| #REDIRECT [[IR 05000338/1985027]]
| | {{Adams |
| | | number = ML20137T209 |
| | | issue date = 11/14/1985 |
| | | title = Insp Repts 50-338/85-27 & 50-339/85-27 on 851007-1103. Violation Noted:Failure to Maintain Necessary Quality Records to Verify Qualification of Personnel Performing Actions Specified in Design Change Procedures |
| | | author name = Branch M, Elrod S, Luehman J |
| | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| | | addressee name = |
| | | addressee affiliation = |
| | | docket = 05000338, 05000339 |
| | | license number = |
| | | contact person = |
| | | document report number = 50-338-85-27, 50-339-85-27, NUDOCS 8512060410 |
| | | package number = ML20137T187 |
| | | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS |
| | | page count = 8 |
| | }} |
| | See also: [[see also::IR 05000338/1985027]] |
| | |
| | =Text= |
| | {{#Wiki_filter:. .-_ . - . ._. - . |
| | . . |
| | * |
| | o UNITED STATES |
| | NUCLEAR REGULATORY COMMISSION |
| | [{jnD GEc |
| | ' *r |
| | o, |
| | y REGION il |
| | j j 101 MARIETTA STREET,N.W. |
| | *'- 2 ATLANTA. GEORGI A 30323 |
| | %...../ . |
| | '' |
| | Report Nos.: 50-338/85-27 and 50-339/85-27 |
| | Licensee: Virginia Electric & Power Company |
| | Richmond, VA 23261 |
| | Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7 |
| | Facility Name: North Anna 1 and 2 |
| | Inspection Conducted: Octobir 7 - November 3,1985 |
| | , Inspectors: . W. A dov7[J9kf |
| | M. W. Branch (SRI ) Date Signed |
| | . |
| | ~5 L + W NJJlt15X |
| | J. G. Luehman (RI) Date Signed |
| | Approved by: . |
| | h M0JMiW( |
| | S. Elrod, Section Chief Date Sicjned |
| | Division of Reactor Projects |
| | i |
| | SU E RY |
| | Scope: This routine inspection by the resident inspectors involved 175 |
| | inspector-hours on-site in the areas of engineered safety features (ESF) walk- |
| | down, operational safety verification, monthly maintenance, monthly surveillance, |
| | preparations for refueling, design changes and modifications, and Inspection and |
| | l Enforcement Information Notice follow-up. |
| | Results: One violation was identified - failura to maintain necessary quality |
| | records to verify qualification of personnel performing the actions specified in |
| | design change procedures (paragraph 7). |
| | 8512060410 851115 |
| | PDR ADOCK 05000338 |
| | ' |
| | O PDR |
| | - - - . . .,-. . .-. .- - .. . - - . - . |
| | |
| | - - - ~. - . . |
| | . . |
| | ' |
| | . |
| | t |
| | i |
| | REPORT DETAILS |
| | 1. Licensee Employees Contacted |
| | i |
| | E. W. Harrell, Station Manager l |
| | D. B. Roth, Quality Control (QC) Manager |
| | : G. E. Kane, Assistant Station Manager |
| | , |
| | E. R. Smith, Assistant Statien Manager |
| | R. O. Enfinger, Superintendent, Operations |
| | J. R. Harper, Superintendent, Maintenance |
| | A. H. Stafford, Superintendent, Health Physics |
| | J. A. Stall, Superintendent, Technical Services |
| | J. R. Hayes, Operations Coordinator |
| | D. A. Heacock, Engineering Supervisor |
| | : D. E. Thomas, Mechanical Maintenance Supervisor |
| | E. C. Tuttle, Electrical Supervisor |
| | ! |
| | R. A. Bergquist, Instrument Supervisor |
| | 4 F. T. -Terminella, Quality Assurance (QA) Supervisor |
| | R. S. Thomas, Engineering Supervisor |
| | G. H. Flowers, Nuclear Specialist |
| | J. H. Leberstein, Licensing Coordinator |
| | ! |
| | i Other licensee employees contacted include technicians, operators, |
| | mechanics, security force members, and office personnel. |
| | 1 |
| | 2. Exit Interview |
| | The inspection scope and findings were summarized on November 5,1985, with |
| | selected individuals identified in paragraph 1. The licensee acknowledged |
| | the inspectors' findings. The licensee did not identify as proprietary any |
| | of the material provided to or reviewed by: the inspectors during this |
| | inspection. |
| | 3. Licensee Action on Previous Inspection Findings |
| | This was not inspected during this reporting period. |
| | . |
| | , |
| | 4. Unresolved Items |
| | , |
| | Unresolved items were not identified during this inspection. |
| | 5. Plant Status- |
| | , Unit 1 |
| | The unit . operated at or. near 100% power during most' of the inspection |
| | period. On the evening of November 3,1985, _ the unit was shut down to |
| | ' |
| | commence.the cycle five six refueling outage. |
| | - |
| | 4 |
| | - , - . . _ . - , . . , . _ , , , , , , _ .,,.m, -.# ,- . ._.,....cmy,. , .. - , - - , , - y , . |
| | |
| | . - _ _ . |
| | . . |
| | I |
| | ' |
| | . |
| | , |
| | 2 |
| | . |
| | One reactor trip occurred on Unit 1 during the inspection period. The |
| | a following paragraphs describe the operational transient which resulted in a |
| | manual trip of the reactor by the control room operator on October 24, 1985. |
| | - |
| | At 3:30 a.m. , the 480 volt AC circuit breaker for battery room exhaust - |
| | fan 1-HV-F-57C failed and caused melting of the vertical bus bars in |
| | motor control center (MCC) IJ1-1. This resulted in an electrical trip |
| | of the MCC supply breaker,14J-4, and subsequent loss of power to |
| | equipment supplied from the MCC. The equipment that was de-energized |
| | 4 |
| | included the battery chargers for two of the four instrument buses and |
| | the solenoid valves (TV-CC-106A, B, and C) which supply component |
| | cooling water (CC) to all three reactor coolant pumps' (RCP) motor oil, |
| | stator, and shroud coolers. |
| | ' |
| | ! |
| | - |
| | At 3:45 a.m., a power decrease was initiated because of increasing RCP |
| | motor bearing temperatures. |
| | - |
| | At 3:50 a.m. , manual reactor and turbine trips were initiated in |
| | . |
| | preparation for securing the RCPs. |
| | - |
| | At 3:52 a.m. , all three RCPs were secured and natural circulation was |
| | established. The incident was classified as an unusual event (UE) per |
| | . |
| | the site emergency plan and the necessary notifications were initiated. |
| | . |
| | ' |
| | - |
| | At 6:45 a.m. , the 1A RCP was restarted af ter installing a temporary |
| | jumper which allowed opening TV-CC-106A, thereby re-establishing CC |
| | flow to the RCP motor. |
| | - |
| | At 7:54 a.m. , repairs to MCC 1J1-1 were completed and at 8:56 a.m. 'all |
| | loads except 1-HV-F-57C were re energized and returned to normal. |
| | - |
