IR 05000324/1988200: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20246H858
| number = ML20246H858
| issue date = 04/26/1989
| issue date = 04/26/1989
| title = Ack Receipt of 890329 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Emergency Operating Procedure Team Insp Repts 50-324/88-200 & 50-325/88-200
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Emergency Operating Procedure Team Insp Repts 50-324/88-200 & 50-325/88-200
| author name = Peebles T
| author name = Peebles T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8905160211
| document report number = NUDOCS 8905160211
| title reference date = 03-29-1989
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 21:46, 16 March 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Emergency Operating Procedure Team Insp Repts 50-324/88-200 & 50-325/88-200
ML20246H858
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/26/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8905160211
Download: ML20246H858 (1)


Text

__ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _

. . .

, . .

April 26, 1989 Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN: Mr. Lynn W. Eury Executive Vice President Power Supply P. O. Box 155 Raleigh, NC 27602 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-200 AND 50-324/88-200 Thank you for your response of March 29, 1989, to the Emergency Operating Procedure Team Inspection addressed in NRC Inspection Report No. 50-325/88-200 and 50-324/88-200 issued on February 23, 1989, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it acceptable. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely,

.

(ORIGINAL SIGNED BY T. A. PEEBLES)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety cc w/ encl:

R. B. Starkey, Jr., Manager Brunswick Nuclear Project J. L. Harness, Plant General Manager State of North Carolina bcc w/ encl:

NRC Resident Inspector Document Control Desk

,

RII RII RII if4 U 0 PKe ogg:obw HDfnce TAPE e les /s '

04/g89 04/4/89 04/.j (,/89 i

8905160211 890426 g g PDR ADOCK 05000324 Q PDC pf

_ - - - . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _