IR 05000275/1989020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20245E966
| number = ML20247R829
| issue date = 07/31/1989
| issue date = 07/31/1989
| title = Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program
| title = Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted
| author name = Schaefer D, Schuster M
| author name = Pate R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name =  
| addressee name = Shiffer J
| addressee affiliation =  
| addressee affiliation = PACIFIC GAS & ELECTRIC CO.
| docket = 05000275, 05000323
| docket = 05000275, 05000323
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 50-275-89-20, 50-323-89-20, NUDOCS 8908140070
| document report number = NUDOCS 8908080113
| package number = ML20245E970
| package number = ML20245E970
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 2
}}
}}


Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:- - - - -_ _ ..  - - _ - -
T
.. ;
[
g.


r S AFEOi'. bs'40S 4?e UMM AD2 J.;''
l
The information on this page-is considered to be' appropriate for public, disclosure pursuant to 10 CFR. 2.790 U. S. NUCLEAR REGULATORY COMMISSION
'
<
3pfih.JM3.R U hO bis NN JUi ; I "O Docket Nos. 50-275 and 50-323      i Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention: Mr. J. D. Shif fer, Vice President Nuclear Power Generation Gentlemen:
Subject: NRC ' Security-Inspection - Diablo Canyon, Units 'I and 2 This letter refers to an unannounced routine Safeguards Inspection of your
' activities at Diablo Canyon Power Plant (DCPP), Units 1 and 2, authorized under NRC License Nos. DPR-00 and DPR-82, conducted by Mr. D. Schaefer of Region.V on July'10 through 14, 1989. This letter also refers to the discussion of the inspection findings held by the inspectors with Mr. J. Townsend, Plant Manager, and members of the DCPP and PG&E staff on July 14, 198 Further, this letter refers to a telephone discussion between Messr R. Todaro, DCPP, and D. Schaefer of this office on July 18, 198 Areas examined during this inspection are described in the enclosed'inspecticn report. . Within these' areas, the inspection consisted of selective examination of procedures and representative records, interviews with facility and contract personnel, and observations by the inspecto Within the scope of the inspection, no violations were observe In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed report will not be placed in the Public. Document Room and will receive limited distributio We have determined that the enclosure to this letter contains Safeguards Information and must be protected against unauthorized disclosure in accordance with the provisions of 10 CFR 73.2 Should you have any questions concerning this letter, we will be glad to discuss them with yo


==REGION V==
Sincerely,
l Report No' /89-20 and 50-323/89-20 (IE-V-898)
,
Docket No .and 50-323 License No 'DPR-80 and DPR-82 Licensee: ' Pacific Gas and Electro: Q.roany 77 Beale Street, Room 1451 San Francisco, California 94106 Facility NameDiablo' Canyon Power Plant (DCPP), Jnits 1 and 2 Inspected At: San.Luis Obispo County, California
  ..' ' '
  . Inspection Conducted: July 10 through 18, 1989
hks Robert.pnkk 0$L
        .. q Inspector: l G < i']  ! ^! e-   E'' l D. Schaefer, Physigal Security Inspector    Date Signed
)     J. Pate, Chief
'
'
8908080113 890731  Nuclear Materials Safety and e .PDR ADOCK 03000273  rDC Safeguards Branch O
p irtu@y:1JNT >
.;t,3,:;r 1: SGI!O" . v'
  , , , , , **'Wi!  -- .
      ;_,,
    ' '
        '
;;c, ; . :. . .: 11%~e "
        - *
        ,j - *
        ,
        - .~
~_- _-_ - _ _ _- --__-- -_-_- ___      _-_&_


Approved By: hh  b        1//Ett M. D. 6chuster, Chief, Safeguards Secticn      Dats Si'gne'd Inspection Summary:
g.-
Areas Inspected: This routine unannounced inspection by a region-based inspector examined the following portions of the licensee's physical ' security program: Physical Security Program for Power Reactors (CORE Inspection Program); Security System Power Supply; Access Control-Personnel; Personnel Training and Qualification Plan; and Follow-up on Events, Generic Letter, and Inspector Identified Problem During this inspection, portions of Inspection Procedures 30703, 81700, 81058, 81070, 81501, 92700, 92701, rind 92703 were use This inspection was begun during regular hour Results: In the areas inspected, the licensee's security program appeared adequate to accomplish their security objective. The licensee was found to be in' compliance with NRC requirements within the areas examined during this inspection, except for the non-cited violation in the area ot:      Compensatory Measures (Inspection Report Details, Paragraph 6).      This non-cited violation involved the licensee's- discovery of a contract security officer sleeping while acting as a compensatory measure for a protected area perimeter alarm zone, 8908140070 890731      "
  --
PDR ADDCK 05000275 G    PDR
-_- - - - ,       ,7
  .. . . ..;. ..+. M "5
;  y
   'e . . N[Md.E.'[ $$ [.      ,, , ,,, ..g '* ' -
< y j .
          ,
Jin ' M OM
L .'Ai .1: - AT i ' '. 71 E
..
   ^
    .  
O   * * ' ' ' *
 