| | At 9:02 a.m. , the UE was terminated and subsequent notifications were |
| | made. |
| | The plant's response to the natural circulation event was as expected; the |
| | . |
| | conditions described in section 9.2.2.5.4 of the Updated Final Safety |
| | Analysis Report (UFSAR), which describes a loss of CC to the RCPs, were |
| | validated. |
| | Unit 2 |
| | The unit was shut down from 100% power on October 11, 1985 because of a |
| | failure of the 2H emergency diesel generator (EDG). Following repairs to |
| | the EDG the unit was returned to power on October 15, 1985, and operated at |
| | or near 100% power for the remainder of the inspection period. Details of |
| | 'the EDG failure are addressed in paragraph 12.of this report. |
| | ~ |
| | 6. Licensee Event Report (LER) Follow-up |
| | , |
| | This was not inspected during this reporting period. |
| | ,- . |
| | , . - -- , - - - |
| | P- *--*y *''?'' "- " |
| | |
| | ._- . __ __ _ .. . _ . __ |
| | . . |
| | ' |
| | . |
| | 3 |
| | 7. Follow-up of Previously Identified Items |
| | (Closed) Unresolved Item 338,339/84-38-02; Validity of Quality Records |
| | Associated With Design Change Procedures. The conditions discussed in |
| | paragraph 10 of Inspection Report 338,339/84-38 have been evaluated by the |
| | NRC and appear to violate the requirements of 10 CFR Part 50 Appendix B, |
| | Criterion XVII, which requires that sufficient records be maintained to |
| | provide information regarding the qualification of personnel performing the |
| | actions specified in the procedures. |
| | The inspector's original concern, as discussed in Inspection Report |
| | 338,339/84-38, is provided below: |
| | Section 5.2.2.1 of Administrative Procedure (ADM) 3.1 discusses the |
| | control of design change procedures. being performed by the Engineering |
| | and Construction (E&C) group. Specifically, the ADM states that, "upon |
| | completion of each shift, the white working controlled copies are to be |
| | ; returned to the design change log room and those steps completed shall |
| | be signed in the master colored controlled copy by the supervisor |
| | , |
| | immediately responsible and knowledgeable of activities completed." |
| | The current practice at North Anna is to only keep the master colored |
| | controlled copy of the procedure. The working copies are thrown away, |
| | thereby destroying the ability to verify personnel qualifications. The |
| | following regulatory concerns associated with this practice were |
| | discussed with station QA personnel: r |
| | - |
| | Technical Specification (TS) 6.10.2.a requires records and drawing |
| | changes reflecting facility design modifications made to systems |
| | and equipment described in the Final Safety Analysis Report be |
| | retained for the duration of the facility operating lic,e,nse. |
| | - |
| | Amendment 4 of the Virginia Electric and Power Company (VEPCO) ' |
| | Topical Report, VEP-1, " Quality Assurance Program, Operations |
| | Phase", commits VEPC0 to collect, store, and maintain QA records |
| | in accordance with NRC Regulatory Guide 1.88, Revision 2,1976, |
| | ; |
| | which endorses American National Standards Institute (ANSI) |
| | N45.2.9-1974. |
| | r - |
| | - |
| | Section-3.2 of ANSI N45.2.9-1974, provides instructions on what |
| | constitutes a valid QA record. |
| | The inspector reviewed several design change procedures and verified that |
| | 4 |
| | ' |
| | the record copy of the procedures do not identify the individuals who |
| | actually performed the actions; therefore, no traceability of qualifications |
| | exists. The design change procedures (DCPs) reviewed, along with the |
| | inspector's findings, are listed below: |
| | _ |
| | - |
| | DCP-82-148, Class IE Transmitter Replacement, required in section |
| | 4.2.1.13 as well ~ as in numerous other sections, that Conax seal |
| | assemblies be installed using Rosemont and Conax installation |
| | i |
| | I |
| | l |
| | . |
| | |
| | . . |
| | ' . |
| | , |
| | 4 |
| | ' |
| | instructions. The working copy and record copy of this procedure were |
| | , |
| | signed by different individuals. |
| | , |
| | - |
| | DCP-83-24, Appendix "R" Emergency Diesel Generator Isolation, required |
| | . |
| | in section 4.11.2 as well as numerous other related sections, that |
| | i specific safety-related cables be disconnected. The working copy and |
| | record copy of this procedure were signed by different individuals. |
| | - |
| | DCP-84-15, Outside Recirculation Spray Pump Valve Replacement, North |
| | i |
| | ' |
| | Anna Unit 1, required in section 4.3.5 that certain precise measure- |
| | ments be made. The working copy and record copy of this procedure were |
| | signed by different individuals. Another section of this DCP (4.5.16) |
| | required a verification that the temperature of the weld returned to |
| | within 5-10 degrees Fahrenheit of room temperature using a contact |
| | thermometer. Once again, the working copy and record copy of the |
| | procedure were signed by different individuals. |
| | < |
| | The failure to provide traceable records regarding the qualification of |
| | individuals actually performing these actions is identified as violation |
| | 338,339/85-27-01, and applies to both units. |
| | 8. Monthly Maintenance |
| | Station maintenance activities affecting safety-related systems and |
| | components were observed / reviewed to ascertain that the activities were |
| | conducted in accordance with approved procedures, regulatory guides and |
| | industry codes or standards, and in conformance with TS. Specific items |
| | observed include the repairs to the 2H EDG discussed in paragraph 12, and |
| | repairs to the Unit 1, IJ1-1 MCC discussed in paragraph 5. |
| | No violations or deviations were identified. |
| | 9. Monthly Surveillance |
| | .t |
| | The inspectors observed / reviewed TS-required testing and verified that |
| | testing was performed in accordance with adequate procedures, that test |
| | instrumentation was calibrated, that limiting conditions for operation (LCO) |
| | were met and that any deficiencies identified were properly reviewed and |
| | resolved. |
| | l |
| | No violations or deviations were identified. |
| | 10. ESF System Walkdown |
| | , The following selected ESF systems were verified operable by performing a |
