ML20212C063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 26: Line 26:
==Dear Mr. Degger:==
==Dear Mr. Degger:==


We have reviewed your letter dated September 8,1997, and the enciesed scenario package for the Waterford 3 Steam Electric Station biennial emergency preparedness exercise scheduled for November 5,1997.
We have reviewed your {{letter dated|date=September 8, 1997|text=letter dated September 8,1997}}, and the enciesed scenario package for the Waterford 3 Steam Electric Station biennial emergency preparedness exercise scheduled for November 5,1997.
Based on our review, we determined that the exercise scenario is appropriate to meet emergency plan r64uirements and exercise objectives. ' Minor questions were resolved during an October 21,1997, telephone di.;cussion with Messrs. J. Lewis and S. Lubinski of your staff.
Based on our review, we determined that the exercise scenario is appropriate to meet emergency plan r64uirements and exercise objectives. ' Minor questions were resolved during an October 21,1997, telephone di.;cussion with Messrs. J. Lewis and S. Lubinski of your staff.
We contacted the Federal Emergency Management Agency, Region VI, during our review.
We contacted the Federal Emergency Management Agency, Region VI, during our review.

Latest revision as of 16:40, 5 May 2021

Forwards Scenario Package for Plant Biennial Emergency Preparedness Exercise Scheduled for 971105.Minor Questions Were Resolved During 971021 Telcon W/Mj Lewis & Lubinski
ML20212C063
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/22/1997
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9710290013
Download: ML20212C063 (5)


Text

  • t UNIT E3 ST ATES

. .f.lp "* "%,I'4 e NUCLEAR REGULATORY COMMISSION l f $ REoloN IV

.f 611 RYAN PLAZA oRIVE. SulT E 400 I k'+9 * * * * * / AR LINOl oN, TE xAS 760118064 I October 22, 1997 Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066

SUBJECT:

1997 EMERGENCY PREPAREDNESS EXERCISE SCENARIO PACKAGE

Dear Mr. Degger:

We have reviewed your letter dated September 8,1997, and the enciesed scenario package for the Waterford 3 Steam Electric Station biennial emergency preparedness exercise scheduled for November 5,1997.

Based on our review, we determined that the exercise scenario is appropriate to meet emergency plan r64uirements and exercise objectives. ' Minor questions were resolved during an October 21,1997, telephone di.;cussion with Messrs. J. Lewis and S. Lubinski of your staff.

We contacted the Federal Emergency Management Agency, Region VI, during our review.

Mr. E. Boaze had no comments for us to relay to you.

Should you have any questions concerning this letter, please contact Ms. Gail Good of my staff at (817) 860-8215.

Sincerely, (f G 4WN B'i dine Murray, Chief Plant Support Branch j Division of Reactor Safety /

Docket No.: 50-382 License No.: NPF-38 t 5 5-cc:

Executive Vice President and Chief Ope ating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 9710290013 971022 kk, .

PDR ADOCK 05000382 kk,k gi ,((, i F PDR

Entergy Operations, Inc. 2-Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES-  !

Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066

..ianager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Loulslana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825 1697 Director, Nuclear Safety &

y- Regulatory Affairs Waterford 3 SES Entergy Operations, Inc, s P.O. Box B Killona, Louisiana 70066 William H. Spell,~ Administrator Louisiana Radiation Protection Division P.O. Box 82135

. Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057

. - . . _ _ _ - _ . . . _ . _ _ _ . _ _ . _ . _ . _ _ . _ . ,_._ .._....___m.._,_.__.__ . _ _ _ _ . . . . _ .

9 Entergy Operations, Inc. 3-Mr. William A. Cross = .,

' Bethesda Licensing Office

.3 Metro Center

r. Suite 610 Bethesda, Maryland 20814 Winston & Strawn ,

1400 L Street, N.W.

Washington, D.C. - 20005 3502 Training, Exercises, & Evaluation Branch Chief FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, Texas 76201 3698

/

_ ._._ ~.s. . . . _ - . _ . _ . . _ . _ . . _ . . _ . _ . _ _ ~ . . _ _ . . . _ _ _ _ _

Entergy Operations, Inc. 4 hCGI DMB (A045)

-Regional Administrator Waterford Resident inspector D/DRS DD/DRS DRP Director -

DRS-PSB Branch Chief (DRP/D)

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

C. A. Hackney, RSLO MIS System (Elko)

RIV File Al File (Hodges) .

DOCUMENT NAME: G; . JLTRS\WATEXSCN.97 To receive copy of document, innmate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB/SEPA 6 C:DRS/PSB m GMGood:nh (cM(s ~

BMurray 6 l10/2/97 10d $

V' OFFICIAL RECORD COPY

}

Entergy Operations, Inc. _,_

Regional/Administrator-

~

.Waterford Resident inspector.

D/DRS DD/DRS DRP Director DRS-PSB Branch Chief (DRP/D)

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

C. A. Hackney, RSLO MIS System (Elko)

RIV File

- Al File (Hodgec) s l

4 l

IDOCUMENT NAME: G:\DRSLTRS\WATEXSCN.97 j To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB/SEPA - 6 C:DRS/PSB A GMGood:nh -(,fM(g BMurray

~

6 10@97 10@97 V~ OFFICIAL RECORD COPY