ML20206R427
| ML20206R427 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/02/1986 |
| From: | Elin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20206R431 | List: |
| References | |
| NUDOCS 8609050423 | |
| Download: ML20206R427 (2) | |
Text
.
>l e.
1 i
e i
SEP 0 21986
+
.f'a i
Mr. James'D. Shiffer,,Vice President,
Nuclear Power Generation-
' Pacific Gas and Electric. Company 177 Beale' Street San Francisco, California 94106
Dear Mr. Sh'iffer:
l -
o i
SUBJECT:
4 EXAMINATION REPORT On July 15-23, 1986, the NRC' administered examinations to-employees of your company who had applied for licenses to operate your Diablo Canyon Units 1/2 Nuclear Power Plants. At the conclusion of the written examinations, the i
examination questions were discussed with those members of your staff
. identified in the enclosed report.
s In accordance with 10 CFR 2.790(a) a copy of this letter and enclosures (1)
'and (2) will be placed in the NRC's Public Document Room. The examination scores and results for individual applicants are exempt from disclosure by 10 CFR'2.790(a)(6) and, therefore, enclosure (3) will not be placed in the NRC's'Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, J. O. Elin, Chief i
Operations Section
Enclosures:
1.
Examination Report No. 50-275/CL-86-01 [w/ attachment (A)]
.2.
Examination and Answer Keys (SR0 & RO) 3.
Power Plant Examination Results Summary j
ec w/ enclosures (1), (2) and (3):
T. Martin, Training Manager a
cc w/ enclosure (1) only:
J. Martin, RV P. Narbut, SRI:
R. Pate, RV J. Elin, RV P. Morrill, RV, Chief Examiner R.' Muscat, RV (2 copies)
H.'Schierling, NRR i
cc w/ enclosures (1) and (2) only:
?
I i 8609050423 860702 PDR ADOCK 05000275 e-V PDR
i
. SEP 021986 bec w/ enclosure 1 only:
Greg Cook B. Faulkenberry Resident Inspector Project Inspector State of CA
~
o 1
.i s
3
/
/
Region V h'
9/ D86 9/p86
,.