JUN 151988 Florida Power and Light Company
: ATTN:  Mr. W. F. Conway Senior Vice President - Nuclear
      'P. O. Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
 
==SUBJECT:==
DOCKET NOS. 50-250 AND 50-251 This acknowledges the receipt of your letter of April 11, 1988, which trans-mitted Revision 13 to the Turkey Point Physical Security Plan.
Our review of the changes has found most of them to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan. A couple of changes require further clarification and a violation will be issued during the next physical security inspection for failing to report one of the changes within 60 days as required by 10 CFR 50.54(p)(2).
These concerns were discussed on May 20, 1988, with Ms. S. Ferrell of your staff and Ms. C. Perny of this office. A brief summary of the concerns are stated in the enclosure to this letter. It is cur understanding that Revision 14 will adequately address these concerns and is currently being prepared.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, William E. Cline, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
 
==Enclosure:==
 
Inconsistent Changes cc w/ enc 1:  (See page 2) 8806210085 880615 PDR F
ADOCK 05000250 PDR.
                                                                                            %/)h I0 \
i
 
Florida Power and Light' Company          2 JUN 151988 m
cc w/ enc 1:
C. M. Wethy, Vice President Turkey Point Nuclear Plant P.O. Box 029100' Miami, Florida .33102 C. J. Baker, Plant Manager Turkey Point Nuclear Plant P.'  O. Box 029100 Miami, Florida 33102 Harold F. Reis, Esq.
Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
Steel,. Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 U. S. Environmental Protection Agency Region IV Regional Radiation Representative 345 Courtland Street, N.W.
Atlanta, Georgia 30308 Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32301 Allan Schubert, Public Health Physicist Manager Office of Radiation Control Radiological Health Services Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road l
Tallahassee, Florida 32301 j                              (cc w/ enc 1 cont'd - see page 3) l 1
 
                                  .          .              _ ~ - .  -                -  . . .
                  ; Florida Power and Light Company-                3
                                                                                    . g, y (cc w/ encl cont'd)
                        . State Planning and Development m                        Clearinghouse Office of Planning and Budgeting
                        . Executive Office of the Governor
                          ~The Capitol Building.
Tallahassee, Florida 32301
    ,                    Sergio Pereira County Manager of Metropolitan Dade County Miami, Florida 33130 Intergovernmental Coordination and Review Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Martin H. Hodder, Esq.
                        '1131 N.E. 86th Street Miami, Florida 33130 bec w/ enc 1:
Document Control-Desk (RG01), 42-P Director, Division of Reactor Inspection and Safeguards, NRR EWS-305A.
Region II Licensing File, (50-250) (15VA), TAB 2 Resident Inspector W. Stansberry, RII State of Florida RII                                            RII CPer      tm                                  JC    jak 06/lf/88                    06/ /88          06/ j 7 /88 l
  - a l
 
          , e ENCLOSURE Inconsistent Changes L --
              'Section    ,Page        Comment 2.2.2. 2-3          This section needs to be clarified to eliminate the contradiction with Section 2.2.1.1 relative to the performance of access control duties by unarmed security force members.
3.2.2.7    3-12          The exemption of Q. A. items from search L
requirements needs further clarification.
The outer shipping container must be opened.
Hermetically sealed and machine sealed materials do not need to have their seals removed. The plan needs to ' clearly differentiate between sealed for shipping, which must be opened, and sealed for environmental, quality or integrity reasons.
Appendix C CEB 1-2      This change describes modifications and associated compensatory measures for the contractor entry building. The plan states that, the changes were made December 28, 1987. The changes were not reported to the NRC until April 11, 1988, thereby failing to meet the reporting requirement of two months as stated in 10 CFR 50.54(p)(2).
Discussions -with FP&L licensing and site management attributed the failure to an ownership problem between corporate and site staffs.
l l
l l
l 1
i l
l
[        -}}

