCB INSPBCTZON SUHHARY THIRD ZNIBRVAL, SBCOND.PBRZOD, SECOND OUTAGB   (98RP)'laeo 1 PCBBA'STATUS Componento HICAL & VOLUHB CONTROL           PRON THB RBGBNBRATIVB HX N I             0 Zone:Number: 3-049                                                                     S   ONG'T SBC. XZ                                TR S B H Summary Bxamination Area                        Catgy  Bxam                          A   B I 0           B Remarko Number  Identification                          Item No~Hethod        Procedure      T   C G H R           e>> Calibration Block *+
0 0 4l Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT'NIT 3 INSBRVICB INSPBCI'ION SUHMARY Page: 18 THIRD INTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB Claoo 1 PCBBA'TATUS Componente MICAL&VOLUHB CONTROL SBAL INJBCTION LOOP A{98RR)Zone Number: 3-050 Summary Bxamination Area Number Identification ASHB SBC.XZ Catgy Bxam Item No Hethod Procedure N I 0 S ONGT T RSBH A B I 0 B Remarko T C G H R ee Calibration Block++RBR.DN.NO.5613 P 647 S SH.1 182721 H-2'DOUBLB ACTING RBSTRAINT F1.10B VT 3 NDB 4~3-12 B X---10/03/1998
RBP. DWG. NO. 5613 P-644 S           SH. 3 177700 2 -CH-1302-10'ZPB B J   PT             NDB 3'.3-19     C   X - - - 10/05/1998 -           PT complete, NRI.
-Bxpaneion cample celection, NRZ (CR 98-1357).  
TO BLBOW              B9.40 177800 2i-CH-2302-11                             B-J   PT             NDB 3.3-19     C   X - - -           10/05/1998 - PT complete, NRZ.
~CI 0 0 Date:>>12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 19 INSERVZCE INSPECTION
BLBOW TO              PIPS              B9.40 178200 2i-CH-1302-24                             B-J   PT             NDB 3.3-19    C    X - - -           10/05/1998 - PT complete, NRI.
PZPB'TO TBB                              B9.40
 
0 0
4l
 
Date:   12/29/1998                               TURKBY POINT NUCLBAR   PLANT'NIT 3                                 Page:    18 INSBRVICB INSPBCI'ION SUHMARY THIRD INTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB {98RR)
Claoo 1 PCBBA'TATUS Componente MICAL & VOLUHB CONTROL SBAL INJBCTION LOOP A N I  0 Zone Number: 3-050                     ASHB                                     S  ONGT SBC. XZ                                 T  RSBH Summary  Bxamination Area              Catgy   Bxam                           A  B I0  B Remarko Number  Identification                Item No Hethod       Procedure         T C G H R ee Calibration Block ++
RBR. DN. NO. 5613 P 647 S SH. 1 182721   H-2                                     VT 3         NDB 4 ~ 3-12     B X - - - 10/03/1998 - Bxpaneion cample celection,
        'DOUBLB ACTING RBSTRAINT        F1. 10B                                            NRZ (CR 98-1357).
 
~CI 0
0
 
Date: >>12/29/1998                                 TURKEY POINT NUCLEAR PLANT UNIT 3                                       Page:     19 INSERVZCE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, SECOND OUTACB (98RP)Class I PCBBA STATUS Compon'ento MZCAL&VOLUME CONTROL SEAL INJECTION LOOP C N I 0 Zone Number: 3-051 SummarY Bxamination Area Number Identification
 
~SBC.XZ Catgy Bxam Item No Method Procedure S 0NGT T RSEH A B I 0 B Remarks T C G M R<<e Calibration Block ee REP.DWG.NO.5613-P-646 S SM.1 182840 1'.5i CH 1302-4 RC PUMP TO PZPB B J PT B9.40'DB 3~3 16 C X---10/02/1998
THIRD INTERVAL, SECOND PERIOD, SECOND OUTACB (98RP)
-PT complete, NRZ.182900 1.5"-CH-1302-PB1 PIPING FLANGB BOLTING B-G-2 VT-1 87.70 VT-1 NDB 4.1-1 C---X 9/29/1998-VT-1 complete, RZ (CRB T9.9-1.1/4
Class I PCBBA STATUS Compon'ento MZCAL & VOLUME CONTROL SEAL INJECTION LOOP C N I   0 Zone Number: 3-051                                                                 S  0NGT SBC. XZ                                  T  RSEH SummarY Bxamination Area                 Catgy    Bxam                            A  B I0  B Remarks Number Identification   ~             Item   No Method         Procedure       T   C G M R <<e Calibration Block   ee 182840 REP. DWG. NO.
~1-6 X---98-1406).10/14/98-VT 1'Y QC following corrective actions per CR B 98-1406, NRI.183300 2i-CH-1304-2 BLBOW TO PIPB B-J PT B9.40 NDB 3.3-16 C X---10/02/1998
1'. 5i CH 1302-4 RC PUMP TO PZPB 5613-P-646 S SM. 1 B J B9.40
-PT complete, NRZ.00 2'-CH-1304-3 PIPB TO BLBOW B-J PT B9.40 NDB 3.3-16 C X---10/02/1998
                                                  'DB PT                3 ~ 3 16     C   X - - - 10/02/1998 -   PT complete, NRZ.
-PT complete, NRZ.183500 2~-CH-1304-4 ELBOW TO PIPE B J PT B9~40 NDB 3.3-16 C-X--10/02/1998
182900 1.5"-CH-1302-PB1                 B-G-2   VT-1           NDB 4.1-1       C   - - - X 9/29/1998 - VT-1 complete, RZ (CRB PIPING FLANGB BOLTING            87.70    VT-1          T9.9-1.1/4 1-6
-PT complete, acceptable rounded indication.
                                                                              ~      X - - 1406) . 10/14/98 - VT 1'Y QC following corrective actions per   CR B 98-1406, NRI.
183600 2'-CH 1304-5 PIPB TO BLBOW B-J PT B9~40 NDE 3'-16 C X---10/02/1998
183300 2i-CH-1304-2                     B-J     PT             NDB 3.3-16       C   X - - - 10/02/1998 - PT complete, NRZ.
-PT complete, NRI.183700 2i-CH-1304-6 BLEOW TO PIPE B-J PT B9.40 NDE 3.3-16 C X---10/02/1998
BLBOW TO  PIPB                  B9.40 00 2'-CH-1304-3                     B-J     PT             NDB 3.3-16       C   X - - - 10/02/1998 - PT complete, NRZ.
-PT complete, NRZ.185000 2"-CH-1304-PB2 PZPZNG RLANGB BOLTING BG2 VT1 B7~70 NDB 4.1-2 C X---9/29/1998-VT-1 complete, NRZ.  
PIPB TO BLBOW                    B9.40 183500 2~-CH-1304-4                     B J     PT             NDB 3.3-16       C   - X - - 10/02/1998 - PT complete, acceptable ELBOW TO  PIPE                  B9 40
~O 0 Date: 12/29/1998 TURKEY POINT'NUCLBAR PLANT UNIT 3 INSBRVICB INSPECTION SUHHARY THIRD'INTERVAL, SBCOND PERIOD, SBCOND OUTAGB (98RF)Class 1 PCBBA STATUS Components Page: 20 NICAL 6 VOLUME CONTROL SEAL INJBCI'ION LOOP C Zone Number: 3-051 Summary Bxamination Area Number Identification SBC.XI Catgy Exam Ztem No Hethod Procedure N I 0 S ONGT T RSBH'A B I 0 E, Remarks T C G H R ss Calibration.
                                            ~                                                rounded indication.
Block se REF.DWG.NO.5613 P 646 S SH.1 185300'4 DOUBLE ACTING RBSTRAZNT VT 3 F1.10B VT 3 NDB 4.3-4 C---X 09/27/1998
183600 2'-CH 1304-5                     B-J     PT             NDE 3 '-16       C   X - - - 10/02/1998 -   PT complete, NRI.
-VT 3 complete, RZ (CRB T9.9-3'.1/4.3-22 X---98-1357).10/11/98-VT-3 by ()C following corrective actions per CR()98 1357', NRZ.185730 H-2 DOUBLB ACTING RESTRAINT F1.10B VT-3 NDB 4.3-18 B X---10/03/1998
PIPB TO BLBOW                    B9 ~ 40 183700 2i-CH-1304-6                     B-J     PT             NDE 3.3-16       C   X - - - 10/02/1998 - PT complete, NRZ.
-Bxpanoion oample selection, NRZ (CR 98 1357).185760 PS-2B DOUBLB ACI'ING RBSTRAINT F A Fl'.10B VT-3 NDB 4.3-16 B X---10/03/1998
BLEOW TO  PIPE                  B9.40 185000 2"-CH-1304-PB2                   BG2 VT1                 NDB 4.1-2       C   X - - - 9/29/1998 - VT-1 complete, NRZ.
-Expansion sample selection, NRI (CR 98-1357)~65 PS 2A DOUBLB ACI'ING RBSTRAINT F-A VT 3 F1~10B NDB, 4.3-17 B X---10/03/1998
PZPZNG RLANGB BOLTING            B7 ~ 70
-Expansion sample selection, NRI (CR 98-1357)~
 
II II Date: 12/29/1998 CTOR COOLANT PUMP C TURKEY POINT NUCLEAR PLANT UNIT 3 ZNSERVZCB ZNSPBCTION
~O 0
 
Date: 12/29/1998                                   TURKEY POINT'NUCLBAR PLANT UNIT 3                                     Page:  20 INSBRVICB INSPECTION SUHHARY THIRD'INTERVAL, SBCOND PERIOD, SBCOND OUTAGB (98RF)
Class 1 PCBBA STATUS Components NICAL 6   VOLUME CONTROL SEAL INJBCI'ION LOOP C N I  0 Zone Number: 3-051                                                                 S ONGT SBC. XI                                T RSBH Summary Bxamination Area                 Catgy     Exam                           'A B I0  E, Remarks Number  Identification                    Ztem No Hethod          Procedure        T C G H R ss Calibration. Block se REF. DWG. NO. 5613 P 646 S   SH. 1 185300'   4                                       VT 3         NDB 4.3-4         C - - - X 09/27/1998 - VT 3 complete, RZ (CRB DOUBLE ACTING RBSTRAZNT            F1. 10B VT 3          T9.9-3'.1/4.3-22   X - - - 98-1357). 10/11/98 - VT-3 by ()C following corrective actions per   CR()
98 1357', NRZ.
185730 H-2                                         VT-3         NDB 4.3-18       B X - - - 10/03/1998 - Bxpanoion oample selection, DOUBLB ACTING RESTRAINT            F1. 10B                                            NRZ (CR 98   1357) .
185760 PS-2B                             F A     VT-3         NDB 4.3-16       B X - - - 10/03/1998 - Expansion sample DOUBLB ACI'ING RBSTRAINT          Fl'. 10B                                            selection,   NRI (CR 98-1357) ~
65 PS   2A                           F-A     VT 3         NDB, 4.3-17       B X - - - 10/03/1998 - Expansion sample DOUBLB ACI'ING RBSTRAINT          F1 10B
                                              ~                                                selection, NRI (CR 98-1357)   ~
 
II II
 
Date: 12/29/1998                         TURKEY POINT NUCLEAR PLANT UNIT 3                                     Page:    21 ZNSERVZCB ZNSPBCTION  


==SUMMARY==
==SUMMARY==
THIRD INTBRVAL, SECOND PBRIOD, SBCOND OUTAGE (98RP)Claee 1 PCBBA STATUS Componento N I 0 Page: 21 Zone Number: 3-058 Summary Examination Area Number Identification SBC.XZ Catgy Exam Item No Method Procedure S ONGT TRSBH A B I 0 B Remarkc T C G H R*e Calibration Block ee REP.DWG.NO.5813 M 4008 204000 3-RCP-C-L1 THRU L3 ZA ZNTBGRAL ATTACHMENT B-K PT B10.20 VT 3 NDE 3.3-25 NDB 4.3-19 NDB 3.3-30 NDB 3.3-31 C---X X X X-10/08/1998
 
-PT complete, 2 re)actable linear indicatione
THIRD INTBRVAL, SECOND PBRIOD, SBCOND OUTAGE (98RP)
-{CR 98-1517).10/08/98-VT;3 complete NRZ.10/12/98 and 10/13/98-re-examination of indication areao following corrective actionc per CR 98-1517, NRZ.
Claee 1 PCBBA STATUS Componento CTOR COOLANT PUMP C N I   0 Zone Number: 3-058                                                       S  ONGT SBC. XZ                                TRSBH Summary Examination Area         Catgy   Exam                           A   B I 0 B Remarkc Number  Identification            Item  No Method        Procedure      T   C G H R *e Calibration Block ee REP. DWG. NO. 5813 M 4008 204000 3-RCP-C-L1 THRU L3 ZA     B-K     PT             NDE 3.3-25     C   - - - X 10/08/1998 -   PT complete, 2 re)actable ZNTBGRAL ATTACHMENT        B10.20 VT  3          NDB 4.3-19          X      linear indicatione -{CR 98-1517) .
Cl Date: 12/29/1998 NICAL&VOLUNB CONTROL Zone Number: 3-069 TURKBY POINT NUCLBAR'PLANT UNIT 3 ZNSBRVZCB ZNSPBCTZON SUNNARY THIRD ZNTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB (98RP)Class 1 PCBBA STATUS Components RBGBNBRATZVB HBAT RXCN N I 0 S ONGT Page: 22 Summary Bxamination Area Number Identification SBC.XI Catgy Bxam Item No Nethod Procedure T RSBH A B I 0 B Remarks T C G N R ee Calibration Block ee RBP.DWG.NO.5613 N 4009 204100 RGX 3B200 VISUALS POR LBAKAGB VT-2 VT-3 NDB 4~2-1 NDB 4.3-1 C X---09/21/1998
NDB 3.3-30          X      10/08/98 - VT;3 complete NRZ. 10/12/98 NDB 3.3-31          X-      and 10/13/98 - re-examination of indication areao following corrective actionc per CR 98-1517, NRZ.
-VT-3 complete, NRZ.X---10/26/1998
 
-VT-2 complete, NRI.
Cl Date: 12/29/1998                               TURKBY POINT NUCLBAR 'PLANT UNIT 3                                 Page: 22 ZNSBRVZCB ZNSPBCTZON SUNNARY THIRD ZNTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB (98RP)
II'l 4b Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 23 ZNSBRVZCB INSPECTION SUHMARY THIRD INTBRVAL, SECOND PERIOD, SBCOND OUTAGE (98RF)Class 2 PCBBA STATUS Components SIDUAL HEAT REMOVAL SYSTEM INSIDE CONTAINMBNT N I 0 Zone Number: 3-081 Summary Examination.Area Number Identification SBC.XZ Catgy Exam Item No Hsthod Procedure S ONGT T RSBH A E I 0 B Remarks T C G H R ss Calibration Block++RRP.DWG.NO.5613 P 587 S SH.1 252900 100-SI-2304-2LU Elbow Long Seam Upstream C P-1 PT C5.12 UT NDB 3.3 9 NDB 5.4-2 C X--'-9/30/1998-PT complete, NRZ.10/3/1998 X----UT complete, NRI.*s UT 27 253000 10'-SZ-2304-2 BLBOW TO VALVB HOV-3-744A C-P-1 PT C5.11 UT NDB 3.3-9 NDB 5.4-2 C X---9/30/1998-PT complete, NRZ.10/3/1998 X----UT complete, NRZ.**UI'-39 ss 253100 10'-SI-2304-3 VALVB HOV-3-744A TO PZPB C-P-1'T'C5.
Class 1 PCBBA STATUS Components NICAL & VOLUNB CONTROL  RBGBNBRATZVB HBAT RXCN N I   0 Zone Number: 3-069                                                            S ONGT SBC. XI                              T  RSBH Summary Bxamination Area               Catgy    Bxam                          A  B I0  B Remarks Number Identification                 Item No Nethod         Procedure       T   C G N R ee Calibration Block ee RBP. DWG. NO. 5613 N 4009 204100 RGX 3B200                               VT-2         NDB 4 ~ 2-1     C   X - - - 09/21/1998 - VT-3 complete, NRZ.
11'T NDB 3'-9 NDB 5.4-1 C-X--,9/30/1998
VISUALS POR LBAKAGB                    VT-3          NDB 4.3-1          X - - - 10/26/1998 - VT-2 complete, NRI.
-PT complete,, acceptable X---rounded indication.
 
10/01/98-UT complete, NRI.UT-27 0 0 Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT UNIT 3 Page: 24 INSBRVICB ZNSPBCTION
II
'l 4b
 
Date: 12/29/1998                                       TURKEY POINT NUCLBAR PLANT UNIT 3                                     Page:     23 ZNSBRVZCB INSPECTION SUHMARY THIRD INTBRVAL, SECOND PERIOD, SBCOND OUTAGE (98RF)
Class 2 PCBBA STATUS Components SIDUAL HEAT REMOVAL SYSTEM INSIDE CONTAINMBNT N I   0 Zone Number: 3-081                                                                     S  ONGT SBC. XZ                                          T  RSBH Summary Examination.Area               Catgy            Exam                            A  E I0  B Remarks Number Identification                 Item         No Hsthod         Procedure       T   C G H R   ss Calibration Block ++
RRP. DWG. NO. 5613 P 587 S SH. 1 252900 100-SI-2304-2LU                 C       P-1   PT             NDB 3.3 9       C   X - - '- 9/30/1998 - PT complete, NRZ. 10/3/1998 Elbow Long Seam Upstream        C5.12          UT            NDB 5.4-2            X - - - - UT complete, NRI.
                                                                                                      *s UT 27 253000 10'-SZ-2304-2                   C-P-1           PT             NDB 3.3-9       C   X - - - 9/30/1998 - PT complete, NRZ. 10/3/1998 BLBOW TO VALVB HOV-3-744A      C5. 11          UT            NDB 5.4-2            X - - - - UT complete, NRZ.
                                                                                                      ** UI'-39 ss 253100 10'-SI-2304-3                   C-P-1'T'C5.
NDB 3 '-9       C   - X - -,9/30/1998 - PT complete,, acceptable VALVB HOV-3-744A TO PZPB                    11'T              NDB 5.4-1            X - - - rounded indication. 10/01/98 - UT complete, NRI.
UT-27
 
0 0
 
Date: 12/29/1998                               TURKBY POINT NUCLBAR PLANT UNIT 3                                     Page:     24 INSBRVICB ZNSPBCTION  


==SUMMARY==
==SUMMARY==
THIRD ZNTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB (98RF)Claee 2 PCBBA STATUS.Componento.
 
IDUAL HBAT RBHOVAL SVSTSN INSZDB CONTAZNHRNT N'I 0 Zone Number: 3-085 Summary Bxamination Area Number Identification SBC.XI Catgy Bxam Item No Hethod Procedure S ONGT T RSBH A B I 0 B Remarke T C G H R*e Calibration Block ee RBP.DN.NO.5613 P 587 S SH.1 260100 8-SZ-2303-1 RBDUCBR TO PIPE C-P 1 PT C5.11 Ul'DB 3.3-8 NDB 5'-3 C X---9/30/1998-PT complete, NRI.10/1/1998-X--UT complete, geometry.*e UT-41 e*
THIRD ZNTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB (98RF)
0  
Claee 2 PCBBA STATUS. Componento.
'Date: 12/29/1998 H PRBSSURB SAFBTY TURKBY POINT NUCLBAR PLANT UNIT 3 ZNSBRVZCB INSPBCTION
IDUAL HBAT RBHOVAL SVSTSN INSZDB CONTAZNHRNT N'I 0 Zone Number: 3-085                                                             S    ONGT SBC. XI                                T    RSBH Summary Bxamination Area               Catgy   Bxam                           A   B I 0 B Remarke Number  Identification                Item  No Hethod        Procedure        T   C G H R *e Calibration Block ee RBP. DN. NO. 5613 P 587 S SH. 1 260100 8 -SZ-2303-1 RBDUCBR TO PIPE C-P 1 C5. 11 Ul'DB '-3 PT                3.3-8 NDB 5 C   X - - - 9/30/1998 - PT complete, NRI. 10/1/1998
                                                                                      - X - - UT complete, geometry.
                                                                                            *e UT-41 e*
 
0
'Date: 12/29/1998                                 TURKBY POINT NUCLBAR PLANT UNIT 3                                   Page: 25 ZNSBRVZCB INSPBCTION  


==SUMMARY==
==SUMMARY==
THIRD INTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RF)Claee 2 PCBBA~STATUS Componente INFARCTION INSIDB CONTAINMBNT N I 0 Page: 25 Zone Number: 3-096 SummarY Bxamination Area Number Identification ASM B SBC.XZ Catgy Bxam Item No Method Procedure S 0NGT T RSBH A B I 0 B Remarkc T C G M R ee Calibration Block<<e RBF, DWG.NO.5613 P 764 S SH.1 289415 3i-SZ-2304 3 PZPB TO RBDUCZNG BLBOW C-F-1 PT C5.21 UT NDB 3.3-17 NDB 5.4 11 C X---10/03/1998
 
-PT complete, NRZ.X---10/05/1998
THIRD INTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RF)
-UT complete, NRZ.UT-57 289418 2i-SZ-2304 1 RBDUCING BLBOW TO PZPB C-F-1 PT C5.30 NDB 3.3-17 C X---10/03/1998 PT complete, NRZ.289424 2'SZ-2304-3 BLBOW TO PIPB C-F-1 PT C5.30'NDB 3.3-21 C X 10/04/1998 PT complete, NRZ.
Claee 2 PCBBA~STATUS Componente H PRBSSURB  SAFBTY INFARCTION INSIDB CONTAINMBNT N I   0 Zone Number: 3-096                       ASMB                                    S  0NGT SBC. XZ                                T  RSBH SummarY Bxamination Area                 Catgy   Bxam                           A   B I 0 B Remarkc Number  Identification                  Item  No Method          Procedure      T   C G M R ee Calibration Block <<e RBF, DWG. NO. 5613 P 764 S   SH. 1 289415   3i-SZ-2304 3                     C-F-1   PT             NDB 3.3-17     C   X - - - 10/03/1998 - PT complete, NRZ.
i~4l Date: 12/29/1998 N PEEDWATER SYSTEM LOOP A.TURKBY POINT NUCLEAR PLANT UNIT 3 INSBRVICB INSPECTION
PZPB TO RBDUCZNG BLBOW            C5. 21  UT              NDB 5.4 11        X - - - 10/05/1998 - UT complete, NRZ.
UT-57 289418   2i-SZ-2304 1                     C-F-1   PT             NDB 3.3-17     C   X - - - 10/03/1998   PT complete, NRZ.
RBDUCING BLBOW TO PZPB            C5.30 289424   2 'SZ-2304-3                     C-F-1   PT             'NDB 3.3-21     C   X       10/04/1998   PT complete, NRZ.
BLBOW TO  PIPB                    C5.30
 
i
~
4l
 
Date: 12/29/1998                               .TURKBY POINT NUCLEAR PLANT UNIT 3                                     Page:  26 INSBRVICB INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PBRIOD, SECOND OUTAGB: (98RP)Claen 2 PCBEA STATUS Components N I 0 Page: 26 Zona Number: 3-109 Summazy Examination Area Number Identification SBC.XZ Ca'tgy Bxam Item No Method Pzocedure S ONGT T RSBH A B I 0 E Remarks T C G M R*+Calibration Block+*REP.'DWG.NO.5613 P 651 S SH.1 330500 AUGMBNTBD BXAMZNATION FROM NOZZLE RAMP TO 1 DIAMETER ON BLBOW AUG UT NDB 5.16-2 A--X X 10/08/1998
 
-Augmented UT complete, geometry, acceptable incluaion~(previouely dlopoeltioned).
THIRD INTERVAL, SECOND PBRIOD, SECOND OUTAGB: (98RP)
ee UT-20, UT-29  
Claen 2 PCBEA STATUS Components N PEEDWATER SYSTEM LOOP A N I   0 Zona Number: 3-109                                                             S  ONGT SBC. XZ                                  T  RSBH Summazy Examination Area               Ca'tgy   Bxam                           A B  I0  E Remarks Number  Identification                Item   No Method         Pzocedure       T C   G M R *+ Calibration Block +*
~O II 0 Date: 12/29/1998 IN FBBDWATBR SYSTBM LOOP B TURKBY POINT NUCLBAR PLANT UNIT 3 INSBRVICB INSPBCTZON
REP. 'DWG. NO. 5613 P 651 S SH. 1 330500 AUGMBNTBD BXAMZNATION           AUG     UT             NDB 5.16-2     A   - - X X 10/08/1998 - Augmented UT complete, FROM NOZZLE RAMP TO 1 DIAMETER                                                      geometry, acceptable incluaion ON BLBOW                                                                            ~(previouely dlopoeltioned).
ee UT-20, UT-29
 
~O II 0
 
Date:   12/29/1998                               TURKBY POINT NUCLBAR PLANT UNIT 3                                   Page:  27 INSBRVICB INSPBCTZON  


==SUMMARY==
==SUMMARY==
THIRD ZNTBRVAL, SBCOND PBRZOD, SECOND OUTAGB (98RF)Class 2 PCBBA STATUS Components Page: 27 Zone,Numbetu 3-110 Summary Bxamination Area Number Identification ASMB SBC.XI Catgy Bxam Item No Method Procedure N I 0 S ONGT T RSBM A B I 0 B Remarks T C G M R ee Calibration Block ee RBF.DWG.NO.5613 P 652 S SM.1 333800 AUGMBNTBD BXAMINATZON FROM NOZZLB RAMP TO 1 DZAMBTBR ON BLBOW AUG UT NDB 5.16-1 A--X-10/07/1998
 
-Augmented UZ'xam complete, geometry.UT-20, UT-29 0 0 Date: 12/29/1998 ZN PRBDWATBR SYSTEM LOOP C TURKBY POZNT NUCLBAR PLANT UNIT 3 INSBRVZCB INSPBCI'ION
THIRD ZNTBRVAL, SBCOND PBRZOD, SECOND OUTAGB (98RF)
Class 2 PCBBA STATUS Components IN  FBBDWATBR SYSTBM LOOP B N I  0 Zone,Numbetu 3-110                     ASMB                                     S  ONGT SBC. XI                                 T  RSBM Summary  Bxamination Area              Catgy   Bxam                           A B  I0  B Remarks Number  Identification                Item No Method         Procedure       T C   G M R ee Calibration Block ee RBF. DWG. NO. 5613 P 652 S SM. 1 333800   AUGMBNTBD BXAMINATZON           AUG     UT             NDB 5. 16-1     A   - - X - 10/07/1998 - Augmented UZ'xam complete, FROM NOZZLB RAMP TO 1 DZAMBTBR                                                      geometry.
ON BLBOW UT-20, UT-29
 
0 0
 
Date: 12/29/1998                               TURKBY POZNT NUCLBAR PLANT UNIT 3                                   Page:  28 INSBRVZCB INSPBCI'ION  


==SUMMARY==
==SUMMARY==
THIRD INTBRVALy SBCOND PBRIOD>SBCOND OUI'AGB (98RF)Clacs 2 PCBBA STATUS Componento N I 0 Page: 28 Zone Number: 3-111 Summary Bxamination Area Number Identification SBC.XI Catgy'Bxam Item No Method Procedure S 0NGT T RSBH A B I 0 B Remarkc T C G H R ee Calibration Block ee RBF.DWG.NO.5613-P-178 S SH.1 338200 AUGMBNTBD BXAMZNATZON FROM NOZZLB RAMP TO 1 DZAMBTBR ON BLBOW AUG UT NDB S.16-3 A--X X 10/8/1998-Augmented UT complete, geometry, acceptable incluaion (previouely diopooitioned).
 
UT-20~UT-29  
THIRD INTBRVALy SBCOND PBRIOD> SBCOND OUI'AGB (98RF)
~Ci'Cl TURKEY POINT UNIT 3 1998.REFUELING OUTAGE-Summary of'ystem Pressure Testing  
Clacs 2 PCBBA STATUS Componento ZN PRBDWATBR SYSTEM LOOP C N I   0 Zone Number: 3-111                                                               S  0NGT SBC. XI                                  T RSBH Summary Bxamination Area               Catgy   'Bxam                           A B I 0 B Remarkc Number  Identification                Item  No Method          Procedure        T C G H R ee Calibration Block ee RBF. DWG. NO. 5613-P-178 S SH. 1 338200 AUGMBNTBD BXAMZNATZON           AUG     UT             NDB S. 16-3     A   - - X X 10/8/1998 - Augmented UT complete, FROM NOZZLB RAMP TO 1 DZAMBTBR                                                      geometry, acceptable incluaion ON BLBOW                                                                            (previouely diopooitioned).
~O~O 0 Abstract This report details the pressure testing of selected Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3.These inspections were performed prior to and during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October.28, 1998.In addition to the specific pressure tests listed, all Class 1 bolted connections were inspected in accordance with 3-OSP-045.1 and Class 2 bolted connections inside containment were examined utilizing 3-OSP-045.2.
UT-20~ UT-29
Piping and components were selected and tested in accordance with Section XI of the American Society, of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code"Rules for.Inservice Inspection of Nuclear Power Components," 1989 Edition with no addenda with relief as granted by the 10 CFR 50.55a.  
 
~ll, 0 I 0 Procedures The following FPL procedures and documents were utilized to provide instructional guidance for the performance of the required ASME XI pressure testing.OP-1004.1 3-OSP-045.1 3-OS P-045.2 0-AD M-523 Reactor Coolant System-System Leak Test Following RCS Opening.ASME Section Quality Group A Bolting Examination.
~Ci
*ASME Section Quality Group B Bolting Examination.
'Cl
*ASME Section XI Pressure Tests for Quality Group A,B,C, Systems/Components.
 
NDE-4.2 Visual Examination VT-2 Conducted During System Pressure Tests.*Relief Request Code Case N-533 Authorization for Turkey Point Units 3 and 4.(TAC NOS.M98149 and M98150) 0 0 SYSTEM  
TURKEY POINT UNIT 3 1998 .REFUELING OUTAGE-Summary of'ystem Pressure Testing
 
~O
~O 0
 
Abstract This report details the pressure testing of selected Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3. These inspections were performed prior to and during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October.28, 1998. In addition to the specific pressure tests listed, all Class 1 bolted connections were inspected in accordance with 3-OSP-045.1 and Class 2 bolted connections inside containment were examined utilizing 3-OSP-045.2.
Piping and components were selected and tested in accordance with Section XI of the American Society, of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for. Inservice Inspection of Nuclear Power Components," 1989 Edition with no addenda with relief as granted by the 10 CFR 50.55a.
 
  ~ll, 0
I 0
 
Procedures The following FPL procedures and documents were utilized to provide instructional guidance for the performance of the required ASME XI pressure testing.
OP-1004.1             Reactor Coolant System-System Leak Test Following RCS Opening.
3-OSP-045.1          ASME Section Quality Group A Bolting Examination.
* 3-OS P-045.2          ASME Section Quality Group B Bolting Examination.
* 0-ADM-523            ASME Section XI Pressure Tests for Quality Group A,B,C, Systems/Components.
NDE-4.2             Visual Examination VT-2 Conducted During System Pressure Tests.
* Relief Request Code Case N-533 Authorization for Turkey Point Units 3 and 4. (TAC NOS.
M98149 and M98150)
 
0 0
 
SYSTEM  


==SUMMARY==
==SUMMARY==
: 'UNIT-3 The following safety related Class 1, 2, and 3,systems, or sections thereof were pressure tested in accordance with ASME Section XI.Name of System Service Air Intake Cooling Water Primary Water Make-up Component Cooling Water Reactor Coolant Chemical and Volume Control Residual Heat Removal Safety Injection Safety Injection Accumulator System Main'Steam Feedwater Auxilliary, Feedwater System Number 13 19.20 30 41 47 50 62 64 72 74 75  
: 'UNIT-3 The following safety related Class 1, 2, and 3,systems, or sections thereof were pressure tested in accordance with ASME Section XI.
~li Nl 0  
Name of System                                               System Number Service Air                                                         13 Intake Cooling Water                                                 19 Primary Water Make-up                                               .20 Component Cooling Water                                               30 Reactor Coolant                                                       41 Chemical and Volume Control                                           47 Residual Heat Removal                                                 50 Safety Injection                                                     62 Safety Injection Accumulator System                                   64 Main'Steam                                                           72 Feedwater                                                             74 Auxilliary, Feedwater                                                 75
~A'cron ms ADM:-ASME: CSS: CCW CVCS: ECC: FW: ICW: NDE: PWO: Administrative American Society of Mechanical Engineers Containment Spray System Component Cooling Water Chemical and Volume Control System Emergency Containment Cooler Fee dwater Heat Exchanger Intake Cooling Water Non Destructive.
 
Examination Plant Work Order PZR: Pressurizer RCP: RO: RV: SFPC: SG'PCW: VCT: WO'eactor Coolant Pump Residual heat Removal Restricting Orifice Relief Valve Reactor Spent Fuel Pool Cooling Steam Generator Turbine:Plant Cooling Water Volume Control Tank Work Order 0 0 0 Test Paeka e Develo ment The specific pressure test boundaries were selected after review of the applicable plant operating diagram/code boundary drawings.The piping systems were broken down into sub-systems.
~li Nl 0
The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves.These sub-systems were then assigned a test package:number, which could be tested in the entirety, or based on availability, could be broken down further into numerous tests within the specific sub-system.
 
The pressure test package numbers contain six segments of information, Sample: 03-CCW-30110-H-01 A A A A A A 1 2 3 4 5 6 1.Unit number (00)common to units 3 and'4.(03)Unit specific.(04)Unit specific.2.System abbreviation.
~A'cron ms ADM:     Administrative ASME:     American Society   of Mechanical Engineers CSS:      Containment Spray System CCW        Component Cooling Water CVCS:      Chemical and Volume Control System ECC:      Emergency Containment Cooler FW:        Fee dwater Heat Exchanger ICW:      Intake Cooling Water NDE:      Non Destructive. Examination PWO:      Plant Work Order PZR:       Pressurizer RCP:               Coolant Pump Residual heat Removal RO:        Restricting Orifice WO'eactor RV:        Relief Valve Reactor SFPC:      Spent Fuel Pool Cooling Steam Generator SG'PCW:
3.System number[First (2)digits].4.Sub-system number[(2)or (3)digits].5.Type of test (H)hydrostatic, (P)pneumatic, (L)leakage, (F)functional, (I)inservice, (S)static head (I)system inservice, (L)system leakage.6.Number of test performed within the specific sub system.
Turbine:Plant Cooling Water VCT:      Volume Control Tank Work Order
0 41 SERVICE AIR SYSTEM 13 03-IA-1301-L-01
 
-, Test date 10/17/9S This test was performed due to the replacement of check valve 3-40-205 under WO 97006713 01.Code case N-416-1 was invoked for this replacement activity.No leakage was noted during the test.  
0 0
~O II INTAKE COOLING WATER SYSTEM 19 03-ICW-1950-L-02
0
-Test date 05/25/97 This test was performed due to the replacement of 3-50-377 under WO 96022773 01.No leakage was noted during the leakage test.03-ICW-1995-L-01
 
-Test date 11/07/97 This test was performed due to the abandonment of 3-50-360 and the addition of 3-50-382 under WO 995017287 01 and PC/M 97-002.No leakage was noted during the test.03-ICW-1965-L-03
Test Paeka     e Develo ment The specific pressure test boundaries were selected after review of the applicable plant operating diagram/code boundary drawings. The piping systems were broken down into sub-systems. The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves. These sub-systems were then assigned a test package:number, which could be tested in the entirety, or based on availability, could be broken down further into numerous tests within the specific sub-system.
-Test date 11/07/97 This test was performed due to the replacement of 3-50-354 under WO 97003235 01.No leakage was noted during the test.03-ICW-1903-L-02
The pressure test package numbers contain six segments         of information, Sample:                         03-CCW-30110-H-01 A A       A A     A A 1 2     3 4   5 6
-Test date 12/07/97 This test was performed due to the replacement 3-50-367 under WO 97018298 01.No leakage was noted during the test.03-ICW-1998-I-01
: 1.     Unit number (00) common to units       3 and'4. (03) Unit specific. (04) Unit specific.
-Test date 10/13/98 This test was performed due to the replacement of 3-50-331 and associated expansion joint under WO 98019911 01.No leakage was noted during the test.03-ICW-1997-I-01
: 2.     System abbreviation.
-Test date 10/19/98 This test was performed due to the replacement of the 3A intake cooling water pump under WO 97022434 01, discharge check valve 3-50-311 under WO 97005184 01, and associated expansion joint per under WO 97005183.No leakage was noted during the test.
: 3.     System number [First (2) digits].
0 i PRIMARY MAKEUP WATER SYSTEM 20 03-PWMU-2006-F-01
: 4.     Sub-system number [(2) or (3) digits].
-Test date 10/17/98 This test was performed due to the addition of a reducing tee to allow installation of a new thermal relief valve.This work was performed under WO 98014670 01 and PCM 97-003.No leakage was noted during the test.
: 5.     Type of test (H) hydrostatic, (P) pneumatic, (L) leakage, (F) functional, (I) inservice, (S) static head (I) system inservice, (L) system leakage.
0 Cl COMPONENT COOLING WATER SYSTEM 30 03-CCW-30308-H-01
: 6.     Number   of test performed within the specific   sub system.
-Test date 01/23/98 This test was performed due to the addition of the CCW head tank per PC/M 96-092 and WO 97001397 01.No leakage was noted during the hydrostatic test.03-CCW-30229-L-01
 
-Test date 05/23/97 This test was performed due to the repair of the access cut into the shell side of CCW HX"A" per condition report 97-0070 and WO 97002428 01.No leakage was noted during the inservice test.03-CCW-30202-I-02
0 41
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
 
No leakage was noted during the test 03-CCW-30203-I-03
SERVICE AIR SYSTEM         13 03-IA-1301-L-01 -, Test date 10/17/9S This test was performed due to the replacement of check valve 3-40-205 under WO 97006713 01. Code case N-416-1 was invoked for this replacement activity. No leakage was noted during the test.
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
 
No leakage was noted during the test.03-CCW-30204-1-02
~O II
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
 
No leakage was noted during the test.03-CCW-30207-I-03
INTAKECOOLING WATER SYSTEM                 19 03-ICW-1950-L Test date 05/25/97 This test was performed due to the replacement of 3-50-377 under WO 96022773 01.
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
No leakage was noted during the leakage test.
No leakage was noted during the test.03-CCW-30208-I-03
03-ICW-1995-L Test date 11/07/97 This test was performed due to the abandonment of 3-50-360 and the addition of 3 382 under WO 995017287 01 and PC/M 97-002. No leakage was noted during the test.
.-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
03-ICW-1965-L Test date 11/07/97 This test was performed due to the replacement of 3-50-354 under WO 97003235 01.
No leakage was noted during the test.03-CCW-30209-I-03
No leakage was noted during the test.
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
03-ICW-1903-L Test date 12/07/97 This test was performed due to the replacement 3-50-367 under WO 97018298 01.
No leakage was noted during the test.
No leakage was noted during the test.
0 0 COMPONENT COOLING WATER SYSTEM 30 CONTINUED 03-CCW-30309-L-01
03-ICW-1998-I Test date 10/13/98 This test was performed due to the replacement of 3-50-331 and associated expansion joint under WO 98019911 01. No leakage was noted during the test.
-Test date 10/19/98 This test was performed due to the addition of the CCW Head Tank~per PC/M 96-092'nd WO 98010744-01.
03-ICW-1997-I Test date 10/19/98 This test was performed due to the replacement of the 3A intake cooling water pump under WO 97022434 01, discharge check valve 3-50-311 under WO 97005184 01, and associated expansion joint per under WO 97005183. No leakage was noted during the test.
Code case N416-1 was invoked for this modification for the two tie in welds at the CCW Surge Tank and at RV-3-707.No leakage was noted during this test.03-CCW-30311-I-02
 
-Test date 10/19/98 This test was performed due to the replacement of RV-3-707 per PC/M 96-092 and WO 98010744-01.
0 i
No leakage was noted during this test.03-CCW-30314-L-01
 
-Test date 10/24/98 This test was performed due to the installation of the CCW Head Tank per PC/M 96-092 and WO 97001397 01.This test was applicable to the.tie in welds at PCV-3-832 and the existing piping.Code case N-416-1 was invoked for this modification.
PRIMARY MAKEUP WATER SYSTEM 20 03-PWMU-2006-F Test date 10/17/98 This test was performed due to the addition of a reducing tee to allow installation of a new thermal relief valve. This work was performed under WO 98014670 01 and PCM 97-003. No leakage was noted during the test.
No leakage was noted during the test.10  
 
~lk.~O REACTOR COOLANT SYSTEM 41 03-RCS-4101-L-04
0 Cl
-Test date 10/27/98 This test was performed due to the replacement of the bonnet of LCV-3-460 per PWO WO 98020991 01.No leakage was noted during this test.03-RCS-4101-L-03
 
-Test date 10/26/98 This test involved the leakage test of Reactor Coolant System piping inside containment following the Unit-3 Refueling Outage.This leakage test addressed the following replacements:
COMPONENT COOLING WATER SYSTEM 30 03-CCW-30308-H Test date 01/23/98 This test was performed due to the addition of the CCW head tank per PC/M 96-092 and WO 97001397 01. No leakage was noted during the hydrostatic test.
Component Worl<Order Remarks RV-3-551A RV-3'-551B RV-3-551 C 970211'14 01 98001032 01 98001039 01 Valve Replacement Valve Replacement Valve Replacement The following leakage was identified at bolted connections during the leakage test and documented on a Condition Report: Component 3A RCP Flange LCV-3-460 Leakage Seal Housing Body to Bonnet CR Number CR 98-1651 CR 98-1652 11  
03-CCW-30229-L Test date 05/23/97 This test was performed due to the repair of the access cut into the shell side of CCW HX "A"per condition report 97-0070 and WO 97002428 01. No leakage was noted during the inservice test.
~O CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING AND LETDOWN SYSTEM 47 03-CVCS-4750-I-01
03-CCW-30202-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test 03-CCW-30203-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
03-CCW-30204-1 Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.
No thru wall leakage was observed.03-CVCS-4751-I-03
03-CCW-30207-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements.
03-CCW-30208-I-03      .- Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.
No leakage was noted during the test.03-CVCS-4752-I-03
03-CCW-30209-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.
-Test date 09/21/98 This test was performed,to meet the 1989 Edition of ASME Section Xl periodic pressure test requirements.
 
No leakage was noted during this test;03-CVCS-4762-L-01
0 0
-Test date 10/25/98 This test was performed due to the replacement of 3-293C per WO 97011724 01 and 3-293D per WO 97011725 Ol.No leakage was noted during this test.12  
 
~~
COMPONENT COOLING WATER SYSTEM 30                        CONTINUED 03-CCW-30309-L Test date 10/19/98 This test was performed due to the addition of the CCW Head Tank~per PC/M   96-092'nd WO 98010744-01. Code case N416-1 was invoked for this modification for the two tie in welds at the CCW Surge Tank and at RV-3-707. No leakage was noted during this test.
RESIDUAL HEAT REMOVAL SYSTEM 50 03-RHR-5014-F-02
03-CCW-30311-I Test date 10/19/98 This test was performed due to the replacement of RV-3-707 per PC/M 96-092 and WO 98010744-01. No leakage was noted during this test.
-TEST Date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI perodic pressure test requirements.
03-CCW-30314-L Test date 10/24/98 This test was performed due to the installation of the CCW Head Tank per PC/M 96-092 and WO 97001397 01. This test was applicable to the.tie in welds at PCV-3-832 and the existing piping. Code case N-416-1 was invoked for this modification. No leakage was noted during the test.
No leakage was noted during the inservice leak test.03-RHR-5017-'F-02
10
-Test date 10/11/98 This test was performed to meet the 1989 Edition of ASME Section XI perodic pressure Test requirements.
 
No leakage was noted during the inservice'leak test.13 0 0 SAFTEY IN JECTION ACCUMULATOR SYSTEM 64 03-SIA-6402-F-04
~lk.
-Test date 09/21/98 This test was performed to meet the ASME Section XI 1989 Edition periodic pressure test requirements.
~O
No through wall leakage was noted during the leakage test.14
 
REACTOR COOLANT SYSTEM 41 03-RCS-4101-L Test date 10/27/98 This test was performed due to the replacement of the bonnet of LCV-3-460 per PWO WO 98020991 01. No leakage was noted during this test.
03-RCS-4101-L Test date 10/26/98 This test involved the leakage test of Reactor Coolant System piping inside containment following the Unit-3 Refueling Outage. This leakage test addressed the following replacements:
Component                   Worl< Order                     Remarks RV-3-551A                   970211'14 01            Valve Replacement RV-3'-551B                   98001032 01            Valve Replacement RV-3-551 C                   98001039 01             Valve Replacement The following leakage was identified at bolted connections during the leakage test and documented on a Condition Report:
Component                     Leakage                      CR Number 3A RCP Flange                 Seal Housing                  CR 98-1651 LCV-3-460                     Body to Bonnet               CR 98-1652 11
 
~O CHEMICALAND VOLUME CONTROL SYSTEM CHARGING AND LETDOWN SYSTEM 47 03-CVCS-4750-I-01     - Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No thru wall leakage was observed.
03-CVCS-4751-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.
03-CVCS-4752-I Test date 09/21/98 This test was performed,to meet the 1989 Edition of ASME Section Xl periodic pressure test requirements. No leakage was noted during this test; 03-CVCS-4762-L-01       - Test date 10/25/98 This test was performed due to the replacement of 3-293C per WO 97011724 01 and 3-293D per WO 97011725 Ol. No leakage was noted during this test.
12
 
~
  ~
 
RESIDUAL HEAT REMOVALSYSTEM 50 03-RHR-5014-F TEST Date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI perodic pressure test requirements. No leakage was noted during the inservice leak test.
03-RHR-5017-'F Test date 10/11/98 This test was performed to meet the 1989 Edition of ASME Section XI perodic pressure Test requirements. No leakage was noted during the inservice'leak test.
13
 
0 0
 
SAFTEY INJECTION ACCUMULATORSYSTEM 64 03-SIA-6402-F Test date 09/21/98 This test was performed to meet the ASME Section XI 1989 Edition periodic pressure test requirements. No through wall leakage was noted during the leakage test.
14
 
MAINSTEAM SYSTEM 72 03-MS-7214-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements. No leakage was noted during this test.
03-MS-7215-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements. No leakage was noted during this test.
03-MS-7216-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements. No through wall leakage was noted during the test.
15
 
41 FEEDWATER SYSTEM 74 03-FW-7428-F Test date 10/25/98 This test was performed due to the replacement of the stuffing box on the south end valve CV-3-2900 per WO 97023322 01. No leakage was noted during this test.
16
 
iO t
  ~O 0
 
AVXILIARYFEED%ATE<R SYSTEM 75 03-AFW-7557-L Test date 02/18/98 This test was performed due to the replacement of a section of piping adjacent to valve AFSS-016 under WO 98003759 01 and piping adjacent to valve AFSS-015 under WO 98003757 02. Code Case N-416-1 was invoked for this replacement activity. No leakage was noted during the leakage test.
17


MAIN STEAM SYSTEM 72 03-MS-7214-I-03
4k I,
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements.
i Cl}}
No leakage was noted during this test.03-MS-7215-I-03
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements.
No leakage was noted during this test.03-MS-7216-I-03
-Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements.
No through wall leakage was noted during the test.15 41 FEEDWATER SYSTEM 74 03-FW-7428-F-03
-Test date 10/25/98 This test was performed due to the replacement of the stuffing box on the south end valve CV-3-2900 per WO 97023322 01.No leakage was noted during this test.16 iO t~O 0 AVXILIARY FEED%ATE<R SYSTEM 75 03-AFW-7557-L-01
-Test date 02/18/98 This test was performed due to the replacement of a section of piping adjacent to valve AFSS-016 under WO 98003759 01 and piping adjacent to valve AFSS-015 under WO 98003757 02.Code Case N-416-1 was invoked for this replacement activity.No leakage was noted during the leakage test.17 I, 4k i Cl}}

Latest revision as of 21:06, 3 February 2020

Refueling Outage ISI Rept.
ML17355A220
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/20/1999
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17355A219 List:
References
NUDOCS 9902120290
Download: ML17355A220 (272)


Text

{{#Wiki_filter:TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-1 Owners'ata Report for Inservice Inspections 9902i20290 990i20 PDR ADOCK 05000250 8 PDR

li 0

TURKEY POINT PLANT UNIT 3 1998 REFUELING OUTAGE INSERVICE INSPECTION REPORT This Inservice Inspection report is for the 1998 Turkey Point Unit 3 refueling outage. This was the second outage of the second period in the third ten-year interval. The attached Inservice Inspection summary tables detail the Inservice examinations performed during the outage. The attached NIS-2 forms list the repairs and replacement activities which have taken place since the previous Unit 3 submittal, as well as those performed during the 1998 refueling outage. The Examinations performed included: t Primary nozzle inner radius UT examinations were performed on the "C" Steam Generator. Augmented Feedwater Ultrasonic examinations were performed on the A, B and C Steam Generator FW nozzles, adjacent piping, and fittings. Accessible Reactor Vessel internal surfaces were visually examined along, with the Reactor Vessel flange surface. Also examined were selected components from the Reactor Coolant, Residual Heat Removal, Safety Injection, Waste Disposal, and Chemical and Volume Control systems. 100-. of the A, B, and C Steam Generator tubes were Eddy Current tested. Visual examination and functional testing, of snubbers was performed in accordance with ASM'ection XI, as modified by Relief Request No. 4, and Plant Technical Specifications. System Pressure testing was performed'n Quality, Group A, B, and C piping and components. The examinations performed exceed the minimum requirements for ISI examinations for this period.

Ii FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 7

1. Owner: Florida Power and Light Company 700 Universe Blvd.

Juno Beach, Florida 33408

2. Plant: Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street
                   .Florida City, Florida 33035
3. Plant Vnit:~

4 ~ Owner Certificate of Authorization (if required) ~

5. Commercial Service Date
6. National Board Number for Vnit:

7 Components Inspected: Manufacturer State or Nat'l Component or Manufacturer or Installer Province Board A urtenance or Installer Serial No. No. No. Reactor Pressure Babcock and 610-0116 j N/A N-160 Vessel Wilcox 3PSRV1 Steam Generator C Westinghouse 16A-5885-3 FSGT-3003

                                                         '/A           N-776 3E210C Reactor Coolant    Pump  Westinghouse   3P200C          N/A         N/A
  'C Regenerative Heat       .Westinghouse   3E200           N/A         N/A Exchan   er Reactor Coolant          Bechtel        N/A             N/A         N/A S  stem Safety Injection         Bechtel        N/A             N/A         N/A S  stem Chemical and Volume Bechtel             N/A             N/A         N/A Control S stem RHR S stem               Bechtel        N/A             N/A        :N/A'/A Main Feedwater          'Bechtel        N/A             N/A S stem o

Il 0

NIS-1 Report (continued) Page 2 of 7 Owner: Florida Power 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408

2. Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035
3. Plant Unit:~

4, Owner Certificate of Authorization (if required)

5. Comnercial Service Date :
6. National Board Nwher for Unit:
8. Examination Dates  : From to
9. Inspection Period Identification  : Second Period
10. Inspection Interval Identification: Third Interval, from
11. Applicable Edition of Section XI ~39 Addenda~a~
12. Date/Revision of Inspection .Plan:
13. Abstract of examinations and tests.

Inservice Examinations of selected Class 1 and 2 components and piping systems of Florida Power and Light's (FPL) Turkey Point Unit 3 were performed during the 1998 Refueling Outage. This outage was the second outage of the second period in the third ten year interval. The 1998 outage began on September 21, 1998 and ended on October 28, 1998. The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the American Society of Mechanical Engineers (ASME) Section XI, 1989 Edition. Manual Ultrasonic, Visual, and Liquid Penetrant non-destructive methods were utilized to examine components, piping, and their supports. The examinations were performed in accordance with FPL NDE procedures, and supported by examiners supplied by Raytheon Engineers 2 Constructors. See the attached lnservice Inspection Summary for details of the examination scope and examination results. Eddy Current examinations on Steam Generators A, B, and C were conducted by ABB personnel from October 5, 1998 through October"B" 8, 1998. A total of 9560 tubes were examined. One tube in the Steam Generator,was preventively plugged during this outage due to mechanical wear at the adjacent anti-vibration bar. See the attached NIS-BB Report for examination scope and results.

~lb Ik

e 2. 3. Owner: NIS-1 Report (continued) Page 3 Florida Power 8 Light Company, 700 Universe:Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit:~ of 7

4. Owner Certificate of Authorization (H required)
5. Conmercial Service Date :
6. National Board Number for Unit:

Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.. Visual examination and functional testing services were supplied by Inc. One non-safety related snubber failed a hand 'asic-PSA, strok'e during a visual examination, and also failed a subsequent functional test before being replaced. There were no snubber failures in the safety related visual, or functional test sample.. See the attached Snubber Examination Report for examination scope and results. System Pressure testing was conducted by Turkey Point plant personnel and supported by Raytheon Visual examiners to ASME Section XI and applicable plant procedures. See the attached System Pressure Test Report for test boundaries and results. Approximately two-thirds of the scheduled examinations for the second period have been performed. The remainder of the second period examinations are scheduled for the next refueling outage. This meets or exceeds the requirements of Program B of ASME Section XI and applicable relief requests.

14. ,Abstract of Results of Examinations and Tests.

C1a:~ A -RPV B-N-1 Vessel Interior Visual examination was performed. There were no reportable indications noted. An Ultrasonic examination was performed on the "C" Steam Generator inlet and outlet nozzle inside radius sections."Also examined were the support structure, including the S/G integral attachments by VT-3, and the manway bolting by VT-1 method. There were no reportable indications noted. Eddy Current examinations were .performed on the tubing of the three Steam Generators. One tube in "B" Steam Generator was preventively plugged during this outage due to mechanical wear at the anti-vibration bar. The results of the examinations are detailed in the attached NIS-BB report.

0 0

, 2. 3. 4~ Owner: NIS-1 Report (continued) Page 4 Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S'N 344 Street, Florida City, Florida 33035 Plant Unit:~ Owner Certificate of Authorization (if required> of 7

5. Comnercial Service Date :
6. National Board Number for Unit:

An integral attachment on "C" RCP was examined with surface and visual methods. Rejectable linear indications,"C"were recorded during the PT exam on the. 3-RCP-C-L2-IA RCP integral attachment (See section 15, "Abstract of Corrective Measures" ). There were no further reportable indications noted. A VT-3 visual examination was performed near the .beginning of the outage to examine the Regenerative HX for boric acid crystal accumulation and evidence of leakage. A VT-2 visual,,examination was performed during the system leakage test prior to startup to examine for evidence of leakage. There were no reportable indications noted. Reactor Coolant piping welds and one support were examined using surface, volumetric.'c, and visual, techniques. There were no reportable indications noted.. Waste Disposal piping welds were examined using surface methods. There were no reportable indications noted.. Safety Injection piping welds and supports were examined with volumetric, surface and visual methods. There were no reportable indications noted.

0 II 4I

, 2. 3. 4. Owner: NIS-1 Report (continued) Page 5 Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear'Power Plant, 9760 SW 344 Street,, Florida City, Florida 33035 Plant Unit:~ Owner Certificate of Authorization (if required) of 7

5. Comnercial Service Date :
6. National Board Number for Unit:

Residual Heat Removal piping welds and supports were examined using surface, volumetric and visual methods. A loose clamp bolt was recorded during the VT-3 exam of a support. In addition, arc strikes were found outside of the exam area during a piping PT exam (See section 15, "Abstract of Corrective Measures" ) . There were no further reportable indications noted. Chemical and Volume Control piping welds were examined using surface techniques. Piping supports, components and pressure retaining bolting were examined visually. Two of the supports examined had rejectable conditions, and one of those resulted in a sample expansion (See section 15, "Abstract of Corrective Measures" ). Boric acid was observed during a visual exam of pressure retaining flange bolting (See section 15, "Abstract of Corrective Measures" ). There were no further reportable indications noted. Augmented ultrasonic examinations were performed .on areas from the nozzle ramp out to a point one pipe diameter on the upstream elbow on all three Feedwater lines inside containment. Previously recorded acceptable slag inclusions were noted during the exams. There were no reportable indications noted.

0 4l

NIS-1 Report (continued) Page 6 of 7 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 3340B

2. Plant: Turkey Point Nuclear Power Plant, 9760 SW 344St rect, Florida City, Florida 33035
3. Plant Unit:~
4. Owner Certificate of Authoritation (if required)

Cormercial Service Date  :

6. National'Board Number for Unit:

15 . Abstract of Corrective Measures Boric acid accumulation was found at the flange gasket during a VT-1 examination of CVCS flange bolting. The flange gasket and bolting were replaced per Condition Report I 98-1406. Rejectable linear indications were found during a PT exam on the "C" RCP integral attachment. The indications were characterized as manufacturing flaws. The indications were then removed. and re-examined by PT per Condition Report I 98-1517. A bent rod was discovered during a VT-3 examination of a CVCS pipe support and was replaced per Condition Report I 98-1358. A sheared U-bolt was discovered during a VT-3 examination of a CVCS restraint and was replaced'ith a restraint of a different design per Condition Report I 98-1357. A sample expansion of seven additional supports was performed as part of the corrective actions within Condition Report I 98-1357 and in accordance with ASME Sect. XI, Para. IWF-2430. No further reportable conditions resulted from the examinations of the expansion selections. Two arc strikes were discovered outside of the examination area during the PT exam of a RHR piping weld. The,arc strikes were removed and re-examined per Condition Report g98-1437. A loose clamp bolt was found during a VT-3 examination, of a RHR system spring hanger. The clamp bolting of the spring hanger was replaced per Condition Report I 98-1405. One tube in "B" Steam Generator was preventively plugged during this outage due to mechanical wear at the adjacent anti-vibration bar. One non-safety related snubber failed a hand stroke during a visual examination, and also failed a subsequent functional test before being replaced. There were no snubber failures in the safety related visual, or functional test sample. Indications which exceeded the acceptance criteria were evaluated by FPL Engineering to determine acceptability for continued service. There were no conditions that were determined to be unacceptable for continued service, however as good practice, FPL chose to correct all indications that exceeded the Code acceptance criteria.

41 0 0

NIS-1 Report, (continued) Page 7 of 7 Owner: Florida'Power 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408

2. Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035
3. Plant Unct:~
4. Owner Certificate of Authorization (if required)
5. Comnercial Service Date :
6. National Board Number for Unit:

We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASHE Code, Section XI, and c) corrective measures taken conform to the rules of the ASHE Code, Section XI. Certificate of Authorization No. Expiration Date A/A Date: Signed: By C~WW CERTIFICATE 'OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors, and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 9/21/98 to 10/28/98, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI. By signing this certificate, neither the inspector nor his employer makes any warranty,, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. 8'ZSa 8 ) nspector's 'S'ature National Board, State, Province, and Endorsements Date:

0 TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements

lpga il

Abstract The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3. These repairs or replacements were performed prior to and during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October 28, 1998 Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for Inservice Inspection of Nuclear Power Components," 1989 Edition with no addenda.

Report No. Date 97-032-3 ,07/29/97 97-033'-3 11/12/97 97-034-3 11/19/97 97-035;3 11/i9/97 97-036-3 11/19/97 97-037-3 Number not used 97-038-3'7-039-3 ii/19/97 12/08/97 98-001-3 02/02/98 98-002-3 02/23/98 98-003-3 02/23/98 98-004-3 02/23/98 98-005-3 02/27/98 98-006-3 02/23/98 98-007-3 04/20/98 98-008-3 08/25/98 98-009-3 10/06/98 98-010-3 10/10/98 98-011-3 10/23/98 98'-012-3 10/20/98 98-013-3 10/13/98 98-014-3 10/20/98 98-015-3 10/29/98 98-016-3 10/20/98 98-017-3 10'/20/98 '8-018-3 10/18/98 98-01'9-3 11/05/98 98-020-3 10/20/98 98-021-3 10/20/98 98-022-3 10/22/98

0 Report No. ~ Date 98-023-3 10/30/98 98-024-3 10/20/98 98-025-3 10/24/98 98-026-3 10/22/98 98-027'-3 10/22/98 98-028-3 11/17/98 98-029-3 10/21/98 98-030-3 10/22/98 98-031-3 10/29/98 98-032-3 3.0/24/98 98-033-3 10/29/98 98-034-3 ~ 10/29/98 98-035-3 10/29/98 98-036-3 10/29/98 98-037-3 10/29/98 98-038-3 11/02/98 98-039-,3 10/29/98 98-040-3 10/29/98 98-041-3 10/29/98 98-042-3 10/29/98 98-043-3 10/30/98 98-044-3 11/17/98

iCI 0 f 4l J

FORK NIS-2 OMIERS REPORT FOR REPAIRS OR REPLACEMENTS As 'Required by the Provisi'ons of the ASKE Code Section XI

1. Owner Florida Power 8 Li ht Date 07 29 97 700 Universe Blvd. Jwm Beach Fl. 33COB Sheet of 2 Address
2. 'Plant Turke Point Plant Unit PNO ¹:63/8811 QO ¹: 96022774 9760 SM 34C Street Florida Cit Fl. 33035 Address Repair'Organization P.O. No.,Job Ko.,etc
3. Nork Performed by Florida Power 8Li ht Type Code Symbol Stamp N A Name Authorization Ko. N A Expiration Date N A P.O. Box C332 Princeton Fl. 33032 Address.
4. Identification of System: COMPONENT COOLING llATER System ¹: 30 Quality Group: C 5~ (a) Applicable Construction Code B31.1 1955 Edition, 'NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Conyonents Repaired or Replaced, and Replacement Conponents Name of Name of IManufacturerI Kational I Other IYear I Repaired I ASKE I
          ~

Component Nanufacturer I. Serial Mo. Board Ident I f i cat i on IguiltI Replaced or I Code I I Replacement ISteny I I I /~Yes Se IHEAVY HEX NUTS 320 3 4" IN/A IN/A IN/A IUTC¹ 409358 IUMK I Replacement I No I IHEAVY HEX HUTS IM/A IN/A IN/A IUTC¹'409356 IUHK IReplacement IMo I 100 1-1 8 ITHREADED ROO 3/4" ,IN/A IN/A 'IM/A 'IUTC¹ 409357 IUNK IReplaccttlcAt IMo I160 STUDS FABRICATEO IBOLTP SOUARE HEAD IM/A ,IK/A IUTC¹ 406543 IUMK IReplacement INo I 20 1 1 8N ITHREADED RCO 1-1/8" IN/A IN/A IN/A IUTC¹ 409288 . IUNK IReplacement INo I20 STUDS FABRICATED 7..Description of Nork: REPLACED BOLTIMG ON COMPONENT COOLING MATER HEAT EXCHANGER PTC4. 3E207C

8. Tests Conducted: Hydrostatic: Pnaznet ic: Kcminal Operating Pressure pressure~s s ts Test Tsessersture u e ~

F 97-032-3

Sheet 2 of 2 FORK NIS-2 (Baclk)

9. Remarks: KECHANICAL CONNECTION NO QELOING REOUIRED CFRT IF,I CATE OF COKPLIANCE lie certify that the statceents made in the report are cokrec't aM this replacement conforms to <<he rules of the ASKE Code, Section XI.

Type Code Syahoi Steep I Certificate Authoripat'ion Noi ~ ~NA Expiration Date Signed Owner c/I/ D or IhsM/r's Oesignee,

                                                 $  Q~~jj~Q~,

Title Date @Q', 19 I CERTIFICATE OF INSERVICE INSPECTION I I, the undersignLM, holding a valid ccxanission issued by the National Board of Boiler and Presaura Veasel inspectors and the state or Province of Dade County and eeployed by Arkwright Kutual Insurance Company of Norwood, Ka. have inspected the components described in this Owners R'eport during the period ~ Q/15~/97~ tb 07/28/97 and state that to the; best of my 4mwledge and belief, the Owner has perform< examilnations and taken corrective measures describexl in this owners Report in a'ccor'dance with the requirements of lhe hsKL code, Section XI ~ I By signing this certificate neither the Inspector nor his e'mpioyer makes any warranty, expr'essk ok implied, concerning the examinations and corrective measures described in this Owner,'s Report.'ur'the'rmor'e, neither the Inspector nor his eayloyer shall be liable 'in c'>ny imanrmr for any personal InJury o'r pr'ope'rty

      .damage or a loss of any kird arising from or connected with th'is inspection.

Comni ssi ons,, NB 823~0~NI~ Ins ctors igna'ture Natiorel Board, State, Providerx:e, and E+5orsements Oa 19 97-032-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPL'ACEMENTS As Required. by.~&revisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 11 12 97 700 Universe Blvd. Juno Beach Fl'. '33408 Address Sheet '1 of 2
2. Plant Turke Point Plant Unit 3 PWO ¹:63/1924 lJO ¹: 97003235 9760 Su'3C4 Street Florida Cit Fl'. 33035 Address Repair Organization P;O. Ho.,Job Ho.,etc
3. Uork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization No.

s Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: Intake Coolin Hater S stem System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code 831.1 '955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition'of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer( National Other (Year ( Repaired / ASME Component ,Manufacturer J Serial No. Board Identification ]guilt/ Replaced or /'ode /

I / Replacement (Stamp / I I /~res se )GATE VALVE IJEHKINS IN/A ,IH/A I3-50-354 (1991 ]Replaced (Ho e I IGATE VALVE iJEHKINS [N/A IH/A $

                                                                                      .I3-50-354                         (1997 )Replacement      [No
7. Description of Uork: REPLACE VALVE 3-50-35C - DRAIN VALVE TO CCU HX "C" INLET IIATER BOX 03-ICU-1965-L-03
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Other VT-2 Pressure~5 ig Test Teaperature 78 oF 97-033-3

Sheet 2 of 2 l!i IFORHI NIS 2 (Back)

9. Remarks: HECNANICAL CONNECTION NO IVELDING PER,FORHED.

CERT I IF I CATE OF GDHPLIANCE Me certify that thc statements made in the report are correct and this replacement conforms to the rul,es bf the Code, Section XI. 'SHE Type Code Symbol Stamp Cert ificate o Authorizatibn No. ~NA Expiration Date A Signed Owner or Own&I's D~esi!ynce, TitLe l)ate 4~/' I I 1p P'7 CERTIFICATE OF Ih!SERVICE INSPECTIOl'I I, the undersigned, holding a valid comnisslon issued Iby the Ii!ational Board of Boiier and Pressure Vessel inspectors and the state or province of Dad'e County.and ovytoyed by Arkwright Hutuat !insurance Ckxnpany bf Norwood, Ha. have InsFected the components described in this Owners Report durilng the period D2/C4/97 to 11/12/97 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures descril~ in this Owners Report in accordance with the requirements of the ASHE Code Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or inpiied, concerning the e,i<aminations and corrective measures described in this Owner's Report. Furtheraere, neither the Inspector nor his ecpioyer shall be liable-in~ any manner for any personat injury or property damage or a loss of any kind arising from or connected with t'his'ns'pection'. Commissionk it!B Hl230,~N,~I Inspect rs Si+gr ture National Board, State, Providence, ahd I!ndoI'secjcnts I D e 97-033-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Roquirod~~e.Provisions of, the ASHE Code Section XI

1. OMner Florida Power & Li ht Date 11 19 97 700 Universe Blvd. Jum Beach Fl. 33408 Sheet ..1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:63/6488 WO ¹: 94030848 9760 SW 344 Street Florida Cit Fl. 33035
                           'A         Address                                                           Repair Organization P.O. Ho.,Job No.,etc 3; Work Performed by        'Florida Pouer     & Li ht                                  Type Code Symbol Stamp                              N A Name                                                 Authorization.Ho.                                   H A Expiration Date                                     N A 9760  SW 344   Street     Florida Cit       FL. 33035 Address
4. Identification of System: S nt Fuel Pit Cooli S stem System ¹: 33 Quality Group: C
5. (a) Applicable Construction Code ,831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989'Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Kanufacturer) National Other lYear I Repaired I ASNE I Component Nanufacturer ] Serial No. Board Identif ication )Built) Replaced or ) Code f
                                                                                                                                        ) Replacement ']Stamp    f I       I                 Yes No iHEAVY HEX NUT  (1),              N/A                   IN/A            IH/A         ISTOCK CODE 278221                          JUNK    (Replacement      No e
7. Description of Work: Re laced to bonnet nut on valve 3-798A.
                                                                                            'nesetic:

Nominal Operating Pressure pressure Nrrs sts Test Turpereture u A 'F 97-034-3

Sheet 2 of 2 0 FORH NIS-2 (Back) 9..Remarks: HECNANICAL CONNECTION NO uELOING".REOUIRED. CERTIFICATE'OF COHPLIANCE I

    'Me  certify that the   statements    made in the report are correct    and this  replacement conforms to the rules ofthe ASHE Code,    Section XI.
     ~Type Code Symbol Stamp                                            N 8
     .Certificate, of uthorization
     -$ ]gned OMner o No.
                                   ~cKrp~~p thawer's OFsigree,
                                                       ~N A a~R,g, Tit(e
                                                                +&i f~      ~s     ~
                                                                                      '- Expiration Date Date      ~+V       8', N A
                                                                                                                        '19 p7, CERTIFICATE OF INSERVI CE INSPECTION I, the undersigned, holding a valid coamission issued by the National Board of Boiler and.pressureiVessei            i inspectors and the state or Province of Dade County and employed by Arksiright Hutual Insurance Compariy of~

NorMood, Ha. have inspected the cccpawnts described in this,ONneds R~rt 4>ring the period 12'/08/94 i to 11/19/97 and state that to the best of my knowledge and belief, the OMner has performed examinstiions~ and taken corrective measures described in this Ihners;Report in aecordanee Nith the requirements of the ASHE~ Code, Section XI. By signing this;certificate neither the Inspector norihis capt'ayers',makes any uarranty, expressed or Ispiied, concerning the examinaticns and corrective measures described in this Ovner's Report..fur~thermore, neither the Inspector rer his,employer shall be, liable in;any manrier for any personal injury or property ~

       'damage or a .loss of any kird aiiising fred or connected with this i~nspection.

Camniisslons HII82'$0 N Inspectors Sipyr ure National Board, State, Providence, and'ndorsenerits Date 19 Qp 97.-034-3

FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMEHI'S As Required~ the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 11 19 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet >1 of 2 Address
2. Plant Turke Point Plant Uni t PMO ¹:63/1762 ¹: 95017287 PCM ¹: '97-002'O 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stan@ N A Hane Authorization No. N A Expiration Date N A 9760 SM 34C Street Florida Cit FL. 33035 Address
4. Identification of System: Intake Cooli Mater stem System ¹: 19 Quail ty Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable, Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement, Components, Name of Name of )Manufacturer National )

Other [Year f Repaired f ASME f Component Manufacturer [ Serial Ho. Board Identification (Builtf Replaced'or / Code /

                                                                                                                            /  Replacement     )Stamp    /
                                                                                                                                                 ~esrese ITHREADED ROO                  H/A                  iN/A            [H/A        ] STK CODE 204C361       2044361. UHK     Replacement        No F40 STUDS FABRICATED                                                              & 295031 IHEAVY HEX NUT  (80)           H/A                  [H/A            IH/A        I  TK 'CODE 220689        414058     I UNK   ]Replacement       ]Ho STK CODE 027842         413848
7. Description of Mork: ADDED VALVE 3-50-382 MODIFIED SUPPORT 8045-H-172-11 REMOVED THE INTERNALS OF VALVE 3-50-360.AND ABONDONED THE VALVE BODY IN PLACE.

LEAKAGE TEST PERFORMED UNDER 03-ICMe1995-L-OI.

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X
                                                                                                                                        ~

Other VT-2 Pressure~5 'ig Test Temperature 78 F 97-035-3

Sheet 2 of 2 FOIRH NIIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION'O llELDING REOUI RED.

CERTI F I CATE OF COHPLIANCE Me certify that the ststersents made in the report sre correct snd this repiscerrent conforrtrs to the rules of the ASHE Code, Section XI ~ Type Code Symbol Stamp Certificate of Authorization'No. IN~A Own r or Ownerls De. ignee, f itis CERTIFICATE OF INSERVICE IliSPIECTION I, the undersigned, holding s vslicl cormission issued by their National Board of Boiler and PressUre 'Vesael and the state or province of Dade Crxx>ty and empioyrxi by Arkwright Hutusl Insurance Company of 'nspectors Ha. have inspected the corporents descriibed in this Owners Report during the period 06/24/97 'orwood, to 11/19/97 and state that to the best of my'nowledge and balief, the Owner hss performed eXaminsti'ons'and taken corrective measures. described in this Owners Report in ar!cordsnde with the requirements of the A'SHE'Code, Section XI. By signing this certiificste neither the Inspector nor hi's errylo'yer makes any warranty, expressed or Implied, concerning the exatrrinstions and correctiive,measurea described in this Ihrner's Report. Furtherrsora, neither the Inspector nor his employer shall be liable in alny msnnar for any personal Injury or property damage or a loss of any kind arising from or conrw.cted with'his -inspection. Comnissions NB 823~ON~I~ Inspe 6rs gnature I NatIionhi'oard, State, Providence, and Endorsrments 19 Z 97-035-3

FORH NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Po~er & Li ht Date 11 19 97 Name 700 Universe. Blvd. Juno Beach Fl. 33408- Sheet -.1 of 2 Address
2. Plant Turks Point Plant Unit PMO ¹:63/0160 MO ¹: 96025230 9760 SM 344 Street Florida Cit .Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Stsap N A Name Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address 4~ Identification of System: C t Cooli Mater S stem System ¹: 30 Duality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Conponcnts Repaired or Replaced and Replacement Cceponcnts Name of Name of )Hsnufsctureri National Other iyear Repaired I ASHE I Component Hanufacturer i Serial Ho. Board Identification iBui lt Replaced or i Code i Replacement ]Steep )

JYesreu HEAVY HEX HEAD CAP SCREM N/A iH/A IN/A STK CODE 992553 iUHK Replacement iHo 4

7. Description of Mork: REPLACED 4 NUTS ON IHLET DOOR OF COHPOHENT COOLING MATER HEAT EXCHANGER >>8>>.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure preeeure~MA TN Teat Teetetreture N A 'F 97.036-3

Sheet 2 of 2 iO FORH NIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO MELDINB REOUIRED.

CERTIFICATE OF COHPLIANCE lie certify that the statements made in the report are correct and this replacerent conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Stamp Certificate of Authorization No., N~l A Expiration Date Signed 19 ~+ Owne or Own(&s Designfe, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned,.holding a valid corrmission issued by'ha Nation'al Board of Boiler and pressure Vessel and the state or Province of Dade County,and employed by Arkwriight Hutual Insurance Company 'nspectors Ha. have inspected the ceqxments descriibed in this Owners Report during the period 09/26/96 of'orwood, and state that to the best of my knowledge and belief, the (hawr has performe9 examinati'ons'and'aken

                                                                                                                                                                     'o'1/19/97 corrective measures described in this Owners Report in accorcfance with the recpirements of the ASHE Code, Section XI ~

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or~ iapiied, concerning 'the examinatiam and corrective measures described in this Owner's Report. Furthenmore, neither the Inspector nor h'is employer shall be liable in ai~ manner for any personal inJury or pr*perty damage or a loss of any kind arising from or conrected with this inspectice. Ccamissions,, rs NB,B23D~N~I'ational Inspec S nature Board, State, Providence, and Endorsements 119 97-036-3

FORH NIS-2 OMMERS REPORT FOR REPAIRS OR'EPLACEHENTS As Required~-the-Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 11 19 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:63/1350'CH WO ¹: 9C003086
                                                                                             ¹:            94-096 9760 Su 344   Street   Florida Cit      Fl. 33035 Address                                                   Repair Organization P.O. No.,Job No.,etc
3. Mark.Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho.

Expiration Date N A 9760 SM 34C Street Florida Cit FL. 33035 Address

4. Identification of System: Intake Coolin Hater S stem System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code 831. 1 1955 Edition, MA Addenda,'~N A Code Case (b) Applicable Edition of Section XI Utilized, for Repairs or Replacements 19S9 Edition,~MA Addenda,~HA Code Case
6. Identification of Cceyonents Repaired or Replaced and Replacement Components Name of Meme of. (Hanufacturer( National Other '(Year ( Repaired (

ASHE Component Hanufacturer Serial No. 'Board Identification Replaced or ( Code ('Built( (

                                                                                                                                                '( Replacement     (Sesame    (
                                                                                                                                                                     ~rue   e PIPE SPOOL                    (N/A                 (N/A            (N/A           STK CODE 1951271                           (UNK               (Replacement        No ITHREADEO ROD                   IH/A                 IN/A            IH/A          (STOCK CODE 295071                          (UMK               (Replacement      (No I  80  STUDS FABRICATEO (HEAVY HEX NUT                  IN/A                 (N/A            IH/A          (STOCK CODE 278611                          (UMK               (Replacement      (No

( 40 (PIPE PLUG IH/A IH/A IN/A (STK CODE 337661, 349691 (UNK (Replacement (No 2

7. Description of Mork: VALVE CV-3-2202 REHOVED AND REPLACED. WITH PIPE SPOOL PIECE PER PCH 94-096.'EAKAGE TEST PERFORHED'UNDER 03-IClJ-1921-L-03.

S. Tests Conducted: 'ydrostatic: Pneunstic: Hominal Operating Pressure X

                                                                                                                                                            ~

Preeeure~a ig Test Temperature F 97-038-3

Sheet 2 of 2 FORM NIS-2 (Back) 0

9. Remarks: HECNANICAL CONNECTION NO llELDING REOUIRED.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct~and~ this rLpiacement conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Stamp .~ll A Certificate f Authorization No. N~A 'Expiration Date Signed d A/A S

                                  's Designee, Title r~dAA       P k           AAAA    mA~A+~A Owne   or Owns CERTIFICATE lOF  INSERVICE INSPECTION I, the'ndersigned, holding a valid commission issued by the Nakiodl Board of Boiiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by'rkwright Hutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report dur ing the period            09/16/95 and state that to the best of my knowledge and beiiief, the Owner has performed examiriatikns and    'o'1/19/9/

taken corrective measures descr,ibed in this Osrners Report in accordance with the requirements of the ASHE Coda, Section XI. By signing this certificate neither the Inspector nor hisI ~loyier rakes any warranty, eXpreased or implied, concerning the examinations and corrective measureS deacribed'in this Owner's Report. Furthermore, neither the, inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any Icind ariising from or connected with ~thik irIspedtion. Conaissium,,NB 8230~M~I Ins ctors ignature Natiionai Board, State, Providence, and ErxkIrsehenIIs 97-038-3

0 FORM NIS-2 OHHERS REPORT FOR REPAIRS'OR REPLACEMENTS As Required~ the&rovisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 12 08 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet ~ 1 of 2 Address
2. Plant Turke Point Plant Uni t 3 PHO ¹:63/4845 lJO ¹: 97018298 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Nork Performed, by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization No. H A Expiration Date N A 9760 SN 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Intake Cooli Hater S tern System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~HA Code Case (b) Applicable Edition of Section XI. Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code*Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents Name of Name of ]Manufacturer( National [ Other [Year [ Repaired f ASME (

Component Manufacturer ) Serial No. Board Identification ]Built( Replaced or ( Code J J. Replacement ]Stamp f I V~es Vo AGATE VALVE IJENKINS VALVE IN/A IN/A (3-50-367 1991. [Replaced No I AGATE VALVE IJENKINS VALVE IN/A'N/A I3-50-367 (1997 )Replacement [No

7. Description of Norkt REPLACE VALVE 3-50-367 DUE TO EXCESSIVE SEAT LEAKAGE.

LEAKAGE TEST PERFORMED UNDER PRESSURE TEST 03-1N-1903-L-02.

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Other VT-2 Pressure 14 ~ig Test Temperature 67 ~

F 97-039-3

Sheet 2 of 2

                                                                                                                                        ~O FORM HIS-2 (Back)
9. Remarks: MECHANICAL CONNECTION No uELDIHG REauIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp H A Certificate of Authorization No. ~N A Expiration Date N 'A Signed 5i+/dn.- d~p~.wr AA~~ Dat Owner or Owner'a~Des~inca, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by. the National Board of Boiler and pressure~ vessel~ inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have .inspected the ccapoi~ts described in this 04neds Rapport during the period 12/08/97 and state that to the best of my knowi.edge and belief, the ~ir 08/07/97 has performed examinations and

                                                                                                                                  'o taken corrective measures clescribed in this (owners Report in accordance with the requirements of the AsME code,                  ~

( Section XI. By signing this certificate neither the Inspector nor his ehyldyer~ makes any warranty, expressed-or Implied, concerning the examinations and corrective measures described in this owner 's Report. Furthermore, neither the Inspector nor his enpioyer shall be liable in any manner for any personal injury or or a loss of any kirxi arising from or connected. with this inspection. property'amage Conmiissions, H '2' N I In ors nature National Board, State, Providerice, and Endoraements Date 97-039-3

FORM r HIS-2 OWNERS REPORT FOR REPAIRS. OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 02 02 98 700 Universe 'Blvd. Juno Beach Fl. Sheet ~ 1 of 2 33408'ddress
2. Plant Turke Point Plant Unit Nate PWO'¹:69/6167 WO ¹: 97026548 CR ¹: 96-1374 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ko.,Job No.,etc
3. Work Performed by Florida Power 8 Li ht Type Code. Symbol Stamp N A Name Authorization No. N A Expiration Date K A 9760 SW 344 Street Florida Cit FL. 33035 Address
4. Identification of Systemt Intake Coolin Water S stem System ¹: 19 Quality Group: C r
5. (a) 'Applicable Construction Code 831. 1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Cotponents Repaired or Replaced and Replacement Components
         ,Name of                     Name  of       IManufactureri'National                                Other              IYear   I   Repaired      I ASME I

~ / Component Manufacturer Serial'No. Board Identification IBuilti Replaced or Code I I I I I Replacement Istamp I I iYesrege IM 196 6 N/A ,IN/A 'iN/A ilCW PIPE SUPPORT IN/A IRepaired INo

7. Description of Work: MODIFY SUPPORT ¹ M-196-6 TO EXCLUDE WATER INTRUSION.
8. Tests Conducted: Hydrostatic: Pnetgtatic: Hominal Operating Pressure Other VT-3 pressure~u S tg Tese resgerseure HA oF 98-001-3

Sheet 2 of 2 IFORMI NIS-2 (Back)

9. Remarks: ALL WELDING PERFORHED IN ACCORDANCE LIITH APPROVED PlLANT PR6CE6UREC.~

'ERTII-ICATE OF COHPLIANICE Me certify that the statements made ini the report are correct and this repair conforms to the'ui.cs bf the Code, Section XI. 'SHE Type Code Symbol Starry ~NA Certificate of Authorization No. ~N A Signed 3 c~/~~ < ~~~~~ ~iiace ~~~ ~~ n

19 Q<P 98-001-:3 FORM NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required~~he Provisions of the ASME Code Section'XI 1; Ih<<M.r Florida Power & Li ht Date 02 23 98 700 Universe'Blvd. Juno Beach Fl. 33408 Sheet i 1 of 2 Address

2. Plant Turke Point Plant Uni t 0

'PMO.¹: 69/6551 MO ¹ 98003962 01 CR ¹:98.0276 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc . Mork Performed by Florida Power & Li ht Type 'Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address

4. Identification of System: Emer enc Feedbfater S tom System ¹: 75 Quality Group: C
5. (a) Applicable Construction Code B31.1 T955 Edftfon,~NA Addenda,~uA cade case 8

(b) Applicable Edition of section xi Utilized for Repairs or Replsceaents 1989 Edftfon,~HA" Addenda,~HA coda case Identification of Components Repaired or Replaced and Replacement Components Name of Name of iManufacturer National Other iYear i Repaired i ASHE i Corponent Manufacturer i Serial No. Board Identification iBuilti Replaced or i Code i i Replacement )Staap i I I Yes No 80117-H-334-11 IN/A H/A AFM PIPING SUPPORT JN/A iReplaced No Description of Mork: REPLACE CLAMP BOLTING NUT UTC¹ 396923 AHD ALL THREAD UTC¹ 415246 ON PIPE SUPPORT 80117-K-334-11. i Tests Conducted: Hydrostatic: Pneunst i c: Nominal Operating Pressure ~ Other VT-3 Pressure~@ A ig Test Tecpersture N A F 98-002-3 Sheet 2 o)f 2 FORH NIS.2 (Back)

9. Remarks: HECHANICAL -CONNECTION NO M=LDING REQUIRED CERTIF I CATE OF MiPLIANCE Me certify that the statements amde in the report are correct and this ~replacement conforms to <<he rules of tHe ASHE Code, Section XI.

Type Code Symbol Staap Certificate f Authorization No. ~NA Expiration Date N A Signed Owner or Owre 4rA~ ~pihM~ 's Designe, Title ~ ~ . Date ~+~ '9'+ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure Vesseb inspectors and the state or Province of Dade Cumty and eqployed'by Arkwright Kutual Insurance Company,-of Norwood, Ha. have inspected the ccayonents described in this C~rs Report during the period 02/17/98~ to 02/19/98 and'state that to the best <>f my knowledge and belief, the Owner has performed examinations an'd taken corrective measures describxl in this Owners Report in accordance with the requirements of the iASHE Code, Section'Xl. I By signing this certificate nowhither the Inspector.nor hfs eeployer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described'is this (amer's Report. Ful thdrmoie, neither the Inspector nor his eapioyer shall be liable in any ma+mr for any personal Injury or property damage or a loss of any kind arising from or corrected with thiis inspection. Comnissions, NB 82~30 'N ~I Ins ors S nature National Board, State, Providence, and Endoraements Dst ~HZ 19 FP 98-002-3i FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the. Provisions of the ASNE Code Section XI

1. Owner Florida Power & Li ht Date 02 23 98 700 Universe Blvd. Jwm Beach Fl. 33408 Sheet n 1 of. 2 Address
2. Plant Turke Point Plant Unit 3 PMO ¹: 69/6555 MO ¹: 98003962 02 CR ¹:98-0276 9760 Su 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job'No.,etc

. Mork Performed by Florida Power & Li ht Type Code Symbol Stamp M A Authorization Mo. N A Expiration Date M A 9760 SM 344 Street Florida Cit FL. 33035 Address

4. Identification, of System: Emer enc Feedwater S stem System ¹: 75 Quality Group: C
5. (a) Applicable Construction Code B31. 1 '1955 Edition,~ua Addenda,~ua code casa lu> Applfcaule Editian of section xi utillted for Repairs or Replacements 1989 Edftfan,~ll A Addenda,~ll A code case Identification of Components Repaired or Replaced and Replacement Coaponents Name of Name of (Manufacturer National, (

Other (Year I Repaired ( ASNE ( Carpcfnent Manufacturer ( Serial No. Board Identification (Built( Replaced or ( Code ( ( Replacement (Stamp ( I I Y~es Eo (80117-H-334-12 IN/A (H/A (AFll PIPING'SUPPORT (N/A (Replaced Mo I (80117 H 334 13 (N/A (N/A'N/A (N/A (AFM PIPING SUPPORT (N/A (Replaced (No Descriptionfof Mark: REPLACED PIPE CL'ANP BOLTING NUTS UTC¹ 370708 & ALL THREAD UTC¹ 415246 ON SUPPORT 80117-H-334-12. REPLACED PIPE CLAMP UTC¹ 334081 PIPE CLAMP BOLTIMG NUT UTC¹ 370708 & ALL THREAD UTC¹ 415246 AND'SPHERICAL BEARING UTC¹ 406950 ON SUPPORT 80117-H-334-13. Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure ~ Other VT-3 Pressure~u A iE Test Teaperature E A F 98.003-3 Sheet 2 of 2 FORN HIS"2 (IBack)

9. Remarks: NECNANI CAL CONNECT IOlk hIO MIELDING'ZEOUIIRED.

CERTIFICATE OF COI4PLIAHCIE Ne certify that the statenents nlade in the report are correct and this replacement confotans to the irules of th' ASNE Code, Section XI. Type Code Symbol Stamp Certificate of Authorization sisnat dW +g No. +~~4 Title'xpiration ~NA DgA'l~ Date N A Owner o Owre~r s DeYignee, CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, hofidfng a valid cimnfssfon issued by the NatieMl Board of Boiler and Pressure Vesseb inspectors and the state or Province of Dade Cax)ty and employed by 'Arkwt ight Nutual Insurance Company of Norwood, Na. have inspected the compceents dlescribed in th'is Owners s Report during the perfod 02/Iy/98o 02/17/98 and state that to the best of my knowledge and belief, the OwIer has Iperformwf examfnationn and taken corrective measures described in this Owners: Report 'in accordance with the requirements of the ASNE Code, Section XI ~ By signing this certfffcate neither the Inspector nor his enployer malkes any warranty, expressed or inplied, concerning the examfretfons and corrective measures clescrfbed in this Ctwner's Report. Furthermore, neither the Inspector nor his etployer shall be liable in any~manner ~for any personal injury or property damage or a loss of any kind arising fran or cemected wftIh this inspection. um Inspect rs S iturie'onmissions, N 8 ' N I National Board, State, Providence, and Endorsements ' Date o2. PF'8-083-3 0 FORM NIS-2 ONHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required~ the. Provisions of the ASME Code Section XI

1. Owner Florida Po~er & LI ht Date 02 23 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of' Address
2. Plant Turke Point Plant Unit 3 PMO ¹: 69/6563 IJO ¹: 98003962 03 CR ¹:98-0276 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc

. Mork Performed by Florida Power & Li ht Type Code Syffhol Stomp N A Name Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address

4. Identification of System: Emer enc Feedwater S stem System ¹: 75'Juality Group: C
5. (a) Applicable Construction Code 831.1 1955 Editicn,~NA Addenfs,~@A Code Csee (8> Applicable Edition of Rection Rl utillted for Rcpeirs or Rcplecenents 1989 Edition,~gs Adfendo,~HA code csee J

Identif ication of CJJJponents Repaired or Replaced and Replacement Components Name of Name of (Manufacturer) National Other IYear Repaired ) ASME ) Component Manufacturer [ Serial No. Board Identification [Built Replaced or ) Code [ I ( Replacement )StaJJJp [ I Jt~es Eo [80>>7- H-334-07 N/A IH/A IH/A IAFM PIPING SUPPORT K/A )Replaced )No I (80>>7-H-334-08 IN/A fN/A )AFll PIPING SUPPORT JK/A )Replaced iNo I )80>>7-H-334-09 IN/A (H/A )N/A 'AFN PIPING SUPPORT /H/A )Replaced )Ho Description of Morkt REPLACED PIPE CLAMP UTC¹ 334081 AHD PIPE CLAMP BOLTING NUTS UTC¹ 370708 & ALL THREAD UTC¹ 415246 ON SUPPORT'0>>7-H-334-07. REPLACED PIPE CLAMP UTC¹ 334081 AND PIPE CLAMP BOLTING NUTS UTC¹ 370708 & ALL THREAD O'IC¹ 415246 ON SUPPORT 80>>7-H-334-08. REPLACED PIPE CLAMP BOLTING NUTS UTC¹ 370708 & ALL THREAD UTC¹ 415246 AND SPHERICAL BEARING UTC¹ 406590 ON SUPPORT 80>>7-H-334-09. Tests Conducted: Hydrostatic: Pnemmt ic: Nominal Operating Pressure Other VT-3 pressure~g A ig Test Tespersture H A F 98-004-3 Sheet 2 of 2 Cl FORH 14IS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO MELDING REQUIRED.

CERTIFICATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this replacement conforms <<o the rules of the ASHE Code, Section XI. Type Code Symbol Stamp N A Certificate of uthorization Ko. ~NA Expiraticn Date N 'A gf c'5 2 > Signed Owner o Owrer's Designee, Jg/cd~ Title CQ~ 0'kir ~ a~~~ '9'ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccemission issued by the National Board of Boiler and Pres! ure Vessel inspectors and the state or Province of Dade Ccxnty and eapioyed by Arkwr igh't Mutual Insurance Catpany of Norwood, Ha. have inspected the components descr ibex'n this Owners Report during the period 02/17'/98'o 02/19/98 and state that to the best of my knowledge and belief, the'Owner has pcrforaxxl examiinations and taken corrective measures descrihxi in this iDwners Report in accordance with the reluirements of the ASHE Code, Section XI. By signing this certificate neiither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures desc< ibed in this Owner's Report. Fukthe!rmoke, neither the Inspector nor his empl!oyer shall be liable in any manrwr for any persormi injury or property damage or a loss of any kind arising from or corrected with this !inspection. /7 Cannissions' NB 825~0~4 Inspec ors S ture Ma'tional Board, State, Providence, and Endorsemeats Dat p,p 98.004-3 FORH>NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required~ the. Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 02 27 98 700 Universe Bl'vd. Juno Beach Fl. 33408 Sheet ~ 1 of 2 Address

~ 2. Plant Turke Point Plant Unit 3 PWO ¹: 69/6539 WO'¹: 98003759 01 CR ¹:98.0276 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc Work Performed by Florida Power 8 Li ht Type Code Syahol Stamp N A Name Authorization No. N A Expiration Date N A 9760 SW 344 Street Florida Cit FL. 33035 Address

4. Identification of System: Emer enc Feedwater S tern System ¹: 75 Quality Group: C
5. (a) Applicable Construction Code B31.1 1055 Edition,~NA Addenda,~NA code case (b) Applicable Edition of Section XI Utilized for Repairs. or Replacements 1989 Edition,~NA Addenda,N416-1 Code Case Identification of'omponents Repaired or Replaced and Replacement Components Name of Name of iHanufactureri National Other iYear Repaired i ASHE i Component Hanufacturer i Serial No. Board Identification iBuilt Replaced or i Code i I I Replacement iStamp i I iYesreao iAFll PIPING.8 SUPPORTS, iN/A IN/A N/A i N/A IN/A Replaced iHo Description of Work: REPLACED 90 SECTION OF 2" PIPING UTC¹ 376381 30'ECTION OF 2" PIPING 'l ELBOW UTC¹ 409259 ELBOW UTC¹ 410531 'VALVE AFSS-016 UTC¹ 405485 2 COUPLINGS UTC¹ 378120 2 COUPLINGS UTC¹ 413702 AND 5 HANGER STRAPS UTC¹ 414393 FOR H-01 H-02 H-03 H-04 8 H-05.

PRESSURE TEST PERFORHED UNDER PRESSURE TEST PACKAGE ¹ 03-AFW-7557-L-01. 'Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure ~ Other VT-2 3 Sressore~glg ig Test Temperature 467 F 98-005-3 Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: ALL WELDING PERFC)RHED IN ACCORDANCE WITH THE FPL WEL C NTR L NUAL~.

CERTIFICATE OF COMPLIANCE We certify that the statenents made in the report are correct arKI this replacement confonas to the rules of the ASHE Code, Section XI. Type Code Symbol Stamp Certificate of uthori a)ion No.~ ~N A Expiration Date N A ~ Signed Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by tHe National'oard of Boiler and pressure Vessels inspectors and the state or province of Dade C~)nty and employed by A'rkwright Hutual Insurance Company of Norwood, Ha. have inspected the compaeents d'escribed in this Owners. Report during the period 02/18/98~ t~o 02/19/98 and state that to the best of my knowledge.and belief, the owner has performed examinations and taken corrective measures describ< in this owners Report in accordance with the requirements of the iASHE Code,~ Section XI. I By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examirw)tions and corrective measures described in this ()wner's Report. Fui'thdrmoi'e, neither the Inspector r)or his employer shall be liable in any ~manner 'for any personal injury or property damage or a Loss-of any kind'arisfng from or coax)ected with thiis inspect'ion. rP Cermisslons NB 8230 ~M~I Inspect rs S iture National Board, State, Providence, and Endorsementsi 98-OD5-3 FORH'NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS 0

1. Owner Florida Power 8 As Required by the Provisions of the ASHE Code Section XI Li ht Date 02 23 98 Name 700 Universe-Blvd. Juno Beach Fl. 33408 Sheet ~ 1 of 2 Address 2~ Plant Turke Point Plant Uni t PMO ¹: 69/6553 MO ¹: 98003759 02 CR ¹:98-0276 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc

~ 'Work Performed by Florida Power 8 Li ht Type Code Syshol Stnap N A Authorization No. N A Expiration Date 'N A 9760 SM 34C Street Florida Cit FL. 33035 Address

4. Identification of System: Emer enc Feedwnter S stem System ¹: 75 Quality Group: C'e (a) Applicable Construction Code B31.1 1555 gdrttee,~HA Address,~HA cede case (b) Applicable Edition'of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,NC16-1 Code Case Identification of Components Repaired or Replaced and Replacement Components Name of 'Name of Hanufnctureri Hational Other I Year I Repaired I ASHE Component Hanufacturer Serial Ko. Board Identification iguiiti, Replaced or,i Code i Replacenent (Stamp I' Yes Ho IST-49 H/A N/A iN/A )AFSS-015, PIPING, SUPPORT iH/A )Replacement No STRAP OH H-04 Description of Mork: REPLACE 6'ECTION OF 2" PIPING UTC¹ 407118 UPSTREAH AND DOMHSTREAH OF AFSS-015 VALVE AFSS-015 UTC¹ 405485 1 FLAT HANGER STRAP UTC¹ 414393 ON H-04 AHD 1 COUPLING UTC¹ 413702 .

PRESSURE TEST PERFORHED UNDER PRESSURE TEST PACKAGE ¹ 03-AFM-7557-L-01. Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure Other VT-2 3 eressere~atg 15 Test Teaperature 467 ~ F 98-006-3 Sheet ',2 of 2 ~li FORH NIS-2 (Back)

9. Remarks: ALL WELDING PERFORHED IN ACCORDANCE WITH THE FPL WELD CO TR L HANUAL~

CERTIFICATE OF COHPLIANCE We certify that the statejjjents made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI'ype Code Symbol Stamp Certificate o Authori tion Noe N~A Expiration Date N 'A Signed . ~@.~ d~~ ~~ .'~~ 'ate <<X ~~ '9 '7P" Owner r Ownerrs Designee,'Title CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, holding a valid cajjljji!sion issued by'he'Natiojwji Board of Boiler and Presaure'easel' inspectors and the state or province of Dade County and.employed by Arkwright Hutual, Insurance Cospany of Norwood, Ha. have inspected the cojjjporjents described in this Oknerjs Rhjport during the period 02/17/98 to 02/19/98 and state that to the be. t of my knowledge and belief, the Owner has perforjjxd examinationS and taken corrective measures described in this Owners. Report in accordance with the requirements of <<he ASHG Code, Section XI. By signing this certificate neither the Inspector nor his ejljpldyer makes any Warranty, expressod ot implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the .inspeotor mr his erptoyer shall be liable in any raanner for any personal injury or property I damage or a 'toss of any kind arising fran or connected with'his inspection. Conmi ssions,, NB, 823~ON~I Inspec Signature National Hoard, State, Providence, and Endordemejjjts ' Dot~ W 98-006-3 FORM NIS 2 OWNERS REPORI'OR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASME Code Section XI

l. Owner Florida Po~er & Li ht Date 04 20 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address
2. Plant Turke Point Plant Unit 3 Name PWO ¹: 63/7530 WO ¹: 97026573 01 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc

. Work Performedeby Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. Expiration Date N A 9760 SW 344 Street Florida Cit FL. 33035 Address

4. Identification of System: CVCS Char in & Letdo~n S stem System ¹: C7 Qual'ity Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition,~us Addenda,~uA code Ease (8) Applfoaula Edition of section Xi utillted for Repairs or Replaoanents f989 Edition,~g A Addenda,~u A Code Case
6. Identification of Components Repaired'or 'Replaced and Replacement Coaponents Name of Name of iHanufactureri National Other iYear ( Repaired i ASHE i Component Manufacturer (

Serial Ho. i Board Identification igu3lti Replaced or i Code,i / Replacement iStamp i I I i~tea Ro I3P201A IUHIOH PUHPSE INC IH/A IH/A ICHARGING PUHP aAw (N/A iReplaced iHo >. Description, of Work: REPLACED FLUID CYLINDER'ASSEMBLY 0070887 8 STUDS 0041092 AND 16 NUI'S 0039198 ON THE INLET FLANGE 2 STUDS 0204C36 ON THE OUTLET FLANGE. PRESSURE TESTING PERFORHED UNDER PRESSURE TEST PACKAGE 03-CVCS-4761-L-02.

8. Tests Conducted: Hydrostatic: Pneunatict Nominal Operating Pressure Other VT-2 pressure~2358 sig Test Tarpersture 89 'F 98-007-3

Sheet 2 of 2 ~O FORM,HIIS.2 (Back)

9. Remarks: MECHANICAL COHhlECTIOH NO WELDING REOUIRED.

CERTIFICATE OF COMPLIAHCE we certify that the statements matfe iin the report aire correct"and'hi's replacement conforms tai the rules of the ASME Code, Section XI. Type Code Symbol Stamp Certificate f Author zatiion No. N(A Expiration Date ~NA II Signed D.t. Owner or Owner's Designei, Title CERTII'ICATE OF IiNSERVICE INISPECTION I, the undersigned, hcilding a valid comission issued by the National *Board of Boiler and Pressuii e Vessel inspectors and the state or Province of Dade County and ~layed by Arkwright Mutual Insurance Coapbny 'of Ma. have inspected )the cowimnents descrited in this Owners Report during the period 03/'l1/98 to 'orwood, 03/26/98 and state that to the best of'y knowledge and belief the Amer ha. performed examinations and taken corrective measures described in this Owiners Report in accordance with the requires!ents of the ASME Code, Section XI. By signing this certificate neither the Inspector nor 'his employer makes any warranty, expressed or Implied, concerning the examiinations and corrective measures'es'cribed 'in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury. or iproperty damage or a loss of ahy kind arising free or connected wi'th this'nspection. 7 ns , NB 8230~M ~l Inspec ors S nature Natiionai. Board, state, providence, and Fndorsements Date 19~5+ 98-007-3 0 FORM NIS-2'OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As RequirM&y~&xovisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 08 25 98 700 Universe Blvd. Juno Beach Fl. 33C08 Sheet of 2 Address
2. Plant Turke Point Plant Unit PWO ¹: 63/90C3 WO ¹: 98014640 01 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,ctc I,

( 3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Authorization Ho. H A Expiration Date N A 9760 SW 34C Street Florida Cit FL. 33035 Address

4. Identification, of System: CVCS Char in 8 Letdown S stem System ¹: C7 Quality Group: B
5. (a) Applicable Construction Code .1955 Edition,~uA Addenda,~sA code csee (b> Applicable Edition of section'xi utilitcd for. Repairs or Replacements 1989'Edftion,~m A Addenda,~m A code case Identification of Components Repaired or Replaced and Replacement Components Name of Name of )Manufacturers National i Other iYcar i Repaired J ASHE )

Component Hanufacturer i Serial No. Board Identification iguilt) Replaced or i Code i i Replacement )Stamp i I I iYe~feuo I CYLINDER FLUID ASSEMBLY I N/A [N/A ]N/A i3P2018 UTC¹ 419287 )UNK. iReplaccd ]No

7. Description of Work: REPLACED CHARGING PUHP 39201B CYLINDER FLUID ASSEHBLY.

. Tests Conducted: Hydrostatic: Pncunatic: Nominal Operating Pressure X a Other VT-2 pressure~2350 is Test Temperature 103 DF 98-008-3 Sheet 2 of 2 I IFORHI NIS-2 (Back) 9..Remarks: HECNANICAL CONNECTIiO~NNO WELDING REOUIRI=D. CEIRTIFICATE OF COMPLIANCE Me certify that the statements made in the report sre corrcrt and this replacement cionforms to thc rules of thc ASHE Code, Section XI. Type Code Symbol Stamp Certificate of uthoriz~tiain No. ~NA Expli.stion Date N~A siiinal&l .. owner +~1 .~~&2 8g~ owns's DesigneeTitle ~ /4~4' CERT IF ICATI-: OF INSERVICE INSPECI'ION I, the undersigned, holiding a valid conmission issued b'y the N'atidnal Board of Boiler snd Pres'surt. Veascl, inspectors snd the state or Province of Dade County and em'pio)'ied by I'irkwright Hutusl Insurance Colnpahy o' Norwood, Ha. have inspected thie cenponents described in this Owners Report during the period 07/29/98'o 08/18/98 and state that tai the best of my knowledge and belief, thc Owner has performed extnninstions and taken corr'ective,measures. desarib< in this Owners IRep'ort in accordance with the requirencnts of 'the 'ASHIL Ct'fade,'ection XI. By signing this certificate neither the Inspector nor his amp'loyer makes any warranty, expressed or implied, concerning the examinations snd corrective measures dlescribed in this Owner's Report. Furth/rmoke, neither the 'Inspector nor his employer shall be liable in any manner for any personal ilnjury or-property damage or a loss of sny kind srisiing fram or car+ected witl this ilnspection. Caamissions, iiB 82!M~~ll i I pec rs Si aturc 'a'tiki IHoard, State, Providence, snd Endorsements 98-008-3 O FORH NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions. oF the ASHE Code Section XI E. Owner Florida Po~er 8 Li ht Date 10 06 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet ~ 1 of 2 Address

2. Plant Turke Point Plant Unit 3 Nane PMO,¹: 63/9082 MO ¹: 98014933 01 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization,P.O. No.,Job No.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Authorization No. 'N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Emer enc Feedwater S stem System ¹: 75 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition,~sa Addenda;~MA Code Cosa ibl APPlicable Edition of Section'Xi Utlllted for RePairs or RePlacnnents 1989 Edition,~m A Addenda,~u A Coda Case Identification of Components Repaired or Replaced and Replacement Components Nane of Name of [Hanufacturer( National [ Other )Year [ Repaired (

ASHE ( Component Manufacturer ] Serial, Ho. Board Identification [Builtf Replaced or f Code f f Replacement JStarrp ] 'I I ~yes Mo iRDOE THREADED [N/A IN/A N/A (UTC 416260 ASHE SA-193 (UNK [Replaced No 16 STUDS FABRICATED GRADE B7 CHUTE HEAVY HEX (6) IN/A IN/A H/A IUTC 396208 ASHE SA-194 IUNK IReplaced )No GRADE 2H

7. Description of Mark: REPLACED'IX 6 NUTS AND 6 'TUDS ON CHECK VALVE 3-20-340.

Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other Pressure~is Test Temperature ~ F 98-009-3 '.theet 2 of 2 FORM HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTI~ON NO WELIDING REWIRED.

CERTIFICATE OF COMPLIANCE He certify that the statements made in the report aire correct and this replacement conforms to the rules of the ASME Code, Section XI ~ Type Code Symbol Stamp H A Certificate of A orizatiipo Ho. N~A Expiration Date N A gtg~~ dMW~ gener or ner's g Pes'iignee, .S iQ ilrtte Date CERTIFICATE OF INSERVICE INSPECTIOH I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of, Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspected the components described in this (hairs Report during the. period 08/05/98 to ID/05/98 and state that to the best of my knowledge and bellief, the Owner has performed examinatidns hand taken corrective measures described in this (hmers Report in accordance with,the requireraents of th'e ASME Coda, Section XI. By signing this certificate neither the Inspector nor his eagloyer makes any warranty expressed or implied, concerning the examinations and corrective measures descri'bed'in this Ownergs Report. Furthermore, neither the Inspector nor his er~loyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arjising from or connected with ~this inspection. Connissions , HB 823 H I Inspector Sig~na re National Beard, States Providence, and Endarsements 3 98 009'-3 I FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 5 ~ Owner Florida'Power & Li ht Date 10 10 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet ' of 2 Address

2. Plant Turke Point Plant Unit PMO ¹: 63/9666 QO ¹: 98018973 01 CR ¹:98-1358 9760 Su 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Nork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 S'M 34C Street Florida Cit FL. 33035 Address
4. Identification of System: CVCS Char in & Letdown tern System ¹: 47 Duality Group: A
5. (s) Applicable Construction Code 831.1 1955 Edit l o~nAuAdd d e~uncaCode Case lbl Applicable Edition of section xl utlllted for Repairs or Rcplscannnts 1989 d Et ff~oHnA Addendau~a,code case Identification of CaJJponents Repaired or Replaced and Replacement CaJJponents Name of Name of fHsnufacturerf National Other Iyesr I Repaired f ASHE I CaJJponent Hanufacturer f Serial Ho. 'oard f Identsftcatton fBuiltf Replaced or f Code f f Replacement fStamp f I I Jatos uo fSTUD (1) N/A H/A IN/A ISTK CODE ¹12053 1 iUNK f Replacement f Ho UTC¹4918326 I

INUTS (2) fH/A fN/A IN/A ISTK CODE ¹27832 1 f UNK f Replacement f Ho UTC¹370708 ASME SA-19C e

7. Description of Mork: REPLACED BENT 1 2 IN. EYE ROO AND Tuo' 2 IN. NUTS.

Tests Conducted: Hydrostatic: Pneusatic: Nominal Operating Pressure '/i.Other Vf' Pressure~f8 Test Teapcrature 98-010-3 'Sheet 2 of 2 FORH NIS-2', (Back)

9. Remarks: HECHAMICAL CONHECTIOM NO HELDING REQUIRED.

CERTIFICATE OF COMPLIANCE we certify that the statement!> made lin the report are correct~and this replacement conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Staap N A Certificate of A horfz tion Mo. hi~A >>Ill>>>>d . ~$ ~ ~~M+  !~+~'9 + ~ Date P~Z ~ .19 Owner Owne <s Designhe, Tftf~e CERTIFICATE OF INSERVICE I,HSPECTIOH I, the undersigned, holdling a valid coamission issued'y the National Board of Boiifer and Pressure Vessel inspectors and the state or province of Dade County and employed by Arkwrfght Mutual Insurance Company'f Ha. have inspected the ccayonents described fn this Owners Report during the period 10/01/98 'orwood, ~ to~ ( 10/10/98 and state t'hat to the best of my knowledge and be~lief, the Ownet has performed examin1atfons and taken corrective measures described in this CX~rs Report in accorclance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations.and corrective measure< described'n this Owner's Report. IFurt'her!nore, neither the Inspector nor hlis employer shall be Ifabfe in any manner for e1ny personal; fnjury or property damage or a loss of any kind arising from or connected with this inspection. 7 Inspect Si ure Ccami!>>sfons ', 'NB ',8230~M~I ~Nat~fondf Bayard, State, Providence, and Endorsements Date l4 98.010-3 0 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEHTS As Required. by-,the&rovislons of the ASME Code'Section XI Te Owner Florida Power 8 Li ht Date 10 23 98 700 Universe Blvd.'wm Beach Fl. 33408'ddress Sheet ' of 2

2. Plant Turke Po3nt Plant Unit 3

 ; None PMO ¹: 63/9708 MO ¹: 98019132 01 CR ¹:98-1357 9 9760 SM 344 Street Flor3da Cit Fl. 33035 Address Repair Organ3zation P.O. No.,Job No.,etc 3., Mork Performed by Florida Power 8 Li ht Type Code Synhol Steep N A Name Authorization No. Expiration Date 9760 SM 344 Street Florida Cit FL.. 33035 Address

4. Identification of System: CVCS Char i 8 Letdown S stem System ¹: 47 Quality,Group: A
5. (a) Applicable Construction Code B31.1 1955 Edit f~oHnA Addenda~It A cods case (8> Applleanle Edftfon of station xl utlllted for'Repairs or Replaoeeents 1989 Edftfon,~ua Addenda,~ua code case Identif icat3on of Conponents Repaired or Replaced and Replacement Components Mane of Name of )Manufacturer National Other )Year i Repaired )

ASNE i Component Manufacturer i Serial.No. Board Identification iBui lti Replaced or i Code i i Replacement )Stony i ~Yes uo SHARK H-4 U-BOLT N/A IN/A H/A 'N/A I iUNK I )Replaced No iSUPPORT MARK H-4 H/A H/A iUTC 416088 i1998 )Replacement iHo

7. Description of, Work: R laced sheared U-Bolt on S rt H-4 'With welded a le 'iron 2<<x2<<x1 4<< in accordance with MRA ¹ CR-98-1357-01.

Tests Conducted: Hydrostatic: Pnematic: Nominal Operating Pressure Other VT-3 Pressure~f9 Test Teaperature 'F 98.011-3 Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: ALL MELDING PERF6RHED IN ACCORDANCE IlITH APPROVED PL NT PR ED RES CERTIFICATE OF COIHPLI ANCE lie certify that the stateaents made in the report are correct and this repllacement confo<wns to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of A horizatio~ No. ~NA Expiration Date N A Signed~ Owner or (hq r's De~slglme, Titl '9ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler, and Pressure Vessels inspectors and the state or province of Dade Cmnty and eaployed by A'rkwright Hutual Insurance CoaTMn'y of Norwood, Ha. have inspected the components descr lb'n this Owners Report during, the period 10/02/98'6 10/11/98 and state that to the'best of my knowledge and belief, the Owner has.perform< examinat~ions and-taken corrective measures describxl in this (hners Report in accordance with the requirements of <<he ASHE Code, Section XI. cI By signing this certificate ne'ither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Csaw.r's Report.-Fui'thermoke, neither the Inspector nor his eapioyer shall be liable in any manner for any personal injury or pi operty damage or a loss of any'ind arising from or corrected with this inspection. Comnissions, N 0 N Inspector Signa ure National Board, State, Providame, and Endorsemests Date 98-0'11-3 FORH NIS-2 ONNERS REPORT FOR REPAIRS OR REPLACEHENTS As&equirecU5y the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 10 20 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of Address 2'.

Plant Turke Point Plant Uni t pMD ¹: 63/9767 uo ¹: 98019092 01 cR ¹:98-1405 9760 Su 3C4 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Mo.,Job No.,etc

3. Nork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date M A 9760 Su 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Residual Heat Remove\ S stem System ¹: 50 Duality Group: A
5. (s) Applicable Construction Code 831.1 1955 Edition,~u A Addende,~m A Code Csee (M> Applicsnle'Edition of Rection Nl Ntlllted for Repairs or Replacements 19E9 Edition,~MA Addende,~NA code case Identification of Components Repaired or Replaced snd Replacement Components Name of Name of (Hanufacturer( National Other (Tear ( Repaired (

ASHE ( Component Hanufacturer Serial Mo. Board Identification (Built( Replaced or Code 'I9 ( ( Repiac~t (St~ ( ( ( I ( I [Y~es No (srUDs <2) IN/A (N/A (STK CODE 29510 1, 1 1/2" iUNK (Replacement (No I R 95-0154 Urc ¹ 352002 (Nurs <4) IM/A IM/A (STK CODE 27989 .1,1 1/2" (UNK (Replacement (No R91-7958 Urc ¹ 420655

7. Description of Work: REPLACED 2 STUDS AND C NUTS ON CLAHP OF SUPPORT 3-RCH-12.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other Vr-3 Pressure~fs Test Temperature ~

F 98-012-3 Sheet' of 2 FORK IHIS.2 (IIack)

9. Remarks: KEcNAMIcAL coNNEcTIolf~wo llELDING REOUIRED.

CERTIFICATE OF COKPLIANCI= Me certify that the statctncnts made in the report are correct and this ireplscement conforms to the irui*s oif tHe ASKE Code, Section XI ~ Type Code. Symbol Stamp Certificate of thoriiation Ho. ~HA Expiration'Date Signed ~ Owner or Own~rrs Designee, ,I gTi<CWl s~@pr~. CERTIFICATE OF IH.ERVICE INSPECTION I, the undersigned, hol<ding a valid contnission issued by the National: Board of Boiler and Preasur* Veasei, Inspectors.ind the state or Province of Dade Co<atty and entploycd by Arkwright Mutual Insurance Con@any of Norwood, Ka. have inspected th<c components d'escribed in this Owners Report during the period 1'0/06/98'o 10/11/98 and state that to the best of my knowledge and belief, the Ower has performed examination's and taken corrective measures described in this Owners Report in accordance with the requirements of itheiASKE Code,~ Section XI. I By signing this certificate neither the Insp<mtor nor his anpioyer malkes any warranty, express'cd *r inplied, concerning the exnmir<ations and corrective measures described in th<is Amer<s Report. Furthermo're, the Inspector nor his cnploycr shall be liable in any imanner ~for any pet sonal injury, or property 'either damage or a loss of any kind arising fran or cortnected witlh th<is insF<ection. Conmissions, Ml 8'30 N I Inspector S i gnC re National Board, state, providence and Endorsemcnts Date cPcP 19,FI< 98-012-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required~cthe.Provisions-of the ASME Code Section XI Florida Power 8 Li ht Date 10 13 98

1. Owner 700 Universe Blvd. Juno Beach Fl. 33408 Sheet '1 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹: 63/9741 WO ¹: 98019305 01 CR ¹:98-1436 9760 SW 344 Street Florida 'Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Work Perforned by Florida Power S Li ht Type Code Symbol Stamp N A Authorization Ho. N A Date r'xpiration N A 9760 SW 344 Street Florida Cit FL. 33035 Address 4~ Identification of System: CVCS Char in 8 Letdown S stem System ¹: 47 Quality Group: A
5. (a) Applicable Construction Code 831.1 1955 Edition,~MA Addenda,~HA code casa lb) APPllcsble Edition of Section Xl Utlllted for RePairs or RePlscnnents 1989 Edition,~HA Addenda,~HA Coda Case dentification of Components Repaired or Replaced and Replacement Components Name of 'Name of iManufactureri National )

Other )Year J Repaired i ASME i Component Manufacturer i Serial No. Board Identification ieui Iti Replaced or ) Code i [ Replacenent iStamp ) I I JYeereso iROD, THREADED IH/A IH/A IH/A IUTC'20599 ASME SA-193 IUNK I Replaced i Ho I4 STUDS FABRICATED GRADE 87 IHUT HEAVY HEX (8) )H/A IH/A JH/A iUTC 420345 ASME SA-'194 iUNK iReplaced iNo GRADE 28

7. Description of Work: REPLACED FOUR 4 STUDS AND EIGHT 8 HUTS ON FLANGE BOLTING VENT VALVE 3-300C.

Tests Conducted: Hydrostatic: Pnewet i c: Hominal Operating Pressure 9 Other VT-1 Pressure~ is Test Taoperature 'F 98-013-3 Sheet 2 of 2 FORH NIS.2 (Back)

9. Remarksr HECMANICAL CONNECTION NO uELDING REQUIRED.

CERTIFICATI: OF COMPLIANCE Mc certify that the statements made in thc report are correct and thlis lreplacement conforms to the rule's of the ASHE Code, Section XI. Type Code Symbol Stamp ~NA Certif icate of A horization Mo. ~ ~MA Expiration Date ~N 'A Sign~iwner Owner<a Desiirnce, Tit4 f+>>>>r>> CERTIFICATE OF INSIERVICE INSPECTION I I I, the undcrsigncd, holdling a valid commission issued by the National Board of Boiler and Pr esture'essel 'I and the state or Province of Dade County and employed by Arkwright Hutuai, Insurance Conpany of 'o 'nspectors I Norwood, Ha. have inspectedl the compo<rents described in this Okner<s R<lport during the period 10/05/98 10/12/98 and state 'that to the best of my knowledge and belief, the Owner has perfinrmcd examinations and taken corrective measures dlcscribcd in this thrners Report in arcordance with the requirements of the ASHE'ode, Section XI. By signing this certificate neither the Ir<spcctor nor his crlyldycr'mak'es any warranty, expressc'd or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, I neither the Inspector nor his enpioycr shall'be liable in any manner for any personal injury or pdopeity or a loss of any kind arising from or connected with thiis inspection. 'amage I Co<rrnissions,, NB, 823~0M~I Inspe 6rs ignature National Board, State, Providence, and Endorscrncnts Date 98-013-3 FORH NIS-2 OMIERS REPORT FOR REPAIRS OR REPLACEHEHTS As'Required by<he&rovfefons of the ASHE Code Section XI

5. Owner Florida Power 8 Li ht Date 10 20 98 700 Universe Blvd. Jun Beach Fl. 33408 Sheet of 2 Address
2. Plant Turke Point Plant Unit 3 PNO ¹: 63/9745 MO ¹: 98019304 01 9760 Ql 3CC Street Florida Cit Fl. 33035 Address Repair Orgsnizatfon P.O. No.,Job No.,etc
3. Nork Performed by Florida-Power 8 Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 SM 34C Street Florida Cit FL. 33035 Address
4. Identification of System: REACTOR COOLANT SYSTEH System ¹: 41 Duality Group: A
5. (a) ApplicabLe Construction Code . B31.1 1955 Edition,~ss Addenda,~ss Code Case ibl Applicable.Edition of. section xl utlllted for Repairs or Replacements 1959 Edftfon,~kA Addenda,secede case dentificstion of Components.Repaired or Replaced and Replacement Components Name, of Name of iHsnufacturer National Other Year i Repaired i ASHE i Component Hanufscturer i Serial Ho. Board Identification Builti Replaced or i'ode i i Replacement istamp )

I ]~Yes Mo IH/A 'iSTK 29493 UHK i Replacement ')No iSTUDS (4) N/A IN/A CODE 1 I UTC ¹ 420599 IHUTS (8) H/A IH/A IH/A 'iSTK CODE 27963 1 UNK iReplacement iNo I UTC ¹ 420345

7. Description of Mork: REPLACED 4 STLSS AND '8 NUTS ON REACTOR 'COOLANT PUHP A 3P200A SEAI. BYPASS FLANGE ¹2 Tests Conducted: llydrostatlc: .Pnetmmtfc: Nominal Operating Pressure Other VT-1 pressure~is Test Teepersture 'F 98-014-3

Sheet 2 of 2 FORM NIS-2 (Bedeck) 9., Remarks: THIS IS A-BOLTED CONNECTION ,'NO MELDIMC REO<JIRED. CERTIFICATE OF COMPLIANCE ue certify that the statements made in the report erie correct and this replacement conforms to the rules of the ASHE Code, Section XI. Type Code Sy<<hol Staap ~NA Certificate of Au orixaticp No. ~MA Expiration Date N s.g~< iiste~CF 'wner'r <er<s DI.signee, Ktie A.'ERI'IFIiCATE OF INSERVICE INSPECTION I, the undersigned, holciing a veiled ceo<<<issicin issued by the National Board of Boiler and Pressure Ve':set inspectors and the state or Priovir<co of Dade County and'<<cloyed k<y A~kwr ight Hutua'I Insurance Coepany of Norwood, Ha. have inspected the ccepo<~ts described in this O<<ners Report during the period 1k/05/98 tio 10/12/98 and state that to the best of my knowl,edge and belief, the Owner has performed e'xamfnations an<) taken corrective measures described in this Owners Report in ai:cordance with the recF<irements of t'e ASHE'<xfe, ( Section XI. I By signing this certificate neither the Ir<spector nor hi's e<ipioyer,makes any warranty, expressed or I implied, concerning the exa<<<fnatio<<s and corrective measure's d<'rscribeci'n, this Owner's Report. Furthe<~re, neither the Inspector nor his <'epiioyer shall be liable In any <<<armer for any personal injury or p<'operty damage or a loss of any kind ar ising from or connected with'.this inspection. Cci<<<<< fssicns ' NB '8230 N I Inspe ors nature Nation<<I Board, State, Providence, and Endorsenents 4 D.t. < 19F<F 98.014-3 FORM MIS-2 OllMERS REPORT FOR REPAIRS OR REPLACEMENTS ,0 As Required-by the'Provisions of the ASNE Code ',Section XI

1. Owner Florida Power S Li ht Date 10 29 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address
2. Plant Turke Point Plant Unit PWO ¹: 63/9306 WO ¹: 98016375 01 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp Authorization No. H A ExpirationfDate N A 9760 SW 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Intake Coolin Water S stem System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition,~ll A Addenda;~NA code case lb> Applfcable Edition of section xl vtlllted for Repairs or Replacements 1989 Edttten,~HA Addenda,~MA code case

, Identification of Cceponents Repaired or Replaced and Replacement Components Name of Name of iManufactureri National 'i Other iYear J Repaired i ASHE i Component Manufacturer i Serial No. Board Identification isuilti Replaced or i Code i i Replacement iStamp i uo isTUDS (5) iM/A IH/A IN/A I STK-CODE 29510 R70591 IUHK ,)No UTC ¹ 412858 I ISTUDS I iMUTS (1) (10) IN/A IN/A IN/A IN/A iM/A UTC ¹ ISTK CODE 403825'~ves iSTK-CODE 29507 R36058003 420348 86 "R iUNK IUHK iMo iHo I UTC ¹ iCARBOM STEEL PLATE H/A IN/A IN/A (STK-CODE 30272 )UMK (Mo UTC ¹ 415954

7. DescriPtion of Work: REPLACED 6 STUDS 10 NUTS ASSOCIATED WITH'VARIOUS FLANGED CONNECTIONS AMD 1 CARBOH STEEL PLATE ASSOCIATED WITH SUPPORT N 196-1 DURING INTAKE CRAWL THRU.

. Tests Conducted: Hydrostatic: Pneunat3c: Nominal Operating Pressure Other VT-1 8 VT-3 pressure~TO Test Tesperature oF 98-015-3 t Sheet 2 of 2', ll:ORH NIS-2 (Back)

9. Remarks: ALL MELDING PERFORHED IN ACCORDANCE NITH THE FPI NE!LD ONTROL!HANUAL.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the'ul.es of the ASHE Code, Section XI. Type Code Symbol Sta<<p N A Certificate of Authorization hlo. ~N A Expiration Date Signed ~ Owner o th<nerds Designe6, Tltl<i Date 19 57~. CENTI PICA'liE OF INSERVICE INSPECTION I, the undersigned, holding a valid c<mmission issued by the Ikational Board of Boil.er and Pressurle Vessel inspectors and the state-or Province of Dadle County and employed by Arkuright Hutual Insurance C<Npany Of Norwood, Ha. have inspected the c<NT.onents described in this Owners 'Report during the period OB/25/98 to 10/14/98 and state that to the best of my knowledge and belief, the Owner has perfor!med exa<sinatims end taken corrective measures described in this Ow<mrs Report in accordance with the requirements of the ASHE Code Section XI. By signing this certificate neither the Inspector nor his eaployer makes any warranty, expressed or implied, concerning the examinations and corrective measu'res'described in this Ownerda Report. Furthermore, neither the Inspector nor his employer shall be, liable in! any manner for any personal injury or property damage or a loss of any kind arising! from or c<xmected with this'nSpection. commissions , IkB 823O,~N,~I Inspecto s S~i ture national Board, atatapravidon,oa, ald llndoIatdantst'ate 5V'8-015-3 FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI 1 ~ Owner Florida Power 8, Li ht Date 10 20 98 700 Universe Blvd. Juno Beach Fl..33408 Sheet of 2 Address

2. Plant Turke Point Plant Unit PN ¹: 63/9837 N-¹: 9801984801 CR ¹:98-1517 9760 Sll 344 Street Florida Cit Fl. 33035 Address Repair Organizat~on P.O. No.,Job No.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stan@ N A Authorization No. N A Expiration Date N A 9760 Su 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code B31. 1 1955 Edition.~NA Addende,~NA code cess (fd APPllosule Edition of Soutien Xi Utllixed for Reoefrs or RePfsooemnts 1959 Edition,~N A Addende,N~A Code Csee

. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iHanufactureri National i Other iYear i Repaired i ASHE i Confponent Hanufacturer i Serial No. Board Identification iguilti Replaced or i Code i i Replacement istanp i I I ft~es No iREACTOR COOLANT PUHP C iMESTINGNOUSE iN/A iN/A I3P200C iN/A iRepaired iYes HOOEL ¹ V1101-B1

7. Description of Norkt REHOVAL OF 2 LINEAR INDICATIONS BY GRINDING ON PUHP LUG . EXAHINATION AREA 3-RCP-C-L2 IA
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other PT Pressure~4 A sfE Test Tempereture N A UF 98-016-3

Sheet 2 of 2 FOIRH MIS-O2 (Back)

9. Remarks: REMOVAL OF 2 LINEAR INDICATIONS BY iGRIMGING OM PUMP LUG.

CERT IF ICATE OF COHPLIANCE Me certify that the stateelents made in the ireport are correct'nd th'is "repair conforms to the rule<'f the ASHE Code, Section XI. ~ll Type Code Symbol Starqp N A Certificate of A hoiization Mo. N~A Expltstlotl Oats a siss~~ 19, OMner or (hsM;r s Design2, Title CERTIFICATE OF INSERVIiCE INSPIECTIOM I, the undersigned9, holding a validI c(xsaission issued byl the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Comity and'esyloyed by Ar'kwright Hutual Insurance Caq~ny of Norwood, Ha. have inspected the cor~nent. described in this Ounera Report during the period '0/10/9B 'o I 10/15/98 and state that to the best of my knowledge and belief, the Ouner has performed eXaminatfons'and I taken corrective measures described in this Osrners Report in accordance uIth the requirements df the ASHEiCode, I Section XI. By signing this certificate neither the Inspector nor hils ea'pioyer makes any Marrant'y, expressed concerning 'the examinations and correctiive measures doscribed in this (hrnerts Report. 'FurtherImork', or'Is@lied, neither the Inspector nor his eaployer shall be l,iabie in any manntcr for sny,personal injury od prspedty i damage or a loss of any kind arising from or connected arith this inspection. ~ p7 eamnisslks Xs 828~88~2} Inspec rs S nature sot latest ltaattl, stats p 0 \deltas, atld Elldotstsetlts (n~g 98-01i5.3 FORH NIS-2 OMNERS REPORT 'FOR REPAIRS OR REPLACEHENTS iAs Required by the Provisions of the ASHE Code" Section XI I. Owner Florida.Power & Li ht 'Date 10 20 98 700 Universe Blvd. Juno Beach Fl. 33C08 Sheet of 2 Address

2. Plant Turke Point Plant Unit 3 PMO; ¹: 63/5688 MO ¹: 97022075 01 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Mo.,Job No.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stamp N A

,Authorization Mo. N A Expiration Date N A 9760 SM'3CC Street Florida Cit FL. 33035 Address

4. Identification of System: Steam Generator S stem System ¹: 71 Quality Group: B
5. (a) Applicable Construction Code 831. 1 1955 Edition,~ss Addenda,~ss Code Case lg> Appliosgle Edition of seotlon xl Ntllited for Repairs or Replaoonents 1989'Edftfon,~ss Addenda,~NA code case

. Identification of Components Repaired or Replaced and'Replacement Components Name of Name of iHanufactureri National Other iYear i Repaired i ASHE i Component Hanufacturer i Serial Mo. Board Identification iBuilti Replaced or i Code i I. i Replacement.,iStaap /~yes No i Tl I I I

iBOLT, HEAVY HEX 1 1/4" iMESTIMGHOUSE iH/A iN/A iUTC 420280 iUMK ;iReplaced iNo SA-193 GR B7
7. Description of Mork: REPLACED ONE 1 BOLT OM STEAH GENERATOR "Bs 3E210B SECONDARY HANMAY COVER.
8. Tests Conducted: Hydrostatic:t Pneunat ic: Hominal Operating Pressure Other "'T-1 Pressure~f9 Test Ttspersture 'F 98.017-3

Il Sheet 2 of 2 FOIIH NIS-2 (Back)

9. Remarks: KECNANICAL COHNEC1I'IOH NO NELDIIIG RIEQUIRED.

CERTIFICATE OF COMPLIANCE lie certify that the statanents made in the report ere correct and this replacement conforms to the rules of, the ASHE Code, Section XI. Type Code Symbol Steep Certif icate of AuthorizaILion No'M~A Expiration Date N 'A Signed ' Owner or 4+~( v@iN Ne,+Ppr<cM i!r~g Designee/Title ~~+ Date 1 9++ CERTIFICATE OF INSI.'RVICE INSPECTION I, the undersigned, holdling a valid caINeission issued by the National Board of Boiler and pressure'essel and the state or Province of Dade County and employed by Arkwright Hutuai. Insurance Company ofi 'nspectors Norwood, Ha. have inspectedl the components described in thi's Owners RLport during the period 10/03/97 to t 10/18/98 and state that to the be. t of my knowledge and belief, the Owner hss performed exsmi'nations snd taken coriectivc measures d'escribed in this Owners Report in secordsnee with the requirements of the ASHB Code, > Section XI. By signing this certificate neither the Inspector nor his ekpldyer mek'es any warranty, expressed or implied, concerning the examinations snd corrective measures described in thiis owner's IReport. Furthermore, neither the Inspector nor his,imployer shall be liable in s'ny mann'cr for.sny personal Injury or property damage or a loss of sny kind arising from or connected with this i~nspection; Conmi ssi ons HB. 82 0 H Inspe or s nature National Board, State, provideree, and EndorsIcments Date 19~~V 98-0117-3 FORH NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACENEHTS As Required by the Provisions of the ASHE Code Section XI

5. Owner Florida Power 8 Li ht Date 10 18 98 700 Universe Blvd. Juno Beach Fl'. 33408 Sheet ~ '

of 2 Address

2. Plant Turke Point Plant Unit Name PMO ¹: 63/9675 MO ¹: 98018674 01 CR ¹:98-1319 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization.P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Power S Li ht Type Code Symbol Stamp N A Authorization Ho. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. '33035 Address 4~ Identification of System: S nt Fuel Pit Cooli S tern System ¹: 33 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edft fcn~NA Addenda,~NA Code Case

Applicable Edltlcn of section,xl utillted for Repairs or Repleeenents 1989 Edftfon,~ua Addenda,~sa cede case Identification of Caqmnents Repaired or Replaced and Replacement Coaponents Name of Name of iNanufactureri National i Other iYear i Repaired i ASHE i Component Hanufacturer i Serial Ho. Identification )Builti Replaced or ) Code i i Repiac~t iSt~ i i~Yea No IU BOLTN C S N MITH NUTS IH/A H/A , N/A UTC 419889 UHK Replaced (Ho STK CODE 29355 IAHGLE, HOT ROLLED ,IN/A IN/A i UTC '416088 iUNK Replaced iNo STK CODE 29598 BAR, FLATS C.S. 'IN/A lN/A iH/A iUTC 374021 iUNK iReplaced ,iNo STK CODE 29739

7. Description of Mork: REPLACED SUPPORT S-1 DUE TO CORROSION.
8. Tests Conducted: Hydrostatic: Pneuaat i c: Hominal Operating Pressure Other VT-3 Pressure~To Test Turpersture ~

F 98-018-3 Sheet 2 of 2 FCCH NIS-2 (Back)

9. Remarks: ALL IJELDING PERFDRHED IN AccoRDANcE wlTH THE FPL QEL6 coRTRdL HANUAL!

CERTIFICATE OF COHPLI ANCE Me certify that the stateaents made in the report are correctt and this replacement,conforms to the rules of th6 ASHE Code, Section XI. Type Code Symbol Steep ~NA Certificate of A horization Koo N~A ExDtrotion Doto ~D x Donor or om:rex D tntttllrx , of& Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valicl canaission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of. Dade Cawty and eaploycd by Arkwright Hutual Insurance C~ny 10/18/98 Ha. have inspected the cavporents described in this Owners Report during the period 10/01/98 and state that to the best of my knowledge and &lief; the Owner has performed examiinations'nd of'orwood, 'o taken corrective measur'es described in this Ctwners Report in adcordance with the requirements of the ASHE'ode, Section XI. By signing this certlificate neither the Inspector nor his enyloyer. makes any warranty, expressed or implied, concerning the examinations and correctiive measured'kscribed in'hi's &merts.Report. FurtheAnorL, ,neither the Inspector nor his employer shall be liable in airy a'ernii.r for any per. onal inJury or; prioper'ty or a loss of any kind arising from or conrmcted with this inspection. 'amage C<xnni ss iona NB 823~ON~12 Inspectors Sig lure ~ Nat'ionhl B'oard, State, Providence, and Endorsements D.t. 98.018-3 FORH NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the",Provisions-of-the ASHE Code Section XI h.,Owner Florida Power 8 Li ht Date 11 05 98 700 Universe Blvd. J~ Beach Fl. 33COB 'Sheet R 1 of 2 Address

2. Plant Turke Point Plant Unit 3 Mama PMO ¹: 63/9858 MO ¹: 98019911 01 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Syaboi Staap H A Authorization Ho. N A Expiration Date 9760 SM'34C Street Florida Cit FL. 33035 Address
4. Identification of System: Intake Cooli Mater S tern System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code B31.1 1995 Edit fan,~us Addenda,~us codo case (h) Applicshle Edition of section xi utilited for Repairs or Replscuaertts 19E9 Ed tfi on~us Addenda,~us code case Identification of Components Repaired or. Replaced and Replacement Components Name of Mene of (Hanufacturer . National (

Other (Year ( Repaired ( ASHE (- Component Hanufacturer ( Serial Ho. Board Ident i f ication (Built( Replaced or ( Code ( ( Replacement (Stamp ( I I i~Ves uo (ICM CHECK VALVE (H/A (85223 (N/A (3-50-331 24" CHECK VALVE (UNK (Replaced (No (ICM CHECK VALVE IATMOOO 8 HORRILL IHT9895 (3-50-331 STK CCOE 52545 (UHK (Replacewlt (Mo SN2 UTC ¹'19370

7. Description of Mork: REPLACE INTAKE COOLING MATER CHECK VALVE 3-50-331.

PRESSURE TEST PERFORMED UNDER PRESSURE TEST PACKAGE 03-ICM-1998-1-01. Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure other vt-l vr-2 pressure~?I is test teepersture 85 'F 98-019.3 Sheet 2 of 2 FORH NIS"2 (Back) 9.,Remarks: THIS IS A NECHAHICAL CONNECTION~HO MELDING REQUIRED. CERTIFICATE OF COHPLIAHCE Me certify that the statements made in the report are correct artd this.'repl,acement conforms to the tule's of th' ASHE Code,,Section XI. Type Code Symbol Stamp Certificate of A thoriiation No. ~NA Expiration Date N 'A Big~ I~ .44.r<" Date '19'+~ Owner Own r's Desigr, Tit(ee CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid camnission issued by the National Board of Boiiee and Pressure'Vessel inspectors'nd the state or Province of Dade Co+sty and employed by Arkwright Nutual Insurance Company of Norwood, Na. have inspected'he camporents described in thi's Owners Report during the period 10/11/98 'o 10/19/98 and state that to the best of my knowledge and.&lie'f, the Owner has performed examinations and taken corrective measures described in this Owners Repor t i'n ac:cordance with the requirenents of the ASHE'ode, Section XI. By signing this certiificate neither the Inspector nor his eayioyer makes any warranty, expressed concerning the exmainatie~ and correctiive measured'kscribed in this Oner's Report.,Furthe&norh, or'mplied, neither the Inspector nor his eepioyer shall be l,iabie in ahy mann'er 'for any personal injury or property damage or.a loss of any kind arising from or conrmcted with this inspection. Cccmi as i ons NB 823~ON~I~ I c rs Sig ture National Board, State, Providence, and Endorsanents Dat 19~& 98-019-3 FORM MIS-2 OMMERS REPORT FOR REPAiRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl . 5)oner Florida P~r B Li ht Date 10 20 98 700 Universe Blvd.'~ Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant". Unit 3

,PQ).N: 63/9743 ll N: 98019306 01 CR r/:98.1436 9760 Su 344 Street Florida Cit -'Fl. 33035 Address Repair Organization P.O. Mo.,lob.Mo.,etc Mork Performed by Florida Pncer S Li t Type Code Syntel Stanp M A Authorization'No. Expiraticn Date M A 9760 Su 344 Street Florida Cit FL. 33035

4. identification of Systeet Safet ln ection S tefs Systeia Nr 62 Quell ty Group: B
5. (a) Applicable Construction Code B31.1 f955 dRftf en~ca Addenda,~cs Coda Casa lb> A~lfcsbfe Rdltlcn of sectlonxl ut,lifted for Repairs or Rcofac~ts f959 Rdftfcn,~ea Addende~NA code case dentification of Ccafpcnents Repaired or Replaced and Replaceeent Coffponents Naae of Mace of (Manufacturer( National ( Other (Year ( Repaired ( ASME (

Coafponent Manufacturer ( Serial No. Board ident i f ication (Built( Replaced or ( Code ( I ( Replacoaent IStawp ( I I I ~tac Na (STUDS (8) IN/A  ; IN/A (N/A (7/8" UTC 409897 (UNK (Repl aceaent Xo IFE 3 932 STK CME 29499 INUTS (16) IN/A IN/A IN/A (7/8" UTC 419762 IUNK '(Replacement INo (FE.3-932 STK CN)E 27838 . Description of Mork: REPLACED 8 ST(IS NN 16 NUTS ON FE-3-932. . Tests tenducted: llydrostatlc: Pnnnatfcr Nosinal Operating Pressure Other VT-1 Pressure~N A is tact testorature 'F 98-020-3 Sheet.2 Pf 2 FORH NIS-2 i,'Beck)

9. Remarks: THIS IS A BOLTED CONNECTION~MD FIELDING RECUIRED.

CE'RT IF I CATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this replacement conform to thai rules of the i ASHE Code, Section XI. Type Code Symbol Stamp N A Certificate of A horizatigp No. ~NA Expiration Da'te N A ~~gF<'-. g s gav5/c 2 1 iy QP'O (her or naris IIAIgneeg TI e 4 "V CEltTIFICATE OF IMSERVICE INSPECTION I,. the undersigned, ho'lding ~ valid ceeaission issued by the National Board of BoILer and Pressure Vessel inspectors and the state or Province of Dadle Cixmty nrxi employed by'rkaright Mutual Insurance Ceepeny of Morwxd, Ha. have Inspected the componeots described in this Owners Report during the period 10/05/98 to 10/19/98 and state, that to the hest of my knowledge and belief,, the Oeer hss performed examinatiare and taken corrective measures descril~ in this Owners Report in accordance Mith the requirements of the ASIA Code, Section XI. gravure By signing this. certificate neither 'the Inspector nor his eaployer makes arry Narranty, expressed or Is@i ied, concerning the examinations anf corrective measures described In this thawer's Report. Furthermore, neither the Inspector nor his employer shaLL be Liable in any earner for any personal injury or, property damage or a loss of arD kind arising from or cornected NI'th'his'nspection. Ccomi salons MB 8230 N I Inspector SI Nati~onal Board, State, Providence, and Fndorsements Date 19 ~'g I 98-020-3 FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 10 20 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet - 1 of 2 Address
2. Plant Turke Point Plant Unit PQO>¹: 63/9744 lQ'¹: 98019307 01 CR ¹:98-1436 9760" SM 344 Street Florida Cit Fl. 33035 Address Repair'Organization P.O. Mo.,Job No.,etc
3. Nork Performed by 1Florida Power & Li ht Type Code'Symbol Stamp N A Name Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Safet In ection S tern System ¹: 62 Quality Group: B
5. (a) Applicable Construction Code B31.1 '1955 Edition,~ga Addenda,~sa cafe case ln) Applfaspla Edition of Station Ri Utilized for Repairs or Replsonoents 1989 Edition,~NA Addenda,~ll A Code Case

. Identification of Components Repaired or Replaced and Replacement Components Name of Name of )Manufacturer) National Other Year ( Repaired ( ASHE ( CoJJponent Manufacturer ) Serial No. Board Identification Built( Replaced or I Code ) ( Replacement ]Stanp ] I J~Yes lfo ]STUDS (8) iM/A IH/A ISTK CODE 29499 1 (Replacement )No IFE 3 933 7 8" UTC 409897 iNUTS (16) IH/A IN/A ISTK CODE 419762'UNK 27838 1 [UNK )Replacement ]No IFE 3 933 7 8" UTC

7. Description of, Morkt REPLACED 8 STUDS AND 16 HUTS ON FE-3-933.

. Tests Conducted: Hydrostatic: Pneunatict Nominal Operating Pressure Other VTe1 Pressore~H A ig Test Teepereture NA UF 98-021-3 Sheet 2 of 2 Cl FORH NIS-2 (Back)

9. Remarks: THIS IS A BOLTED CONNECTION NO HELDING REOIJIRED.

CERTIFICATE OF COHPLIANCE He certify that the statesxmts macle in the rleport are correct tandl this repiacement conforms tal the rules of the ASHE Code, .Section XI. Type Code Symbol Stamp N A Certificate of Aut rizatiion INo. ~ N/A 3;,.~~ Ower or Oj!fwrds lDesignee, Title ~ Da'te A+~~ i 19 d~~ CERTIIF I CATE OF INSERVICE IIISPECTI(N I, the undersigned, holding a valid ccxanission issued by the National Bloard of Boiler and Pressure Vessel inspectors and,the state or IProvincle of'ade County and Smplbyed by'rkuright Hutual Insurance Coayany of Norwood, Ha. have inspected the components descril~ in thisi Owhersl Report during the period 10/05/98 to 10/19/98, and state that to the best of my kmsiedge and bel.ief, the (XlNwr has performed examinations end taken corrective measures described in this Oelners Report irt accordance Mith the requirements of the A!'AE Code, Section Xl. By signing this'ertificate neither the Inspector nor'his'mployer makes any Harrantyd expressed or is@lied, concerning t'e examinat!ions and corrective measSresi described in this Owmrds Report. Fu'rtherslore, neither the Inspector nor his ea!pioyer shalll be Iiable in any manner fer any personal injury or property damage or a loss of .al'ny kind arising from or connected uiith thia inapection. tarnnlsslons IIB 3233~BI Inspectors Sigln~a!re Bett nel Beard, Staten PrOnldanae, 2nd Brddraelenan Date 98e021s 3 FORN NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACENENTS As Required by the-Provisions of the ASHE Code JSection XI . Owner Florida Power 8 Li ht Date 10 22 98 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address fa 2. Plant Turke Point Plant Unit PWO ¹: 63/9047 WO ¹: 98014670 01 PCN ¹: 97-003 9760 SM.344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job,No.,etc r

3. Mork Performed by Florida Power '8 Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 SM-344 Street Florida Cit FL. 33035 Address
4. Identification of System: Primer Mater Makeu S stem System ¹: 20 Quality Group: 8
5. (a) Applicable Construction Code B31. 1 1955 Edition,~NA Addenda,~HA Code Case (o) Applicable Edition of scotia xoi utilited for Repairs or Replaonnents 19E9 Edition,~pa Addenda,~uA tous toss
6. Identification. of Components Repaired or Replaced and Replacement Components Name of (Nanufacturer( National Other IYear '( Repaired I'SHE I Nanufacturer ( Serial No. Board Identification ]guilt( Replaced or 'f Code f

( Replacement /StaJJJp / I I J~ees Ro STEEP SOCKETWELD (H/A IN/A IUTC 420016 )UHK (Replacement ]No STK CODE 35122 iREDUCERE INSERT IN/A IH/A IUTC 420034 JUNK [Replacement [Ho STK CODE 46688

7. Description of, Mork: INSTALLATION OF A 2" TEE FOR RV-3-302 PER PCN 97-003. CODE CASE N-416-N

'WAS INVOKED FOR THIS REPAIR REPLACEMENT ACTIVITY. LEAKAGE TEST PERFORNED UNDER 03-PWHU-2006-F-01

8. Tests Conducted: Hydrostatic: Pneumatic: Hominal Operating Pressure Other VT-2 Pressure~160 sip Test Teapersture DF 98-022-3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: ALL WELDING PERFORMED IN ACCORDANCIE 'WITH APPROVED PL NT ~PRO ED RES,'CODE CASE N-416-1 WAS ENVOKED FOR THIS REPAIR REPLACEHENT ACTIVlTY.

CERTIFICATE OF COHPLIANCE We certify that the statenents made in the report are correct and this replacement conforms to the rulers of th' ASHE Code, Section XI'ype Code Symbol Stamp Certificate, of Aut orizatiop No. ~N A Expiration Date ~NA Lair +C7~/~ Owner or ner's Desiginee, Title 47 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid conmission issued by tHe National Board of Boiler and Presaure.Veasel~ inspectors and the state or province of Dade County and employed by Arkwright Hutual Insurance Cehpady of ' Norwood, Ha. have inspected the components d'ascribed in th'is Ownels R'eport during the period 08/12'/98~ tb 10/20/98 and state that to the best of my knowledge and beliaf, the Owner has performed examinat'iona and taken corrective measures idescribed in this Owners ',Report in accordance with the requirements of the ~ASHE Code, Section XI. I By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examirmtions and corrective measures described in this Owner's Report. Fui thdrmoke, neither the Inspector nor his emp'loyer shall be lia'ble in any ~manner ~for any'ersonal Injury or property damage or a loss of any kind arising from or connected with this inspectiion. ~ y'7 l."omni ss iona ~H82$~0N ~i Inspectors igm t e National Board, State, Providence, and Endorsements 'ate I 98.022-3 .FORM NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI u

5. Owner Florida Power & Li ht Date 10 30 98 Name 700 Universe Blvd. Jum Beach Fl. 33408 Sheet > 1 of 2 Address
2. Plant Turks Point Plant Unit 3 PMO ¹: 63/6668'MO ¹: 97027648 01 CR ¹:97-1377 9760 SM 344 Street Florida.Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Mork Performed by Florida Power & Li ht Type Code Synhol Stomp M A Authorization No. M A Expiration Date H A 9760 SM 344 Street Florida Cit FL. 33035 Address 4~ Identification of System: C t Coolin Mater tern System ¹: 30 Quality Group: C r
5. (a) Applicable C~truction Cm 831.1 1955 Edftfan,~ll A Addenda,N~Acode case (5) Applicable Edition of section Ni Ntllfted far Repairs or Replaces>>nts 19R9 Edition,~us Addenda,~uc code case Identif ication of Components Repaired or Replaced snd Replacement Ca5T5onents Hams of Name of [Manufacturer] Hational 'Other (Year f Repaired [ ASHE f Component Manufacturer (

Serial No. Board Identification [guilt] Replaced or [ Code f Replacement ]Stamp f I [~tes Na (VALVES SMING CHECK f BONNEY FORGE H/A ,)H/A (STK CODE 222259 2 )UHK Replacement iMo 3-721A UTC 419226 [FLANGEE CARBON STEEL IH/A ]N/A '[M/A [STK CODE 102064 1 '(UMK J Replacement J No UTC 418535 ELBOM. SOCKETMELD IH/A IH/A /H/A /STK CODE 34037 1 JUNK ) Replacement ( Ho J UTC 415333" IPIPE ~ CARBON STEEL IN/A fH/A ,JN/A (STK CODE 30687 1 [UHK (Replacement ]Mo ISCHEDULE 160 UTC 417701 IPIPE CARBON STEEL 'IN/A IN/A IM/A ISTK CODE 30623 1 IUHK IReplscement ]No ISCHEDULE 40 UTC 373909

7. Description of Mork: REPLACED VALVE 3-721A AMD ASSOCIATED PIPIHG IM ACCORDANCE MITH CR 97-1377.

THE FOLLOMING ADDITIONAL PARTS MERE REPLACED: RDO THREADED 1 STUD 'FABRICATED STK CODE 29501 1 UTC 415374 ,NUT 2 HEAVY HEX STK CODE 27840 1 UTC 415395. CODE CASE N-416-1 MAS INVOKED FOR THIS REPLACEHEHT ACTIVITY. LEAKAGE TEST PERFORMED UNDER PRESSURE TEST 03-CCM-3036-L-01 . Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure 1 Other VT-2 Pressure~tlp ig Test Teaparcture 86 ~ F 98.023-3 Sheet 2 of 2 FORH NIS-2 OBack)

9. Renarks: ALL MELDING PERFC!RHEO IN'CCORDANCI= MITH APPROVED PL HT PRCk EDIIRES>>

CERTIFICATE OF COHPLIAHCE Me certify that the statements n>>ade in the report are correct and this ~replLacement conforms to the rules of thee ASHE Code, Section XI. Type Code Symbol Stamp Certificate of uthorization No. ~NA Expi rat I c!n D ate N A Signed Owner fC ~ 3~/HA ~~2 x~~ >>'7~ Owner s Desigrme~ Title Date~ CERTIFICATE OF INSERVICE INSPECTIOH I, the undersigned, holding a valid comnisslc!n issued by th'e National Board of Boiler and Pressure Ve. sel inspectors and the state or Provir!ce of Dade Cecity and employed by Arkwright Hutual Insurance Cori@any of Norwood, Ha. have inspecteci the ccxnponents describe>>d in this Owners'Report durir!g the period 03/05'/98'o 10/22/98 and'state that to the best of my knowledge a!L!d 6elici.f, the Owner-has performed examiinations and taken corrective measures described iiri this Owners Report in accordance with the rejuiretnents of the,hSHE Code, Section XI ~ By signing this certificate neiither the Inspector nor his en@layer makes,any warranty, expressed or implied, concerning the examinatic!ns and corrective measures described in th'is Owner's Report. Furthe'rmore, neither the Inspector nor his empl,oyer shall be liable in any manner 'for any personal Injury or property~ damage or'a loss of any kir6 arisi'ng,from or cor!nected witiir this insp6ction. i/7 Ccxnnissions NB 823~0~>> Inspect r's SIg&ture ~ Ka~tiorhal Board, State, Providence, anci Endorsenents Date $ Igi) 98.023-3 0 FORH NIS-2 OHNERS REPORT FOR REPAIRS OR REPLACENENTS As Required~-the Provisions of the ASNE-Code Section XI E. Owner Florida Power & Li ht Date 10 20 98 700 Universe Blvd. Jam Beach Fl. 33408 Sheet of' Address

2. Plant Turke -Point Plant Unit PHO ¹: 63/9871 HO ¹: 98019927 01 CR ¹:98-1406 9760 SH 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O.'No.,Job Ho.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stony N A Authorization No. N A Expiration Date 9760 SM 344 Street Florida Cit FL. 33035 Address 4~ Identification of System: Reactor Coolant S tern System ¹: 41 Dual i ty Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition,~ue Addenda,~se Code Case (8) Appticstde Edition ai section xi Utilitcd for Repairs or Rcplaccannts 1989,Edition,~H A Addenda,~N A code case Identif ication of Components Repaired or Replaced and Replacement Coaponents Name of Name of )Hanufacturer National Other )Year I Repaired I ASNE I Coayonent Nanufacturer (

Serial No. Board Identif ication )Built[ Replaced or ) Code ] ( Replacement [Stamp ) I ~Yes Eo ITHREADED ROD 5 3/ IH/A . H/A H/A UTC¹ 0000415374 UNK (Replacement No ) 4 STUDS FABRICATED STK CODE ¹ 0029501 1 /8 HEAVY HEX NUTS N/A IH/A IUTC¹ 0000394551 I UNK )Replacement )Ho STK CODE ¹ 0044572 1

7. Description of'llork: REPLACED 4 5 3 488 STUDS AND 8 NUTS ON SEAL INJECTION FLANGE TO 3C RCP.

Tests Conducted: Hydrostatic: Pnmnatic: Nominal Operating Pressure Other VT-1 'pressure~is Test Tceperature 'F 98-024-3 Sheet 2 of 2 I FiDRH NIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION~NO l!ELDTMG REOUIREII).

