Advises That Portions of 880419 Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Requests Resubmittal of Corrected Plan Pages as Necessary to Maintain Plan Continuity
ML20154F919
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/17/1988
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8805240122
Download: ML20154F919 (4)


Text

- _

^ 1

, . . $AFEGUARDS INFORMATION MAY 17 1980 I

I Docket Nos. 50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention: Mr. J. D. Shiffer Vice President, Nuclear Power Generation l

Gentlemen:

l

' This acknowledges the receipt of your letter, dated April 19, 1988, by which l you transmitted Revision 16 to the Diablo Canyon Nuclear Power Plant Physical l Security Plan, dated March, 1984. We have determined that portions of these I plan changes are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable. However, as indicated in the enclosure, portions do not l appear fully consistent with the provisions of 50.54(p). Accordingly, you are i

to follow your previously approved plan in regard to these items. Resubmit 'j corrected plan pages as necessary to maintain plan continuity.

The changes in Revision 16 found not fully consistent with 10 CFR 73.57 were i

discussed telephonically between A. McQueen of this office and L. Fischer at Diablo Canyon on May 2, 1988.

Enclosure 2 to your letter forwarding the original Revision 16 submittal of June 30, 1987, and NRC Headquarters correspondence referred to in your letter of November 9, 1987, submitting changed pages to Revision 16, indicated that changes submitted with Revisions 15 and 16 are currently under review at NRC Headquarters and are the subject of continuing correspondence between Pacific l Gas and Electric Company (PGandE) and the Office of Nuclear Reactor Regulation (NRR). Our review does not address those changes and we are informed that NRR will respond directly to PGandE regarding those changes, i Should you want to pursue revising the security plan with respect to the changes set forth in the enclosure, you should resubmit under the provisions of 10 CFR 50.90.

The enclosure to this letter contains Safeguards Information which is required to be protected against unauthorized disclosure in accordance with 10 CFR 73.21.

j i The enclosures to your letter contain Safeguards Infonnation of a type l specified in 10 CFR 73.21 and are being withheld from public disclosure, i

! 8805240122 000517 PDR ADOCK 05000275 EWLOSWE CV.YIAIN3 F PDR  !

S4PD7JrcS INFORMATION.

UPON SEPARATION IHIS \

PAGE IS DECONTROLLED. S AFEGUAH1h 1N!: UHMA IIUN <

l

If'you have any questions'concerning_ this matter, please contact A.- D. McQueen of this office at (415) 943-3770. . '

l Sincerely, 1

, original sign..

Ross A. Scarano, Director '

Division of Radiation Safety 'l and Safeguards 1

Enclosure:

As stated.

i cc w/o Enc 1: Service List /  :

Document Control Desk, HQV -  !

I cc w/ Enc 1: R. J. Erickson, Safeguards Branch, NRR l J. L. Gibson, PDRS, NRR NRR Docket File, HQ i D. W. Schaefer, RV I l A. D. McQueen, RV

{ RVA$h Q))h f AMcQueen DSchaefer Mic,jy_

b er ontgomery 5/lk/88 5/IP/88 j 5/W/88 5//p8 l

l l

l I

i l

l

[

L

\

l Mr. J. D. Shif fer I I

Pacific Gas and Electric Company Diablo Canyon cc:

Richard F. Locke, Esq. NRC Resident Inspector Pacific Gas & Electric Company Diablo Canyon Nuclear Power Plant Post Office Box 7442 c/o U.S. Nuclear Regulatory Commission San Francisco, California 94120 P. O. Box 369 Avila Beach, California 93424 Janice E. Kerr, Esq.

California Public Utilities Commission Mr. Dick Blakenburg 350 McAllister Street Editor & Co-Publisher San Francisco, California 94102 South County Publishing Company P. O. Box 460 Arroyo Grande, California 93420 Ms. Sandra A. Silver 660 Granite Creek Road Bruce Norton, Esq.

Santa Cruz, California 95065 c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 Mr. W. C. Gangloff San Francisco, California 94120 Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Managing Editor Creston, California 93432 San Luis Obispo County Telegram Tribune 1321 Johnson Avenue Chairman P. O. Box 112 San Luis Obispo County Board of San Luis Obispo, California 93406 Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas and Electric Company Director 1726 M Street, N. W. Energy Facilities Siting Division Washington, DC 20036-4502 Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, California 95814 Dian M. Grueneich Marcia Preston Ms. Jacquelyn Wheeler Law Office of Dian M. Grueneich 3033 Barranca Court 380 Hayes Street, Suite 4 San Luis Obispo, California 93401 l San Francisco, California 94102 j

.~

Pacific Gas & Electric Company Diablo Canyon '

cc:

Ms. Laurie McDermott, Coordinator Ms. Nancy Culver Consumers Organized for Defense 192 Luneta Street of Environmental Safety San Luis Obispo, California 93401 731 Pacific Street, Suite 42 San Luis Obispo, California 93401 President California Public Utilities Mr. Jack McGurk, Acting Chief Commission Radiological Health Branch California State Building State Department of Health 350 McAllister Street Services San Francisco, California 94102 714 P Street, Office Building #8 i Sacramento, California 95814 Michael M. Strumwasser, Esq.

Regional Administrator, Region V Special Assistant Attorney General U.S. Nuclear Regulatory Commission State of California 1450 Maria Lane Department of Justice Suite 210 3580 Wilshire Boulevard, Room 800 Walnut Creek, California 94596 Los Angeles, California 90010 l

i l

- , . . - - _ _ - . - . . . _ . . , . . . . _ - - - - . - _ - _ . .-