| Peach Bottom Atomic Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ | | Peach Bottom Atomic Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ |
|
| |
|
| ML14239A199 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SHansell/GSB for SBarber/ GSB FBower/ FLB DATE 08/22 /14 08/22 /14 09/02/14 Distribution w/encl: (via E-mail) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP S. Hansell, DRP, SRI B. Smith, DRP, RI S. Schmitt, DRP, AA A. Bowers, RI, OEDO R. Powell, DRP DRS Branch Chiefs (6) N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Page 1 of 1 08/27/2014 15:33:52Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SitePeach BottomInspection / Activity Plan 07/01/2014 | | ML14239A199 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SHansell/GSB for SBarber/ GSB FBower/ FLB DATE 08/22 /14 08/22 /14 09/02/14 Distribution w/encl: (via E-mail) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP S. Hansell, DRP, SRI B. Smith, DRP, RI S. Schmitt, DRP, AA A. Bowers, RI, OEDO R. Powell, DRP DRS Branch Chiefs (6) N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Page 1 of 1 08/27/2014 15:33:52 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2014 |
| -12/31/2015 2561-SAFSTOR11 IPOrganization, Management, And Cost Controls At Permanently Shutdown Reactors 3680106/23/2014 08/30/2014 2561-SAFSTOR11 IPOrganization, Management, And Cost Controls At Permanently Shutdown Reactors 3680106/27/2015 06/30/2015 1 IPSafety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 3780106/27/2015 06/30/2015 1 IPSelf-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 4080106/27/2015 06/30/2015 1 IPMaintenance And Surveillance At Permanenly Shutdown Reactors 6280106/27/2015 06/30/2015 1 IPDecommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 7180106/27/2015 06/30/2015 1 IPOccupational Radiation Exposure 8375006/27/2015 06/30/2015 1 IPRadioactive Waste Treatment, And Effluent And Environmental Monitoring 8475006/27/2015 06/30/2015 1 IPSolid Radioactive Waste Management And Transportation Of Radioactive Materials 8675006/27/2015 06/30/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | -12/31/2015 2561-SAFSTOR 1 1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 06/23/2014 08/30/2014 2561-SAFSTOR 1 1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 06/27/2015 06/30/2015 1 IP Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 37801 06/27/2015 06/30/2015 1 IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 40801 06/27/2015 06/30/2015 1 IP Maintenance And Surveillance At Permanenly Shutdown Reactors 62801 06/27/2015 06/30/2015 1 IP Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 71801 06/27/2015 06/30/2015 1 IP Occupational Radiation Exposure 83750 06/27/2015 06/30/2015 1 IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring 84750 06/27/2015 06/30/2015 1 IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 86750 06/27/2015 06/30/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
|
| |
|
| Page 1 of 2 08/27/2014 15:32:05Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SitePeach BottomInspection / Activity Plan 07/01/2014 | | Page 1 of 2 08/27/2014 15:32:05 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2014 |
| -12/31/2015 EP-EP ANNUAL REPORT 4 2,3 IPDrill Evaluation711140601/01/2014 12/31/2014UPRATE-71004 - POWER UPRATE 3 2,3 IPPower Uprate 7100401/01/2014 12/31/20147111111B-LSRO REQUAL INSP W/ P/F RESULTS 2 2,3 IPLicensed Operator Requalification Program7111111B06/02/2014 12/31/2014 RS56-71124.05,.06 1 2,3 IPRadiation Monitoring Instrumentation71124.0509/08/2014 09/12/2014 2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/08/2014 09/12/2014 2,3 IP71151-OR01 09/08/2014 09/12/2014 2,3 IP71151-PR01 09/08/2014 09/12/20147111108G-U2 INSERVICE INSPECTION 1 2 IPInservice Inspection Activities - BWR7111108G10/27/2014 10/31/2014 IP49001-EC/FAC POWER UPRATE 1 2 IPInspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 4900111/03/201411/07/20143/23EXAM-INITIAL OL EXAM 3 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU0191102/23/2015 02/27/2015 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU0191103/23/2015 04/03/2015 EP-EP ANNUAL REPORT 4 2,3 IPDrill Evaluation711140601/01/2015 12/31/2015 RS123-71124.01,.02,.03 1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0102/23/2015 02/27/2015 2,3 IPOccupational ALARA Planning and Controls71124.0202/23/2015 02/27/2015 2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/23/2015 02/27/2015 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 4 2,3 IPFire Protection [Triennial]7111105T03/16/2015 03/20/2015 2,3 IPFire Protection [Triennial]7111105T03/30/2015 04/03/2015 EP-EP PROGRAM INSPECTION 1 2,3 IPAlert and Notification System Testing711140203/09/2015 03/13/2015 2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/09/2015 