| | walkdown of the accessible and essential portions of the systems on |
| | October 25, 1985. |
| | - |
| | Unit 1 and Unit 2 EDG remote and local breaker alignment. |
| | No violations or deviations were identified. |
| | . |
| | |
| | . . l |
| | - |
| | . |
| | 5 |
| | 11. Routine Inspection |
| | The inspectors' observations during the inspection period verified that |
| | control room manning requirements were being met. In addition, the |
| | inspectors observed shift turnover to verify that continuity of system |
| | status was maintained. The inspectors periodically questioned shi fi, |
| | personnel relative to their awareness of plant conditions. |
| | Through log review and plant tours, the inspectors verified compliance with |
| | selected TSs and LCOs. |
| | During the course of the inspection, observations relative to Protected and , |
| | Vital Area security were made, including access controls, boundary inte- |
| | grity, search, escort and badging. |
| | On a regular basis, radiation work permits (RWP) were reviewed and specific |
| | work activities were monitored to assure they were being conducted per the |
| | RWPs. Selected radiation protection instruments were periodically checked, |
| | and equipment operability and calibration frequency were verified. |
| | . |
| | The inspectors kept informed, on a daily basis, of the overall status of , |
| | both units and of any significant safety matters related to plant opera- ; |
| | tions. Discussions were held with plant management and various members of |
| | the operations staff on a regular basis. Selected portions of operating logs |
| | and data sheets were reviewed daily. |
| | The inspectors conducted various plant tours and made frequent visits to the |
| | Control Room. Observations included' the following: witnessing work |
| | activities in progress; verifying the status of operating and standby safety |
| | systems and equipment; confirming valve positions, instrument and recorder |
| | readings, ann'unciator alarms, and housekeeping. |
| | No violations or deviations were-identified. |
| | 12. Diesel Generator Failures < |
| | Both units at North Anna have experienced numerous internal failures of |
| | their EDG engines. The failures can be categorized as either piston / ring |
| | failure or cylinder liner scoring / cracking failures. The licensee' has |
| | attributed past failures _ to severe TS testing requirements (ie. fast, cold |
| | starts and/or fast loading). The term " fast, cold start" refers to the TS |
| | requirement to start the'EDG from ambient conditions and reach rated voltage . |
| | and frequency within 10 seconds. |
| | ' |
| | The diesel engines are manufactured by the Fairbanks Morse Engine Division |
| | of Colt Industries (model 38TD8-1/8), and. use a 12-cylinder, opposed piston, |
| | turbocharged design. These EDGs are rated for continuous duty at 2750 |
| | kilowatts (KW), for 2000 hours at-3000 KW, and for 30 minutes at 3300 KW. |
| | The diesel manufacturer and the licensee speculated that the most probable |
| | cause of piston / liner failures could be attributed to stress-related damage |
| | to the wrist pin-to-connecting rod and wrist pin-to piston insert bushings, |
| | J |
| | |
| | _ _. .__. |
| | 1 . . |
| | * |
| | . |
| | 6 |
| | , |
| | causing piston distortion with ultimate contact between the piston and the |
| | cylinder liner. This contact causes excessive heating and continued piston |
| | growth until high temperature stress-related piston or liner cracking |
| | occurs. This results in pressurization of the crar.kcase and engine shutdown |
| | by the engine protection system. A wrist pin-to-connecting rod bushing on |
| | < |
| | damaged equipment removed from the 2H diesel was measured and found to have |
| | elongated by approximately 0.2". |
| | On October 18, 1985, the licensee' met with members of the NRC staff which |
| | included personnel from NRR, IE, and Region II. The purpose of the meeting |
| | ! was to discuss the details and probable cause of recent engine failures, and |
| | the proposed corrective actions to improve reliability. The licensee |
| | ; discussed past engine failures and presented their estimate of the most |
| | probable cause; the upcoming complete engine overhaul was also discussed. |
| | i The licensee committed to complete the engine overhauls prior to returning |
| | the units to power following the November 1985 and April 1986 refueling |
| | cutages -for Units 1 and 2, respectively. Additionally, the licensee |
| | . presented information to justify continued operation of the units until |
| | completion of these overhauls; this included past failure analyses and |
| | ' |
| | details of previous component replacements. |
| | The diesel generator reliability improvement program was required as part of |
| | License Amendment No. 48 of the Unit 2 TS and will be closely followed by |
| | the inspectors during the upcoming refueling outages; this is identified as |
| | ' |
| | Inspector Follow-up Item (IFI 338, 339/85-27-02). |
| | I |
| | No violations or deviations were identified. |
| | ; |
| | , 13. Inspection and Enforcement Information Notice (IEIN) Follow-up |
| | : IEIN 85-82, Diesel Generator Differential Protection Relay Not Seismically |
| | Qualified, identifies a concern that General Electric (GE) model 12CFD |
| | rel_ays, often used for EDG protection against electrical shorts and grounds, |
| | are not seismically qualified. The . inspectors verified that EDG output |
| | , |
| | breaker protection at North Anna is 'not being provided by the type relays |
| | 4 |
| | identified in the IEIN. The protection for both North Anna 1 and 2 is |
| | l' |
| | provided by GE model 12HFA and 12CFVB relays which are not addressed in the |
| | IEIN. |
| | 14. Preparations for Refueling |
| | , |
| | 4 |
| | During the week cf October 28, 1985, the inspector reviewed the upcoming |
| | refueling outage schedule and discussed major objectives of the outage with |
| | the refueling coordinator. The inspector also reviewed several refueling |
| | procedures and verified that the licensee had reviewed vendor change |
| | recommendations and appropriately modified station implementing procedures. |
| | ' |
| | No violations or deviations were identified. |
| | : |
| | : |
| | , |
