ML20052F981: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,*
e' TOLEDO
                                                                        %sm EDISON April 8, 1982                                                Log No. K82-612 File: RR 2 (P-6-82-03)
Docket No. 50-346 License No. NPF-3 g
CD    Q Mr. Norman Haller, Director Office of Management and Program Analysis                              RECEIVED, U. S. Nuclear Regulatory Commission                              I                      h\
Washington, D. C. 20555                                          ;    MAY131982>      -
9'  11 R.113 1 M 311CW'838' )
 
==Dear Mr. Haller:==
55EM yM "
Monthly Operating Report, March, 1982      4                E Davis-Besse Nuclear Power Station              A      (A Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Statiot. Unit 1 for the month of March,1982.
Yours truly.
Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/BMS/ljk Enclosures cc:  Mr. James G. Keppler Regional Administrator, Region III Encl:  1 copy Mr. Richard DeYoung, Director Office of Inspection and Enforcement Encl: 2 copies f[M 6.II Mr. Luis Reyes NRC Resident Inspector Encl:  1 copy 8205140208 820408 PDR ADOCK 05000346 R                    pop THE TOLEDO EDISON COMPANY  EDISON PLAZA 300 MADISON AVENUE    TOLEDO. OHIO 43G52}}

Latest revision as of 16:37, 10 March 2020

Forwards Monthly Operating Rept for Mar 1982
ML20052F981
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/1982
From: Murray T
TOLEDO EDISON CO.
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20052F982 List:
References
K82-612, NUDOCS 8205140208
Download: ML20052F981 (1)


Text

,*

e' TOLEDO

%sm EDISON April 8, 1982 Log No. K82-612 File: RR 2 (P-6-82-03)

Docket No. 50-346 License No. NPF-3 g

CD Q Mr. Norman Haller, Director Office of Management and Program Analysis RECEIVED, U. S. Nuclear Regulatory Commission I h\

Washington, D. C. 20555  ; MAY131982> -

9' 11 R.113 1 M 311CW'838' )

Dear Mr. Haller:

55EM yM "

Monthly Operating Report, March, 1982 4 E Davis-Besse Nuclear Power Station A (A Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Statiot. Unit 1 for the month of March,1982.

Yours truly.

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/BMS/ljk Enclosures cc: Mr. James G. Keppler Regional Administrator, Region III Encl: 1 copy Mr. Richard DeYoung, Director Office of Inspection and Enforcement Encl: 2 copies f[M 6.II Mr. Luis Reyes NRC Resident Inspector Encl: 1 copy 8205140208 820408 PDR ADOCK 05000346 R pop THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43G52