03/13/2015 2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/09/2015 03/13/20157111111B-REQUAL INSP W/ P/F RESULTS 2 2,3 IPLicensed Operator Requalification Program7111111B03/16/2015 03/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | -12/31/2015 EP-EP ANNUAL REPORT 4 2, 3 IP Drill Evaluation7111406 01/01/2014 12/31/2014UPRATE-71004 - POWER UPRATE 3 2, 3 IP Power Uprate 71004 01/01/2014 12/31/20147111111B-LSRO REQUAL INSP W/ P/F RESULTS 2 2, 3 IP Licensed Operator Requalification Program7111111B 06/02/2014 12/31/2014 RS56-71124.05,.06 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 09/08/2014 09/12/2014 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/08/2014 09/12/2014 2, 3 IP71151-OR01 09/08/2014 09/12/2014 2, 3 IP71151-PR01 09/08/2014 09/12/20147111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 10/27/2014 10/31/2014 IP49001-EC/FAC POWER UPRATE 1 2 IP Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 4900111/03/201411/07/20143/23EXAM-INITIAL OL EXAM 3 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU01911 02/23/2015 02/27/2015 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU01911 03/23/2015 04/03/2015 EP-EP ANNUAL REPORT 4 2, 3 IP Drill Evaluation7111406 01/01/2015 12/31/2015 RS123-71124.01,.02,.03 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/23/2015 02/27/2015 2, 3 IP Occupational ALARA Planning and Controls71124.02 02/23/2015 02/27/2015 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 02/23/2015 02/27/2015 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 4 2, 3 IP Fire Protection [Triennial]7111105T 03/16/2015 03/20/2015 2, 3 IP Fire Protection [Triennial]7111105T 03/30/2015 04/03/2015 EP-EP PROGRAM INSPECTION 1 2, 3 IP A lert and Notification System Testing7111402 03/09/2015 03/13/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/09/2015 03/13/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/09/2015 03/13/20157111111B-REQUAL INSP W/ P/F RESULTS 2 2, 3 IP Licensed Operator Requalification Program7111111B 03/16/2015 03/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
|
| |
|
| Page 2 of 2 08/27/2014 15:32:05Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SitePeach BottomInspection / Activity Plan 07/01/2014 | | Page 2 of 2 08/27/2014 15:32:05 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2014 |
| -12/31/2015 PI&R BI-PI&R - BIENNIAL 5 2,3 IPProblem Identification and Resolution71152B04/06/2015 04/10/2015 2,3 IPProblem Identification and Resolution71152B04/20/2015 04/24/2015 ISFSI-ISFSI LOADING INSPECTION 1 2,3 IPOperation Of An ISFSI 6085505/01/2015 06/30/2015 2,3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.105/01/2015 06/30/2015 RS7-71124.071 2,3 IPRadiological Environmental Monitoring Program71124.0706/22/2015 06/26/201571124.08-RADWASTE1 2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/20/2015 07/24/2015 RS45-71124.04, .05 1 2,3 IPOccupational Dose Assessment71124.0407/20/2015 07/24/2015 2,3 IPRadiation Monitoring Instrumentation71124.0507/20/2015 07/24/20157111108G-U3 INSERVICE INSPECTION 1 3 IPInservice Inspection Activities - BWR7111108G09/14/2015 09/18/2015 RS12-71124.01, .02 1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/05/2015 10/09/2015 2,3 IPOccupational ALARA Planning and Controls71124.0210/05/2015 10/09/2015 2,3 IP71151-OR01 10/05/2015 10/09/2015 2,3 IP71151-PR01 10/05/2015 10/09/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | -12/31/2015 PI&R BI-PI&R - BIENNIAL 5 2, 3 IP Problem Identification and Resolution71152B 04/06/2015 04/10/2015 2, 3 IP Problem Identification and Resolution71152B 04/20/2015 04/24/2015 ISFSI-ISFSI LOADING INSPECTION 1 2, 3 IP Operation Of An ISFSI 60855 05/01/2015 06/30/2015 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2015 06/30/2015 RS7-71124.07 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/22/2015 06/26/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/20/2015 07/24/2015 RS45-71124.04, .05 1 2, 3 IP Occupational Dose Assessment71124.04 07/20/2015 07/24/2015 2, 3 IP Radiation Monitoring Instrumentation71124.05 07/20/2015 07/24/20157111108G-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 09/14/2015 09/18/2015 RS12-71124.01, .02 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/2015 2, 3 IP Occupational ALARA Planning and Controls71124.02 10/05/2015 10/09/2015 2, 3 IP71151-OR01 10/05/2015 10/09/2015 2, 3 IP71151-PR01 10/05/2015 10/09/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000277/20230062024-02-28028 February 2024 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006) IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) IR 05000277/20220062023-03-0101 March 2023 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) ML23019A0752023-01-19019 January 