CERT IF I CATE Ol- COMPLIANCE Ne certify that the statenents made in the reFert are correct and tlhis replacement conforms to the 'rules of .the ASHE Code, Section XI. Type Code Symbol Stamp Certificate of Sig~l Au orizati 7 n Ko. ~MA n'~ Expiration Date M A ar'e:sigi, Titlp~AFK~@g~~ aate Osmer or ~ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdinRI a valid coamission issued by the National Board of Boiler and pressure and the state or Province of Dade Cexmty and aqpioyed by hrkMt igh't Hutual Insurance Coepanly of vessels'nspectors Norwmd, Ha. have inspected the components described in th'is Owners RepoI t cfuring the period 10/12/98 tIo 10/20/98 and state that to the best of my kncneiedge and belief, the (oner has,performed examinations an'd taken corrective measures descritxxf in this (Nners Report in accordance with the. requirements of the ASHE Code, XI. 'ection I By, signing this certificate neither the Inspector nor hfs esploye'r makes any warranty, expressed or implied, concerning the examinmt3ons and corrective measures dlescribed in this OMner's Report. Fui theIrmoj'e, neither the Inspector ror his enployer shall be lia'ble in any manner 'for any personal Injury or property damage or a loss of any kind arising from or corlnected leith thiis inspectIion. Y7 Ccmnissions, , NB 8230 (My(l) Inspector ignature Natiexml Board, State, IProvidewe, and Endorsements 'ate 98.024-3 0 FORM HIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required~ Xhe.ProVjsions of the ASHE Code Section XI <<. Owner Florida Power 8 Li ht Date 10 24 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant Unit PMO ¹: 63/6670 MO ¹: '97027651 01 CR ¹:97-1377 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization'P;0. Ho.,Job No.,etc
3. Mork Performed by. Florida Power 8 Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address
4. Identification of System: C nt Coolin Mater S stem System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955.Edition,~NA Addenda,~HA code case (u) Applicable Edition of section xi Utilized for Repairs or Replaoeannts 1959 Edition,~u A Addenda,~N A code case Identification of Components Repaired or Replaced and'Replacement Components Name of Name of iNanufactureri National Other iYear i Repaired i ASNE i Component Kanufacturer i Serial Ho. Board Identification iguilti Replaced or i Code i i Replacement istamp i I I /~Tes No iVALVE, SMIHG CHECK BOMMEY FORGE IN/A IN/A ISTK CODE 222259 2 iUMK iReplacement iMo 3-721 C UTC 419226 iFLANGE, CARBON STEEL iN/A IH/A ,

IN/A iSTK CODE 102064 1 iUMK iReplacement iNo UTC 418535 IELBOMN SOCKETMELD IN/A iN/A iH/A iSTK CODE 34037 1 iUHK iReplacement iHo UTC 415333 IPIPEN CARBON STEEL iH/A IH/A IN/A ISTK CODE 30624 i UHK i Repl acement i No ISCHEDULE 40 UTC 382384 IPIPE ~ CARBONeSTEEL iH/A IN/A IH/A ,ISTK CODE 30623 1 iuHK iReplacement iNo ISCHEDULE UTC 373909 t

7. Description of Mork: REPLACED VALVE 3-721C AND ASSOCIATED PIPING IN ACCORDANCE MITH CR 97-1377.

THE FOLLOMING ADDITIOMAL PARTS MERE REPLACED: PIPE CARBON STEEL SCHEDULE 160 STK CODE 30687 1 UTC 417701. CODE CASE H-416-1 'MAS INVOKED FOR THIS REPLACEMENT ACTIVITY. LEAKAGE TEST PERFORHED UNDER PRESSURE TEST'3-CCM-3036-L-01. . Tests Conducted: Hydrostatic: Pneunat i c: Nominal'perating Pressure Other VT-2 Pressure~tf9 iN Test Tespersture 86 dF 98.025-3 Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: ALL MELDING PERFORKED IN ACCORDANCE u!TH APPROVED PLANT PROCEDURES.~

CEIRT IF I CATE OF COKPLIANCE lie certify that the statements made in the reiport are correct and this'eplacement conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Stamp N rA Certificate of thoriza ion No. ~NA Expiration Date N A r Signed Date Owner or nerr Designed, Tiitle CERTIFICATE OIF INSERVICE INSPECT IOhl I, the undersigned, holiding a valid comrrission issued by the Natiional. Board of Boiler and Pressure VesseL inspectors and the state or proviince of Dade Cc~ty and employed by Arkwright Hutusl Insurance CcrrTKrny Of Norwood, Hs. have inspected the components dcscrib< in this Owners Report during the period 63/1~2/98 to 10/20/98'nd state that to the best of my knowledge and beliief, the (hnner has performed exar'ainatior'rs a'nd taken corrective measures described in this Owrrers Report in accordance with the requirements of the ASHE Code, Section Xl ~ By signing this certifiicate neither the Inspector nor his empi,oyer makes any warranty, cxprcsscd or implied, concerning the examinstiions and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in sny manner for any personal injury or property damage or s 'loss of any k'ind arising from or'onnected with this insipection. Cornrrissiona 8 8 30 N I Inspect s ~Si sture National Board, State, Providence, snd Endorsements Date 98'025.3 FORH NIS-2 OMHERS REPORT. FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI I. Owner Florida Power 8 Li ht Date 10 22 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point 'Plant Unit PMO ¹: 63/5733 MO ¹: 97022434 01 CR ¹l95-240 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Mork'Performed by Florida Power & Li ht Type Code Symbol Stamp H A Authorization Ho. H A Expiration Date 9760 SM 344 Street .Florida Cit FL. 33035 Address
4. Identification of System: Intake Coolin Mater S stem System ¹: 19 Quality Group: C

'5's) Applicable Construction Code 831.1'955 Edttfcn,~ll A Addenda,u~a COde Cosa lui Applicable Edition of secticn xi utillted for Repairs or Replscesents 1959 Edition,~s A Addenda,u~a code case Identification, of Components Repaired or Replaced and.ReplacementlComponents Name of Name of iHanufactureri National Other iYear i Repaired i 'ASHE i Colponent Hsnufscturer i Serial No. 'oard ) 'dentification )Built) Replaced or i Code J I i Replacement igtamp i I I J~ts So I IPUHP 3P9A IJOHHSTOH IH/A IH/A l3P9A (1ST 2) .JUNK (Replaced i No I iPUHP 3P9A iJOHHSTON IH/A IN/A I3P9A (IST-7) iUHK i Replacement iNo 7..Description of Mork: REPLACED 3A'ST-2 ICM PUMP MITH SPARE PUHP IST-7 . PRESSURE TEST PERFORHED'NDER 03-ICMe1997-1-01. .~ Tests conducted: t Eydroststfc:t pneusstlc: t Nominal Operating Pressure VT-2 Pressure~23 lg Test Tesperature 82 oF Other 98-026..3 Sheet 2 cf 2 FORH NIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION NO MELO ING REQUIRED.

CERTIFICATE OF CONPLIAKCE Ne certify that the state<ants made in 'the rep>rt are correct and this repiaceoent conforms to the rules of the ASNE Code, Section XI. Type Code Symbol Sta<<y Certificate of thor ization No. ~NA Expire'tion Bate N~A II<< Owner or ~~ r'signee,, / 6+ Ic~ ~4'. ~'<<< ~~dcPg Title <9QW CERTIFICATE OF INSERVICE INSPECTION I, the undersignedholding a valid co<<mission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and.cloyed by Arkwright Nutiml Insurance iomp-~ny of Norwood, Ha. have inspected the ceqwnents described in ~this Owners'Report during the period 10/21/98 '12/19/97 'o and state that to the best of my 'krx>wledge and bel,'ief', the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requireemnts of the ASNE Code, Section XI. I By signing this certificate neither the Inspector nor his, e<<ployer makes any, warranty, expressed or implied, concerning the examinatiors and corrective measures described in this Owner's Report. Furt'hera<ore, neither the Inspector nor his employer shall be liable in ady m'oner for any personal Injury or'roperty damage or a loss of any kind arising from or iconr<ectcd with this Inspectice. Inspectors Signa re National Board, State, Providence, and Endorsements r Oate 98.6 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the. Provisions of the ASHE Code Section XI I. Owner Florida Power & Li ht Date 10 22 98 700 Universe Blvd. Juno Beach Fl. 33408 of 2 Address

2. Plant Turks Point Plant Unit PWO ¹: 63/6604 WO ¹: 97005183 01 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization No. N A' Expiration Date A 9760 SW 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Intake Coolin Water S stem System ¹: 19 Quality Group: C 5~ (a) Applicable Construction Code 831.1 1955 Edition,~ua Addenda,g~accde Case (b> Applicable Edition of Section Xi Utllited for Repairs or Replacements f959 Edition,~u A Addenda,~s A 'ode Case Identification of Components Repaired or Replaced snd Replacement Components Name of Component Name of Hanufacturer / Serial No.

Board'ther /Hanufactureri National i Identification iYear i iBuilt) Repaired i ASHE i Replaced or i Code i i Replacement )Stamp i I I i~res Eo J-3a 1406 ISTK CODE 14195 i Replacement i No 'UHK iX GARLOK iN/A IH/A 1 UTC ¹ 405248

7. Description of Work: REPLACED EXPANSION JOINT XJ-3-1406.

SYSTEH LEAKAGE TEST PERFORHED UNDER 03-ICWe1997-1-01. .I Tests Conducted: Hydrostatic: Pneunatic: Hominal'perating Pressure VT-2 Pressure~23 sic Test Temperature 82 oF Other 98-027-3 Sheet 2 of 2 FORK HIS-2 (Back)

9. Remarks: MECHANICAL JOIHT HO NELOIHG REQUIRED.

CERTIFICATE OF COHPLIANCE Ne certify that the statements made in the repor t are correct iandi thiis replacement conforms to the rules. of the ASHE Code, Section Xl. 'Type Code Syrrhoi Stamp Certificate of A horizatfon No. HJAA , Expiration Date H A r S I gned~ Dare .'19 gP Srner or rrs esfgne~e, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a validl cormnfssion issued bye the National Board of Boiler snd Pressure Vessel ( inspectors and the state or Province of Dade'County and eaployed by ArkwrIight Hutual Insurance Company of Norwood, Ka. have fnspected the crxrponents descriibcd fn this Owners Report during the period 12/17/i97 i tq 10/21/98 and state that to the best of my'rmwledge and belief, .the Owner has performed examinations and taken corrective measures described in this Owners Rcport in accordance with,the requfrrments of the ASHE,Code, Section XI. By signing this certiificate neither the Inspector nor his errpioyer 'makes any warranty, expressed or irrplfed, concerning the examinations and correctIive measures described in, this Owner's Report. Furthermore, neither the Inspector nor his employer shall be Itfabie in any manner for any personal injury or property damage or a loss of any kind arising from or conrmcted with; this inspection. Corrmissions NB 8230 H I Inspe ors gnature National Board, State, ProvIidence, andh Endorsements ,( 98.027-3 FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the-Provisions of the ASHE Code Section XI .. Owner Florida Power & Li ht Date 11 17 98 700 Universe Blvd. J2s3o Beach Fl. 33408 Sheet of ~ 2 Address

2. Plant Turke Point Plant Uni t 3 PMO ¹: 63/6625 lQ ¹: 97005184 01 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc
3. Nork Performed by Florida Power & Li ht Type Code Syshol Stamp M A Authorization Ho. M A Expiration Date M A 9760 Su 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Intake Cool i Mater S tern System ¹: 19 Duality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition,~VA Addenda,~pa Cede Case (b) Applicable Edftion of section Ei utllited for Aepalrs or Eeplscnsents 1959 Edition,~p A Addenda,~u A code case Identification of Carponents Repaired or Replaced and Replacement Coaponents Name of Name of iHanufactureri National i Other iYear i Repaired i ASHE i Component Manufacturer i Serial No. Board Identification iBuilti Replaced or i Code i I Replacement 1St~ I iV~es Vo IVALVEE CHECK ATlNOO & HORRILL iH/T 9895405- N/A UTC 419361 UHK Replacement iMo S Hl 52 45 1 IH/A IN/A iH/A iSTK CODE 44563-1 iUHK iReplacement iNo I STUD l1 1 8<<X 19<< 'TC 383150 iHUT IN/A IH/A iN/A iSTK CODE 44563-1 iUNK iReplacement iHo i1-1 8<< UTC 407540

,iICU CHECK VALVE IN/A i75203 iN/A i3-50-311 iUHK iReplaced iHo

7. Description of Morkt REPLACED CHECK VALVE 3-50-311 INCLUDING 19 STIIS AMD 38 HUTS AT FLAMGED CONNECTIONS.

SYSTEH LEAKAGE TEST PERFORHEO UNDER'03-ICN-1997-L-OI. Tests Conducted: Hydrostatic: Pneumat ic: Hominal Operating Pressure ~ Other ET-1 ET-2 pressure~23 ls Test Teoperature 82 F 98-028-3 Sheet 2 of 2 II FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION MOl WELDING REQUIRED., p CERT I FIUTE OF COMPLIANCE Me certify that, the staten>>nts made in the ireport are correct and this replacer>>nt conforms to the rules of the ASNE Code, Section XI ~

Type Code Syshol Stosp N A Certificate of Authoriz:ion Expiration Date N A ~ No.i IN~A s g~~ (her o (hex <<<I<<<<<Meupw 's Designeet7Title P pp

>nts describecl in this OMnerls Report during the period 12/18/97 to 11/05/98 and state that to the be< t my Carnal of .knoMIedge and belief, the OMner has performed examinationsi and taken corrective measures dlescribed in this (hners Report in accordance Mith the requirements of the ASME: Code, Section XI. I By signing this certificate neither the Inspector nor his eSpidyer makes any Marranty, expressed or implied, concerning the examinations and corrective measures described in thfis Oia>>rps Report. Furithermore, neither the Inspector nor h,is erployer shall be liable in any manner for any personal inJury or property damage or a loss of any kind arising fromi or connected with this inspection. ss I ons NB 8230 N I Ins to Signa re Natior'mi Board, State, Providence, andi Endorsements Date 98-028-3 FORM HIS-2 OWERS REPORT. FOR REPAIRS OR REPLACEMENTS As Required by, the Provisions of the ASHE Code Section XI I. Owner Florida Power 8 Li ht Date 10 21 98 700'niverse Blvd. Juno Beach'l. 33408 Sheet of 2 Address

2. Plant Turke Point Plant Unit

'Name PNO ¹: 69/7853 MO ¹: 98017985 01 CR ¹:98-0276 9760 SN 344 Street 'Florida Cit 'Fl'. 33035 Address Repair Organization P.O. No.,Job No.,etc

3. Nork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 Su 344 Street Florida Cit FL. 33035 Address 'I
4. Identification of System: Emer enc Feedwater S stem System ¹: 75 Quality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition,~sa. Addenda,~sa Code Csee (b) Applicable Edition of section zi Utilized for Repairs ar. Replacements 1989 Edition,~ma Addenda,~gs code case A

Identification of Components Repaired or Replaced and Replacement Cosponents Name of Name of [Manufacturer( Mational Other )Year ') Repaired ) ASHE ) Component Manufacturer ( Serial No. Board Identification [Builtf Replaced or, f Code f / Replacement /Stamp / I I [t~es No IROD CONTINUOUS THREAD IH/A ]N/A JN/A ,/STOCK CODE ¹ 29486 1 /UNK /Replacement /Mo i1'TUD FABRICATED UTC ¹ 415246 )MUTE HEAVY HEX (4) .JM/A ]N/A [STOCK CODE ¹ 27832 1 )UHK ]Replacement [No UTC ¹ 370708

7. Description of Uork: REPLACED'ONER BOLT OH AFM SUPPORT 80117-H-334-01

. Tests Conducted: Hydrostatic: Pnesnat i c: Nominal Operating Pressure Other VT-3 pressure~is Test Temperature oF 98-029-3 Sheet 2 of 2 41 FORM NIS-2 (Back)

9. Remarks: HECHANICAL CONMECTION NO WELDING REOUIRED.

CERTIFICATE OF COHPLIANCE lie certify that the statements made in the report are cor'rect and'thih replacement conforse to the rules of the ASHE Code, Section XI. Type Code Symbol Stamp Certificate of A orization No. ~NBA SfgllNf~ Ouner or + Oi ~~+ ner's4esignee, .S~ZC TPEIe 2 ~~~4 ~Date~/~6~ ~ 19 5H CERTII'ICATE OF IMSERVICE IMSPECTIW I, the undersignedholding a valLid ccxrmission issued by the National Board of Boiler and Prdssuhe VessLI inspectors and the state or Province of Dade County and,.eaployed by'rkuright Hutual Insurance Company 'of Norgood, Ha. have inspected the caqxxx.nts descriled in this Cheers Report during the per iod 09/'IB/9'8 to 10/21/98 and state that to the best of my knowledge and belief the Ihrner has performed examinations and taken corrective measures described in this Openers Report in accordance uith the requireaents of the ASHE Code, Section XI. By signing this certificate'neither the I'nspector nor his employer makes any uarranty, expressed or implied, concerning the examinations and corrective measdres'escribed in this Ouner's Report. Furthermore neither the Inspector nor his employer, shall be liable iK any ma'nnei'or any perscnai injury or iproperty damage or a loss of any kind arising from or connected ui'th this'napection. f Ccemissions - NB 8230~M ~I Inspectors ignatdre Natl'onal Bo'ard,', State,,providence, a'nd Fndo'rsementa Date 4 19 4l 98-029-3 FORN NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEKEHTS As Required. by the Provisions of the ASHE Code Section XI I. Owner Florida Power '& Li ht Date 10 22 98 700 Universe Blvd. J~ Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant Uni t 3 PMO ¹: 63/5691 MO ¹: 97022083 01 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Authorization Ho. N A Expiration Date N Street Florida Cit FL. 33035 A'760 SM 344 Address
4. Identification of System: Steam Generator S stem System ¹: 71'uality Group: A
5. (a) Applicable. Construction Code 'B31.1 1955 Edttten,~ua. Addenda,u~atode case 181 Applioagle Editionlof se:ation xl Utlllted for Eepsirs or Aeptaeeoents 1989 Edftfen,~ga Addenda,E~IA code Esse Identification of ComI5onents Repaired or Replaced and Replacement Components Name of Name of ]Hanufacturer) National,( Other )Year / Repaired ) ASHE f Coeixfnent Hanufacturer ] Serial No. Board Identification ]Built/ Replaced or / Code f I / Replacement [Stamp /

[~yes go ITUBE PLUG (2) ABB JN/A iN/A ]STOCK CODE ¹ 214658 1 .JUNK iNo EMP NECHANICAL

7. Description of Mork: INSTALLED 2 MEAR PREVENTATIVE PLUGS OH TUBE ROM 42 COLUHN 55.

PLUGS INSTALLED BY ABB COMBUSTION ENGINEERING HOT LEG PLUG SERIAL ¹ MP 1853 COLD LEG PLUG SERIAL ¹ MP 1846 THIS NIS-2 IS FOR RECORD PURPOSES ONLY. . Tests Conducted: Epdroststio: pneunatio: Hominal Operating Pressure Other Pressure~is Test Teopersture oF 98.030-3 Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: HECNANICAL PLUG NO WELDING REOUIRIED.

CERT IF lt CATE OF COHPLIANCIE Me certify that the statements made in the report are correct and this 'replacement conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Sta~ Certificate of Sienese Owner thorization or A~Z$ No. Qer's Designee, Title ~N g r/<WAR-$-~~ A ~ y: Expiration Date Lair ~NA CERl'IF I CATE OF INSERVICE INSPECTION I, the undersigna9, holding a valid cccmission issued by the National Board of Boiler and Pressure Vessels inspectors and the state or Province of Dade County and employ'ed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 16/03/98 to 10/22/98 and state that to the best of my knowledge and belief, the Owner has performed examilnations and taken corrective measures descrilxxi in this i0wners Report in accordance with the requirements of the LSHP Code, Section XI. By signing this certificate nei'ther the Inspector nor hiis ehyibyer makes any warranty, expr'essixl o~r Implied, concerning the examinaticns and correct ive measures described in this Cmer's Report. Furthermore, neither the Inspector nor his empl.oyer shall be liable 'in any,'manr'ier for any personal injury or property damage or a loss of any kind arising from or connected with th'is Inspection. Comnissions,, NB 823~DEMI~ Inspect s Sigsdture National Board, State, Providence, and Endorseeests Date (ear 4l 98-030-3 FORM NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required~-the. provisions of the ASME CodecSection XI Ie Owner 'F I orids Power 8 L i ht Date 10 29 98 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t Mama puO ¹: 63/9656 wo ¹: 98018909 '01 cR ¹:98-1376 9760 SM 34C Street Florida Cit Fl. 33035 Address Repair Organization P;O. Mo.,Job No.,etc
3. llork 'Performed by Florida Power 8 Li ht Type Code Syahol Stamp N A None Authorization No. N A Expiration Date M A 9760 SM 34C Street Florida Cit FL. 33035 Address
4. Identification of System: CVCS Char in 8 Letdown S tern System ¹: 47 Quality Group: A
5. (a), Applicable Construction. Code 831.1 1955 Edit fo~nNAAddende,~gs Code Csee lul Appllcsuls Edition of section Rl Ntlllted for Repelrs or Replscennnts l9E9 Edit fo~nNA o

Addenda,~uA code csee Identification of Components Repaired or Replaced and Replacement Conponents Name Name of iHanufactureri National ) Other, iYear i Repaired i ASNE i of'omponent Manufacturer i Serial'o. Board Identification iguf lti Replaced or i Code / / Replacenent istamp J I I J Ves rego IROOE THREADED IM/A , IH/A IN/A IUTC 418085 iUHK iRepiacement iHo (I STUD FABRICATED ASTK A-193 GRADE B7 iMUTE HEAVY HEX (1) IN/A IH/A , IH/A IUTC 419938 i UHK i Repl acement i No ASHE SA-194 GRADE 7 I'HUT ~ HEAVY HEX (5) (H/A iH/A iN/A iUTC 419893 lUHK iReplacement )Ho ASHE SA-19C GRADE 7

7. Description of'Nork: REPLACED.OME 1 STUD AMD SIX' NUTS OM CONTROL VALVE CV-3-310B.

PRESSURE TEST PERFORMED UMDER PRESSURE TEST PACKAGE'03-RCS-4101-L-03. . Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure Other VT-1'T-2 pressure~2292 slg Test Tespcrsture .547 4F 98-031-3 Sheet 2, of 2 FORH NIS-2 (Back)

9. Remarks: HECNANICAL CONKEiCTICN~INO LIELDING REOI/IREO.

CERTIF ICATE OF COHPLIANCE Ne certify that the statements made in the report are correct and <<his'eplacement conforms to theirulins of the ASHE Code, Section XI. Type Code Symbol Staap NrA Certificate of Authorization No. ~NA Expiration Date A Sign&~ A ~ CX~ /ifgig~w ante ~~~ /'+ ., I9 O' r or s Desi g nI4 Title 'er" CERTIFICATE Ol: IHSERVICE INSPECTION I, the undersigned, holding a valid'oamission issued by the Ilatfbnai Bokrd of 8'oiler and Pressure Vesse'l inspectors and the state dr Provi'ncc of Dade County and employed'by Arkwright Hutual Insurance Ccepany of Norwood, Ha. have inspectrxf t'e coaponents dcscrfbi< in this Owners Report during the periiod 09/30/98 to 10/23/98 and state that to the best of my knowledge and belief, the thawer has perforated examfnatiore and taken, corrective measures descrited in this Owriicrs Report'in accordance with the requfrcments of the ASHE Code, Section XI. By signing this certificate neither the Inspector nor his eapl'.oyer makes any warranty, expressed or iaplied, concerning the examinations and coirrective measures described in this Owrw.r's Refmrt. Furthernore, neither. the Inspector nor his employer shall be liable in any inanner for any personal injury or prop'erty damage or a loss of any kind arising fron or ccencctcd with this inspection. Coarnissfonn i NB 8230.~N ~I Inspect s Si ature National Board, State, Provfdrwcc, arxf Eindorsceants Date c~ j) 98-031-3 FORH NIS-2 OuNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI . (her Florida Pouer"2, Li ht Date 10 24 98 700 Universe Blvd. Jam Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant Uni t 3 PMO ¹: 63/5639 QO ¹: 97021739 01 9760 SM 344 Street 'Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Mork Performed by Florida Poser.s Li ht Type Code Symbol Stamp Name Authorization No.

e Expiration Date N A 9760 SQ 344 Street Florida Cit FL. 33035 Address

4. Identification of Systemt EOUIPHENT NATCH System ¹: 51 Duality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edftfon,~NA Addenda,N~Acode case lcf Applicable Edition of Rection Nl Ntilited for Repairs or Replaceamnts T95il Edition,~u A Addenda,~u A cede case
6. Identification of Components Repaired" or Replaced and Replacement Cfffponents Name'f Name of (Nanufacturer( National Other (Year ( Repaired ( ASHE (

Conyanent Nanufacturer ( Serial No. Board Ident i f ication (Built( Replaced or ( Code ( I ( Replacement (Stafffp ( I ( I [~fs No (BOLT (1) HEAVY HEX IN/A (N/A IN/A (STK CCOE 15135 (UNK (Replacement (No l UTC 412893 (NUT (1) HEAVY HEX IN/A (N/A (N/A (STK CODE 27975 iUNK ,(Replacement (No UTC 418270

7. OeSCriptian Of llOrkt REPLACED ONE BOLT ANO ONE NUT ON THE UNIT 3 EOUIPHENT HATCH 3S10 .
8. Tests Conducted: Hydrostatic: Pneunat i c: Nceinal Operating Pressure-Other VT-1 pressure~NA ic Test Temperature N A ~

F 98-032 3 Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: THIS IS A ICECHANIICAIL CONNECTION NO MELDING REoulRED.

CERT I I: I CATE OF COMPLIANCE Me certify that the statements made in the report are correct snd this replacement conforms to theiruies of the ASME Code, Section XI. Type Code Syshoi Steep N A Certificate of uthorization Mo. ~N A Expil ation Oats N A d~~ ~< Ower Oax.res Oesignee, Title; CERTIFICATE OF IMSERVICE INSPECTION I, the undersignedholding a vsl.id ccmmission issued by the'National Board of Boiler and Pressure Vesse'I inspectors and the state or province of Oack cwnty and employed by Arkuright Mutual Insurance company of Moruood, Ma. have Incq~ted the caqxxM;nts descriked in this'Ouners Report during the period 09/30/98 to 10/24/98 and state that to the best of my kncccledge and belief, the %nor hss per formed examination snd taken corrective measui as described in this Mners Report in accordance Nith the requirements of the ASIIE Code, Section XI. By signing this certificate neither the Inspector nor his emplioyer makes any usrranty, expressed or Implied, concerning the examinatiore snd corrective messures<descr(bed in this fhcner's Report. Furthermore, neither the Inspector nor his employer shel.l be liable in any manner for any personal injury or property damage or a,loss of any k'.ind arising 'from or connected Ninth this inapection.. I Coecaissions NB 8230 N 1 I Inspect rs S~ ture Mati~onai Boardc State, Providence, and Endorsements Oats Z4'99",P FORH NIS-2 OWNERS REPORT FORrREPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code 'Section XI I. Owner Florida Power 8 Li ht Date 10 29 98 700'Universe Blvd. Juno Beach.fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant 'Unit PWO ¹: 63/6669 MO ¹: 97027649 01 CR ¹:97-1377 9760 SM 3CC Street Florida Cit Fl. 33035 Address 'Repair Organization P.O. No.,Job No.,etc
3. Mork Performed'by Florida Power 8 Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration;Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address
4. Identification of System: C nt Cooli Mater S stem System ¹: 30 Duality Group: C
5. (a) Applicable Construction Code 831.1 'l955 Edltfcn,~MA Addenda;~NA code case (tt) Afptfcstrte:Edition of section xi Utilited far Repairs or Replacements 1959 Edittcn.~s A Addenda.~s A code case

. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iNanufactureri National Other )Year i Repaired i ASHE i Component Nanufacturer ( Serial No. Board Identification iguiiti'Replaced or i Code i / Replacement (Stamp i Jt~es Eo iVALVEE SWING CHECK IBONNEY FORGE IN/A'H/A ISTK CODE 222259 2 'TC '419226 I I iUHK 'iReptacement iNo 3-7218 IFLANGE, CARBOH STEEL IN/A iH/A iSTK CODE 102064 1 IUNK IRepiacement IHo I UTC 418535 lELBOME SOCKETMELD IN/A iH/A iSTK CODE 34037 1 'iUNK iReplacement iNo UTC '415333 I PIPE ~ CARBON tH/A IN/A IH/A ISTK CODE 30687 1 iUNK iReplacement iNo UTC 417701 STEEL'SCHEOULE 160 IPIPEE CARBON STEEL , IH/A IH/A IH/A ISTK CODE 30623 1 iUHK iReplacement 'Ho (SCHEDULE 40 UTC 373909

7. Description of Work: REPLACED VALVE 3-721B ANO ASSOCIATEO PIPING IN'ACCORDANCE MITH CR 97-1377.

CODE CASE N-C16-1 MAS INVOKED FOR THIS REPLACEHENT ACTIVITY. LEAKAGE TEST PERFORHED UNDER PRESSURE TEST 03-CCM-3036 L-ol. . Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating'Pressure Other VT-2 Pressure~119 ip Test Temperature 86 4F 98-033-3 Sheet 2 of 2 Cl FORH HIS-2 (Back)

9. Remarks: ALL MELDING PERFORHED IN ACCORIDAHCE NITH APPROVED PLANT, PROCEDURES.'L CERTIFICATE OF COHPLIAHCE lie certify that the statements made in the report are correct and this replacement conforms to,the! rules of the ASHE Code, Sect3on XI.

Type Code Symbol Steep H A Certificate of thorization No.. ~N A Fxpiration Date N A SI.~~ .g/~<<<<<<~=- Date Owner r (h r's Desi!knee, Tit@ .CERTIFICATE OF INSERVICE INSPECTIOII I, the undersignedholding a valid cosmission issued by the Hati,onal Board of BoiKer and Prelssute V!essel inspectors and the state or Province of Dade Cixaty and employed by Arkwright Hutual 'Insurance Company of Norwood, Na. have inspected the comFenents descr3ked in this Owners Report, during the period 03/'12/98 to 10/24/98 and state that to the best of my knowledge and belief<< the Owner has performed examinations 'and taken corrective measures described in this Owners, Report in accordance with the requirements of the ASHE Code, Section XI. By signing this certificate neither the Inspector nor,his,employer makes any warranty, expressed or implied, concerning the examinations and correct3ve measures'described in this Owner's Report. Furthermore<< neither the Inspector nor his employer shai.l be Liable in any manner for any personal injury or ~propert~y damage or a loss of any kind arising from or connected with this, inspection. 'Ccmnlssions HB 8230 N  ! I Inspector Ssgnatiiire Hati'onal Board, State, Providence, a'nd Endersements Date .. ~< ~-p 98-033-3 FORH HIS-2 ONNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE,Code Section XI <. Owner Florida Power 8 Li ht Date 10 29 98 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant Unit PQO ¹: 63/5938 lJO ¹: 97023322 01 9760 SN 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Ilork Performed by Florida Power 8, Li ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Feedwater S stem System ¹: 74 Qual i ty Group: 8
5. (a) Applicable Construction Code B31.1 1955 Edition,~s A Addenda,u~s Code Case ini Applicable Edition of section Rl Mtilfted for Repairs or Replacements 19S9 Edition,~s A Addenda,s~s code case

. Identification of Components Repaired or Replaced and Replacement Components Name of Name of )Hanufacturer) National J Other (Year ( Repaired ) ASHE [ Coeponent Hanufacturer ( Serial No. Board Identification ]Built) Replaced or J Code J f'eplacement JStaay f I I Jatos Me ISTUFFING BOX IN/A IN/A ISTK CODE 203937 2 )UHK )Replacement )Ho iBLEEDER QIING CHECK UTC 418395 ]STUDS CARBON STEEL (4) IH/A IH/A [N/A iSTK CODE 28031 1 [UNK [Replacement ]No I UTC 370211 CHUTE HEAVY .HEX (4) [N/A IH/A fH/A ISTK CODE 27975 1 (UNK (Replacement (Ho UTC 409569 418270

7. Description of llork: REPLACED SOUTH STUFFING'OX FOR VALVE CV-3-2900.

PRESSURE TESTING PERFORHED UNDER PRESSURE TEST PACKAGE ¹ 03-FW-7428-F-03. . Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-2 pressure~1320 is Test Temperature 83 oF 98.034-3 Sheet 2 of 2 iCI FORH NIS"2 (Back)

9. Remarks: HECMAMICAL CONNECTION NO MELDING lREOLIIRED.

CERT I F I CATE OF CCIHPL IANC'E Me certify that the statements made in the rcport sre correct and this replacement conforms to theirulcs of thc ASHE Code, Section XI ~ Type Code Symbol Stamp Certificate of uthorizpion No. ~NA Expiration Date M A Signed ict- ,dew Owner Owner'/Designee', Title CERTIFICATE OIF INSERVICE INSPECTION I, the undersigned, holiding a valid contnission issued by thc Natibnal Board of Boiler and Pressure Vessel inspectors and the state or Proviince of'ade County and employed by Arkwriglht Hutunl Insurance Company of Norwood, Ha. have inspected the conponents described- In this Owners Report during the period '10/23/98 to ID/27/98 and state that to the best of my knowlcdlge and beliief, the Owner hss perfortned examinations snd taken corrective measures described in this Owrw.rs Report in accordance"witlh the requ3remcnts of the ASHE Code,, Section XI. By signing this certif'icste neither the Inspectior nor his employer makes sny warranty, expressed or Implied, concerning the examinstiions and corrective measures described iin this Owner's Rcloort. Furthernx>re, neither the Inspector nor his eqiioyer shall be li,able in any manner for any personal injury or property damage or a loss of sny kind arising fr(xn or ccmnectcd with this inspect;ion. Commissions WB 8230 N I Inspect s S~int ture Mlational Board, State, Providence, ahd Endoiserhcnta Date 98-03I -3 FORM NIS-2 ONNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI I. O~ner Florida Power & Li ht Date 10 29 98 700 Universe Blvd. Jwm Beach Fl. 33COB Sheet of 2 Address

2. Plant Turke Point Plant Unit 3 puo.¹: 63/3585 llo': 97011724 01

'9760 Sll'344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc

3. llork Performed by Florida Power & ki ht Type Code Symbol Stamp N A Authorization No. N A Expiration Date H A 9760 SM 3C4 Street Florida Cit FL. 33035 Address
4. Identification of System: CVCS Char in & Letdown S stem System ¹: C7 Quality Group: 8
5. (a) Applicable Construction'Code 831.1 1955 Edition,~HA Addenda,~ll A code cess (b) Applicable Edition of section xl Utlllted for Repairs or Replaccaents 1959 Edition,~H A Addenda,~M A code case

. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iMsnufactureri National i Other iYear i Repaired i ASME i Component Manufacturer ) Serial No. Board Identification iBuilti Replaced or i Code i I i Replacement istaJJp i I Jatos ao iPIPEE 316 S.S (2F,T) iH/A- ,(H/A iH/A (STK CODE 30938 1 iUHK. )Replacement )No 2w UTC 374075 ASSIZE IVALVE~ 2"GLOBE N/A IN/A IH/A ISTK CODE 53135 1 lUHK IReplacement IHo UTC 405016

7. Description of Uorkt REPLACE EXISTING VALVE 3-293C AHD ASSOCIATED PIPING'.

CODE CASE N-416-1 HAS BEEN INVOKED FOR THIS REPLACEMENT ACTIVITY. PRESSURE TEST PERFORMED UNDER PRESSURE TEST PACKAGE ¹ 03-CVCS-C762-L-01. . Tests Conducted: Hydrostatic: Pneunstic: Nominal Operating Pressure Other VT-2 Pressure~2350 lg Tost Tcapersture 98 oF 98-035-3 Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: ALL MELDING PERFORMED IN ACCORDANCE WITH APPROVEO PLANT PROCEDURES.S CEIRTIF ICATE OF COMPLIANCE Me certify that the statements imsdc in the report are correct snd thisi replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol StanTe N <A Certificate of thoriis on No. ~NA Expiration Date N A sign~~ ~" 4 B~ Owner o Owner" Designee, f1 tie CERTIFICATE OIF INSER'VICE INSPECTION I, the undersigned, hollding a valid cosnission issued by the liationsl Board of Boiler and Pressuce Vessel inspectors and the state or Proviince of Dade County'snd employed by Arkwright Hutust Insurance Conpany of Norwood, Ha. have inspectwi thc components described in this Owners Report duriing the period 05/13/9i~ to 10/27/98 and'state that to the best of'my knowledige and belief, the Owner hss performed exsininstions corrective measures described in this Owrers Report in accordance with the requirements of the ASHE Code, and'aken Section XI. By signing'his certifiicatc neither the Inspector nor his cnyloycr makes sny warranty, expressed or implied, concerning the examinstiions and corrective measures desi:ribed iin this Owner's Reiport. Furthermore, neither ihe .Inspector nor his employer shall be lieble in any manner for any personal injury or property damage or a loss of any kiind ari. ing frcxn or ccemected w'1th this inspection. Conmissiona NB 8230 N I Inspectors i gna+I e Naticnal Board, State, Providence, and Endorsem'ants Date 98-035.3 FORH MIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI (A 2 ~ OWnef Florida Power &, Li ht Date 10 29 98 700 Universe'Blvd. Juno Beach. Fl. 33408 Sheet . of 2 Address

2. Plant Turks Point Plant Unit 3 Name Pl% ¹: 63/3586 lQ ¹: 97011725 01 9760 Su 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc
3. Nork Performed by Florida Power & Li ht Type Code N A Symbol'tan'uthorization Name No N A Expiration Date N A 9760 SM 344 Street Florida Cit FL. '33035-Address
4. Identification of System: CVCS.Char in 8 Letdown S stem System ¹: 47 Quality Group: B.
5. (a) Applicable Construction Code 831.1'955 Edition,~NA Addenda,~MA Cade Csee 18> Applicable Edition of'section El utilltad for Nepsirs or Neplseeannts 1989 Edition,~aa Addenda,~aa coda seas Identification of Components Repafred or Replaced and Replacement Components Name of Name of iHsnufactureri National Other iYear J Repaired, ( ASHE (

CoJJTxment Hanufacturer i Serial Mo. Board Identification iguiiti Replaced or,) Code f J Replacement istaJJJp i I I J~taa No IVALVE~ 2" GLOBE JM/A iM/A (M/A 'ISTK CODE 53135 1 iUMK /Replacement /No UTC 331377 IPIPEE 316 S.S (2FT) IN/A IN/A ,IM/A ,ISTK CODE 30938 1 iUMKE iRepiacement iNo ASSIZE 2" UTC 374075 iELBDME 90 DEGREE )M/a JM/A IM/A ISTK CODE 34889 1 iUNK iRepiacement )No ISIZE 285 UTC 353236

7. Description of llork: REPLACE EXISTING VALVE 3-293D AMD 'ASSOCIATED PIPING.

CODE CASE M-C16-1 NAS BEEN INVOKED FOR THIS REPLACEHENT ACTIVITY. PRESSURE TEST PERFORMED UMDER PRESSURE TEST PACKAGE ¹ 03-CVCS-C762-L-01.

8. Tests Conducted: Hydrostatic: Pneunstic: Nominal Operating Pressure Other VT-2 Pressure~2350 ls Test Teapersture 98 oF 98.036.3

Sheet 2 of 2 FORN NIS-2 (Bsc'k)

9. Remarks: ALL llELDING PERFORMED IN ACCORDANCE MITH APPROVED PtANT PRGCEDUREG.i CERT IF I CATE GF COHPLIANCE Me certify that the statements made in thc report sre correct and this replacement conforms to the rules of the ASNE Code, Section Xl.