I A0B 4 " .r. ',!ROl.I _ _ - - - _-.-___  . _ _ - - - _ _ . _ _ _ _ - - - _ _ - _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _   _ _ - _ _ _ _ - _ _ _ - -
===Enclosure:===
.
 
==Inspection Report==
   'Nos. 50-275/89-20, 50-323/89-20 (IE-V-898) .
  .
 
REGION V/ dot W% "R%In" 'h/n REQUEST COPY ] REQUEST COPY ) REQUEST).QPY ]
fYES- / NO 6ES) / NO 1 YES // -NO) ]
  -
v l    _D TO PDR ]
l:   YES) / NO ]
1   ./
Y$f 8   e' Qfy l
 
l l
E___._._____________________________.______.____.____.__._____
    . _ _ _ _ _ _ _ _ . _ . _ . . _ _ _ _ _ . . . _ __ ._ _ . _ _ _ _ _ __ _ _ _ _ _ _ _ _
}}
}}

Latest revision as of 19:16, 30 January 2022

Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted
ML20247R829
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/31/1989
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20245E970 List:
References
NUDOCS 8908080113
Download: ML20247R829 (2)


Text

- - - - -_ _ .. - - _ - -

.. ;

l

  • '

3pfih.JM3.R U hO bis NN JUi ; I "O Docket Nos. 50-275 and 50-323 i Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention: Mr. J. D. Shif fer, Vice President Nuclear Power Generation Gentlemen:

Subject: NRC ' Security-Inspection - Diablo Canyon, Units 'I and 2 This letter refers to an unannounced routine Safeguards Inspection of your

' activities at Diablo Canyon Power Plant (DCPP), Units 1 and 2, authorized under NRC License Nos. DPR-00 and DPR-82, conducted by Mr. D. Schaefer of Region.V on July'10 through 14, 1989. This letter also refers to the discussion of the inspection findings held by the inspectors with Mr. J. Townsend, Plant Manager, and members of the DCPP and PG&E staff on July 14, 198 Further, this letter refers to a telephone discussion between Messr R. Todaro, DCPP, and D. Schaefer of this office on July 18, 198 Areas examined during this inspection are described in the enclosed'inspecticn report. . Within these' areas, the inspection consisted of selective examination of procedures and representative records, interviews with facility and contract personnel, and observations by the inspecto Within the scope of the inspection, no violations were observe In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed report will not be placed in the Public. Document Room and will receive limited distributio We have determined that the enclosure to this letter contains Safeguards Information and must be protected against unauthorized disclosure in accordance with the provisions of 10 CFR 73.2 Should you have any questions concerning this letter, we will be glad to discuss them with yo

Sincerely,

,

..' ' '

hks Robert.pnkk 0$L

) J. Pate, Chief

'

'

8908080113 890731 Nuclear Materials Safety and e .PDR ADOCK 03000273 rDC Safeguards Branch O

p irtu@y:1JNT >

.;t,3,:;r 1: SGI!O" . v'

, , , , , **'Wi! -- .

_,,

' '

'

c, ; .
. . .
11%~e "

- *

,j - *

,

- .~

~_- _-_ - _ _ _- --__-- -_-_- ___ _-_&_

g.-

--

-_- - - - , ,7

y

< y j .

Jin ' M OM

..

.

Enclosure:

.

Inspection Report

'Nos. 50-275/89-20, 50-323/89-20 (IE-V-898) .

.

REGION V/ dot W% "R%In" 'h/n REQUEST COPY ] REQUEST COPY ) REQUEST).QPY ]

fYES- / NO 6ES) / NO 1 YES // -NO) ]

-

v l _D TO PDR ]

l: YES) / NO ]

1 ./

Y$f 8 e' Qfy l

l l

E___._._____________________________.______.____.____.__._____

. _ _ _ _ _ _ _ _ . _ . _ . . _ _ _ _ _ . . . _ __ ._ _ . _ _ _ _ _ __ _ _ _ _ _ _ _ _