| | . _ _ _ _ _ . _ _ _ _ _ . . _ . _ _ _ _ _ _ . _ . _ _ . . _ _ . - |
| | |
| | . |
| | . . |
| | . |
| | 7 |
| | 15. Design Changes and Modifications (37700) |
| | The design change and modification program was reviewed by the inspectors. |
| | Specifically, the inspectors selected several design change packages and |
| | verified the following: |
| | - |
| | that design changes were reviewed and approved in accordance with TS |
| | and QA program requirements; |
| | - |
| | that design changes were controlled by established plant procedures; |
| | - |
| | that design changes were reviewed and approved in accordance with the |
| | requirements of 10 CFR 50.59; |
| | - |
| | and that operating procedures and drawings were updated in a timely |
| | manner to reflect the modification. |
| | Those design changes reviewed are discussed in paragraph 7 of this report. |
| | No violations or deviations, other than that listed in paragraph 7, were |
| | identified. |
| | t |
| | 4 |
| | 7 |
| | i |
| | , -- |
| | }} |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:UTILITY
MONTHYEARIR 05000338/19900231990-10-0909 October 1990 Insp Repts 50-338/90-23 & 50-339/90-23 on 900819-0915. Violation Noted But Not Cited.Major Areas Inspected: Operations,Maint,Surveillances,Operational Event Followup, LER Followup & Evaluation of Licensee self-assessment IR 05000338/19900191990-09-14014 September 1990 Insp Repts 50-338/90-19 & 50-339/90-19 on 900820-24. Violations Noted But Not Cited.Major Areas Inspected: Licensee Radiation Protection Program Consisting of Review in Areas of External & Internal Exposure Control IR 05000338/19900181990-09-11011 September 1990 Insp Repts 50-338/90-18 & 50-339/90-18 on 900718-0818. Violations Noted.Major Areas Inspected:Operations,Maint, Surveillances,Operational Event Followup,Mods,Self Assessment Capabilities & LER Followup IR 05000338/19900201990-09-0606 September 1990 Insp Repts 50-338/90-20 & 50-339/90-20 on 900906.No Violations or Deviations Noted.Major Areas Inspected: Annual Emergency Preparedness Exercise IR 05000338/19900171990-07-27027 July 1990 Partially Withheld Insp Repts 50-338/90-17 & 50-339/90-17 on 900709-13 (Ref 10CFR2.790).No Violations or Deviations.Major Areas Inspected:Physical Security Program for Power Reactors & Security Plan & Implementing Procedures IR 05000338/19900131990-06-27027 June 1990 Insp Repts 50-338/90-13 & 50-339/90-13 on 900514-18 & 29. Noncited Violations Noted.Major Areas Inspected:Radiation Monitoring Sys,Water Chemistry & QC IR 05000338/19900141990-06-22022 June 1990 Insp Repts 50-338/90-14 & 50-339/90-14 on 900604-08.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Unresolved Item Identified During App R Triennial Insp on 880718-22 IR 05000338/19890261989-09-21021 September 1989 Insp Repts 50-338/89-26 & 50-339/89-26 on 890715-0822. Violation Noted.Major Areas Inspected:Plant Status,Maint, Surveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890221989-08-24024 August 1989 Insp Repts 50-338/89-22 & 50-339/89-22 on 890601-0714.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Maint,Surveillance,Esf Walkdown,Operational Safety Verification,Generic Ltr 88-17 & Plant Startup IR 05000338/19890271989-08-22022 August 1989 Insp Repts 50-338/89-27 & 50-339/89-27 on 890731-0804.No Violations or Deviations Noted.Major Areas Inspected: Followup on Licensee Action Re Previous Insp Findings. Weaknesses Noted Re Labeling of Instruments & App R Sys IR 05000338/19892001989-08-0808 August 1989 Safety Sys Outage Mod & Maint Team Insp Repts 50-338/89-200 & 50-339/89-201 on 890508-12 & 22-26.No Violations Noted. Major Areas Inspected:Implementation of Matl & Work Control Sys to Ensure Mod Conformed to Installation Requirements IR 05000338/19890241989-08-0707 August 1989 Insp Repts 50-338/89-24 & 50-339/89-24 on 890710-14.No Violations Noted.Major Areas Inspected:Functional Areas of Emergency Preparedness Program,Including Training,Audit Repts,Distribution of Changes to EPIPs & Staff Augmentation IR 05000338/19890211989-07-27027 July 1989 Insp Repts 50-338/89-21 & 50-339/89-21 on 890613-14.No Violations or Deviations Noted.Major Areas Inspected: Physical Security Program for Power Reactors,Specifically pre-employment Screening & Clearances ML20247D5441989-07-0707 July 1989 Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26. Violation Noted.Major Areas Inspected:Witnessing Containment Integrated Leak Rate Test,Reviewing Test Procedures & Evaluating Test Results IR 05000338/19890121989-07-0707 July 1989 Corrected Pages 1 & 2 to Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26.Violation Noted.Major Areas Inspected:Containment Integrated Leak Rate Test,Test Procedures,Evaluation of Test Results & Previous Items IR 05000338/19890191989-06-30030 June 1989 Insp Repts 50-338/89-19 & 50-339/89-19 on 890605-08.Major Areas Inspected:Solid Wastes,Transportation of Radioactive Matls & Radwaste & Followup on previously-identified Insp Findings IR 05000338/19890201989-06-28028 June 1989 Insp Repts 50-338/89-20 & 50-339/89-20 on 890605-09 & 12-13. No Violations or Deviations Noted.Major Areas Inspected: Results of 10-yr Ultrasonic Exam of Unit 1 Reactor Pressure Vessel & Observation of Inservice Activities ML20246J9231989-06-27027 June 1989 Insp Repts 50-338/89-14 & 50-339/89-14 on 890418-0531. Violation Noted.Major Areas Inspected:Plant Status, Maint,Surveillance,Esf Walkdown,Operational Safety Verification,Operating Reactor Events & LER follow-up IR 05000338/19890091989-06-0909 June 1989 Insp Repts 50-338/89-09 & 50-339/89-09 on 890522-24.No Violations or Deviations Noted.Major Areas Inspected:Primary & Secondary Chemistry,Radwaste Processing,Radioactive Effluents & Environ Monitoring IR 05000339/19892001989-06-0707 June 1989 Insp Rept 50-339/89-200 on 890213-17 & 0227-0303.Potential Enforcement Items Noted.Major Areas Inspected:Evaluation of Planned Design Changes & Mods Against Regulatory Requirements & Licensee Commitments ML20245D5481989-06-0707 June 1989 Insp Repts 50-338/89-11 & 50-339/89-11 on 890403-07. Violations,Deviations & Unresolved Items Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97, Instrumentation for Light Water Cooled Nuclear Power.. IR 05000338/19890171989-06-0606 June 1989 Partially Withheld Insp Repts 50-338/89-17 & 50-339/89-17 on 890501-05 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Core Insp Program. Noncited