IR 05000275/1986002
| ML20198R682 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/03/1986 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20198R684 | List: |
| References | |
| NUDOCS 8606100170 | |
| Download: ML20198R682 (1) | |
Text
q
,
~
\\
'
-
JUN 0 31986
-
.
Docket Nos. 50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention:
J. D. Shiffer, Vice President Nuclear Power Generation Gentlemen:
Thank you for your letter dated May 28, 1986, informing us of the steps you have taken to correct the items which we brought to your attention in our letter dated April 28, 1986. Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, Or:pinal signed b'y O. F. Crsrb Dennis F. Kirsch, Director Division of Reactor Safety and Projects bec w/cy ltr dtd S/28/86:
RSB/ Document Control Desk (RIDS)
Project Inspector Resident Inspector G. Cook B. Faulkenberry J. Martin State of California Region V j'
W
% ger\\
l JFBurdoin/ norma MMMentonca Chaffee DFKirsch 6/g/86 6/ 3 /86 6/}/86 6/ /86 pg"EsaSnejh5 G
Mo/
i t
i