Latest revision as of 02:51, 17 December 2020

Advises That 880411 Rev 13 to Physical Security Plan Consistent W/Provision of 10CFR50.54(p) & Acceptable. Violation Will Be Issued During Next Physical Security Insp for Failing to Rept One of Changes within 60 Days
ML20155K011
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/15/1988
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Conway W
Florida Power & Light Co
References
NUDOCS 8806210085
Download: ML20155K011 (4)


Text

. - - _ _ _ _ _ _ - _ _

1

~0 w

JUN 151988 Florida Power and Light Company

ATTN: Mr. W. F. Conway Senior Vice President - Nuclear

'P. O. Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

DOCKET NOS. 50-250 AND 50-251 This acknowledges the receipt of your letter of April 11, 1988, which trans-mitted Revision 13 to the Turkey Point Physical Security Plan.

Our review of the changes has found most of them to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan. A couple of changes require further clarification and a violation will be issued during the next physical security inspection for failing to report one of the changes within 60 days as required by 10 CFR 50.54(p)(2).

These concerns were discussed on May 20, 1988, with Ms. S. Ferrell of your staff and Ms. C. Perny of this office. A brief summary of the concerns are stated in the enclosure to this letter. It is cur understanding that Revision 14 will adequately address these concerns and is currently being prepared.

The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, William E. Cline, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

Enclosure:

Inconsistent Changes cc w/ enc 1: (See page 2) 8806210085 880615 PDR F

ADOCK 05000250 PDR.

%/)h I0 \

i

Florida Power and Light' Company 2 JUN 151988 m

cc w/ enc 1:

C. M. Wethy, Vice President Turkey Point Nuclear Plant P.O. Box 029100' Miami, Florida .33102 C. J. Baker, Plant Manager Turkey Point Nuclear Plant P.' O. Box 029100 Miami, Florida 33102 Harold F. Reis, Esq.

Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel,. Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 U. S. Environmental Protection Agency Region IV Regional Radiation Representative 345 Courtland Street, N.W.

Atlanta, Georgia 30308 Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32301 Allan Schubert, Public Health Physicist Manager Office of Radiation Control Radiological Health Services Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road l

Tallahassee, Florida 32301 j (cc w/ enc 1 cont'd - see page 3) l 1

. . _ ~ - . - - . . .

Florida Power and Light Company- 3

. g, y (cc w/ encl cont'd)

. State Planning and Development m Clearinghouse Office of Planning and Budgeting

. Executive Office of the Governor

~The Capitol Building.

Tallahassee, Florida 32301

, Sergio Pereira County Manager of Metropolitan Dade County Miami, Florida 33130 Intergovernmental Coordination and Review Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Martin H. Hodder, Esq.

'1131 N.E. 86th Street Miami, Florida 33130 bec w/ enc 1:

Document Control-Desk (RG01), 42-P Director, Division of Reactor Inspection and Safeguards, NRR EWS-305A.

Region II Licensing File, (50-250) (15VA), TAB 2 Resident Inspector W. Stansberry, RII State of Florida RII RII CPer tm JC jak 06/lf/88 06/ /88 06/ j 7 /88 l

- a l

, e ENCLOSURE Inconsistent Changes L --

'Section ,Page Comment 2.2.2. 2-3 This section needs to be clarified to eliminate the contradiction with Section 2.2.1.1 relative to the performance of access control duties by unarmed security force members.

3.2.2.7 3-12 The exemption of Q. A. items from search L

requirements needs further clarification.

The outer shipping container must be opened.

Hermetically sealed and machine sealed materials do not need to have their seals removed. The plan needs to ' clearly differentiate between sealed for shipping, which must be opened, and sealed for environmental, quality or integrity reasons.

Appendix C CEB 1-2 This change describes modifications and associated compensatory measures for the contractor entry building. The plan states that, the changes were made December 28, 1987. The changes were not reported to the NRC until April 11, 1988, thereby failing to meet the reporting requirement of two months as stated in 10 CFR 50.54(p)(2).

Discussions -with FP&L licensing and site management attributed the failure to an ownership problem between corporate and site staffs.