Violation Re Improper Badging Noted ML20244E5611989-06-0606 June 1989 Insp Repts 50-338/89-18 & 50-339/89-18 on 890515-19. Violations Noted.Major Areas Inspected:Areas of Inservice Insp - Observation of Work & Work Activities IR 05000338/19890131989-06-0202 June 1989 Insp Repts 50-338/89-13 & 50-339/89-13 on 890418-20. Violations Noted.No Deviations Identified.Major Areas Inspected:Areas of Welding safety-related Components & Review of Reactor Vessel 10-yr Ultrasonic Exam Program ML20245D3511989-06-0202 June 1989 Insp Repts 50-338/89-15 & 50-339/89-15 on 890501-05. Violation Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Areas of External & Internal Exposure Control & Program to Maintain Doses ALARA ML20244B8151989-05-17017 May 1989 Insp Repts 50-338/89-08 & 50-339/89-08 on 890321-0417 & 0425-0503.Violations Noted.Major Areas Inspected:Plant Status,Maint,Surveillance,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890041989-04-26026 April 1989 Insp Repts 50-338/89-04 & 50-339/89-04 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Seismic Analyses for as-built safety-related Piping Sys Per IE Bulletin 79-14 IR 05000338/19890101989-04-17017 April 1989 Insp Repts 50-338/89-10 & 50-339/89-10 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Safety Sys Outage Mod Insp Followup ML20245C0071989-04-13013 April 1989 Insp Repts 50-338/89-05 & 50-339/89-05 on 890320-24. Violations Noted.Major Areas Inspected:Radiation Protection Program in Areas of Organization & Mgt Controls,Training & Qualifications & Internal Exposure Control IR 05000338/19890051989-04-13013 April 1989 Insp Repts 50-338/89-05 & 50-339/89-05 on 890320-24. Violations Noted.Major Areas Inspected:Radiation Protection Program in Areas of Organization & Mgt Controls,Training & Qualifications & Internal Exposure Control IR 05000338/19890031989-04-12012 April 1989 Insp Repts 50-338/89-03 & 50-339/89-03 on 890203-0320. Violations Noted.Major Areas Inspected:Plant Status,Maint, Surveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890071989-04-11011 April 1989 Insp Repts 50-338/89-07 & 50-339/89-07 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Work Observation,Inserice Insp Data Review & Licensee Recovery Efforts from 890225 Hot Leg Plug Failure ML20247F0791989-03-23023 March 1989 Insp Repts 50-338/89-02 & 50-339/89-02 on 890221-23.No Violations Noted.Major Areas Inspected:Licensee Response to Emergency Response Facility Appraisal Open Items & Emergency Preparedness Program Enhancement Items IR 05000338/19880361989-03-21021 March 1989 Insp Repts 50-338/88-36 & 50-339/88-36 on 881231-890202. Violations Noted Re Failure to Take Prompt Corrective Action Re Inadequate Instrument Air Quality.Major Areas Inspected: Plant Status,Maint,Surveillance & LERs IR 05000338/19890061989-03-20020 March 1989 Insp Repts 50-338/89-06 & 50-339/89-06 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Steam Generator Tubing & Reviews of NDE Procedures IR 05000338/19880261989-02-16016 February 1989 Suppl to Insp Repts 50-338/88-26 & 50-339/88-26.Results of Analysis & Evaluation of Health Physics Counting Room Indicate Considerable Improvement Between Licensee & NRC Data for Radionuclides IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000338/19880271988-10-24024 October 1988 Insp Repts 50-338/88-27 & 50-339/88-27 on 880820-0916.No Violations Noted.Major Areas Inspected:Plant Status,Maint, Surveillance & Operational Safety Verification,Including Reviews of Backshift Operations IR 05000338/19880291988-10-19019 October 1988 Insp Repts 50-338/88-29 & 50-339/88-29 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected: IE Bulletin 79-14 IR 05000338/19880301988-10-0707 October 1988 Insp Repts 50-338/88-30 & 50-339/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected: Requested Actions on NRC Bulletins,Temporary Instruction 2500/26 & Licensee Action on Previous Insp Followup Items ML20155C2181988-09-26026 September 1988 Insp Repts 50-338/88-24 & 50-339/88-24 on 880815-19. Violations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Emergency Facilities Equipment ML20154R3651988-09-20020 September 1988 Insp Repts 50-338/88-26 & 50-339/88-26 on 880815-19.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Measurements & Counting Room QA for in-plant Radiochemical Analyses ML20155A1911988-09-15015 September 1988 Insp Repts 50-338/88-22 & 50-339/88-22 on 880716-0819. Violations Noted.Major Areas Inspected:Plant Status,Maint, Sueveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19880131988-09-13013 September 1988 Insp Repts 50-338/88-13 & 50-339/88-13 on 880718-22. Violation Noted.Major Areas Inspected:Triennial post-fire Safe Shutdown Capability Reverification & Assessment, Including App R Compliance & post-fire Shutdown Capability IR 05000338/19880251988-09-0707 September 1988 Insp Repts 50-338/88-25 & 50-339/88-25 on 880808-12.No Violations,Deviations or Program Weaknesses Noted.Major Areas Inspected:Plant Chemistry,Chemical Corrosion & Pipe Wall Thinning IR 05000338/19880141988-08-18018 August 1988 Insp Repts 50-338/88-14 & 50-339/88-14 on 880627-30.No Violations or Deviations Noted.Major Areas Inspected: Emergency Response Facility & Equipment,Interviews W/Util Personnel & Equipment for Emergency Response Organization IR 05000338/19880211988-08-12012 August 1988 Insp Repts 50-338/88-21 & 50-339/88-21 on 880611-0715.No Violations or Deviations Noted.Major Areas Inspected: Plant Status,Ler,Review of Inspector Followup Items,Monthly Maint Observation & Operator Safety Verification ML20151W7621988-08-0909 August 1988 Insp Repts 50-338/88-18 & 50-339/88-18 on 880606-10. Violations Noted.Major Areas Inspected:External Exposure Control & Assessment,Control of Radioactive Matls, Contamination,Surveys & Monitoring & Solid Waste IR 05000338/19880171988-07-0808 July 1988 Insp Repts 50-338/88-17 & 50-339/88-17 on 880606-10.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of Inservice Insp Data from Unit 2,1987 Refueling Outage & Maint Records Review of Coolant Pump IR 05000338/19880121988-07-0606 July 1988 Insp Repts 50-338/88-12 & 50-339/88-12 on 880420-22.