{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION I==
475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406 1415
 
August 29, 2024
 
David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
 
SUBJECT: UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2024 005 AND 05000278/2024 005)
 
==Dear David Rhoades:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Please contact me at 610-337-5337 with any questions you have regarding this letter.
 
Sincerely, Jonathan E. Grieves, Chief Projects Branch 4 Division of Operating Reactor Safety
 
Docket Nos. 05000277 a nd 0 5000278 License Nos. D PR44 and DPR-56
 
Enclosure:
Peach Bottom Inspection Plan
 
cc w/encl: Distribution vi a ListServ SUBJECT: UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2024005 AND 05000278/2024 005) DATED AUGUST 29, 2024
 
DISTRIBUTION:
RLorson, RA (R1ORAMAIL RESOURCE)
DCollins, DRA (R1ORAMAIL RESOURCE)
BWelling, DORS (R1DORSMAIL RESOURCE)
RMckinley DORS (R1DORSMAIL RESOURCE)
PKrohn, DRSS (R1DRSSMAIL RESOURCE)
JZimmerman, DRSS (R1DRSS MAIL RESOURCE)
JGreives, DORS JSchussler, DORS SFlanagan, DORS BFord, DORS SRutenkroger, DORS, SRI CDukehart, DORS, RI SSchmitt, DORS, AA MSimmons, RI OEDO RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource
 
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 4/ROP-25 Peach Bottom Inspection Plan Transmittal Letter.docx ADAMS Accession No. ML24240A220 SUNSI Review n -Sensitive Publvlle
 
Sensitive n -Publiclyvlable
 
OFFICE RI/DORS RI/DORS ME user JGri TE 27/24 27/24 OFFIAL RERD CO Site Inspection Activity Plan Peach Bottom
 
07/01/2024 - 06/30/2026
 
Unit Start End Activity CAC Title Staff Count
 
Fire Protection - Peach Bottom 3
 
2,3 7/22/2024 7/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
 
2,3 8/5/2024 8/9/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
 
Access Control, Equipment Testing and Maintenance, Training, SPR 3
 
2,3 9/23/2024 9/27/2024 IP 71130.02 000734 Access Control
 
2,3 9/23/2024 9/27/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
 
2,3 9/23/2024 9/27/2024 IP 71130.07 000739 Security Training
 
2,3 9/23/2024 9/27/2024 IP 71130.09 001656 Security Plan Changes
 
2,3 9/23/2024 9/27/2024 IP 71151 001338 Performance Indicator Verification
 
RP - 71124.01 Rad Haz and 71151 PI Verification 1
 
2 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
2 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification
 
Inservice Inspection - Peach Bottom Unit 2 1
 
2 10/28/2024 11/1/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
 
Material Control and Accounting - Peach Bottom 1
 
2,3 2/3/2025 2/7/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
 
EP Program Inspection - Peach Bottom 2
 
2,3 2/24/2025 2/28/2025 IP 71114.02 000717 Alert and Notification System Testing
 
2,3 2/24/2025 2/28/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
 
2,3 2/24/2025 2/28/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
2,3 2/24/2025 2/28/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
 
2,3 2/24/2025 2/28/2025 IP 71151 001397 Performance Indicator Verification
 
PB Requal Inspection with P/F Results 1
 
2,3 3/24/2025 3/28/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2,3 3/24/2025 3/28/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
 
RP - 71124.06 RETS 1
 
2,3 4/7/2025 4/11/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
 
Commercial Grade Dedication - Peach Bottom 3
 
2,3 4/21/2025 4/25/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
 
2,3 5/5/2025 5/9/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
 
RP - 71124.05 Rad. Instruments 1
 
2,3 5/5/2025 5/9/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
 
Prepared on 7/30/2024 9:34:14 AM 1 of 3 Site Inspection Activity Plan
 
Access Control, Protective Strategy, TSR, SPR, PIs - PB 4
 
2,3 5/19/2025 5/23/2025 IP 71130.02 000734 Access Control
 
2,3 5/19/2025 5/23/2025 IP 71130.05 000737 Protective Strategy Evaluation
 
2,3 5/19/2025 5/23/2025 IP 71130.09 001656 Security Plan Changes
 
2,3 5/19/2025 5/23/2025 IP 71130.14 000743 Review of Power Reactor Target Sets
 
2,3 5/19/2025 5/23/2025 IP 71151 001338 Performance Indicator Verification
 
PI&R Biennial Team Inspection - Peach Bottom 4
 
2,3 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution
 
2,3 9/22/2025 9/26/2025 IP 71152B 000747 Problem Identification and Resolution
 
RP -71124.08 Rad Waste and Part 37 1
 
2,3 9/15/2025 9/19/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
 
Inservice Inspection - Peach Bottom Unit 3 1
 
3 10/27/2025 10/31/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
 
RP - 71124.01 Rad. Hazards 1
 
3 10/27/2025 10/31/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
Access Control, AA, FFD, Sec Plan Review, PI, ISFSI - PB 3
 