Type Code Symbol Steep NrA Certificate of thorizs~on No. ~NA Expiration Date N A Sign~' Owner o Owner" s Designee, Title .I Gate gA / +>>~ 19 CERTIFICATE OIF INSERVICE INSPECTION I, the undersigned, holiding a valid conrnission issued by tlhc National Board of Boiler and Pressure Vessel inspectors and the state or Proviince of Dade Ccemty and employed by Arkwright Nutual Insurance Conpany of Norwood, Na. have inspected the components described in this Owners Report during the period DS/13/9'o, 10/27/98'nd state that to the best of my knowledge and belief, the Owner has performed exrxninations and taken corrective measures descrilmd in this Owrrcrs Report in accordance with thc requirements of the ASNE Code Section XI. By signing this certifiicate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the exsminatiions and corrective measures described lin this Owner's Report. Furthernere, neither the Inspector nor his employer shall be liable in any manner for sny personal injury or property damage or a loss of sny k'ind arising from or ccxwected with this inspection. Comnissiona NB 8230 N I Inspectors ign ee e National Board, State,'Providence, shd Endoiserr!enta Date I 98-036-3 FORH NIS-2 (MIERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI I. Owner Florida Power 8 Li ht Date 10 29 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet - 1 of 2 Address

2. Plant Turke Point Plant Unit PHO ¹: 63/5682.IJO ¹, 97022063 01 9760 SM 344 Street FloridssCit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. 'Work Performed'by Florida Power 8 Li ht Type Code Symbol Staff@ N A Authorization No. N A Expiration Date N A 9760 Su 344 Street Florida Cit FL. 33035 Address
4. Identification of System: Steam Generator S stem System ¹: 71 Quality Group: 8
5. (s) Applicable Construction Code B31.1 1955 Edition,~NA Addenda,~NA code case in) Applicable Edition of seatlon xi Utilized for Repairs or Reptaoaannts,1959 Edition,~aa Addenda,~aA code cosa Identification of Components Repaired or Replaced and Replacement Components Name of Name of iHsnufactureri National Other iYear i Repaired ) ASHE 'i Component Hanufacturer i Serial No. Board identification iBuilti Replaced or i Code i I J Replacement igtaJJJp i I I I Jurat Xo IBOLTS (2) HEAVY HEX I N/A IN/A IH/A iUTC 393626 )UHK )Replacement iHo STK CODE 15169
7. Description of Mork: REPLACED ONE BOLT OH STEAH GENERATOR A 3E210A'ANDHOLE A AND ONE BOLT ON STEAN GENERATOR 3E210A HANDHOLE B.

. Tests Conducted: Hydrostatic: Pneunstic: Hominal Operating Pressure Other VT-1 pressure~g A sig Test Toapersture NA oF 98-037-3 Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: THIS IS A BOLTED CONNECTION NO MELDING REOUIRED.

CERTIFICATE OF CCIHPLIANCE Me certify that the statements made in the report sre correct'nd this replacement conforms to theirulcs of the ASKE Code, Section XI. Type Code Symbol Stamp N 'A Certificate of thorization No.. ~NA Expil'stion Date N A A,:/ Owner r 4g Ownei is Desig ~di ce, Title O.i. ~~ CERTIFICATE Ol- INSERVICE INSPECTION I, the undersigned, holding a valid conrnission 'issued.by the Natibnal Boardaof Boiler and prcdsurL Vdssel inspectors and the state or Province of Dade County and employed iby Arkwright Hutual Insurance Company of Norwood, Hs. have inspected tlhe,components describi< in. this Owners Report during the periiod 10/05/98 to 10/27/98 arid state that to this best. of my knowledge and boil~of, the owner hss performed cxsiiiinsItiorha shd taken corrective measures descriticd in this Owriiers Reportiin accordance with the requirements of the AsKE code, Section XI. I By signing this certifiicate neither the Inspector nor his employer makes sny warranty, expressed or implied, concerning the examinations encl corrective measures describad in this Owner's Report. Furthermore,i neither the Inspector nor his, cniploycr shall be liable In~any msnneri for sny personal injury or property damage or a loss of sny k1ind arising from oir connected with tIhfs inspection. I ~r<Z/ Comnissi~<" hlB 8230 N I I lnspecto S I gnat ure Naticnal'oard, State, providence, arxI Endorscments D.t. 98-i037-3 FORH NIS-2 (MIERS REPORT FOR REPAIRS OR REPLACEMENTS As Required. by the Provisions of the AsHE code section xI

1. Owner Florida Power & Li ht Date 11 02 98 700 Universe Blvd. Juno Beach Fl. 33CDB Sheet
  • 1 of 2 Address
2. Plant Turke Point Plant Unit puO ¹: 63/5520 Mo ¹: 9702115201 cR ¹:98-1c66 9760 Sll 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. 'llork Performed by = Florida Power & Li ht Type Code Symbol Stomp N A Name Authorization,No.

ii Expiration Date N A 9760 Sli 3CC Street Florida Cit 'FL. 33035 Address

4. Identification of System: Reactor Vessel System ¹: 43 Quality Group: "A 5~ (a) Applicable Construction Code 831.1 i955 Edition,~N A Addenda,R~A coda case iu> Applicable Edition of seation xi utlllted for Repairs or Replaeeme ts i959 Edition,~u A Addenda,~u A code case Identification of Components Repaired or Replaced snd, Replacement Coaponents Name of Name of iHsnufsctureri National Other iYesr i Repaired i ASHE i Component Hanufacturer i Serial Ho. Board Identification iguiiti Replaced or i Code i i Replacement istamp i I I it~os uo IROOETHREADED (CFT) 'lM/A iN/A IH/A ISTK CODE 29499 1 iuNK (Replacement iMo 8 STUDS FABRICATEO UTC 403918 I

INUT~ HEAVY HEX (16) IN/A iH/A IN/A ISTK CODE 27838 1 iUNK iRepiacement iNo UTC 419762

7. Description of llork: REPLACED 8 STUDS AND'6 NUTS ON'POOLPIECE ROa3-6316.

. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-1 Pressure~is Test Temperature 4F 98-038-3 Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: HECHAHICAL CONNECTION HO 14ELDING REDUIRED.

CERTIFICATE OF COHPL,lANCE Me certify that the statements made in the report are correct and this replacement conforms to thei ru(es of the i ( ASHE Code, Section XI. Type Code Symbol Stan@ N A Certificate of Authoriiation Owne or n / (her's Ho. r ~N c+~< ~ Desi!Bnee, T~e A ~f~ Expiratiion Date Date IH A I9 CERTIFICATE OF INSERVICEi INSPECTION I, the undersigned, holding a valid comnissiion issued Iby the Nationail Board of Boil.er and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright, Hutual linsurance Company of Norwood, Ha. have inspected the cotT.'onents described In this Owners 'Report during the period O9/22/97 to ID/27/98 and state that to the Lest of my knowlecfge and belief, the Owner has performed exmalnatiom and taken corrective measures described in this Owners Report'n 'accordance with the requirements of the ASHE Code Section XI. By signing this certificate neither the Inspector nor Ihis eaployer makes any warranty, expressed or implied, concerning the examinations and corrective measures 'described in this Owner's Report. Furthermore, neither the Inspector nor his etipioyer shall be liable ini any manner for any personal injury or property damage or a loss of any kind arisingi from or connected with this'nspection. Yy7 Commissions B 230 N I Inspector Sigrw~ e Nationa( Board, State, providence, ahd Endoi'scents Date 98-038-3 FORM NIS-2 OHHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI ,0i. Owner Florida Power & Li ht Date 10 29 98 Name 700 Universe Blvd. Juno Beach Fl. 33C08 Sheet of 2 Address

2. Plant Turks Point Plant Uni t PNO ¹: 63/5518 lJO ¹: 97021114 01 9760 SM 344 'Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Nork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date N A

'9760 SN'344 Street Florida Cit FL. 33035 Address

4. Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831. 1 f955 Edition,~uA Addenda,~ua Code case (8) Applicable Edition of .Rection xl otllited for Repairs or Replsoements 1989 Edition,~ua Addenda,~ua code case

. Identification of Components Repaired or Replaced and Replacement Components Name of Name of IManufacturerI National I' Other IYear I Repaired I ASME I Component Manufacturer Serial Ho. Board Identification IBuiltI Replaced or I Code I ,I Replacement IStsmp I I I i~tea llo IPRESSURIZER RELIEF VALVE ICROSBY IH512C9-1362 IH/A IRV-3-551A IUNK IReplaced INo IPRESSURIZER RELIEF VALVE I CROSBY IH51249-1579 IN/A I TK CODE 176172 1 IUHK IReplacement INo IRVm3-551A UTC 419094

7. Description of'Morkt REMOVE AND REPLACE PRESSURIZER SAFETY VALVE RV-3-551A.

PRESSURE TEST PERFORMED UNDER PRESSURE TEST PACKAGE ¹ 03 RCS-4101-L-03 ' Tests Conducted: Hydrostatic: Pneusatic: 'Nominal Operating Pressure other vi.l 9'i.2 pressure~2292 io Test Temperature 547 'F 98.039-3 Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION HO llELOING REOOIRED.

CEIRT IF ICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to. the rules of the ASHE Code, Section XI. Type Code Symbol Stanp NiA Certificate of thorization Ho. ~NA Fxpiration Date H A Signed +k.+ ACk:B~~ bate PC" 7 ~ . lb'~ Owner or inerbs70esignee, Title CERTIFICATE OF Ih1SERVICE IHSPECTION I, the undersigned, holding a valid ccxnnissiion,issued by the Hationall Board of Boiler and Pressure Vessel inspectors and the state ior Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspected the caq:ionents described in this Owners Report during the period 09/22/97 to 10/27/98 and state that to the best of my knowledge and belief, the Owner has p'erformed exabainations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code / Section XI. By signing this certificate neithier the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures;desdribed in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable ini any manner for any personal injury or property damage or a loss of any kind ari;sing frit or connected with this inspection. Cermissions NB fl230 N I Inspecto Sign ure National Board, State, Providence, and Endorsecbenta Date 98.039.3 FORH NIS-2 ONNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 10 29 98 700 Universe Blvd. Juno Beach Fl. 33COB Sheet 1 ~ .of 2 Address
2. Plant Turke Point Plant Unit PUO ¹: 63/6871 lJO ¹: 98001032 01 9760 SU 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Mark.performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Authorization.No. N A Expiration Date N A 9760 SM 3CC Street Florida Cit FL. 33035 Address
4. Identification of System: Reactor Coolant S tem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831.1 f955 Edition,~sa Addenda,~sa code case

<h> Applioehle Edition of saotlon Ri vtlllted for Repairs or Replsomnents f959 Edition,~sa Addenda,~sa code case . Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Hanufacturer i Serial No. Board'ther iHanufactureri National Identification IYe " I Repaired iguilti Replaced or I ASHE I i Code i'i Replacement iStamp.i I I /Y~es ito IPRESSURIZER 'RELIEF VALVE ICROSBY iH51249-1360 iN/A: IRV-3-551B iUNK iReplaced iNo 1' iUNK 'iReplacement iPRESSURIZER RELIEF VALVE iCROSBY IH51249-1581 IN/A ISTK CODE 176173 iNo iRV-3-5518 UTC 419093

7. Description of,'Nork: REHOVE AND REPLACE PRESSURIZER SAFETY'VALVE RV-3-5518.

PRESSURE TEST'ERFORMED UNDER PRESSURE TEST PACKAGE ¹ 03-RCS-4101-L-03. . Tests Conducted: Hydrostatic: Pneutetic: Nominal Operating Pressure Other Vt.i VT.2 Pressure~2292 ig Test Temperature 547 'F 98-040-3 Sheet 2 of 2 Ili FORH HIS-2 (Back)

9. Renarks: HECHANICAL CONNECTION NO MELDING REOOIRED.

CERTIFICATE OF COKPLI,'ANCE Me certify that the statrxncnts made in the report are cor;rect snd this replacement conforms to the rules af the ASKE Code, Section XI. Type Code SymboL Starrp Certificate of uthorizajton No. ~HA .'..; Expiration Date N' Signed ) Orrncr /'@~i~ ~~~4>w 82a~C-or Ogner's Dr:signce+Title i~~~ v Date /+'/ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a val:id comniission ilssucd by the National Board of Boiler and Prcdsur& Vdsscl inspectors and the state ar Province of Dade county and enploycd by Arkuright Kutual Insurance cqmpapy qf Norrrood, Ha. have inspected the components describrxi in this OMners Ilepart during the period 01/15/98 to 'lO/27/98 and state that to the best of ray. knoulcdgc and belief, the Orrncr hss performed cxrNirinslti&s shd taken corrective measures described 'in this Orrncrs Report 'in accordance rrith the requirements of ithei ASHE Code, Section XI. I By signing this certificate neither the Inspector nor his enplioyer makes any lrarranty, expressed or implied, concerning the examinations andi corrective measures described in this rhrner's Report. Furthermore,i ncithcr the Inspector nor his erploycr shall be liable in,sny: manner:for sny personal injury or property damage or a Loss of sny kind arising from or connected lrith this inspection,. Carrrnissiony MB 8230 N i I Inspe ors Srgnature National'oard, State, Pravidence, arrd Endorsements Date 9B-040.3 FORH NIS-2 ONNERS REPORT FOR REPAIRS OR'REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI (. Obdner Flor(ds Pobder 8 Li ht Date 10 29 98 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address

2. Plant Turks Point Plant Unit PNO ¹- 63/6874 IQ ¹: 98001039 01 9760 SM 34C Street Florida Cit Fl. 33035 Address Repair,Organization P.O. No.,Job'Noecetc 3 ~ Uork Performed by Florida Pager S Li ht Type Code 'Symbol Stamp Authorization No. N A Expiration Date 9760 SN.3C4 Street Florida Cit FL. 33035

'Address

4. Identification of System: Reactor Coolant S stem System ¹: C1 Quality Group: A
5. (a) Applicable Construction Code B31. 1 1955 Edition,~ll A Addenda,~ll A code case (b> Applicable Edition of'ection Xl Utilized for Repairs or Rcplacnnents 1959 Edition,~u A Addenda,~u A Code Case
6. Identification of Coayonents Repaired or Replaced and Replacement Components Name of Name of ,iHanufactureri National Other IYear J Repaired I ASHE I Component Hanufacturer i Serial No. Board Identification 'iguilti Replaced or ) Code i i Replacement (Stamp (

I I' i~tea Ro I PRESSURIZER RELIEF VALVE I CROSBY I H51249-1361 I N/A I RV-3-551C /UNK i Replaced / No IPRESSURIZER RELIEF VALVE I CROSBY IN6987700004 IN/A 'STK CODE 176171 1 iUNK iReplacement iNo IRV-3-551C UTC 419092

7. DescriPtion of'ork: REHOVE AND REPLACE PRESSURIZER SAFTEY VALVE RV-3-551C.'RESSURE TEST PERFORHED UNDER PRESSURE TEST'ACKAGE ¹ 03.RCS-4101-L-03.
8. Tests Conducted: Hydrostatic: Pneusstic: Nominal Operating Pressure Other VT-1 VT-2 pressure~2292 ig Test Temperature 547 UF 98.041-3

Shee't 2 of 2 I FORM NIS-2 (Back)

9. Remarks: HECNAMICAL CONNECTION MO llELOIMG REQOIRED.

CIERT IF I CATE OF COHPLIANCE lie certify that the statcsatnts made in the report. are correct.and this replacement conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Stoep IN A Certificate of A horizati No. N~A Expiration Oate N A Owner 4~ or (I(meir's esignee, T'Otic Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid corrmission issued by the Nationai Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and ~employed by Arlkwright Hutuai Insurance C~ny of Norwood, Ha. have inspected the cocponents described in:this Owners Report during the period 01/15/98 to 10/27/98 and state that to the best of my kpowiedge and belief, the Owner has performed examinations and taken corrective measures describecl in this Owners Report in accordance with the requireaents of the ASHE Code, Section XI. By signing this certificate ineither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described, In, this Owner~s Report. 'Furthersere, neither the Inspector nor his empioyer shatl lm liable in any manner for any personal, injury. or..property damage or a Loss of any kind arising from or connected with this inspection. Inspector Signet re Ccemissions >> NB 823O M I National Board, State, Providence, and Endorseeents 98-04'l-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the,ASME Code Section XI <. Owner Florida Power & Li ht Date 10 29 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address

2. Plant Turke Point Plant Unit Name PWO ¹: 63/0137 WO ¹: 98020991 01 CR ¹:98-1652 9760 SW 344 Street 'Florida Cit Address

'l. 33035 Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A 9760 SW 344 Street Florida Cit FL. 33035 Address
4. Identification of System: CVCS Char in & Letdown S tem System ¹: 47 Duality Croup: A
5. (a) Applicable Construction Code B31.1 1955 Edition,~s A Addenda,H~A code case lhi Applicahlo Edition of sectlorl Xi Utilized for Recsirs or RePlecements 1989 Edition,~H A Addenda,H~A Cede Case

. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Mane of ]Manufacturer( National Other ]Year Repaired f ASHE ( Carponent Manufacturer ) Serial Mo. Board Identification ]Built Replaced or f Code f I J,Replacement )Stsap f I I /T~es Ho JSTUDE WITH MUT (3) IN/A IN/A iH/A IUTC 416012 JUNK )Replacement )No STK CODE 56928-1 iBONHETE VALVE (1) ICOPES WLCAN IN/A fH/A IUTC 414031 ,)UHK [Replacement [Ho STK CODE 56650-1

7. Description of Work: REPLACED BOHNET AMD 3 STUDS WITH NUTS OH LCV-3-460.

LEAKAGE TEST PERFORMED UNDER 03-RCS-4101-L-04. . Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT.1 VT 2 Pressure~2285 is Test Temperature 547 'F 98.042-3 Sheet 2 of 2 FORM HIS-2 (Back) Il

9. Remarks: MECHANICAL CONNECTION NO YIELDING REQ!JIREO.

CEIRTI F I CATE OF COMPLIANCE Me certify that the statements made in the relport are correct snd this~ replacement conforms to the rules of the ASHE Code, Section XI ~ Type. Code Symbol Stan@ NIA Certificate of horizatiop No. ~NA Expiration Date N A Sig.~~ Owner or oner" s OLfsignee, itle CERTIFICATE OIF IHSER'VICE IHSPECTIOII I, the undersigned, holding a valid c<Nmission issued by the National Board of Boiler and Pressure Vessel inspectors, and the state or Province of Dade Ccenty and empioyediby Arkwright Mutual Insurance Company of Norwood, Ka. have Inspectw! the components described in this Owners Report during the period '10/26/98 to 10/27/98 and state that to the best of my knowledge and belief, the Owner has performed exa<ninatio<m and taken corrective measures descriIM in this Owners Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his emplloyer makes any warranty, expressed or ispiied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kiind arising from or connectedl with this inspection. Com<nission+ HB 8230 N I Inspect s Signature National Board, State, Providence, and Endorsements Date ~7,q+P'8-042-3 FORH NIS-2 OHNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI n

z. Owner Florida Power $ Li ht Date 10 30 98 700 Universe Blvd. Jum Beach Fl. 33408 Sheet n 1 of 2 Address
2. Plant Turke PointIPlant Unit 3 I

PNO ¹: 63/4106 lO ¹: 97006713 01 CR ¹:97-0315 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc

3. llork Performed by Florida Power 8 Li ht Type Code Syabol Stamp N A Authorization No. N A Expiration Date N A 9760 SM 344 Street Florida Cit FL'. 33035 Address Identification, of System: InstruTTent Air System ¹: 94 Duality Group: 8
5. (a) Applicable Construction Code 831.1 f955 Edttfon,~NA Addenda,~NA Code Case (b> Applicable Edition of section xl ut,fllted for Repair's or Rcplaceannts l989 Edition,~u 6 Addenda,~u 6 cocle case Identification of Conlponents Repaired'or Replaced and'Replacement Components Name of Name of iHanufactureri National Other iYear 'i'epaired i ASHE i Component Hanufacturer [ Serial No. Board Identification 'iBuilti Replaced or J Code i i Replacement iSterp i I ~Ye s No IVALVEN SHING CHECK I LAD I SH H/A N/A (UTC 417420 iUNK, Replacement No I

'TK CODE 182361-2 )PIPER CARBON STEEL IN/A iN/A IN/A IUTC 411979 iUNK i Replacement iNo Sl'K CODE 30626-1

7. Description of.Nork f REPL'ACED EXISTING CHECK VALVE 3-40-205. CODE CASE N-416-1 HAS BEEN INVOKED-FOR'HIS REPLACEHENT ACTIVITY.

PRESSURE TEST PERFORHED UNDER PRESSURE TEST PACKAGE ¹ 03-IA-1301-L-01. Tests Conducted: Hydrostatic: Pnewetic: Nominal Operating Pressure ~ Other VT-2 pressure~Ed ig Test Tespersture F .98-043-3 Sheet 2 of 2 ~l FORM NIS-2 (Baclc)

9. Remarks: ALL WELDING PERFORMED IN ACCORDANCE MITH THE FPL llEL'D CONTR'OL MANUAL'. CDDF. CASE N4'16-1 WAS ENVOKED FOR THIS REPI.ACEMENT ACTIVITY.

CERTIFICATE OF CCMPLIAHCE lie certify that the statenents made in the reiert are; correct and tihisireplaceaent conforms to the 'rules of the ASME Code, Section XI. Type Code Symbol Stamp N A Certificate of Authorization Signed ~ c4~d~5p Owner, or ~~~% Ho. r'. -; ~~NA 3Q r &~n wr'skesignee'Title -) Expiration Date D.t. N A CERTIFI CATIE OF INSERVICE INSPECTION I, the undersigned, holding a valid coninission issued by the Natienai Board of Boiler and Pressure Veasel inspectors and the, state or Province of Dade Catty and cloyed 'by Arkwright Mutual Insurance Coo@any of Norwood, Ma. have Insixmted the corn@ments de'scribed in this Owners Report during the period 06/23/97 to 10/28/98 and state that to the best of my Iknowiedge and beli'ef, 'he Owner has performed examinations and taken corrective measures described iin this Owners Report 'in acccrdance with the requirements of'he'ASME Code, Section XI. / By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed or ( implied, concerning the examinations and corrective measures descrilxxi fn this Owner's Report. Furthermore, neither the Inspector nor his eayloyer shall be liable, in any manner for any personal injury or property damage or a loss of any kind arising frea or cennected with this inspection; Coaaiissiona NB ~30 N I Inspecto Signa ure National Board, State, Providence, and Endoraements Date 19 5" F'8-043-3 FORM NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required bynthe Provisions of the ASHE Code Section XI

8. Owner Florida Power & Li ht Date 11 17 98 700 Universe Blvd. Juno Beach Fl. 33408 Sheet s 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PMO ¹: 63/3977 MO ¹: 97001397 01 PCN ¹: 96-092 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Authorization Ho. N A Expiration Date M A 9760 SM 344 Street Florida Cit FL. 33035 Address
4. Identification of System: C nt Cooli Mater S stem System ¹: '30 Quality Group: C
5. (s) Applicable Construction Code B31.1 1955 d Et sf~casa Addend~eat Code Case (al Applicable Edftfoll of sectfon Xf U\flf.ted for RePafl'a ol'CPlocnaents 1989 Edftfon,~HA Addenda,~ll A Code Case Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer/ National / Other /Year f Repaired f ASHE /

Coe ponent Ksnufacturer .] Serial No. Board Identification )guilt] Replaced or / Code / I Replacement /Stamp ( 'I I I /~tes No l3T 216 ) VARIOUS VARIOUS I H/A iCCM HEAD TANK IVAR. I"epiacement INO NOD IF I CATION

7. Description of Mork: ADDITION'OF CCM HEAD TANK AND ASSOCIATED PIPING FITTINGS SUPPORTS AMO VALVES PER PC H 96-092 INCLUDING MORK ORDERS 97001397 01'ND 98010744 01. CODE CASE N-416-1 MAS INVOKED FOR THIS HOOIFICATIOM. HYDROSTATIC PRESSURE TEST 03-CCM-30308-H-01 AMO PRESSURE TESTS 03-CCM-30314-L-01 03-CCM-30311-1-02 AND 03-CCM-30309-L-01 MERE PERFORMED AS REQUIRED UNDER PC H 96-092.
  • SEE INDIVIDUAL PRESSURE TEST PACKAGES FOR TEST PARAHETERS.

'ests Conducted: Hydrostatic: Pnematic: Nominal Operating Pressure Other VT-1 2 3 Prcssure~ fg Test Tarperature * 'F 98-044-3 Sheet 2 of 2 F(RH IHIS.2 (Back)

9. Remarks: ALL MELDING PERFORHED IN ACCORDANCE MITK THE FPL MELD CONTROL HANUAL: 'ASE N-416-1 INVOKED FOR THIS HOOIFICATION.

CERTIFICATE OF COHPLI'ANCIE i/e certify that the statements amde in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI. Type Code Symbol Stamp N A ~'@~4M Expiration Date Certificate of Autho zatian No. ~NA N/A s; D.t. 4~<< Owner or Ower/'s Desig~e, Title CERT IF I CATIE OF INSERVICE INSPEC1'ION I, the undersigned, holding a valid ccmnission issued by the Niationai Board of Boiler and Pressure Vessel inspectors and the state or Province of IDade Catty and eaployed by Arkwright Mutual Insurance Company of Norwood, Ha; have inspo:ted the ceqxnents desciribed in this Owners Report during the period 05/27/98, to 11/03/98 and state that to the best of my knowledge and belief,, the Owner has performed examinations and taken corrective measures described in tlhis Owners Report in accordance with the requirements of thai,ASHE Code, Section XI ~ I By signing this certificate neither t'e Inspector nor his ~loyei makes any warranty, expressed or implied, concerning the examinations and corrective measures'descrihM in this Owner's Report. Furthermore,; neither the Inspector nor his employer shall, be liable in, any, manner, for any personal injury or property damage or a loss of any kind arising fram or connected with this inspection. Comnissions',,- 'B 8230 I Ins ors S nature National',Board, State, Providence, and Endorsements Date 19.+P 98-Oi44-3 TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations ~O Page 1 of1 FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATIONRESULTS As required by the provisions of the ASME Code Rules EDDY CURRENT EXANINATIONRESULTS PLANT: Turkey Point Unit 3 EXAMINATIONDATE: October 5 1998 through October 8, 1998 Tubes Steam Total Total Tubes Plugged as Tubes Plugged Total Plugged Generator Tubes Preventative This Outage Tubes in S/G Inspected 20%-39% 40 Maintenance 3E210A 3194 6 0) 20 3E210B 3187 3E210C 3179 27 (() 35 LOCATION OF INDICATIONS(3) (20% - 100%) Support Support Top of Top of Total Total Steam AVB Locations Locations Freespan Tubesheet Tubesheet Indications Indications Generator Bars 1 thru 6 1 thru 6 06H -06C to t1 TSP to P1 TSP 20%-39% )40% Cold Leg Hot Leg U-Bend Cold Leg Hot Leg 3E210A 11 (() '0 3E210B 22 (()(2) 22 (()g) 3E210C 43 (i) 43 (i) Remarks: (1) Mechanical wear damage at anti-vibration bars (AVB) was depth sized using qualified bobbin coil sizing technique. (2) One tube was preventatively plugged in SG 3B for AVB wear progression. (3) Some tubes may have more than one AVB wear indication reported. Date: ~~ ~~ 9'repared by: CSI S/G Eddy Current oordinator Date: 2.(J9 Reviewed by: I Inspections Supe isor Date: o I Reviewed by: 28 CSI S/G echnical S ecialist ~Ci 0 CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT g 3

                                       '09/98 COMPONENT : S/G'                                             Page   :  1 Date   : 10/13/98 Examination 'Dates.: 10/05/98 thru 10/08/98 Total Number of Tubes Inspected .....:            3194 Total Indications Betveen 20< and 394                             11 Greater than or equal to 404                     0 Total'orrosion type Indications      "VOL"            0 Total Tubes Plugged    as Preventive Maint               0 Total Tubes Plugged                                      0 Location Of Indications    208   to 100$  &  "VOL'"

Hot Leg Cold Leg TSH .5 to 01H -2.1 0 TSC .5 to 01C -2.1  : 0 01H -2.0 to '06H +2.0 ~ 0 01C -2.0 to 06C +2,.0 : 0 06H +2.1 to AV1 -3.1,: 0 06C +2.1 to AV4 -3.1  : 0 AV1 -3,.0 to AV4 -3'.0: 11

   ~O

~

 ~

il

INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 09/98 OHPONENT  : S/G A ,Page: 1 DESCRIPTION : ALL 20K TO 39K'INDICATIONS Date: 10/13/98 Time: .15:55:32 I'xtent

+

[Roe[Col[Leg[* *ITst/Note[ Reel I I I Probe I I Location

                                                                         ,   09/98 IVolts[Dcg[Ch I   I
                                                                                                         ~    N/A I'/,[Diff[ Location IVolts[Dcg[Ch I g I I
+---I-     I      I "I- --- I-          I-            I:                -I-    --'I --I -I-- I----I-------------I-----I---I---I---.

I 33[ 41[ C 'I ITEKTECPS[AC025, 'IA-720-H/ULC [AV1 .0 I

                                                                                .9I'P 2[ 26[          I           I      I   I   I      I
I. C I 'ITEKTECPSIAC025 'IA-720-M/ULC .IAV2 .0 I '4l IP 2['>>I .I I I'

I I I I I C I ITEHTECPSIAC025 ,IA-720-H/ULC IAV3; .0 I 1.41 I>>I 29[. I I I I I I I ;I' C I ITEKTECI.R[AC025 IA-720-H/ULC IAV4 .0 I -4[ I>>I >>I I I I I I I I 31[ 44[ K I IT cTEM IAK025 [A-720-H/ULC IAV3 .0 I ~ 4[ I>>l, 29I I I I I I I I 38[ 45[- C I [TEKTECPSIAC024 IA-.720-H/ULC IAV2 .0 1.8[ ;IP 2[. 35[ I I I I I I C I .ITEKTECPSIAC024 IA-720-H/ULC IAV3 .0 .8['P 2[ 28[ I I I I I I 37[ 47[ C I ITEKTEC IAC027 'IA-720-H/ULC IAV3 .'0 1.0[ [P 2[ 28[ I I [ I I I 30[ 52[ C I ITEHTECPCIAC030 IA-720..H/ULC IAV3 .0 .4[ IP 2[ 29,[ I I I I

                                                                                                                                     'I
I 28[ 59[ C I ITEKTEc IAc034 IA-720.M/ULc IAV2 ;0 I -7l I>>[ 25I I I I I I 'I I I. I C I ,ITEKTEC

'---I---I---I---I--------I-IAC034 IA-720-M/ULC IAV3 I'--

                                                                   .0      I    .5[     I>>I>>l         I           I      I   I
                                                                        --I ----I---I---I---I----I------.---- I----.I---I---I---.

I I I Number of RECORDS Selected from Current Outage: '11 Number of TUBES Selected from Current Outage: 6

0 il

DISTRIBUTION

SUMMARY

                 'B'UMULATIVE  TURKEY  POINT UNIT if 3 09/98 COMPONENT :  S/G                                          Page   :  1 Date   : 10/13/98 Examination Dates   : 10/05/98 thru    10/08/98 Total Number of Tubes Inspected   .....:       3187 Total Indications Between 20> and 39~                          22 Greater than or equal to 40%                  0 Total Corrosion type Indications "VOL"             0 Total Tubes Plugged as Preventive. Maint               1 Total Tubes Plugged                                    0 Location Of Indications   20>  to 100>  &  "VOL" Hot Leg                                Cold Leg

.TSH .5 to 01H -2. 1: 0 TSC .5 to 01C -2.1  : 0 01H -2.0 to 06H +2.0 : 0 01C -2.0 to 06C +2.0  : 0 06H +2.1 to AVl -3.1 .: 0 06C +2.1 to AV4 -3.1  : 0 AV1 -3.0 to AV4 -3.0 : 22

~O 0

INDICATIOHS/TREHDIHG REPORT PTH-3 OUTAGE : 09/98 OHPOHENT : S/G B

          ~                                                                                              Page   :    1 DESCRIPTIOH:t ALL 40X TO 100K, VOL 8:PTP INDICATIONS                                                      Date: 10/13/98 Time: 15:58:21.

+ I,I I Extent I 09/98 H/A I IRovlcoIILcgI** ITst/Hotel Reel I I.ocation IVoltslDeglch I x IDiffl Location IVoltslDeglCh I X 'I +---I---I-.-I- -I--------I- I I- --I----I---I---I---I- I I I .I--.I---+ I,-QI 55I K l39XITEGTEK IBH016 IA-720-K/ULc IAY3 .0 1.5I IP 2IPTPI

 --- I--I--I--    I-----I--                      I I
                                                        ----------I----I--I--I---l-       I I

I I I I I

                                                                                                                  .I--.I---+

I Hunbcr of RECORDS Selected from Current Outage 1 Number of TUBES'Selected from Current Outage: 1

0 0 0

INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 09/98 OMPONENT  : S/G 8 Page  : 1 DESCRIPTIOH  : ALL 20X TO 39K INDICATIONS Date: 10/13/98 Time: 15:58:51 + 'L I I Extent I 09/98 I I N/A I [Row(coi(Leg(**"ITst/Note( Reei Probe Location (Voits(oeg(ch X,(Diff( Location IVoits(Deg(ch ( X (

  --I--I--I- l               --I----      I

( I --I ----I---I - ( I l I

                                                                                                                       . I. I         I

( 28( 111 H I ITECTEKLR(BK011 (A-720.M/ULC I AV4 .0 .3( (I z( zzl I I I I 29[ 12[ H I ITECTEHLRIBH011 I 720.M/ULC IAY1 .0 I. z( 23( I I I 26( 20( H ( ITECTEH IBH025 (A-720-M/ULC IAV4 .0 .5( li z( zi( I I I I ( 34( 31( H I ITECTEHPS(BH018 (A-72D.M/ULC (AV2 .0 ~ 3( I>>l >>I I I I I I I I O' ITECTEHPs[BH018 (A 720-M/ULc (AV3 .0 .5( I>>I >>I I I I I- 32( 34I H I ITECTEHPSIBH021 IA-720-M/ULC IAV1 .0 .8( (I z( 30( I I I I I H [ ITECTEKPSIBH021 (A-720-M/ULC IAV2 .0 .5( l>>I >>I I I I I I I H I ITECTEHPSIBH021 IA-720.M/ULC IAV3 .0 I>>I 32I I I I I I H I ITECTEHPSIBH021 IA-720-M/ULC (AV4 .0 ~ Sl I>>I >>I I I I I 34( 46( H I ITECTEHPSIBH019 IA-720-M/ULC IAV2 .0 1.0I I>>I 30( I I I ( ( K ( (TECTEHPS(BH019 (A-720-M/ULC (AV3 .0 1.4 ( I>>l >>I I I I ( 35( 48( K I ITECTEHPSIBHD16 IA-720.M/ULC IAV2 .0 .4I I>>l >>I I I I I I I K ( [TECTEHPS(BH016 IA-720-M/ULC (AV3 .0 as( (I 2( 27( I I 11( 50( c I (TEHTEcsc(Bc003 (a-720-M/ULC IAV1 .0 IP 2( zs( I I ( 34( 51( H I ITEC'IEHPS(BK016 IA-720-M/ULC lAVI .0 .2( '(p z( z1( I I N ( (TECTEHPSIBH016 (A 720-M/ULC IAV2 .0 1 ~ 1( IP 2( 34[ I I I I I K I ITECTEHPslBH016 IA-720-M/ULC (AV3 .0 ~ 3( IP zl 23( I I I 34( 53( K I ITEGTEK IBH016 Ia-720-M/ULc IAV1 ~ 0 .S( (I Z( 26( I I I I I K I ITECTEH IBH016 (A-720-M/ULC (AVZ .0 ~ 6( IP zl 28[ I I H ( ITECTEK IBH016 IA-720-M/ULC (AV3 .0 .3( IP z( z3( I I I I I H I ITECTEH IBH016 IA-720-K/ULC (AVZ .0 .2( (r z( zz( I I I I I H I +-- I---'I--I-- I-ITECTEH IBH016 IA-720.M/ULC [AV3 .0

                                                                         -I-1.S[      l>>l 39l       I
                                                                                                     -I-(     I I         I             I                            I   I    I   I Number   of  RECORDS    Selected from Current Outage:           22 Number   of  TUBES  SeLected from Current Outage :           11

0 il

CUMULATIVE. DISTRIBUTION'UMMARY r TURKEY POINT UNIT if 3 09/98 COMPONENT : S/G C Page : 1 Date : 10/13/98 Examination Dates  : 10/05/98 thru 10/08/98 Total Number of Tubes Inspected 3 179 Total Indications Between 204 and 39% 43 Greater than or equal to 404 0 Total Corrosion type Indications "VOL" 0 Total Tubes Plugged as Preventive 'Maint 0 Total Tubes Plugged 0 Location Of Indications 204. to 100%, & "VOL" Hot Leg Cold Leg TSH .5 to 01H -2.1 TSC .5 to 01C -2.1 01H -2.0 to 06H +2.0 0'6H 01C -2.0 to .06C +2.0 0

   +2,.1 to  AV1 -3.1       0            06C +2.1 to    AV4  -3.1 AV1 -3.0 to   AV4 -3.0  :   43

0 0

INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 09/98 COMPONENT  : S/G C Page : 1 DESCRIPTION : ALL 20X TO 39X INDICATIONS Date : 10/13/98 Time : 16:04:32

  +                                       \~

I Extent I 09/98 l N/A I (Row(Col(Leg(*~~(Tst/Note(, Reel Probe ( Location (Volts(Deg(Ch I X (Diff( Location (Volts(oeg(Ch ( X (

 '---I---I---I--.I-------I------                                                       I
                                                                                          --       I- --I---I.--I-                     I           I      I,        I

( 31( 15(' I+ ITEKTECPSICC034 (A-720-H/ULC (AV1 .0 .2( (P 2( ZO( I I I I I 30( 17( C (~ (TEHTECPS(CC033 IA-720-H/ULC IAV1 .0 II zl 21( I I I I I 30( 18( C I

                            ~ ITEHTECPSICC033        IA-720.H/ULC IAV1         .0              .2(         IP Zt 23(                              I       I         I       I I 33(    3I(      C     (      (TEKTECPS(CC038     (A-7ZO-M/ULC IAv3         .0             .4f         IP Zt 23(                               I      I          I       I

( 34( 31( c t~ ITEKTEcPs(cc037 IA-7?0-H/ULC IAV2 ~ 0 .5( (I zl z7( I I I I I c ( ITEKTEcPc(cc037 IA-720-M/ULC !AV3 .0 .7( II Zt 29( I I I I t 42( 31( C t>> ITECTEKPS(CK033 tA-720-M/ULC IAV3 .0 .4 f. IP 2( 20( I I I I I 33I 32I C IA ITEHTECPSICC038 IA-720-M/ULC IAV2 .0 ~ 3( I I I I I C IH (TEKTECPSICC038 IA 0 H/ULC IAV3 -3( II 2( 22( I I I t 43( 33( C (d (6AKTECRC(CC038 IA-720-H/ULC tAV3 .3( l ( ( 3s( 3s( c tj ITEHTEci sfcc038 IA-720-H/ULC IAV3 .0 .3( IP zl 21( I I I I I I I I 43( 35 ( c I ~ ITEKTEGPs(cc038 (A-720-M/ULC (AV3 .0 .2( (P 2( Z1( I I I I ( 35( 36( C (i j (TEHTECPS(CC038 (A-720-M/ULC (AV2 .0 .4( I ( I I I I c I (TEKTEGPs(cc038 IA-720.H/ULC (AV3 .0 .5( II ?I 24( I I I I I