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program & Followup on Licensee Action on Previous Insp Findings 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4081998-11-0505 November 1998 Notice of Violation from Insp on 980713-31 & 0921-25. Violation Noted:As of 980712,AFW Pipe Supports Were Not Constructed IAW Details Shown on Design Drawings as Listed ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance ML20155B0671998-10-0202 October 1998 NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Tests Administered on 980817-21 & 31-0903 IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20148B6541997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Operators Failed to Verify That Unit 1 & 2 RCPs 1 Seal Leakoffs & Unit 2 Nr 46 Nuclear Power Range Chart Recorders Were Operational IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7411997-03-21021 March 1997 Notice of Violation from Insp on 970112-0222.Violation Noted:As of 970213,radiation Monitors Installed in Fuel Handling & Storage Locations,Did Not Provide Full Coverage for Area Used for New Fuel Receipt ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970991997-02-21021 February 1997 SALP Repts 50-338/97-99 & 50-339/97-99 for 941225-970111 IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20133G8881997-01-0606 January 1997 Notice of Violation from Insp on 961103-1207.Violation Noted:Licensee Failed to Ensure That Safeguards Area Walls Met Design Basis for Containing Pump Seal Leakage Described in Updated Final Safety Analysis Rept Section 15.4.1.8 ML20133C9491996-12-27027 December 1996 EN-96-098:order Prohibiting Involvement in NRC Licensed Activities Will Be Issued on or About 970102 to Unlicensed Individual Formerly Employed as Contract Millwright.State of VA Will Be Notified ML20149M5831996-12-0202 December 1996 Notice of Violation from Insp on 960922-1102.Violation Noted:Rce Had Not Been Completed for Several Pump 1-CH-P-1A Seal Failures Which Occurred Between 960211 & 0718 IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support PNO-II-96-081, on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed1996-11-13013 November 1996 PNO-II-96-081:on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed ML20134G7971996-10-21021 October 1996 Notice of Violation from Insp on 960811-0921.Violation Noted:Procedure for Irradiated Fuel Damage While Refueling, 0-AP-30 Inadequate ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr ML20134C6401996-09-0909 September 1996 Notice of Violation from Insp on 960810.Violation Noted: on 940802,inadequate Maint Procedure Was Used to Control Maint Activities Affecting Quality IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059L0511994-01-0404 January 1994 EN-94-001:on 940107,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $15,000 Will Be Issued.Action Based on Two Previous Similar Severity Level IV Violations Issued on 901207 & 920515 ML20059B2521993-12-14014 December 1993 Corrected NOV from Insp on 931017-1120,including Response Instruction ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation ML20059B2751993-12-14014 December 1993 Notice of Violation from Insp on 931017-1120.Violation Noted:On 931029,periodic Test Procedure 2-PT-82H Was Not Implemented Correctly & While Performing Step 6.4.5,operator Incorrectly Placed Control Switch Breaker in pull-to-lock IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19933011993-11-12012 November 1993 Exam Rept 50-338/93-301 on 931008-15.Exam Results:Eight ROs & Six SROs Passed Written & Operating Exams.Exam for Both Units IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19933001993-10-20020 October 1993 Exam Repts 50-338/93-300 & 50-339/93-300 on 930825-0910 & 930921-24.Exam Results:Six SROs & Five ROs Received Written & Operating Exams.All Operators Passed Exams IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8521993-08-0505 August 1993 Notice of Violation from Insp on 930620-0717.Violation Noted:Operating Procedure 1-OP-6.5.A Not Implemented Properly,In That While Performing Step 5.3.4.e,operator Failed to Fully Open EDG Exhaust Muffler Bypass Valve ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1581993-07-13013 July 1993 Notice of Violation from Insp on 930509-0619.Violation Noted:Hydrogen Analyzer Determined to Be Inoperable from 930209 to 0509 W/O Implementing Requirements of Action Statement 1999-07-02
[Table view] |
See also: IR 05000338/1985027
Text
. .-_ . - . ._. - .
. .
o UNITED STATES
NUCLEAR REGULATORY COMMISSION
[{jnD GEc
' *r
o,
y REGION il
j j 101 MARIETTA STREET,N.W.
- '- 2 ATLANTA. GEORGI A 30323
%...../ .
Report Nos.: 50-338/85-27 and 50-339/85-27
Licensee: Virginia Electric & Power Company
Richmond, VA 23261
Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7
Facility Name: North Anna 1 and 2
Inspection Conducted: Octobir 7 - November 3,1985
, Inspectors: . W. A dov7[J9kf
M. W. Branch (SRI ) Date Signed
.
~5 L + W NJJlt15X
J. G. Luehman (RI) Date Signed
Approved by: .
h M0JMiW(
S. Elrod, Section Chief Date Sicjned
Division of Reactor Projects
i
SU E RY
Scope: This routine inspection by the resident inspectors involved 175
inspector-hours on-site in the areas of engineered safety features (ESF) walk-
down, operational safety verification, monthly maintenance, monthly surveillance,
preparations for refueling, design changes and modifications, and Inspection and
l Enforcement Information Notice follow-up.
Results: One violation was identified - failura to maintain necessary quality
records to verify qualification of personnel performing the actions specified in
design change procedures (paragraph 7).
8512060410 851115
PDR ADOCK 05000338
'
O PDR
- - - . . .,-. . .-. .- - .. . - - . - .
- - - ~. - . .
. .
'
.
t
i
REPORT DETAILS
1. Licensee Employees Contacted
i
E. W. Harrell, Station Manager l
D. B. Roth, Quality Control (QC) Manager
- G. E. Kane, Assistant Station Manager
,
E. R. Smith, Assistant Statien Manager
R. O. Enfinger, Superintendent, Operations
J. R. Harper, Superintendent, Maintenance
A. H. Stafford, Superintendent, Health Physics
J. A. Stall, Superintendent, Technical Services
J. R. Hayes, Operations Coordinator
D. A. Heacock, Engineering Supervisor
- D. E. Thomas, Mechanical Maintenance Supervisor
E. C. Tuttle, Electrical Supervisor
!
R. A. Bergquist, Instrument Supervisor
4 F. T. -Terminella, Quality Assurance (QA) Supervisor
R. S. Thomas, Engineering Supervisor
G. H. Flowers, Nuclear Specialist
J. H. Leberstein, Licensing Coordinator
!
i Other licensee employees contacted include technicians, operators,
mechanics, security force members, and office personnel.