2,3 1/5/2026 1/9/2026 IP 71130.01 000733 Access Authorization
 
2,3 1/5/2026 1/9/2026 IP 71130.02 000734 Access Control
 
2,3 1/5/2026 1/9/2026 IP 71130.08 000740 Fitness-For-Duty Program
 
2,3 1/5/2026 1/9/2026 IP 71130.09 001656 Security Plan Changes
 
2,3 1/5/2026 1/9/2026 IP 71151 001338 Performance Indicator Verification
 
2,3 1/5/2026 1/9/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations 2,3 2/23/2026 2/27/2026 IP 71130.01 000733 Access Authorization
 
2,3 2/23/2026 2/27/2026 IP 71130.08 000740 Fitness-For-Duty Program
 
Age Related Degradation - Peach Bottom 3
 
2,3 1/26/2026 1/30/2026 IP 71111.21N.04 001832 Age-Related Degradation
 
2,3 2/9/2026 2/13/2026 IP 71111.21N.04 001832 Age-Related Degradation
 
Cyber Security - Peach Bottom 2
 
2,3 3/16/2026 3/20/2026 IP 71130.10 000741 Cybersecurity
 
RP - 71124.03 Resp. Protection and 71124.04 Occupational Dose 1
 
2,3 4/20/2026 4/24/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
 
2,3 4/20/2026 4/24/2026 IP 71124.04 000728 Occupational Dose Assessment
 
EP Exercise Inspection - Peach Bottom 5
 
2,3 4/27/2026 5/1/2026 IP 71114.01 000716 Exercise Evaluation
 
2,3 4/27/2026 5/1/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
Prepared on 7/30/2024 9:34:14 AM 2 of 3 Site Inspection Activity Plan
 
2,3 4/27/2026 5/1/2026 IP 71151 001397 Performance Indicator Verification
 
2026 Peach Bottom Initial Operator Licensing Exam 4
 
2,3 4/13/2026 4/17/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
 
2,3 5/11/2026 5/15/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
 
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - PB 4
 
2,3 5/11/2026 5/15/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
 
2,3 6/1/2026 6/5/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
 
Prepared on 7/30/2024 9:34:14 AM 3 of 3
}}
}}

Latest revision as of 23:05, 3 October 2024

Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005)
ML24240A220
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/29/2024
From: Jon Greives
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024005
Download: ML24240A220 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406 1415

August 29, 2024

David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2024 005 AND 05000278/2024 005)

Dear David Rhoades:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 610-337-5337 with any questions you have regarding this letter.

Sincerely, Jonathan E. Grieves, Chief Projects Branch 4 Division of Operating Reactor Safety

Docket Nos. 05000277 a nd 0 5000278 License Nos. D PR44 and DPR-56

Enclosure:

Peach Bottom Inspection Plan

cc w/encl: Distribution vi a ListServ SUBJECT: UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2024005 AND 05000278/2024 005) DATED AUGUST 29, 2024

DISTRIBUTION:

RLorson, RA (R1ORAMAIL RESOURCE)

DCollins, DRA (R1ORAMAIL RESOURCE)

BWelling, DORS (R1DORSMAIL RESOURCE)

RMckinley DORS (R1DORSMAIL RESOURCE)

PKrohn, DRSS (R1DRSSMAIL RESOURCE)

JZimmerman, DRSS (R1DRSS MAIL RESOURCE)

JGreives, DORS JSchussler, DORS SFlanagan, DORS BFord, DORS SRutenkroger, DORS, SRI CDukehart, DORS, RI SSchmitt, DORS, AA MSimmons, RI OEDO RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 4/ROP-25 Peach Bottom Inspection Plan Transmittal Letter.docx ADAMS Accession No. ML24240A220 SUNSI Review n -Sensitive Publvlle

Sensitive n -Publiclyvlable

OFFICE RI/DORS RI/DORS ME user JGri TE 27/24 27/24 OFFIAL RERD CO Site Inspection Activity Plan Peach Bottom

07/01/2024 - 06/30/2026

Unit Start End Activity CAC Title Staff Count

Fire Protection - Peach Bottom 3

2,3 7/22/2024 7/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

2,3 8/5/2024 8/9/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Access Control, Equipment Testing and Maintenance, Training, SPR 3