                            ~                       IA-720.H/ULC               .0                         (I zl 30(

I 34 I 41 I C I (TEHTECPs IcC037 IAV1 ~ 8( I I I I I I I ( C Il'TEHTECPSICC037 (A-720-M/ULC IAV2 .0 .5( (I 2( 26( I I I I I c (~ (TEHTECPs(Cc037 (A-720-M/ULC (AV3 .0 ~ 6I II 2( z8( I I I I

                            ~ ITEKlECPSICC037       (A-720-M/ULC              .0 I       I      I c I                                              (AV4                      .7(          (P 2( 29(                              I      I         I       I

( 35f 43( C (

                            ~ ITEHTECPSfCC041       IA 72   H/ULC IAV2        .0             .9(       ~

(I z( zs( I I I c (r'TEHTEGPs(cc041 (A-720-M/ULC (AV3 .0 1.2I II 2( 29( I I f

              ,I c I        i   ITEHTECPs(CC041     IA-720-H/ULC   IAV4       .0             .8(          (P zl 24(                             I I

I I I I I I I 34( 44( I ITEKTECPS(CC040 IA-720-H/ULC fAV3 .0 .4f fi 2( z2f t I 35( 44( C ( (TEKTECPS(CC041 IA-720-H/ULC (AV2. .0 1.5 I (I 2( 33( I- I I I I I I c ~ ITEKTECPslcc041 I IA-720-H/ULC IAV3 .0 1.6I (I 2( 34( I I I I I I I c I ITEHTECPslcc041 IA-720-H/ULC IAV4 .0 .6( (I 2( Z1( I I I I I 28( 48( c (H (TEKTEcPsfcco46 IA-720-M/ULC IAV .0 .3( I I I I I 35I 39I 49I 54( c IA c ( (i j ITEKTECPSICC043 (TEHTEcPslcc043 IA-720-M/ULC IA-720-M/ULC IA-720-M/ULC IAV4 (AV3

                                                                              .0
                                                                             .0
                                                                             .0
                                                                                             ~
                                                                                            .3(

Sl IP z( zz( Ii 2( zo( I I I I I I I I ( 26( 58( C ,(TEHTECPS(CC050 (AV1 (P 2( Z6( I I' l I C

             'I c ti      ITEHTECPSICCOSO     (A-720-H/ULC   (AV2 IA-720 H/ULC IAV3
                                                                             .0
                                                                             .0
                                                                                            .7(          (P   2('30(

I I I I I I I I I ITEHTEcPslcc050 .3( IP zl 25( I I I I I I I C Iif ITEHTECScfCC050 fA-720-H/ULC (AV1 .0 .4( (I 2( 21( I I I I ( 28( 60( C (II'TEHTECPSICC050 IA-720-H/ULC IAV2 .0 .2( Ii 2( 23( I I I I I 30( 61( c I< (TEHTEcPs(cc050 IA 72 H/ULC IAV .0 .6( (P 2( Z9( I I I I ( 38( 61( C f~ ITEKTECPS(CC044 IA-720-H/ULC IAV2 .0 .3( (p 2( zs( I I I I ( 25( 62( c t~ ITEKTEcpsfcc049

                           ~ (TEHTEcPsfcc049 (A-720.H/ULC   (AV2       .0             .3f          I>>I >>I                               I      I         I       I I c (                               IA-720 H/ULC   (AV3       ~  0           ~  Sl        IP  zl zzl                           I      I         I       I I    24( 63( c III ITEHTEGPs(cc050                 IA-720-H/ULC   IAV2       .0             ~ 4(         tp z( zs(                            I      t         I       I I       I          C .( H      (TEKTECPS(CC050     (A-720-M/ULC   (AV3       .0             .6I         tp z( z8(                                    I         I 38( 65(

( K ( / (TECTEHPS(CK026 IA-720.M/ULC (AV2 .0 .5( I 'I I ( K' / ITECTEKPS(CK026 IA-720-H/ULC IAV3 .0 .4( 1>>I. 20( I I I I I I I I I I H (

                           ~   (TECTEKPS(CK026    IA-720 M/Ut.C   IAV4       .0             ~  6(       (I 2( 23(                                                      I I    38( 71(       H       ~   ITECTEKPS(CK026    IA-720-M/ULC    IAV3       .0             .6(         IP 2( 23(                             I      I         I       I
   ---I--I--I-- I------I----

( I

                                                                                   --I--         I
                                                                                                                                         .  --I      I         I

0 0

INDICATIONS/TRENDING REPORT. PTN-3 OUTAGE : '09/98 COHPONEHT  : S/G C Page  : 2 DESCRIPTIOH : ALL 20X TO 39X INDICATIOHS Date : 10/13/98 Time: 16:04:34 I ,Extent (Row]col(Leg]'*~./Tst/Notej'eel' I Location 09/98

                                                                   /Volts(Degfch  f X I    I'/A
                                                                                      ]Diff/ l.ocation  /Volts/Deg/Ch,/ X /

I I I I I

                     -      I                     I                I       I
                                                                             -I---I---I---I------------I--- -I---I---I --'

'---I---I- I

                'I          I        -I           l                        I
                                                                             -I---I.--I----I-------------'I----I---I---I.--

Number of RECORDS Sclccted.from Current Outage: 43 Number of TUBES Selected from Current Outage: 27

4I 0

TURKEY POINT UNIT 3, 1998 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers

~Ci ~O

Abstract The attached report details the snubber inspection/testing performed for Florida Power and Light Company, Turkey Point Unit 3. These tests and inspections were performed during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October 28, 1998 Snubber inspection/testing was conducted in accordance with Plant as allowed under Relief Request 4 of the Third Ten Year Interval ISI Technical'pecifications Program.

0 0

Mechanical shock arrestors (snubbers) were visually inspected/handstroked and functionally tested under purchase order A'00032190 by Basic-PSA personnel in accordance with the following plant/vendor procedures: 0-CMM-105. 1 0-OSP-105. 1 O-OSP-105.2 A technical specification visual inspection, ASME Section XI VT-3 and a hand stroking was performed at the following tag locations: 3-1000 3-1002 3-1003 3-1007 3-1008 3-1011 3-1012 3-1013 3-1014 3-1015 3-1016 3-1017 3-1019 3-1020 3-1021 3-1022 3-1023 3-1024 3-1025 3-1026 3-1027 3-1028 3-1030 3-1123 3-1125 3-1126 3-1127 3-1128 3-1130 3-1132 3-1133 3-1134 3-1135 A technical specification visual inspection, ASME Section XI VT-3, NO HAND STROKE, and a.functional test was performed at the following tag locations: 3-1001 3-1018 3-1029 3-1069 3-1082 3-1093 3-1102 3-1111 3-1004 3-1124 3-1129 3-1131 3-1005 r 3-1006 3-1009 3-1010 Italicsindicaies SR Sample snubbers Bold indicates QR Sample snubbers Und rlin in i reviou rebuil A technical specification visual inspection, ASME Section XI VT-'3 and a hand stroking was performed at the following tag locations. Upon completion of the technical specification visual inspection, ASME Section XI VT-3 and the hand stroking, the snubbers were changed out with previously rebuilt and functionally tested snubbers. The removed snubbers were rebuilt and functionally tested and will be utilized as spares for future outages. 3-1043 3-1044 3-1045 3-1046 Word:ptnsfo2/vol.i/common/&p198

0 4l 0

Outage Unit 3 1998 Cycle 17 Re oint Report g Outage WO ¹ 9702360001 0 S Date S S Visual T of T T Serial Inspection A Functional A "L" A Tag T Test T Dimension T Visual S Functional S Number Number Date 3-1000 18015 10/2/98 12.75 Visual inspection-SAT, "L" dimemion acceptable, N/A handstroke SAT, lubricated spherical bearing and load pin with neolube- 24982-3. 3-1001 27095 9/30/98 9/30/98 P. 17.00 Visual inspection -SAT, "L" dimension acceptable, A functional test was performed with the following no handstroke performed, snubber is part of the acciytable results. initial SR sample. Snubber S/N 27095 Snubber was removed with transition tube left in Tension Compression Criteria place, cleaned and lubricated spherical bearings and Test 1) 12.73 17.07 300.00 load pin with neolube -24982-3. Test 2) 8.64 13.79 300.00 Test 3) 0.006 0.006 .02g Test 4) 9.21 13.81 300.00 This SR snubber was tested as of the initial sam le. 3-1002 104 10/2/98 N/A 17.25 Visual inspection-SAT, "L"dimension acceptable, handstroke SAT, lubricated spherical bearing and load pin with neolube- 24982-3. 3-1003 29625 10/2/98 N/A 16.25 Visual inspection-SAT, "L"dimension acceptable, N/A handstroke SAT, lubricated spherical bearing and load pin with neolube -24982-3. 3-1004 101 10/1/98 10/1/98 P 17.375 Visual inspection -SAT, "L"dimension acceptable, A functional test was performed with the following no handstroke performed, snubber is part of the acceptable results. initial QR sample. Spherical bearings and load pin were lubricated with neolube -29482-3. Snubber S/N 101 Tension Compression Criteria Test I) 22.46 17.06 300.00 Test 2) 18.87 9.31 300.00 Test 3) 0.013 0.009 .02g Test 4) 19.13 9.43 300.00 This R snubber was tested as of the initial sam le WORD: PTNSF021 VOLI/COMMON/FRPT98

0 ll

int Outage Report Unit 3 1998 Cycle 17 Refue mg Outage WO ¹ 97023600 01 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Summary Functional Sununary 3-1005 10579 9/28/98 P 9/30/98 P 26.375 P Visual inspection -SAT, "L" dimension acceptable, A functional test was performed with the following No handstroke performed. This snubber was tested acceptable results. as a previous rebuild. Snubber S/N 10579 Tension Compression Criteria Test 1) 113.94 215.71 2500.00 Test 2) 102.68 139.39 2500.00 Test 3) 0.003 0.007 .02g Test 4) 108.67 156.31 2500.00 This R snubber was tested as a revious rebuild. 3-1006 6494 9/28/98 P 9/30/98 P 26.575 P Visual inspection -SAT, "L" dimension acceptable, A functional test was performed with the following No hatxhtroke performed. This snubber was tested accelerable results. as a previous rebuild. Snubber had dislodged bearing .875" on building end and both paddies Snubber S/N 6494 were loose. Tension Compression Criteria Test 1) 71.46 165.39 2500.00 Bearing was restaked and both paddies were Test 2) 33.44 141.81 2500.00 retorqued. Test 3) 0.008 0.007 .02g Corrective actions were performed per Condition Test 4) 43.32 131.19 2500.00 Report (CR 97-2008, PMAI 9841485). This R snubber was tested as a revious rebuild. WORD:PTNS F02/VOL l/COht h(ON/FRPT98

0 II

T oint Outage Report Unit 3 1998 Cycle 17 Re gOutage WO ¹ 9702360001 S Date S S Visual Tof T T Serial Inspection A Functional A . "L" A Tag Number Number Date T Test T Dimension T Visual Summary Functional Summary 3-1007 4590 9/29/98 P 10/2/98 F 26.938 P Snubber passed Technical Specification inspection, Snubber S/N 4590 was put in the bench to stroke. The (Removed) but during IWF inspection the snubber would not snubber was frozen, requiring 6,0001b. for breakaway, rotate and could not be handstroked. CR 98-1404 the acceptance criteria is 2500. CR 98-1404 was was written. The "L" dimension was in acceptable written to address the problem, the snubber was broken range. Load studs were jammed due to snubber down and a list of defective parts were submitted to ISI. 10035 i 27 313 being in a bind. When pipe end load stud was Due to the extent of damage, snubber 4590 willbe (Installed) (As left) removed the pipe shifted .375" to the west. The disposed of. The snubber was rephced with serial ¹ snubber was transported to the trailer for machine 10035. stroking and did not meet the acceptance criteria, it was broken down to determine wear and parts for A functional test was performed with the following rebuild. Snubber serial ¹ 4590 was replaced with acceptable results after rebuild performed on 3/21/97.

                                                                           ¹ serial 10035.                                          Snubber S/N 10035 Tension    Compression      Criteria Test I)    161.38       138.78         2500.00 Test 2)

Test 3) Test 4) 232.46 0.004 224.31 452.13 0.008 397.34

                                                                                                                                                           ..02g 2500.00 2500.00 3-1008    8084           9/30/98    P N/A              27.75       P Visual inspection-SAT, "L"dimension acceptable,        N/A handstroke SAT, lubricated spherical bearing and load in with neolube 24982-3.

3-1009 10542 9/29/98 P 9/30/98 P 26.750 P Visual inspection -SAT, "L" dimension acceptable, A functional test was peiformed with the following no handstroke performed. This snubber was tested acceptable results. as a previous rebuild. SnubberS/N 10542 Tension Compression Criteria Test I) 98.46 89.26 2500.00 Test 2) 95.75 89.97 2500.00 Test 3) 0.005 0.004 .02g Test 4) 95.85 87. 14 2500.00 This R snubber was tested as a revious rebuild. WORD:PTNS F02/VOLI/COMMON/FRFr98

0 0 0

int Outage Report Unit 3 1998 Cycle 17 Refue mg Outage WO N 97023600 01 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Summary Functional Sumntary 3-1010 6530 9/28/98 P 9/30/98 26.500 P Visual inspection -SAT, "L" dimension acceptable, A functional test was performed with the following no handstroke performed. This snubber was tested acceptable results. as a previous rebuild. Snubber S/N 6530 Tension Compression Criteria Test I) 55.31 181.96 2500.00 Test 2) 61.10 139.05 2500.00 Test 3) 0.009 0.006 .02g Test 4) 46.94 136.38 2500.00 This R snubber was tested as a revious rebuild. 3-1011 12376 9/29/98 P 'N/A 20.3750 P Visual inspection -SAT, "L" dimension acceptable, N/A handstroke - SAT, lubricated spherical bearings and load in with neolube 24982-3. 3-1012 8086 9/30/98 P N/A 26.50 P Visual inspection -SAT, "L" dimension acceptable, N/A handstroke - SAT. Removed load pin bracket end and replaced with a load stud and nuts per WO 97027646 Stud (I) 214245-3 Nuts (4) 209608-3 Washers (2) 197329-3 Lubricated spherical bearings and load stud with neolube 24982-3. 3-1013 33624 10/5/98 P N/A 10.500 P Visual inspection MAT;"L" dimension acceptable. Handstroke -SAT. 3-1014 1722 10/5/98 P N/A P Visual inspection -SAT, "L" dimension acceptable. N/A Handstroke -SAT, lubricated spherical bearings and load in with neolube 24982-3. 3-1015 18009 10/6/98 P N/A 12.000 P Visual inspection -SAT, "L" dimension acceptable. Handstroke -SAT, lubricated spherical bearings and load in with neolube 24982-3. 3-1016 18012 10/6/98 P N/A 12.2500 P Visual inspection -SAT, "L" dimension acceptable. N/A Handstroke -SAT, lubricated spherical bearings and load in with neolube 24982-3. 3-1017 18003 10/6/98 P N/A 14.000 P Visual inspection -SAT, "L"dimension acceptable. N/A Handstroke- SAT, lubricated spherical bearings and load in with neolube 24982-3. WORD:PTNS F02/VOLl/COMMON/FRFF98

!l 0 0

T oint Outag Report Unit 3 1998 Cycle 17 Re ng Outage WO ¹ 97023600 01 S Date S S Visual Tof T "L" A T Tag Serial Inspection A Functional A Number Number Date T Test T Dimension T Visual Sunmiaty Functional Summary 3-1018 18013 10/6/98 10/6/98 P 13.5 Visual inspection -SAT, "L" dimension acceptable, A functional test was performed with the following no handstroke performed, snubber is part of the acceptable results. initial SR sample. Snubber S/N 18013 Snubber was removed with transition tube leII in Tension Compression Criteria place, cleaned and lubricated spherical bearings and Test 1) 17 04 11 60 75.00 load pin with neolube 24982-3. Test 2) 12.85 7.87 75.00

                                                                                                                         , Test 3)    0.010      0.011             .02g Test 4) 13.21
                                                                                                                                   ~

4.53 75.00 This SR snubber was tested as of the initial sam le. 3-1019 17425 10/5/98 N/A 17.375 Visual inspection -SAT, "L" dimension acceptable, N/A handstioke -SAT. Note: Indicator numbers have eroded off snubber. It is not an o rabili concern. 3-1020 103 10/5/98 N/A 16.875 Visual inspection -SAT, "L" dimension acceptable, N/A handstroke -SAT. Snubber would not rotate and was completely removed to handstmke. Bearings and pins were rusty, bearings would not move due to rust. (CR 984372) Spherical bearings and pins were cleaned and neolubed 24982-3. 3-1021 16725 10/5/98 N/A 18.313 Visual inspection -SAT, "L" dimension acceptable. N/A Handstroke-SAT. 3-1022 18006 10/5/98 N/A 15.00 Visual inspection SAT. N/A Handstroke SAT. During initial visual inspection it was identified that 13.25 the "L" dimension was out of spec. Per CR 98-1475 the 12" Unbolt was loosened and the support assembly rotated enabling the snubber to achieve the "L" dimension setting of 13.25. Snubber was missing one cotter pin. New cotter pin installed 29139-3. WORD:FTNSFO2/VOLl/COMMON/fRFH8

0 oint Outage Report Unit 3 1998 Cycle 17 Refue mg Outage WO ¹ 9702360001 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Summary Functional Sununary 3-1023 23273 10/5/98 N/A 12.50 Visual inspection SAT, N/A Handstroke SAT. Per CR 98-1475 the 12" U4olt was loosened and 13.25 the support assembly rotated enabling Snubber to achieve the "L" dimension set tin of 13.25. 3-1024 17427 10/5/98 N/A I 17.00 Visual ~on- SAT, "L"dimension acceptable. Hanstroke SAT, lubricated spherical bearing and N/A load in with neolube 24982-3. 3-1025 100 10/5/98 N/A 17.00 Visual inspection SAT, "L"dimension acceptable. Handstroke SAT, lubricated spherical bearing and load in with neolube 24982-3. 3-1026 12394 10/5/98 N/A 19.25 Visual inspection SAT, "L"dimension acceptable. N/A Handstroke SAT, lubricated spherical bearing and load in with neolube 24982-3. 3-1027 16237 10/5/98 N/A 21.00 Visual inspection SAT, "L"dimension acceptable. N/A Handstroke SAT, lubricated spherical bearing and load in with neolube 24982-3. 3-1028 11135 10/5/98 N/A 18.00 Visual inspection SAT. "L" dimension acceptable. N/A Handstroke SAT, lubricated spherical bearing and load in with neolube-24982-3. 3-1029 11330 10/5/98 10/5/98 P 22.00 Visual inspection- SAT, "L"dimension acceptable, A functional test was performed with the following no hartdstroke performed, Snubber is part of the acceptable results. initial SR sample Snubber S/N 11330 Snubber was removed with transition tube left in Tension Compression Criteria place, cleaned and lubricated spherical bearing and Test 1) 16.61 40.40 750.00 load pin with neolube- 24982-3. For reinstallation Test 2) 13.10 24.81 750.00 of Snubber it was necessary to loosen clamp bolt. Test 3) 0.015 0.015 .02g Clamp was re-tightened to the as found ear to ear Test 4) 14.59 24.52 750.00 dimension. Torqued transition tube and installed new safet wire 012237-3. This SR Snubber was tested as of the initial sam le. 3-1030 11121 10/5/98 N/A 21.00 Visual inspection SAT. "L"dimension acceptable. Handstroke SAT, lubricated spherical bearing and load in with neolube 24982-3. WORD: PTNSPO2/VOLl/COMMON/FRPT98

0 II

oint Outag Report Unit 3 1998 Cycle 17 Re gOutage WO¹9702360001 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Summary Functional Summary 3-1043 17899 10/3/98 P 3/17/97 P 22.00 Visual inspection SAT, "L"dimension acceptable A functional test was performed with thc following (Removed) Handstroke SAT, Snubber was removed with acceptable results. transition tube Ielt in place, lubricated spherical bearing and load pin with noelube 24982-3. Replaced Snubber S/N 17899 (Following Overhaul) Installed new safety wire -0012235-3. Tension Compression Criteria Test 1) 65.25 42.24 300.00 12377 Replaced Snubber S/N 17899 with Snubber S/N Test 2) 43.94 29.26 300.00 (Installed) 12377. Test 3) 0.015 0.010 .02g Snubber 17899 was overhauled, functionally tested Test 4) 39.52 25.96 300.00 and sent to Dry Storage buiMng for storage and will be utilized as a spare for future outages. Replacement Snubber S/N 12377 Tension Compression Criteria Test 1) 124.11 100.42 750.00 Test 2) 124.11 116.17 750.00 Test 3) 0.006 0.008 .02g Test 4 70.29 142.58 750.00 3-1044 17900 10/3/98 P 9/16/97 P 21.00 Visual inspection- SAT, "L"dimension acceptable A functional test was performed with the following (Removed) Handstroke SAT, Snubber was removed with acceptable results. transition tube leII in place, lubricated spherical bearing and load pin with noelube- 24982-3. Replaced Snubber S/N 17900 (Following Overhaul) Installed new safety wire -0012235-3. Compression Criteria "'ension 17905 Test 1) 29.69 176.54 300.00 (Installed) Replaced Snubber S/N 17900 with Snubber S/N Test 2) 17.74 160.29 300.00 17905 Snubber 17900 was overhauled, functionally tested Test 3) Test 4) 0.017 36.79 0.019 55.85 '00.00 .02g and sent to Dry Storage buikhng for stoiage and will be utilized as a spare for future outages. Replacement Snubber S/N 17905 Tension Compression Criteria Test I) 29.9 31.8 750.00 Test 2) 72.5 44.1 750.00 Test 3) 0.003 0.004 .02g Test 4) 105.8 78.7 750.00 WORD: PTNSF02/VOL l/COMMON/FRPT98

0 0

oint Outage Report Unit 3 1998 Cycle 17 Re g Outage WO ¹ 97023600 01 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Sumnmy Functional Sununary 3-1045 17189 10/3/98 3/15/97 P 22.00 Visual inspection SAT, "L" dimension acceptable. A functional test was performed with the following (Removed) Handstroke SAT, Snubber was removed with acceptable results. transition tube left in place, lubricated spherical bearing and load pin with noelube 24982-3. Replaced Snubber S/N 17189 (Following Overhaul) 10172 Installed new safety wire -0012235-3. Tension Compression Criteria (Installed) Test 1) 26.84 59.71 300.00 Replaced Snubber S/N 17189 with Snubber S/N Test 2) 22.95 71.76 300.00 10172 Test 3) 0.012 0.007 ~

                                                                                                                                                                      .02g Snubber 17189 was overhauled, functionally tested      Test 4)     16.86      66.19            300.00 and sent to Dry Storage building for storage and will be utilized as a spare for future outages.

Replacement snubber S/N 10172 Tension Compression Criteria Test I) 97.69 39.05 300.00 Test 2) 136.63 45.91 300.00 Test 3) 0.006 0.006 .02g Test 4 68.54 66.06 300.00 3-1046 17903 10/3/98 3/15/97 P 20.75 Visual inspection- SAT, "L"dimension acceptable A functional test was performed with the following (Removed) Handstroke SAT, Snubber was removed with acceptable results. transition tube left in place, lubricated spherical bearing and load pin with noelube 24982-3. Replaced Snubber S/N 17903 (Following Overhaul) 10174 Installed new safety wire -0012235-3. Tension Compression Criteria (Installed) Test 1) 40.56 49.19 300.00 Replaced Snubber S/N 17903 with Snubber S/N Test 2) 33.41 39.63 300.00 10174 Test 3) 0.014 0.008 .02g Snubber 17903 was overhauled, functionally tested Test 4) 33.90 39.78 300.00 and sent to Dry Storage building for storage and will be utilized as a spare for future outages. Replacement Snubber S/N 10174 Tension Compression Criteria Test I) 12.92 62.18 300.00 Test 2) 30.75 84.11 300.00 Test 3) 0.012 0.007 .02g Test 4) 92.76 41.08 300.00 WORD:PTNS F02/VOLl/COMMON/PRPT98

~O Ci

T oint Outag Report Unit 3 1998 Cycle 17 Refue ing Outage WO ¹ 97023600 01 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Sumniary Functional Sumniaiy 3-1069 27072 10/6/98 P 10/6/98 P 16.625 P Visual inspection SAT, "L"dimension acceptable, A functional test was performed with the following no Handstroke performed, Snubber is part of the acceptable results. initial SR sample. Snubber S/N 27072 Snubber was removed with transition tube in place. Tension Compression Criteria Test I) 13.78 25.37 300.00 Test 2) 9.76 18.51 300.00 Test 3) 0.005 0.006 .02g Test 4) 8.62 21.09 300.00 This SR Snubber was tested as of the initial sam le. 3-1082 11932 10/7/98 P 10/5/98 P 27.313 P Visual inspection SAT, "L" dimension acceptable, A functional test was performed with the following no Handstroke performed, Snubber is part of the acceptable results. initial SR sample. Snubber S/N 11932 Load pins were drilled and tapped on one end to Tension Compression Criteria allow for the installation of a pulling device for Test I) 105.51 172.01 2500.00 future removal of this Snubbe'i per MRA 97023600- Test 2) 71.90 143.58 2500.00

02. Test 3) 0.007 0.007 .02g Test 4) 74.80 132.25 2500.00 This SR Snubber was tested as of the initial sam le.

3-1093 27091 10/2/98 P 10/3/98 P 18.313 F Final Visual inspection SAT, no Handstmke A functional test was performed with the following performed, Snubber is part of the initial SR sample. acceptable results. 17.688 During initial visual inspection it was identified that Snubber S/N 27091 the "L" dimension was out of spec. Per CR 98-1476 Tension Compression Criteria the turnbuckle-locking nut was loosened to allow the Test I) 10.51 23.90 300.00 adjustment of the Snubber "L"dimension range. Test 2) 6.73 17.95 300.00 Sriubber "L" dimension was returned back in spec Test 3) 0.006 0.007 .02g and turnbudde nuts were tightened. Test 4) 5.72 17.59 300.00 This SR Snubber was tested as of the initial sam le. WORD: PTNSF02/VOL I/COMMON/FRFF98

~CI '0

T oint Outage Report Unit 3 1998 Cycle 17 Re ng Outage WO //97023600 01 S Date S S Visual T of T T Serial Inspection A Functional A "L" A Tag Number Number Date T Test T Dimension T Visual Summary Functtonal Summary 3-1102 29451 10/3/98 10/3/98 P 11.000 P Visual inspection-SAT, "L"dimension acceptable, A functional test was performed with the following no handstroke performed, snubber is pait of the acceptable results. initial SR sample. Snubber S/N 29451 Tension Compression Criteria Test I) 6.72 6.68 17.50 Test 2) 6.12 5.59 17.50 Test 3) 0.012 0.010 .02g Test 4) 3.79 5.89 17.50 This SR snubber was tested as of the initial sam le. 3-1111 2875 10/6/98 10/6/98 P 17.125 P Visual inspection SAT, "-L" dimension acceptable, A functional test was performed with the following no Handstroke performed, Snubber is part of the acceptable results. initial'SR sample. Snubber S/N 2875 Snubber was removed with transition tube in place. Tension Compression Criteria Test I) 16.80 27.89 300.00 Test 2) 10.35 16.50 300.00 Test 3) 0.009 0.013 .02g Test 4) 9.15 19.39 300.00 This SR Snubber was tested as of the initial sam le.. 3-1123 6484 9/29/98 N/A 27.875 P Visual inspection -SAT, "L"dimension acceptable, Handstroke SAT 9/29/98 9/30/98 P 27.750 P Visual inspection -SAT, "L"dimension acceptable. A functional test was performed with the following 3-1124 12991 No handstroke performed. Snubber is part of the gR Acceptable results. sample. Snubber S/N 12991 Tension Compression Criteria Test I) 58.61 194.71 2500.00 Test 2) 52.51 167.67 2500.00 Test 3) 0.004 0.004. .02g Test 4) 71.34 170.33 2500.00 This R snubber was tested as of the initial sam le. 3-1125 12986 9/29/98 N/A 26.750 P Visual inspection -SAT, "L"dimension acceptable, N/A Handstroke SAT. WORD: PTNS F02/VOLI/COMMON/FRPT98

0 li 0

oint Outag Report Unit 3 1998 Cycle 17 Refu ng Outage WO // 97023600 01 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Summary Functional Summary 3-1126 12989 9/29/98 P N/A 27.000 P Visual inspection -SAT, "L" dimension acceptable, N/A Handstroke SAT. Rust was found on support linder this is not an o rabili .concern. 3-1127 12990 9/28/98 'P N/A 27.1250 Visual inspection -SAT, "L"dimension acceptable, N/A Handstroke -SAT, lubricated spherical bearings and load pin with neolube 24982-3. Snubber I.D. tag was hun 3-1128 12985 9/28/98 P N/A 27.1250 P Visual inspection -SAT, "L"dimension acceptable, N/A Handstroke- SAT. Snubber was stroked with a ~/i ton come-a-long. Lubricated spherical bearings and load in with neolube 24982-3. 3-1129 12987 9/30/98 P 9/30/98 P 26.000 Visual inspection -SAT, "L"dimension acceptable, A functional test was performed with the following No handstroke performed. Snubber is part of the Acceptable results. QR sample. Spherical bearings and load pins were cleaned and Snubber S/N 12987 lubricated with neolube 24982-3. Tension Compression Criteria Test I) 68.33 294.83 2500.00 Test 2) 104.78 258.81 2500.00 Test 3) 0.006 0.006 .02g Test 4) 111.44 287. 16 2500.00 This R snubber was tested as of the initial sam le 3-1130 17840 9/29/98 P N/A 19.6250 P Visual inspection -SAT, "L" dimension acceptable, N/A Handstroke- SAT, lubricated spherical bearings and load in with neolube 24982-3. 3-1131 17837 9/29/98 P 10/I/98 P 19.5000 Visual inspection -SAT, "L" dimension acceptable, A functional test was performed with the following No hatldstroke performed. Snubber is part of the Acceptable results. QR sample. Lubricated spherical bearings and load pin with neolube 24982-3. Snubber S/N 17837 Tension Compression Criteria Test I) 33.61 89.11 750.00 Test 2) 9.99 68.41 750.00 Test 3) 0.015 0.008 .02g Test 4) 46.69 70.60 750.00 This R snubber was tested as of the initial sam le WORD:Fest'02/VOLI/COMMON/FRFr98

~O 0

oint Outage Report Unit 3 1998 Cycle 17 Refue ng Outage WO ¹ 97023600 01 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Number Number Date T Test T Dimension T Visual Sunurtary Functional Summary 3-1132 17838 9/29/98 P N/A 19.000 P Visual inspection -SAT, "L" dimension acceptable, N/A Handstroke SAT. Lubricated spherical bearings and load in with neolube 24982-3. 3-1133 13695 9/29/98 P N/A 19.5000 P Visual inspection -SAT, "L" dimension acceptable, N/A Handstroke SAT. Lubricated spherica bearings and load in with neolube 24982-3. 3-1134 17836 9/28/98 P N/A 19.2500 P Visual inspection -SAT, "L" dimension acceptable, N/A Handstroke SAT. Lubricated spherical bearings and load in with neolube-24982-3. 3-1135 17839 9/2&/98 P N/A 19.2500 P Visual inspection -SAT, "L" dimension acceptable, N/A Handstroke SAT. Lubricated spherical bearings and load in with neolube 24982-3. WORD: FfNS N2/VOLl/COMMON/FRFr98

0 0

TURKEY POINT UNIT 3 1998 REFUELING OUTAGE Suxmnary, of Inservice Inspection Exami.nations

0 Date: 12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 1 INSERVICE INSPBCTION

SUMMARY

THIRD INTBRVAL, SECOND PBRZOD, SBCOND OUTAGE (98RP) Class 1 PCBBA STATUS Components CIOR PRESSURE VESSEL N I 0 Zone Number: 3-001 S 0NGT SBC. XZ T RSBH Summary Bxamination Area Catgy Bxam A B I0 B Remarks Number Identification Item No Method Procedure T C G H, R, ee Calibration Block ee RRP. DWG. NO. 5613 M 4000 001900 VBSSBL ZNTBRZOR 'B-N-1 VT-3 NDB 4.3 20 C - X - - 10/11/1998 - VT-3 complete, slight ACCBSSIBLB ARBAS B13. 10 erosion observed on core barrel nettles. RBP. DWG. NO. 3 V01 013090 VBSSBL TO CLOSURB HBAD HATING B-N;1 VT-3 NDB 4.3-20 C - X - - 10/11/1998 - VT-3 complete, pitting SURPACB ON VBSSBL B13 10

                                          ~                                                observed on flange.

II Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT UNIT 3 Page: 2 ZNSERVICB ZNSPECTZON

SUMMARY

THIRD INTERVAL, SBCOND PERIOD, SECOND OUTAGB (98RP) Claus 1 PCBEA 'STATUS Componento AM GENERATOR C PRIMARY SIDE N I 0 Zone Number: 3-005 ASMB S ON G'T SBC. 'XZ T RSBH Summary.Examination Area iCatgy Bxam A B I0 B Remarke Number Identification Item No Method Procedure T C G M R ee Calibration Block ee RBP. DWG, NO. 5613 M 4005 041100 3-SGC-I-IRS B-D UT, NDB 5. 13-1 C X - - - 10/4/1998 - UT complete NRZ. INLBT NOZZLE INNER RADIUS B3 140

                                          ~

SECTION STEAM GENERATOR 'MOCK UP ** 041200 3-SGC-0-IRS B-D UT NDB 5.13-1 C X - - - 10/4/1998 - UT complete NRZ. OUTLBT NOZZLE INNER. RADIUS B3. 140 SECTION

                                                                                            ** STEAM  GENERATOR MOCK UP  **

041300 3-SGC-I BOLTING B-G-2 VT-1 NDB 4.1 5 C X - - - 10/08/1998 VT-1 complete NRI. STEAM GENERATOR ZNLBT'MANWAY. B7 ~ 30 BOLTING 041400 3 SGC-0 BOLTING B-G-2 VT-1 NDE 4.1-4 C X - - - 10/08/1998 - VT-1 complete NRZ. STEAM GBNERATOR OUTLBT MANWAY B7.30 BOLTING 041510 3-SGC SUPPORT P-A VT-3 NDB 4.3-11 C' - - - 10/02/1998 - VT-3 complete NRZ. SUPPORT LEGS 1 THRU 4 F1 '0V

el 45

  'J

Date:, 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 3 ZNSBRVZCB INSPBC1'ZON SUHHARY THIRD INTERVAL, SBCOND PBRIOD, SECOND OUTAGE (98RP) Class 1 PCBBA STATUS Components CK>R COOLANT SYSTEM LOOP C INTERMEDIATE LEG N I 0 Zone Number: 3-013 ASH B S ONGT SEC. XZ T RSBH Summary Bxamination Area Catgy Bxam A B Z 0 B Remarks Number 'Identification Item No Hethod Procedure T C G H R ee Calibration Black ** REP. DWG. NO. 5613 P 766-S SH. 3 048800 32i-RCS-2303-5 STBAH GBNERATOR NOZZLE TO B-P B5. 70 UI'DB PT NDB 3.3 15 5.4-12 C X

                                                                                       - X 10/02/1998 - PT complete - 2 acceptable rounded indicatians. 10/03/1998 - UT BLBOW                                                                               complete, geometry.

ee UT-26R ee 049000 32%-RCS-2303-7 B-J PT NDB 3.3 12 C X 10/02/1998 - PT complete - 1 acceptable PIPB TO BLBOW 'B9. 11 UT NDB 5.4-6 - X linear indicatian. 10/03/1998 - UT complete geometry. e* UT-12, UT-26R, UT-46 ** 049500 31 RCS 1303 10 B-J PT NDB 3.3-21 C -X- 20/02/1998 - PT complete- 3 acceptable

                                         .B9.11                      5.4-6           X-      rounded indications. 10/03/1998 - UT 0

BLBOW TO PUHP CASING UT NDB complete NRZ. UT-26R

~ll 0

Date: 12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Paget 4 INSBRVICB INSPECTION

SUMMARY

THIRD INTERVALED SBCOND PERIODS SECOND OUTAGB (98RP) Class 1 PCBBA STATUS Components CIOR COOLANT SYSTEM I~P C HOT LEG N I 0 ,Zone Number: 3-014 S ONGT SBC. XZ T RSBH Summary Bxamination Area Catgy Bxam A B I 0 B Remarks Number Identification Item No Method Procedure T C G H R <<<<Calibration Block <<<< RBP. DWG. NO. 5613 P 766 S SH. 3 050200 29<<-RCS-1308-4 B-F PT NDB 3 ~ 3-14 C - X 10/02/1998 - PT complete - 3 acceptable ELBOW TO STBAM GENERATOR B5.70 UT NDB 5.4-9 -X- rounded indications. 10/03/1998 - UT NOZZLE complete, geometry.

                                                                                              <<* UT 26R **

~ll 0 0

'Date:,12/29/1998                                     TURKBY POINT'NUCLEAR PLANT UNIT 3                                      Page:              5 INSBRVICB'NSPEC1'ZON 

SUMMARY

THZRD INTERVAL, SECOND PBRZOD, SBCQND OUTAGE (98RP) Class 1 PCBBA STATUS Components ACIOR COOLANT SYSTEM LOOP C COLD LEG N I 0 Zone. Number: 3-015 ASMB'BC. S 0NGT XZ T RSBH I SummarY Examination Area Catgy Exam A B I 0 'B Remarks Number Identification Item No Method Procedure T C G'M R:ee Calibration Block ee REP. DWG. NO. 5613 P 766 S SH. 3 >050500,27. 5" -RCS-1309-11 B J ~ 'PT NDB 3.3-24 C -X- 10/06/1998 - PT complete, 3 acceptable

        >PUMP CASING TO PIPE             B9 11
                                             ~       UT             NDB 5.4 10            -X-     rounded indications. 10/07/1998 -

geometry. UZ'omplete, UT-12, UT-46 e*

Cl 0 41

Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 6 ZNSBRVICE ZNSPBCI'ZON SUNHARY THIRD INTERVAL, SECOND PBRIOD, SECOND OUTAGE (98RP) Class 1 PCBBA STATUS Components CTOR COOLANT SYSTEM PRESSURIZER SPRAY LINE

                                                                                       'NZ    0 Zone Number: 3-021                                                                 S   ONGT SBC. XZ                                    T   RSBH Summary Bxamination Area                Catgy      Bxam                            A   B I0  B Remarks
,Number  Identification                  Item No Hethod            Procedure        T   C G H R'* Calibration     Block **

REP. DWG. NO ~ 5613 P 661 S SH. 4 062300 45-RC-1305-2 PT NDB 3.3-20 C - X 10/03/1998 - PT complete, acceptable BRANCH CONNECI'ZON'TO ELBOW'-J B9. 11 UT NDB 5.4-7 - X linear indication. 10/06/1998 - UT complete, geometry.