1
2. Exit Interview
The inspection scope and findings were summarized on November 5,1985, with
selected individuals identified in paragraph 1. The licensee acknowledged
the inspectors' findings. The licensee did not identify as proprietary any
of the material provided to or reviewed by: the inspectors during this
inspection.
3. Licensee Action on Previous Inspection Findings
This was not inspected during this reporting period.
.
,
4. Unresolved Items
,
Unresolved items were not identified during this inspection.
5. Plant Status-
, Unit 1
The unit . operated at or. near 100% power during most' of the inspection
period. On the evening of November 3,1985, _ the unit was shut down to
'
commence.the cycle five six refueling outage.
-
4
- , - . . _ . - , . . , . _ , , , , , , _ .,,.m, -.# ,- . ._.,....cmy,. , .. - , - - , , - y , .
. - _ _ .
. .
I
'
.
,
2
.
One reactor trip occurred on Unit 1 during the inspection period. The
a following paragraphs describe the operational transient which resulted in a
manual trip of the reactor by the control room operator on October 24, 1985.
-
At 3:30 a.m. , the 480 volt AC circuit breaker for battery room exhaust -
fan 1-HV-F-57C failed and caused melting of the vertical bus bars in
motor control center (MCC) IJ1-1. This resulted in an electrical trip
of the MCC supply breaker,14J-4, and subsequent loss of power to
equipment supplied from the MCC. The equipment that was de-energized
4
included the battery chargers for two of the four instrument buses and
the solenoid valves (TV-CC-106A, B, and C) which supply component
cooling water (CC) to all three reactor coolant pumps' (RCP) motor oil,
stator, and shroud coolers.
'
!
-
At 3:45 a.m., a power decrease was initiated because of increasing RCP
motor bearing temperatures.
-
At 3:50 a.m. , manual reactor and turbine trips were initiated in
.
preparation for securing the RCPs.
-
At 3:52 a.m. , all three RCPs were secured and natural circulation was
established. The incident was classified as an unusual event (UE) per
.
the site emergency plan and the necessary notifications were initiated.
.
'
-
At 6:45 a.m. , the 1A RCP was restarted af ter installing a temporary
jumper which allowed opening TV-CC-106A, thereby re-establishing CC
flow to the RCP motor.
-
At 7:54 a.m. , repairs to MCC 1J1-1 were completed and at 8:56 a.m. 'all
loads except 1-HV-F-57C were re energized and returned to normal.
-
At 9:02 a.m. , the UE was terminated and subsequent notifications were
made.
The plant's response to the natural circulation event was as expected; the
.
conditions described in section 9.2.2.5.4 of the Updated Final Safety
Analysis Report (UFSAR), which describes a loss of CC to the RCPs, were
validated.
Unit 2
The unit was shut down from 100% power on October 11, 1985 because of a
failure of the 2H emergency diesel generator (EDG). Following repairs to
the EDG the unit was returned to power on October 15, 1985, and operated at
or near 100% power for the remainder of the inspection period. Details of
'the EDG failure are addressed in paragraph 12.of this report.
~
6. Licensee Event Report (LER) Follow-up
,
This was not inspected during this reporting period.
,- .
, . - -- , - - -
P- *--*y *? "- "
._- . __ __ _ .. . _ . __
. .
'
.
3
7. Follow-up of Previously Identified Items
(Closed) Unresolved Item 338,339/84-38-02; Validity of Quality Records
Associated With Design Change Procedures. The conditions discussed in
paragraph 10 of Inspection Report 338,339/84-38 have been evaluated by the
NRC and appear to violate the requirements of 10 CFR Part 50 Appendix B,
Criterion XVII, which requires that sufficient records be maintained to
provide information regarding the qualification of personnel performing the
actions specified in the procedures.
The inspector's original concern, as discussed in Inspection Report
338,339/84-38, is provided below:
Section 5.2.2.1 of Administrative Procedure (ADM) 3.1 discusses the
control of design change procedures. being performed by the Engineering
and Construction (E&C) group. Specifically, the ADM states that, "upon
completion of each shift, the white working controlled copies are to be
- returned to the design change log room and those steps completed shall
be signed in the master colored controlled copy by the supervisor
,
immediately responsible and knowledgeable of activities completed."
The current practice at North Anna is to only keep the master colored
controlled copy of the procedure. The working copies are thrown away,
thereby destroying the ability to verify personnel qualifications. The
following regulatory concerns associated with this practice were
discussed with station QA personnel: r
-
Technical Specification (TS) 6.10.2.a requires records and drawing
changes reflecting facility design modifications made to systems
and equipment described in the Final Safety Analysis Report be
retained for the duration of the facility operating lic,e,nse.
-
Amendment 4 of the Virginia Electric and Power Company (VEPCO) '
Topical Report, VEP-1, " Quality Assurance Program, Operations
Phase", commits VEPC0 to collect, store, and maintain QA records
in accordance with NRC Regulatory Guide 1.88, Revision 2,1976,
which endorses American National Standards Institute (ANSI)
N45.2.9-1974.
r -
-
Section-3.2 of ANSI N45.2.9-1974, provides instructions on what
constitutes a valid QA record.
The inspector reviewed several design change procedures and verified that
4
'
the record copy of the procedures do not identify the individuals who
actually performed the actions; therefore, no traceability of qualifications
exists. The design change procedures (DCPs) reviewed, along with the
inspector's findings, are listed below:
_
-
DCP-82-148, Class IE Transmitter Replacement, required in section
4.2.1.13 as well ~ as in numerous other sections, that Conax seal
assemblies be installed using Rosemont and Conax installation
i
I
l
.
. .
' .
,
4
'
instructions. The working copy and record copy of this procedure were
,
signed by different individuals.
,
-
DCP-83-24, Appendix "R" Emergency Diesel Generator Isolation, required
.
in section 4.11.2 as well as numerous other related sections, that
i specific safety-related cables be disconnected. The working copy and
record copy of this procedure were signed by different individuals.
-
DCP-84-15, Outside Recirculation Spray Pump Valve Replacement, North
i
'
Anna Unit 1, required in section 4.3.5 that certain precise measure-
ments be made. The working copy and record copy of this procedure were
signed by different individuals. Another section of this DCP (4.5.16)
required a verification that the temperature of the weld returned to
within 5-10 degrees Fahrenheit of room temperature using a contact
thermometer. Once again, the working copy and record copy of the
procedure were signed by different individuals.
<
The failure to provide traceable records regarding the qualification of
individuals actually performing these actions is identified as violation
338,339/85-27-01, and applies to both units.
8. Monthly Maintenance
Station maintenance activities affecting safety-related systems and
components were observed / reviewed to ascertain that the activities were
conducted in accordance with approved procedures, regulatory guides and
industry codes or standards, and in conformance with TS. Specific items
observed include the repairs to the 2H EDG discussed in paragraph 12, and
repairs to the Unit 1, IJ1-1 MCC discussed in paragraph 5.
No violations or deviations were identified.
9. Monthly Surveillance
.t
The inspectors observed / reviewed TS-required testing and verified that
testing was performed in accordance with adequate procedures, that test
instrumentation was calibrated, that limiting conditions for operation (LCO)
were met and that any deficiencies identified were properly reviewed and
resolved.
l
No violations or deviations were identified.
10. ESF System Walkdown
, The following selected ESF systems were verified operable by performing a
walkdown of the accessible and essential portions of the systems on
October 25, 1985.
-
Unit 1 and Unit 2 EDG remote and local breaker alignment.
No violations or deviations were identified.
.
. . l
-
.
5
11. Routine Inspection
The inspectors' observations during the inspection period verified that
control room manning requirements were being met. In addition, the
inspectors observed shift turnover to verify that continuity of system
status was maintained. The inspectors periodically questioned shi fi,
personnel relative to their awareness of plant conditions.
Through log review and plant tours, the inspectors verified compliance with
selected TSs and LCOs.
During the course of the inspection, observations relative to Protected and ,
Vital Area security were made, including access controls, boundary inte-
grity, search, escort and badging.
On a regular basis, radiation work permits (RWP) were reviewed and specific
work activities were monitored to assure they were being conducted per the
RWPs. Selected radiation protection instruments were periodically checked,
and equipment operability and calibration frequency were verified.
.
The inspectors kept informed, on a daily basis, of the overall status of ,
both units and of any significant safety matters related to plant opera- ;
tions. Discussions were held with plant management and various members of
the operations staff on a regular basis. Selected portions of operating logs
and data sheets were reviewed daily.
The inspectors conducted various plant tours and made frequent visits to the
Control Room. Observations included' the following: witnessing work
activities in progress; verifying the status of operating and standby safety
systems and equipment; confirming valve positions, instrument and recorder
readings, ann'unciator alarms, and housekeeping.
No violations or deviations were-identified.
12. Diesel Generator Failures <
Both units at North Anna have experienced numerous internal failures of
their EDG engines. The failures can be categorized as either piston / ring
failure or cylinder liner scoring / cracking failures. The licensee' has
attributed past failures _ to severe TS testing requirements (ie. fast, cold
starts and/or fast loading). The term " fast, cold start" refers to the TS
requirement to start the'EDG from ambient conditions and reach rated voltage .
and frequency within 10 seconds.
'
The diesel engines are manufactured by the Fairbanks Morse Engine Division
of Colt Industries (model 38TD8-1/8), and. use a 12-cylinder, opposed piston,
turbocharged design. These EDGs are rated for continuous duty at 2750
kilowatts (KW), for 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> at-3000 KW, and for 30 minutes at 3300 KW.
The diesel manufacturer and the licensee speculated that the most probable
cause of piston / liner failures could be attributed to stress-related damage
to the wrist pin-to-connecting rod and wrist pin-to piston insert bushings,
J
_ _. .__.
1 . .
.
6
,
causing piston distortion with ultimate contact between the piston and the
cylinder liner. This contact causes excessive heating and continued piston
growth until high temperature stress-related piston or liner cracking
occurs. This results in pressurization of the crar.kcase and engine shutdown
by the engine protection system. A wrist pin-to-connecting rod bushing on
<
damaged equipment removed from the 2H diesel was measured and found to have
elongated by approximately 0.2".
On October 18, 1985, the licensee' met with members of the NRC staff which
included personnel from NRR, IE, and Region II. The purpose of the meeting
! was to discuss the details and probable cause of recent engine failures, and
the proposed corrective actions to improve reliability. The licensee
- discussed past engine failures and presented their estimate of the most
probable cause; the upcoming complete engine overhaul was also discussed.
i The licensee committed to complete the engine overhauls prior to returning
the units to power following the November 1985 and April 1986 refueling
cutages -for Units 1 and 2, respectively. Additionally, the licensee
. presented information to justify continued operation of the units until
completion of these overhauls; this included past failure analyses and
'
details of previous component replacements.
The diesel generator reliability improvement program was required as part of
License Amendment No. 48 of the Unit 2 TS and will be closely followed by
the inspectors during the upcoming refueling outages; this is identified as
'
Inspector Follow-up Item (IFI 338, 339/85-27-02).
I
No violations or deviations were identified.
, 13. Inspection and Enforcement Information Notice (IEIN) Follow-up
- IEIN 85-82, Diesel Generator Differential Protection Relay Not Seismically
Qualified, identifies a concern that General Electric (GE) model 12CFD
rel_ays, often used for EDG protection against electrical shorts and grounds,
are not seismically qualified. The . inspectors verified that EDG output
,
breaker protection at North Anna is 'not being provided by the type relays
4
identified in the IEIN. The protection for both North Anna 1 and 2 is
l'
provided by GE model 12HFA and 12CFVB relays which are not addressed in the
IEIN.
14. Preparations for Refueling
,
4
During the week cf October 28, 1985, the inspector reviewed the upcoming
refueling outage schedule and discussed major objectives of the outage with
the refueling coordinator. The inspector also reviewed several refueling
procedures and verified that the licensee had reviewed vendor change
recommendations and appropriately modified station implementing procedures.
'
No violations or deviations were identified.
,
. _ _ _ _ _ . _ _ _ _ _ . . _ . _ _ _ _ _ _ . _ . _ _ . . _ _ . -
.
. .
.
7
15. Design Changes and Modifications (37700)
The design change and modification program was reviewed by the inspectors.
Specifically, the inspectors selected several design change packages and
verified the following:
-
that design changes were reviewed and approved in accordance with TS
and QA program requirements;
-
that design changes were controlled by established plant procedures;
-
that design changes were reviewed and approved in accordance with the
requirements of 10 CFR 50.59;
-
and that operating procedures and drawings were updated in a timely
manner to reflect the modification.
Those design changes reviewed are discussed in paragraph 7 of this report.
No violations or deviations, other than that listed in paragraph 7, were
identified.
t
4
7
i
, --