2,3 9/23/2024 9/27/2024 IP 71130.02 000734 Access Control

2,3 9/23/2024 9/27/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

2,3 9/23/2024 9/27/2024 IP 71130.07 000739 Security Training

2,3 9/23/2024 9/27/2024 IP 71130.09 001656 Security Plan Changes

2,3 9/23/2024 9/27/2024 IP 71151 001338 Performance Indicator Verification

RP - 71124.01 Rad Haz and 71151 PI Verification 1

2 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification

Inservice Inspection - Peach Bottom Unit 2 1

2 10/28/2024 11/1/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Material Control and Accounting - Peach Bottom 1

2,3 2/3/2025 2/7/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Inspection - Peach Bottom 2

2,3 2/24/2025 2/28/2025 IP 71114.02 000717 Alert and Notification System Testing

2,3 2/24/2025 2/28/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

2,3 2/24/2025 2/28/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2,3 2/24/2025 2/28/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

2,3 2/24/2025 2/28/2025 IP 71151 001397 Performance Indicator Verification

PB Requal Inspection with P/F Results 1

2,3 3/24/2025 3/28/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2,3 3/24/2025 3/28/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

RP - 71124.06 RETS 1

2,3 4/7/2025 4/11/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

Commercial Grade Dedication - Peach Bottom 3

2,3 4/21/2025 4/25/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

2,3 5/5/2025 5/9/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

RP - 71124.05 Rad. Instruments 1

2,3 5/5/2025 5/9/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

Prepared on 7/30/2024 9:34:14 AM 1 of 3 Site Inspection Activity Plan

Access Control, Protective Strategy, TSR, SPR, PIs - PB 4

2,3 5/19/2025 5/23/2025 IP 71130.02 000734 Access Control

2,3 5/19/2025 5/23/2025 IP 71130.05 000737 Protective Strategy Evaluation

2,3 5/19/2025 5/23/2025 IP 71130.09 001656 Security Plan Changes

2,3 5/19/2025 5/23/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

2,3 5/19/2025 5/23/2025 IP 71151 001338 Performance Indicator Verification

PI&R Biennial Team Inspection - Peach Bottom 4

2,3 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution

2,3 9/22/2025 9/26/2025 IP 71152B 000747 Problem Identification and Resolution

RP -71124.08 Rad Waste and Part 37 1

2,3 9/15/2025 9/19/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

Inservice Inspection - Peach Bottom Unit 3 1

3 10/27/2025 10/31/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP - 71124.01 Rad. Hazards 1

3 10/27/2025 10/31/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Access Control, AA, FFD, Sec Plan Review, PI, ISFSI - PB 3

2,3 1/5/2026 1/9/2026 IP 71130.01 000733 Access Authorization

2,3 1/5/2026 1/9/2026 IP 71130.02 000734 Access Control

2,3 1/5/2026 1/9/2026 IP 71130.08 000740 Fitness-For-Duty Program

2,3 1/5/2026 1/9/2026 IP 71130.09 001656 Security Plan Changes

2,3 1/5/2026 1/9/2026 IP 71151 001338 Performance Indicator Verification

2,3 1/5/2026 1/9/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations 2,3 2/23/2026 2/27/2026 IP 71130.01 000733 Access Authorization

2,3 2/23/2026 2/27/2026 IP 71130.08 000740 Fitness-For-Duty Program

Age Related Degradation - Peach Bottom 3

2,3 1/26/2026 1/30/2026 IP 71111.21N.04 001832 Age-Related Degradation

2,3 2/9/2026 2/13/2026 IP 71111.21N.04 001832 Age-Related Degradation

Cyber Security - Peach Bottom 2

2,3 3/16/2026 3/20/2026 IP 71130.10 000741 Cybersecurity

RP - 71124.03 Resp. Protection and 71124.04 Occupational Dose 1

2,3 4/20/2026 4/24/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2,3 4/20/2026 4/24/2026 IP 71124.04 000728 Occupational Dose Assessment

EP Exercise Inspection - Peach Bottom 5

2,3 4/27/2026 5/1/2026 IP 71114.01 000716 Exercise Evaluation

2,3 4/27/2026 5/1/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

Prepared on 7/30/2024 9:34:14 AM 2 of 3 Site Inspection Activity Plan

2,3 4/27/2026 5/1/2026 IP 71151 001397 Performance Indicator Verification

2026 Peach Bottom Initial Operator Licensing Exam 4

2,3 4/13/2026 4/17/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

2,3 5/11/2026 5/15/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - PB 4

2,3 5/11/2026 5/15/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

2,3 6/1/2026 6/5/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

Prepared on 7/30/2024 9:34:14 AM 3 of 3