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000277/2023011 and 05000278/2023011 IR 05000277/20220052022-08-31031 August 2022 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) IR 05000277/20210062022-03-0202 March 2022 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) IR 05000277/20210052021-09-0101 September 2021 Updated Inspection Plan for the Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2021005 and 05000278/2021005) IR 05000277/20200062021-03-0303 March 2021 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2020006 and 05000278/2020006) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information IR 05000277/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000277/2020005 and 05000278/2020005) ML20119A8852020-04-28028 April 2020 Stations, Unit 3, Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20190062020-03-0303 March 2020 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2019006 and 05000278/2019006) IR 05000277/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000277/2019005 and 05000278/2019005) ML19119A1202019-04-29029 April 2019 Long-Term Steam Dryer Inspection Plan at EPU Conditions IR 05000277/20180062019-03-0404 March 2019 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2018006 and 05000278/2018006) ML18330A0532018-11-21021 November 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000277/2019403 and 05000278/2019403 IR 05000277/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000277/2018005 and 05000278/2018005) IR 05000277/20170062018-02-28028 February 2018 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 -(Report 05000277-2017006 and 05000278-2017006 Report 05000277-2017402 and 05000278-2017402 Report 05000277-2017501 and 05000278-2017501) ML17340A4112017-12-0505 December 2017 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000277/20170052017-08-28028 August 2017 Updated Inspection Plan Letter 05000277/2017005 and 05000278/2017005 with Rpt. 22 IR 05000277/20160062017-03-0101 March 2017 Annual Assessment Letter Units 2 and 3 - Report Nos. 05000277/2016006 and 05000278/2016006 with Report 22 IR 05000277/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006) IR 05000277/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2015005 and 05000278/2015005) IR 05000277/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277/2014001 and 05000278/2014001) IR 05000277/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2014006 and 05000278/2014006 IR 05000277/20130012014-03-0404 March 2014 ROP-14 2013 Peach Bottom Atomic Power Station Annual Assessment Letter, Report 05000277/2013001 and 05000278/2013001, and Inspection Plan IR 05000277/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000277/2013006 and 05000278/2013006 IR 05000277/20120012013-03-0404 March 2013 Annual Assessment Letter for Peach Bottom Atomic Power Station Units 2 and 3 (Report 05000277/2012001 and 05000278/2012001) ML12318A0022012-11-0909 November 2012 Notification to Perform an Inspection of Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1 - 7 and Request for Information IR 05000277/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Peach Bottom Atomic Power Station (Report 05000277/2012006 and 05000278/2012006) IR 05000277/20110012012-03-0505 March 2012 Annual Assessment Letter for Peach Bottom Atomic Power Station (Report 05000277-11-001 and 05000278-11-001) ML1124113452011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Peach Bottom Atomic Power Station IR 05000277/20100012011-03-0404 March 2011 Annual Assessment Letter for Peach Bottom Atomic Power Station, EOC-11 (05000277/2010001 and 05000278/2010001) ML1024404132010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Peach Bottom Atomic Power Station, Units 2 and 3 ML1006210092010-03-0303 March 2010 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277-10-001 and 05000278-10-001) and Report 22 ML0924402532009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Peach Bottom Atomic Power Station IR 05000277/20090012009-03-0404 March 2009 Annual Assessment Letter - Peach Bottom Atomic Power Station (05000277/2009001 and 05000278/2009001) ML0824704542008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Peach Bottom ML0734705752007-12-13013 December 2007 ROP - Peach Bottom - Change to Inspection Plan, 12/13/07 ML0724306242007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 ML0706106152007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Peach Bottom Station (05-277-07-001 and 05-278-07-001) ML0624305232006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station IR 05000277/20060012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Peach Bottom Atomic Power Station (Report 05000277/2006001 and 05000278/2006001) ML0524207012005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Peach Bottom Atomic Power Station ML0506107082005-03-0202 March 2005 Annual Assessment Letter 2005001-Peach Bottom ML0424404642004-08-30030 August 2004 2004 Peach Bottom Mid-Cycle Performance Review and Inspection Plan 2024-08-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) IR 05000277/20230062024-02-28028 February 2024 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006) IR 05000171/20230012024-02-20020 February 2024 Constellation Energy Generation, LLC - Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report No. 05000171/2023001 IR 05000277/20230042024-02-12012 February 2024 Integrated Inspection Report 05000277/2023004 and 05000278/2023004 IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 IR 05000277/20220042023-04-0505 April 2023 Acknowledgement of Dispute of Green Finding - NRC Inspection Report 05000277/2022004 and 05000278/2022004 IR 05000277/20234012023-03-27027 March 2023 Security Baseline Inspection Report 05000277/2023401 and 05000278/2023401 IR 05000277/20230122023-03-10010 March 2023 Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000277/2023012 and 05000278/2023012 IR 05000277/20220062023-03-0101 March 2023 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) ML23033A3332023-02-0202 February 2023 Integrated Inspection Report 05000277/2022004 and 05000278/2022004 IR 05000171/20220012023-01-0404 January 2023 Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report 05000171/2022001 IR 05000277/20220902022-11-28028 November 2022 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation, Inspection Report 05000277/2022090 IR 05000277/20220032022-10-27027 October 2022 Integrated Inspection Report 05000277/2022003 and 05000278/2022003 and Preliminary White Finding and Apparent Violation IR 05000277/20224012022-09-27027 September 2022 Material Control and Accounting Program Inspection Report 05000277/2022401 and 05000278/2022401 (Cover Letter Only) IR 05000277/20220052022-08-31031 August 2022 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) IR 05000277/19570012022-08-19019 August 2022 631999-Termination License 50-27757-01 for G. Scott Crowther Dba Crowther Associates IR 07200079/20224042022-08-0404 August 2022 NRC Security Inspection Report 07200079/2022404 (Cover Letter) IR 05000277/20223012022-07-28028 July 2022 Initial Operator Licensing Examination Report 05000277/2022301 and 05000278/2022301 IR 05000277/20220022022-07-28028 July 2022 Integrated Inspection Report 05000277/2022002 and 05000278/2022002 IR 05000277/20224032022-07-13013 July 2022 Cyber Security Inspection Report 05000277/2022403 and 05000278/2022403 (Cover Letter Only) IR 05000277/20224022022-06-15015 June 2022 Security Baseline Inspection Report 05000277/2022402 and 05000278/2022402 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2022401 (Cover Letter Only) IR 05000277/20225012022-06-0808 June 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2022501 and 05000278/2022501 IR 05000277/20220112022-05-18018 May 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000277/2022011 and 05000278/2022011 ML22117A0362022-04-27027 April 2022 Integrated Inspection Report 05000277/2022001 and 05000278/2022001 IR 05000482/20220012022-04-25025 April 2022 Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 IR 05000277/20210062022-03-0202 March 2022 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) IR 05000277/20210042022-02-0909 February 2022 Integrated Inspection Report 05000277/2021004 and 05000278/2021004 IR 05000482/20210042022-01-19019 January 2022 Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 IR 05000171/20210012022-01-12012 January 2022 Safstor Inspection Report 05000171/2021001 IR 05000277/20223022022-01-10010 January 2022 Operator Licensing Retake Examination Report 05000277/2022302 and 05000278/2022302 IR 05000277/20210032021-11-0909 November 2021 Integrated Inspection Report 05000277/2021003 and 05000278/2021003 IR 05000482/20210032021-11-0505 November 2021 Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch IR 07200079/20214012021-10-21021 October 2021 ISFSI Security Inspection Report 07200079/2021401 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
September 2, 2014
Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, lL 60555
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2014006 and 05000278/2014006)
Dear Mr. Pacilio:
On August 13, 2014, the NRC completed its mid-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013 through June 30, facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3 were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC also determined the performance at PBAPS during the most recent Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. ln addition to the baseline inspection program at PBAPS, we also plan to conduct Inspection Inspection of Erosion-Corrosion/Flow-Accelerated- In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-Pool wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,/RA/ Fred L. Bower, III, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56
Enclosure:
Peach Bottom Atomic Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML14239A199 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SHansell/GSB for SBarber/ GSB FBower/ FLB DATE 08/22 /14 08/22 /14 09/02/14 Distribution w/encl: (via E-mail) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS F. Bower, DRP S. Barber, DRP A. Turilin, DRP B. Lin, DRP S. Hansell, DRP, SRI B. Smith, DRP, RI S. Schmitt, DRP, AA A. Bowers, RI, OEDO R. Powell, DRP DRS Branch Chiefs (6) N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Page 1 of 1 08/27/2014 15:33:52 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2014
-12/31/2015 2561-SAFSTOR 1 1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 06/23/2014 08/30/2014 2561-SAFSTOR 1 1 IP Organization, Management, And Cost Controls At Permanently Shutdown Reactors 36801 06/27/2015 06/30/2015 1 IP Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 37801 06/27/2015 06/30/2015 1 IP Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 40801 06/27/2015 06/30/2015 1 IP Maintenance And Surveillance At Permanenly Shutdown Reactors 62801 06/27/2015 06/30/2015 1 IP Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 71801 06/27/2015 06/30/2015 1 IP Occupational Radiation Exposure 83750 06/27/2015 06/30/2015 1 IP Radioactive Waste Treatment, And Effluent And Environmental Monitoring 84750 06/27/2015 06/30/2015 1 IP Solid Radioactive Waste Management And Transportation Of Radioactive Materials 86750 06/27/2015 06/30/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 1 of 2 08/27/2014 15:32:05 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2014
-12/31/2015 EP-EP ANNUAL REPORT 4 2, 3 IP Drill Evaluation7111406 01/01/2014 12/31/2014UPRATE-71004 - POWER UPRATE 3 2, 3 IP Power Uprate 71004 01/01/2014 12/31/20147111111B-LSRO REQUAL INSP W/ P/F RESULTS 2 2, 3 IP Licensed Operator Requalification Program7111111B 06/02/2014 12/31/2014 RS56-71124.05,.06 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 09/08/2014 09/12/2014 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/08/2014 09/12/2014 2, 3 IP71151-OR01 09/08/2014 09/12/2014 2, 3 IP71151-PR01 09/08/2014 09/12/20147111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 10/27/2014 10/31/2014 IP49001-EC/FAC POWER UPRATE 1 2 IP Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 4900111/03/201411/07/20143/23EXAM-INITIAL OL EXAM 3 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU01911 02/23/2015 02/27/2015 2 FY15 - PEACH BOTTOM INITIAL OPERATOR LICENSING EXAMU01911 03/23/2015 04/03/2015 EP-EP ANNUAL REPORT 4 2, 3 IP Drill Evaluation7111406 01/01/2015 12/31/2015 RS123-71124.01,.02,.03 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/23/2015 02/27/2015 2, 3 IP Occupational ALARA Planning and Controls71124.02 02/23/2015 02/27/2015 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 02/23/2015 02/27/2015 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 4 2, 3 IP Fire Protection [Triennial]7111105T 03/16/2015 03/20/2015 2, 3 IP Fire Protection [Triennial]7111105T 03/30/2015 04/03/2015 EP-EP PROGRAM INSPECTION 1 2, 3 IP A lert and Notification System Testing7111402 03/09/2015 03/13/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/09/2015 03/13/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/09/2015 03/13/20157111111B-REQUAL INSP W/ P/F RESULTS 2 2, 3 IP Licensed Operator Requalification Program7111111B 03/16/2015 03/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/27/2014 15:32:05 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 07/01/2014
-12/31/2015 PI&R BI-PI&R - BIENNIAL 5 2, 3 IP Problem Identification and Resolution71152B 04/06/2015 04/10/2015 2, 3 IP Problem Identification and Resolution71152B 04/20/2015 04/24/2015 ISFSI-ISFSI LOADING INSPECTION 1 2, 3 IP Operation Of An ISFSI 60855 05/01/2015 06/30/2015 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2015 06/30/2015 RS7-71124.07 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/22/2015 06/26/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/20/2015 07/24/2015 RS45-71124.04, .05 1 2, 3 IP Occupational Dose Assessment71124.04 07/20/2015 07/24/2015 2, 3 IP Radiation Monitoring Instrumentation71124.05 07/20/2015 07/24/20157111108G-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 09/14/2015 09/18/2015 RS12-71124.01, .02 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/2015 2, 3 IP Occupational ALARA Planning and Controls71124.02 10/05/2015 10/09/2015 2, 3 IP71151-OR01 10/05/2015 10/09/2015 2, 3 IP71151-PR01 10/05/2015 10/09/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.