                                                                                                ~* UT 45N ee 062400  4'-RC 1305-2                      B J     .PT             NDB 3 '-20       C   X - - - 10/03/1998 -   PT  complete, NRZ.

ELBOW TO PIPE .B9.11 UT NDB 5.4 7 X 10/06/1998' UT complete, NRZ.

                                                                                                ** UT-45N   ee 063300  3 RCH 13                                   VT-3           NDB 4.3-2        C   X - - - 09/22/1998 - VT-3 complete,      NRZ.

SPRING HANGBR P1. 10C e

0 ll

Date: 12/29/1998 TURKBY POZNI'UCLBAR PLANT UNZT 3 Page: 7 INSBRVICB ZNSPBCTZON

SUMMARY

THIRD ZNTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RP) Class 1 PCBBA STATUS Components TB DISPOSAL SYSTBM LI UID RC LOOP C DRAIN N I 0 Zone Number: 3-028 ASMB S 0 N G T SBC. XZ T R S B H Summary Bxamination Area Catgy Exam A B I0 B Remarks Number Identification Item No Method Procedure T C G H R ee Calibration Block ++ RRP. DWG. NO. 5613 P 671 S SH. 5 079600 2%-RC-1303-1 B-J PT NDB 3 ~ 3-2 C X - - - 09/29/1998 - PT complete, NRZ. BRANCH CONNBCI'ZON TO PZPB B9.40 080100 2w-RC-1303-5 B-J PT NDB 3.3 6 C X - - - 9/30/1998 - PT complete, NRZ. VALVB 3 505A TO PZPB B9.40

0 0 Cl

Date: 12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 8 INSBRVICB'NSPECTION

SUMMARY

THIRD INTBRVAL, SBCOND PBRZOD, 'SBCOND OUTAGB (98RP) Claes 1 PCBBA STATUS Componente IDUAL HEAT REMOVAL FROM RC LOOP'C HOT LEG N I 0 Zone Number: 3-036 ASMB S ONGT SBC. XZ 'T R S B H Summary Bxamination Area Catgy Bxam A B I0 B Remarke Number Identification Ztem No Method Procedure T C G H R ** Calibration Block ee RBP. DWG. NO. 5613-P-669-S SH. 1 121600 3 RCH-12 F-A VT-3 NDB 4.3-6 C - - - X 9/30/1998 - VT-3 complete, RZ '(CR() SPRZNG HANGBR R1 ~ 10C VT-3 NDB 4.3-21 X - - - 98-1405)'. 10/11/1998 - VT-3 following corrective actione per CR B 98-1405,

                                                                                             'NRZ.

121800 14'-RHR-1301-6 B-J PT NDB 3.3-3 X 9/30/1998 - PT complete, acceptable PZPB TO VALVB"MOV-3 750 B9. 11 UT NDB 5.4-8' - X rounded indication. 10/2/98 - UT complete, geometry.

                                                                                              <<* UT 30 ee 122000  VALVB HOV-3 750 BOLTING           B  G-2   VT-1           NDB'. 1-3      'C   X - - - 10/01/1998 - VT-1 bolting   exam complete, VALVB BOLTING                     B7.70                                                NRZ ~

200 3-RCH-11 P-A VT 3 :NDB'.3-7 C X - - - 9/30/1998 - VT-3 complete, NRZ. DOUBLB ACTING RBSTRAZNT F1 ~ 10B

0 Cl 4l

Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT'UNIT 3 Page: 9 INSBRVICB INSPECTION

SUMMARY

THIRD INTERVALED SBCOND PERIOD, SBCOND OUTAGB (98RF) Class 1 PCBBA STATUS Components SIDUAL HEAT REMOVAL TO RC LOOP A COLD LEG N I 0 Zona Number: 3-037 S ONGT SBC. XZ T RSBH Summary Examination Area Catgy Exam A B Z 0 B Remarks Number Identification Item No Method Procedure T C G:M R ** Calibration Block tt RBP DWG NO ~ 5613 P 585 S SH 1 123500 10'Z 1301-2 B J PT NDB 3.3-18 C X - - - <0/02/1998 - PT complete, NRZ. PZPB TO ELBOW B9. 11 UT NDB 5. 4-16 - X - 10/08/1998 - UT complete, geometry. 27 tt 126100 8t RHR 1301 2 B-J PT NDB 3.3-18 C X - - - 10/02/1998 - PT complete, NRZ. PIPE TO BLBOW B9. 11 UT NDB 5 '-5 X - - - 10/03/1998 - UT complete, NRI. 126200 8'HR 1301-3 B J PT NDB 3.3-18 C X - - - 10/02/1998 - PT complete, NRZ. ELBOW TO VALVE 3-876A B9. 11 UT NDB 5.4-5 X - - 10/03/1998 - UT complete/ NRZ ~ tt UT 41 tt

~I! ~lk 0

Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: ZNSBRVZCB INSPBCTION SUMHARY 10'HZR D INTBRVAL, SECOND PERIOD, SECOND OUTAGE (98RP) Class 1 PCBBA STATUS Components IDUAL HEAT REMOVAL TO RC LOOP C COLD LBG N I 0 Zone Number: 3-039 S ONGT SBC. XZ T RS,BH Summary Bxamination Area Catgy Bxam A B I 0 B Remarks Number Identification Item No Hethod Procedure T C G H R <<e Calibration Block ee RBP. DWG. NO. 5613 P 587 S SH. 1 130400 8'-RHR-1305 2A B-J NDB 3.3 "7 C X 9/30/1998 - PT complete, 2 arc strikes PZPB TO PIPE B9 ~ 11 UT NDE 5.4-15 X noted outside of exam area (CR 98-1437) 10/01/1998 - UT complete, geometry. et UT 4] 130500 8'-RHR-1305-3 B-J PT NDB 3 ~ 3-7 X 09/30/1998 PT complete, NRZ. PZPB TO TBB B9 ~ 11 UT NDB 5 ~ 4-15' - X - 10/01/1998 - UT complete, geometry. 131600 8i-RHR-1304-8 B-J PT NDB 3.3-23 ,C X - 10/06/1998 - PT complete, NRI. PZPB TO TBB B9 11

                                          ~     UT             NDB 5.4-13               - X -   10/07/1998'     UT complete, geometry.

et UT 41 te RBP. DWG. NO. 5613-P-587-S SH. 2 132300 10 SI-1303 16 B-J NDB 3.3-13 C -X- 10/03/1998 - PT complete, acceptable BLBOW TO PIPE B9 ~ 11 UT NDB F 4-14 X rounded indication. 10/04/1998 - UT complete, NRZ. tt UT 27 ' e 132600 10; SZ 1303 5 B-J PT NDB 3.3-13 C - X 10/03/1998 - PT complete, acceptable PIPE TO ELBOW 89.11 UT NDB 5.4-18 rounded indication. 10/4/1998 - UT complete, geometry. te UT 27 tt 132900 3-SZH-116A P-A VT-3 NDB 4.3-10 C X - - - 10/01/1998 - VT-3 complete, NRZ. DOUBLB ACTING RBSTRAINT F1.10B 133000 10"-SI-1303-8 B J PT NDB 3.3-10 , C X - - - 9/30/1998 - PT complete,NRI. 10/1/1998 PIPB TO BLBOW B9. 11 UT NDB 5.'4 4 - - X - o UT complete, geometry. ee UT-27

I Ol

Date: 12/29/1998 'TURKEY, POINT NUCLBAR PLANT UNIT 3 Page: 11 INSBRVICB INSPECTION,

SUMMARY

THIRD INTBRVAL, SECOND PERIOD, SBCOND OUTAGB (98RP) Claes 1 PCBBA STATUS Componente srnvar. HEAT RRMovan To Rc Loop.c corD rRG N I 0 Zone Number: 3-039 ASMB S ON'GT SBC. XZ T .RSBH Summary Bxamination Area Catgy Bxam A B Z 0 B Remarko Number Identification Item No Method Procedure T 'C G H R ee Calibration Block ee RBP'. DWG. No. 5613 P 587 S SH.' 133900: 10'-SI-1303 11 B-J PT NDB 3.3-27 C - X 10/07/1998 - PT complete, acceptable BLBOW TO VALVE 3-875C B9 ~ 11 UT NDB 5" 4-17 X- linear indication. 10/8/1998 - UT complete, 'NRZ.

                                                                                                    ** UT  27 **

134300 10 SZ71303-13 B-J PT NDB 3.3-28 C -X- 10/07/1998 - PT complete, 2 acceptable ELBOW To BLBOW B9. 11 UT 'NDB 5.4-17 -X- indicationo. 10/8/98 - UT complete, geometry. 27 134400 10 -SZ-1303-14 8-J PT NDB 3.3-26 C X - - - 10/07/1998 - PT complete, NRZ. BLBOW To PIPE B9. 11 UT NDB 5.4-17 - X - 10/08/1998 -'UT complete, geometry. 27 134500 10 -SZ-1303 15 PIPE TO BRANCH CONNBCTION

                                             .B- J B9 ~ 11 UI'DE PT NDB 3.3-29 5.4-17 C    - X
                                                                                                - - 10/07/1998 - PT complete, acceptable X - rounded indication. 10/08/1998 - UT complete, geometry.

UT 27 <<*

~O Ci

Date: 12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 12 INSBRVICB INSPBCTION

SUMMARY

THIRD INTERVAL, *SBCOND PERIOD, SECOND OUTAGB (98RP) Claee 1 PCBBA STATUS Componente GH HEAD SAPETY INJECTION LOOP B INSIDE CTM N I 0 Zone Number: 3-041 S ONGT SBC. XZ T RSBH Summary, Bxamination Area Catgy Exam A B I0 B Remarko Number Identification Item No Method Procedure T C G H R *e Calibration Block ee REP. DWG. NO. 5613 P 584 S SH, 1 140700 8051-R-528-01 VT-3 NDB 4.3-8 C X - - 10/01/1998 - VT 3 completed, NRZ DOUBLE ACTING RBSTRAINT F1 ~ 10B i(chipped concrete noted). 142100 2" SZ 1302 14 B-J PT NDB 3.3-22 C X - - - 10/04/1998> - PT complete, NRZ. PZPB TO BLBOW B9 ~ 40

~li 0 Cl

Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 13 INSBRVICB INSPECTION

SUMMARY

THIRD INTERVAL, SBCOND PERIOD, SBCOND OUTAGB (98RP) Class 1 PCBBA STATUS Components H MEAD SAFETY INJECX'ION LOOP C INSIDE CZMT N I 0 Zone Number: 3-042 S ONGT SBC. XZ T RSBH Summary Bxamination Area Catgy Bxam A B Z 0 B Remarks Number Identification Item No Method Procedure T C G M R ee Calibration Block ee RBP. DWG. NO. 5613 P 648 S SH. 1 147400 2i SZ-1303-21 B J NDB 3.3 1 C X - - - 09/29/1998 - 'PT complete, NRZ. BLBOW TO PIPB 89.40 147900 2%-SZ-1303-26 B-J PT NDB 3.3 1 C X - - - 09/29/1998 - PT complete, NRZ. PZPB TO BLBOW B9 ~ 40

1 0

Date: 12/29/1998 TURKBY POINT'NUCLBAR PLANT UNIT 3 Page: 14 INSBRVZCB INSPBCTION SUHHARY THIRD INTBRVAL~ SBCOND PBRIODg SBOOND OUTAGB (98RF) Claen 1 PCBBA STATUS Components H HBAD SAFBTY INJBCTION LOOP A INSIDB CTHT N I 0 Zone Number: 3-043 S 0NGT SBC. XZ T RSBH SummarY Bxamination Catgy Bxam A B I0 B Remarke Identification Area'umber Item No Hethod Procedure T C G H' ** Calibration Block ee RBF. DWG. NO. 5613 P 764 S SH; 2 148900 8080-H-010 01 VT-3 NDB 4.3-9 C X - - - 10/01/1998 - VT-3 complete, NRZ DOUBLB 'ACTING RBSTRAZNI'-A F1. 10B noted) . (chipped'oncrete 150000 2 -SZ-1305-5 J PT ,NDB 3.3-5 C X - - - 9/30/1998 - PT complete, NRI. BLBOW'TO PZPB' B9.40 150100 2i-SZ-1305-6 PZPB'TO BLBOW B-J B9. 40'DB PT 3.3-4 "C X - - - 9/30/1998 - PT complete, NRZ. 00 2 -SZ-1305-7 B-J PT NDB 3.3-4 C X - - - 9/30/1998 - PT complete, NRZ. BLBOW TO PZPB B9.40 150300 2i-S1-1305-8 B-J PT NDB 3.3-4 C X - - - 9/30/1998 - PT complete, NRZ. PZPB TO ELBOW B9.40 150400 2'-SZ-1305-9 B-J:, PT NDB 3.3-4 C X - - 9/30/1998 - PT complete, NRZ ~ BLBOW TO PIPE B9.40

 ~!!

1 4!

Date: 12/29/1998 TURKBY POINT.NUCLBAR PLANT UNIT 3 Page: 15 INSBRVICB ZNSPBCl'ZON SUMHARY THIRD ZNTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RP) Claee 1 PCBBA STATUS Componenta HIOAL 8 voLUHB coNTRQL To Rc Loop c HoT LBG N'I 0 Zone Number: 3-045 S ON GT SBC. XZ T RS B'H Summary Bxamination Area Catgy Bxam A B Z 0 B Remarko Number Identification Item No Hethod Procedure T C G H R *e Calibration Block e~ RBP. DWG. NO. 5613 P 661 S SH. 2 165400 3-VCH-132 P-A VT-3 NDB 4.3-5 C X - - - 09/27/1998 - VT-3 complete, NRZ. SINGLB AC1'ZNG RBSTRAINT F1'. 10A

i 4i

Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 16 INSBRVICB INSPBCTION

SUMMARY

THIRD INTBRVAI, SECOND PBRIOD, SBCOND OUTAGB (98RP) Claeo 1 PCBBA STATUS Componente MICAL AND VOLUME CONTROL TO REGENERATIVE HX I N I 0 Zone Number: 3-047, S O'NGT SBC. XZ T R'SBH' Summary Examination Area Catgy Exam B IO B Remarko Number Identification Item No Method Procedure T C G M R <<e Calibration Block e>> RRP. DWG. NO. 5613 P 594 S SH, 1 172500 3-VCH-129 P-A VT-3 NDB 4.3-3 C X 09/27/1998 - VT-3 complete-RI - CRB SZNGLB ACI'ING'BSTRAZNT P1.10A VT-3 T9.9-3.1/4.3-23 X 98-1358. 10/10/1998 - VT-3 by QC following corrective meaoureo per CR 5 98-1358, NRZ.

~O 0 0

Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT UNIT 3 Page: 17 INSBRVZCB INSPBCTZON SUHHARY THIRD ZNIBRVAL, SBCOND.PBRZOD, SECOND OUTAGB (98RP)'laeo 1 PCBBA'STATUS Componento HICAL & VOLUHB CONTROL PRON THB RBGBNBRATIVB HX N I 0 Zone:Number: 3-049 S ONG'T SBC. XZ TR S B H Summary Bxamination Area Catgy Bxam A B I 0 B Remarko Number Identification Item No~Hethod Procedure T C G H R e>> Calibration Block *+ RBP. DWG. NO. 5613 P-644 S SH. 3 177700 2 -CH-1302-10'ZPB B J PT NDB 3'.3-19 C X - - - 10/05/1998 - PT complete, NRI. TO BLBOW B9.40 177800 2i-CH-2302-11 B-J PT NDB 3.3-19 C X - - - 10/05/1998 - PT complete, NRZ. BLBOW TO PIPS B9.40 178200 2i-CH-1302-24 B-J PT NDB 3.3-19 C X - - - 10/05/1998 - PT complete, NRI. PZPB'TO TBB B9.40

0 0 4l

Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT'NIT 3 Page: 18 INSBRVICB INSPBCI'ION SUHMARY THIRD INTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB {98RR) Claoo 1 PCBBA'TATUS Componente MICAL & VOLUHB CONTROL SBAL INJBCTION LOOP A N I 0 Zone Number: 3-050 ASHB S ONGT SBC. XZ T RSBH Summary Bxamination Area Catgy Bxam A B I0 B Remarko Number Identification Item No Hethod Procedure T C G H R ee Calibration Block ++ RBR. DN. NO. 5613 P 647 S SH. 1 182721 H-2 VT 3 NDB 4 ~ 3-12 B X - - - 10/03/1998 - Bxpaneion cample celection,

       'DOUBLB ACTING RBSTRAINT         F1. 10B                                            NRZ (CR  98-1357).

~CI 0 0

Date: >>12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 19 INSERVZCE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, SECOND OUTACB (98RP) Class I PCBBA STATUS Compon'ento MZCAL & VOLUME CONTROL SEAL INJECTION LOOP C N I 0 Zone Number: 3-051 S 0NGT SBC. XZ T RSEH SummarY Bxamination Area Catgy Bxam A B I0 B Remarks Number Identification ~ Item No Method Procedure T C G M R <<e Calibration Block ee 182840 REP. DWG. NO. 1'. 5i CH 1302-4 RC PUMP TO PZPB 5613-P-646 S SM. 1 B J B9.40

                                                 'DB PT                 3 ~ 3 16     C   X - - - 10/02/1998 -   PT  complete, NRZ.

182900 1.5"-CH-1302-PB1 B-G-2 VT-1 NDB 4.1-1 C - - - X 9/29/1998 - VT-1 complete, RZ (CRB PIPING FLANGB BOLTING 87.70 VT-1 T9.9-1.1/4 1-6

                                                                              ~       X - - 1406) . 10/14/98 - VT 1'Y QC following corrective actions per    CR B 98-1406, NRI.

183300 2i-CH-1304-2 B-J PT NDB 3.3-16 C X - - - 10/02/1998 - PT complete, NRZ. BLBOW TO PIPB B9.40 00 2'-CH-1304-3 B-J PT NDB 3.3-16 C X - - - 10/02/1998 - PT complete, NRZ. PIPB TO BLBOW B9.40 183500 2~-CH-1304-4 B J PT NDB 3.3-16 C - X - - 10/02/1998 - PT complete, acceptable ELBOW TO PIPE B9 40

                                            ~                                                 rounded  indication.

183600 2'-CH 1304-5 B-J PT NDE 3 '-16 C X - - - 10/02/1998 - PT complete, NRI. PIPB TO BLBOW B9 ~ 40 183700 2i-CH-1304-6 B-J PT NDE 3.3-16 C X - - - 10/02/1998 - PT complete, NRZ. BLEOW TO PIPE B9.40 185000 2"-CH-1304-PB2 BG2 VT1 NDB 4.1-2 C X - - - 9/29/1998 - VT-1 complete, NRZ. PZPZNG RLANGB BOLTING B7 ~ 70

~O 0

Date: 12/29/1998 TURKEY POINT'NUCLBAR PLANT UNIT 3 Page: 20 INSBRVICB INSPECTION SUHHARY THIRD'INTERVAL, SBCOND PERIOD, SBCOND OUTAGB (98RF) Class 1 PCBBA STATUS Components NICAL 6 VOLUME CONTROL SEAL INJBCI'ION LOOP C N I 0 Zone Number: 3-051 S ONGT SBC. XI T RSBH Summary Bxamination Area Catgy Exam 'A B I0 E, Remarks Number Identification Ztem No Hethod Procedure T C G H R ss Calibration. Block se REF. DWG. NO. 5613 P 646 S SH. 1 185300' 4 VT 3 NDB 4.3-4 C - - - X 09/27/1998 - VT 3 complete, RZ (CRB DOUBLE ACTING RBSTRAZNT F1. 10B VT 3 T9.9-3'.1/4.3-22 X - - - 98-1357). 10/11/98 - VT-3 by ()C following corrective actions per CR() 98 1357', NRZ. 185730 H-2 VT-3 NDB 4.3-18 B X - - - 10/03/1998 - Bxpanoion oample selection, DOUBLB ACTING RESTRAINT F1. 10B NRZ (CR 98 1357) . 185760 PS-2B F A VT-3 NDB 4.3-16 B X - - - 10/03/1998 - Expansion sample DOUBLB ACI'ING RBSTRAINT Fl'. 10B selection, NRI (CR 98-1357) ~ 65 PS 2A F-A VT 3 NDB, 4.3-17 B X - - - 10/03/1998 - Expansion sample DOUBLB ACI'ING RBSTRAINT F1 10B

                                             ~                                                selection, NRI (CR 98-1357)   ~

II II

Date: 12/29/1998 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 21 ZNSERVZCB ZNSPBCTION

SUMMARY

THIRD INTBRVAL, SECOND PBRIOD, SBCOND OUTAGE (98RP) Claee 1 PCBBA STATUS Componento CTOR COOLANT PUMP C N I 0 Zone Number: 3-058 S ONGT SBC. XZ TRSBH Summary Examination Area Catgy Exam A B I 0 B Remarkc Number Identification Item No Method Procedure T C G H R *e Calibration Block ee REP. DWG. NO. 5813 M 4008 204000 3-RCP-C-L1 THRU L3 ZA B-K PT NDE 3.3-25 C - - - X 10/08/1998 - PT complete, 2 re)actable ZNTBGRAL ATTACHMENT B10.20 VT 3 NDB 4.3-19 X linear indicatione -{CR 98-1517) . NDB 3.3-30 X 10/08/98 - VT;3 complete NRZ. 10/12/98 NDB 3.3-31 X- and 10/13/98 - re-examination of indication areao following corrective actionc per CR 98-1517, NRZ.

Cl Date: 12/29/1998 TURKBY POINT NUCLBAR 'PLANT UNIT 3 Page: 22 ZNSBRVZCB ZNSPBCTZON SUNNARY THIRD ZNTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB (98RP) Class 1 PCBBA STATUS Components NICAL & VOLUNB CONTROL RBGBNBRATZVB HBAT RXCN N I 0 Zone Number: 3-069 S ONGT SBC. XI T RSBH Summary Bxamination Area Catgy Bxam A B I0 B Remarks Number Identification Item No Nethod Procedure T C G N R ee Calibration Block ee RBP. DWG. NO. 5613 N 4009 204100 RGX 3B200 VT-2 NDB 4 ~ 2-1 C X - - - 09/21/1998 - VT-3 complete, NRZ. VISUALS POR LBAKAGB VT-3 NDB 4.3-1 X - - - 10/26/1998 - VT-2 complete, NRI.

II 'l 4b

Date: 12/29/1998 TURKEY POINT NUCLBAR PLANT UNIT 3 Page: 23 ZNSBRVZCB INSPECTION SUHMARY THIRD INTBRVAL, SECOND PERIOD, SBCOND OUTAGE (98RF) Class 2 PCBBA STATUS Components SIDUAL HEAT REMOVAL SYSTEM INSIDE CONTAINMBNT N I 0 Zone Number: 3-081 S ONGT SBC. XZ T RSBH Summary Examination.Area Catgy Exam A E I0 B Remarks Number Identification Item No Hsthod Procedure T C G H R ss Calibration Block ++ RRP. DWG. NO. 5613 P 587 S SH. 1 252900 100-SI-2304-2LU C P-1 PT NDB 3.3 9 C X - - '- 9/30/1998 - PT complete, NRZ. 10/3/1998 Elbow Long Seam Upstream C5.12 UT NDB 5.4-2 X - - - - UT complete, NRI.

                                                                                                     *s UT 27 253000  10'-SZ-2304-2                   C-P-1           PT             NDB 3.3-9        C   X - - - 9/30/1998 - PT complete,  NRZ. 10/3/1998 BLBOW TO VALVB HOV-3-744A       C5. 11          UT             NDB 5.4-2            X - - - - UT complete, NRZ.
                                                                                                     ** UI'-39 ss 253100  10'-SI-2304-3                   C-P-1'T'C5.

NDB 3 '-9 C - X - -,9/30/1998 - PT complete,, acceptable VALVB HOV-3-744A TO PZPB 11'T NDB 5.4-1 X - - - rounded indication. 10/01/98 - UT complete, NRI. UT-27

0 0

Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT UNIT 3 Page: 24 INSBRVICB ZNSPBCTION

SUMMARY

THIRD ZNTBRVAL, SBCOND PBRIOD, SBCOND OUTAGB (98RF) Claee 2 PCBBA STATUS. Componento. IDUAL HBAT RBHOVAL SVSTSN INSZDB CONTAZNHRNT N'I 0 Zone Number: 3-085 S ONGT SBC. XI T RSBH Summary Bxamination Area Catgy Bxam A B I 0 B Remarke Number Identification Item No Hethod Procedure T C G H R *e Calibration Block ee RBP. DN. NO. 5613 P 587 S SH. 1 260100 8 -SZ-2303-1 RBDUCBR TO PIPE C-P 1 C5. 11 Ul'DB '-3 PT 3.3-8 NDB 5 C X - - - 9/30/1998 - PT complete, NRI. 10/1/1998

                                                                                      - X - - UT complete, geometry.
                                                                                            *e UT-41 e*

0

'Date:  12/29/1998                                 TURKBY POINT NUCLBAR PLANT UNIT 3                                   Page: 25 ZNSBRVZCB INSPBCTION 

SUMMARY

THIRD INTBRVAL, SBCOND PBRZOD, SBCOND OUTAGB (98RF) Claee 2 PCBBA~STATUS Componente H PRBSSURB SAFBTY INFARCTION INSIDB CONTAINMBNT N I 0 Zone Number: 3-096 ASMB S 0NGT SBC. XZ T RSBH SummarY Bxamination Area Catgy Bxam A B I 0 B Remarkc Number Identification Item No Method Procedure T C G M R ee Calibration Block <<e RBF, DWG. NO. 5613 P 764 S SH. 1 289415 3i-SZ-2304 3 C-F-1 PT NDB 3.3-17 C X - - - 10/03/1998 - PT complete, NRZ. PZPB TO RBDUCZNG BLBOW C5. 21 UT NDB 5.4 11 X - - - 10/05/1998 - UT complete, NRZ. UT-57 289418 2i-SZ-2304 1 C-F-1 PT NDB 3.3-17 C X - - - 10/03/1998 PT complete, NRZ. RBDUCING BLBOW TO PZPB C5.30 289424 2 'SZ-2304-3 C-F-1 PT 'NDB 3.3-21 C X 10/04/1998 PT complete, NRZ. BLBOW TO PIPB C5.30

i

~

4l

Date: 12/29/1998 .TURKBY POINT NUCLEAR PLANT UNIT 3 Page: 26 INSBRVICB INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PBRIOD, SECOND OUTAGB: (98RP) Claen 2 PCBEA STATUS Components N PEEDWATER SYSTEM LOOP A N I 0 Zona Number: 3-109 S ONGT SBC. XZ T RSBH Summazy Examination Area Ca'tgy Bxam A B I0 E Remarks Number Identification Item No Method Pzocedure T C G M R *+ Calibration Block +* REP. 'DWG. NO. 5613 P 651 S SH. 1 330500 AUGMBNTBD BXAMZNATION AUG UT NDB 5.16-2 A - - X X 10/08/1998 - Augmented UT complete, FROM NOZZLE RAMP TO 1 DIAMETER geometry, acceptable incluaion ON BLBOW ~(previouely dlopoeltioned). ee UT-20, UT-29

~O II 0

Date: 12/29/1998 TURKBY POINT NUCLBAR PLANT UNIT 3 Page: 27 INSBRVICB INSPBCTZON

SUMMARY

THIRD ZNTBRVAL, SBCOND PBRZOD, SECOND OUTAGB (98RF) Class 2 PCBBA STATUS Components IN FBBDWATBR SYSTBM LOOP B N I 0 Zone,Numbetu 3-110 ASMB S ONGT SBC. XI T RSBM Summary Bxamination Area Catgy Bxam A B I0 B Remarks Number Identification Item No Method Procedure T C G M R ee Calibration Block ee RBF. DWG. NO. 5613 P 652 S SM. 1 333800 AUGMBNTBD BXAMINATZON AUG UT NDB 5. 16-1 A - - X - 10/07/1998 - Augmented UZ'xam complete, FROM NOZZLB RAMP TO 1 DZAMBTBR geometry. ON BLBOW UT-20, UT-29

0 0

Date: 12/29/1998 TURKBY POZNT NUCLBAR PLANT UNIT 3 Page: 28 INSBRVZCB INSPBCI'ION

SUMMARY

THIRD INTBRVALy SBCOND PBRIOD> SBCOND OUI'AGB (98RF) Clacs 2 PCBBA STATUS Componento ZN PRBDWATBR SYSTEM LOOP C N I 0 Zone Number: 3-111 S 0NGT SBC. XI T RSBH Summary Bxamination Area Catgy 'Bxam A B I 0 B Remarkc Number Identification Item No Method Procedure T C G H R ee Calibration Block ee RBF. DWG. NO. 5613-P-178 S SH. 1 338200 AUGMBNTBD BXAMZNATZON AUG UT NDB S. 16-3 A - - X X 10/8/1998 - Augmented UT complete, FROM NOZZLB RAMP TO 1 DZAMBTBR geometry, acceptable incluaion ON BLBOW (previouely diopooitioned). UT-20~ UT-29

~Ci 'Cl

TURKEY POINT UNIT 3 1998 .REFUELING OUTAGE-Summary of'ystem Pressure Testing

~O ~O 0

Abstract This report details the pressure testing of selected Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 3. These inspections were performed prior to and during the Fall 1998 refueling outage, between the dates of September 21, 1998 and October.28, 1998. In addition to the specific pressure tests listed, all Class 1 bolted connections were inspected in accordance with 3-OSP-045.1 and Class 2 bolted connections inside containment were examined utilizing 3-OSP-045.2. Piping and components were selected and tested in accordance with Section XI of the American Society, of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for. Inservice Inspection of Nuclear Power Components," 1989 Edition with no addenda with relief as granted by the 10 CFR 50.55a.

 ~ll, 0

I 0

Procedures The following FPL procedures and documents were utilized to provide instructional guidance for the performance of the required ASME XI pressure testing. OP-1004.1 Reactor Coolant System-System Leak Test Following RCS Opening. 3-OSP-045.1 ASME Section Quality Group A Bolting Examination.

  • 3-OS P-045.2 ASME Section Quality Group B Bolting Examination.
  • 0-ADM-523 ASME Section XI Pressure Tests for Quality Group A,B,C, Systems/Components.

NDE-4.2 Visual Examination VT-2 Conducted During System Pressure Tests.

  • Relief Request Code Case N-533 Authorization for Turkey Point Units 3 and 4. (TAC NOS.

M98149 and M98150)

0 0

SYSTEM

SUMMARY

'UNIT-3 The following safety related Class 1, 2, and 3,systems, or sections thereof were pressure tested in accordance with ASME Section XI.

Name of System System Number Service Air 13 Intake Cooling Water 19 Primary Water Make-up .20 Component Cooling Water 30 Reactor Coolant 41 Chemical and Volume Control 47 Residual Heat Removal 50 Safety Injection 62 Safety Injection Accumulator System 64 Main'Steam 72 Feedwater 74 Auxilliary, Feedwater 75

~li Nl 0

~A'cron ms ADM: Administrative ASME: American Society of Mechanical Engineers CSS: Containment Spray System CCW Component Cooling Water CVCS: Chemical and Volume Control System ECC: Emergency Containment Cooler FW: Fee dwater Heat Exchanger ICW: Intake Cooling Water NDE: Non Destructive. Examination PWO: Plant Work Order PZR: Pressurizer RCP: Coolant Pump Residual heat Removal RO: Restricting Orifice WO'eactor RV: Relief Valve Reactor SFPC: Spent Fuel Pool Cooling Steam Generator SG'PCW: Turbine:Plant Cooling Water VCT: Volume Control Tank Work Order

0 0 0

Test Paeka e Develo ment The specific pressure test boundaries were selected after review of the applicable plant operating diagram/code boundary drawings. The piping systems were broken down into sub-systems. The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves. These sub-systems were then assigned a test package:number, which could be tested in the entirety, or based on availability, could be broken down further into numerous tests within the specific sub-system. The pressure test package numbers contain six segments of information, Sample: 03-CCW-30110-H-01 A A A A A A 1 2 3 4 5 6

1. Unit number (00) common to units 3 and'4. (03) Unit specific. (04) Unit specific.
2. System abbreviation.
3. System number [First (2) digits].
4. Sub-system number [(2) or (3) digits].
5. Type of test (H) hydrostatic, (P) pneumatic, (L) leakage, (F) functional, (I) inservice, (S) static head (I) system inservice, (L) system leakage.
6. Number of test performed within the specific sub system.

0 41

SERVICE AIR SYSTEM 13 03-IA-1301-L-01 -, Test date 10/17/9S This test was performed due to the replacement of check valve 3-40-205 under WO 97006713 01. Code case N-416-1 was invoked for this replacement activity. No leakage was noted during the test.

~O II

INTAKECOOLING WATER SYSTEM 19 03-ICW-1950-L Test date 05/25/97 This test was performed due to the replacement of 3-50-377 under WO 96022773 01. No leakage was noted during the leakage test. 03-ICW-1995-L Test date 11/07/97 This test was performed due to the abandonment of 3-50-360 and the addition of 3 382 under WO 995017287 01 and PC/M 97-002. No leakage was noted during the test. 03-ICW-1965-L Test date 11/07/97 This test was performed due to the replacement of 3-50-354 under WO 97003235 01. No leakage was noted during the test. 03-ICW-1903-L Test date 12/07/97 This test was performed due to the replacement 3-50-367 under WO 97018298 01. No leakage was noted during the test. 03-ICW-1998-I Test date 10/13/98 This test was performed due to the replacement of 3-50-331 and associated expansion joint under WO 98019911 01. No leakage was noted during the test. 03-ICW-1997-I Test date 10/19/98 This test was performed due to the replacement of the 3A intake cooling water pump under WO 97022434 01, discharge check valve 3-50-311 under WO 97005184 01, and associated expansion joint per under WO 97005183. No leakage was noted during the test.

0 i

PRIMARY MAKEUP WATER SYSTEM 20 03-PWMU-2006-F Test date 10/17/98 This test was performed due to the addition of a reducing tee to allow installation of a new thermal relief valve. This work was performed under WO 98014670 01 and PCM 97-003. No leakage was noted during the test.

0 Cl

COMPONENT COOLING WATER SYSTEM 30 03-CCW-30308-H Test date 01/23/98 This test was performed due to the addition of the CCW head tank per PC/M 96-092 and WO 97001397 01. No leakage was noted during the hydrostatic test. 03-CCW-30229-L Test date 05/23/97 This test was performed due to the repair of the access cut into the shell side of CCW HX "A"per condition report 97-0070 and WO 97002428 01. No leakage was noted during the inservice test. 03-CCW-30202-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test 03-CCW-30203-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test. 03-CCW-30204-1 Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test. 03-CCW-30207-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test. 03-CCW-30208-I-03 .- Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test. 03-CCW-30209-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test.

0 0

COMPONENT COOLING WATER SYSTEM 30 CONTINUED 03-CCW-30309-L Test date 10/19/98 This test was performed due to the addition of the CCW Head Tank~per PC/M 96-092'nd WO 98010744-01. Code case N416-1 was invoked for this modification for the two tie in welds at the CCW Surge Tank and at RV-3-707. No leakage was noted during this test. 03-CCW-30311-I Test date 10/19/98 This test was performed due to the replacement of RV-3-707 per PC/M 96-092 and WO 98010744-01. No leakage was noted during this test. 03-CCW-30314-L Test date 10/24/98 This test was performed due to the installation of the CCW Head Tank per PC/M 96-092 and WO 97001397 01. This test was applicable to the.tie in welds at PCV-3-832 and the existing piping. Code case N-416-1 was invoked for this modification. No leakage was noted during the test. 10

~lk. ~O

REACTOR COOLANT SYSTEM 41 03-RCS-4101-L Test date 10/27/98 This test was performed due to the replacement of the bonnet of LCV-3-460 per PWO WO 98020991 01. No leakage was noted during this test. 03-RCS-4101-L Test date 10/26/98 This test involved the leakage test of Reactor Coolant System piping inside containment following the Unit-3 Refueling Outage. This leakage test addressed the following replacements: Component Worl< Order Remarks RV-3-551A 970211'14 01 Valve Replacement RV-3'-551B 98001032 01 Valve Replacement RV-3-551 C 98001039 01 Valve Replacement The following leakage was identified at bolted connections during the leakage test and documented on a Condition Report: Component Leakage CR Number 3A RCP Flange Seal Housing CR 98-1651 LCV-3-460 Body to Bonnet CR 98-1652 11

~O CHEMICALAND VOLUME CONTROL SYSTEM CHARGING AND LETDOWN SYSTEM 47 03-CVCS-4750-I-01 - Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No thru wall leakage was observed. 03-CVCS-4751-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure test requirements. No leakage was noted during the test. 03-CVCS-4752-I Test date 09/21/98 This test was performed,to meet the 1989 Edition of ASME Section Xl periodic pressure test requirements. No leakage was noted during this test; 03-CVCS-4762-L-01 - Test date 10/25/98 This test was performed due to the replacement of 3-293C per WO 97011724 01 and 3-293D per WO 97011725 Ol. No leakage was noted during this test. 12

~

 ~

RESIDUAL HEAT REMOVALSYSTEM 50 03-RHR-5014-F TEST Date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI perodic pressure test requirements. No leakage was noted during the inservice leak test. 03-RHR-5017-'F Test date 10/11/98 This test was performed to meet the 1989 Edition of ASME Section XI perodic pressure Test requirements. No leakage was noted during the inservice'leak test. 13

0 0

SAFTEY INJECTION ACCUMULATORSYSTEM 64 03-SIA-6402-F Test date 09/21/98 This test was performed to meet the ASME Section XI 1989 Edition periodic pressure test requirements. No through wall leakage was noted during the leakage test. 14

MAINSTEAM SYSTEM 72 03-MS-7214-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements. No leakage was noted during this test. 03-MS-7215-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements. No leakage was noted during this test. 03-MS-7216-I Test date 09/21/98 This test was performed to meet the 1989 Edition of ASME Section XI periodic test requirements. No through wall leakage was noted during the test. 15

41 FEEDWATER SYSTEM 74 03-FW-7428-F Test date 10/25/98 This test was performed due to the replacement of the stuffing box on the south end valve CV-3-2900 per WO 97023322 01. No leakage was noted during this test. 16

iO t

 ~O 0

AVXILIARYFEED%ATE<R SYSTEM 75 03-AFW-7557-L Test date 02/18/98 This test was performed due to the replacement of a section of piping adjacent to valve AFSS-016 under WO 98003759 01 and piping adjacent to valve AFSS-015 under WO 98003757 02. Code Case N-416-1 was invoked for this replacement activity. No leakage was noted during the leakage test. 17

4k I, i Cl}}