ML19341B557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 21: Line 21:
Mr. 8. J. Youngolood, Chief                                                        _
Mr. 8. J. Youngolood, Chief                                                        _
Licensing Bran cn No. 1 Division of Licensing                                                        ,
Licensing Bran cn No. 1 Division of Licensing                                                        ,
                                                                                      .
U.S. Nuclear Regulatory Commission Washington, DC            20555 Suoj e ct :      LaSalle County Station Units 1 and 2 Environmental Tecnnical Specifications NRC Oc cxe t Nos. 50-373/374 R e f e r e n ce (1):      Final Environmental Statement, NUREG-0496; LaSalle County Station Units 1 anc 2
U.S. Nuclear Regulatory Commission Washington, DC            20555 Suoj e ct :      LaSalle County Station Units 1 and 2 Environmental Tecnnical Specifications NRC Oc cxe t Nos. 50-373/374 R e f e r e n ce (1):      Final Environmental Statement, NUREG-0496; LaSalle County Station Units 1 anc 2


Line 38: Line 37:
3 Mr. B. J. Youngbloco, Chief January 23, 1981                                                                                                            ,
3 Mr. B. J. Youngbloco, Chief January 23, 1981                                                                                                            ,
Page 2 4
Page 2 4
e vegetative cover has been established on the cooling pond dike which
e vegetative cover has been established on the cooling pond dike which l
  ,
,i            limits the rainfall runoff to a flow lower than preconstruction i              levels and inhibits oike erosion. The Armstrong                                    Run has been Since    the Armstrong cleaned and the banks reshaped and reseeded.
l
,i            limits the rainfall runoff to a flow lower than preconstruction i              levels and inhibits oike erosion. The Armstrong                                    Run has been Since    the Armstrong
;
cleaned and the banks reshaped and reseeded.
;
Run has oeen repaired and the erosive stresses reduced below preconstruction levels, we request relief from the run revegetation-monitoring requirement.
Run has oeen repaired and the erosive stresses reduced below preconstruction levels, we request relief from the run revegetation-monitoring requirement.
We also request that the quantitative dike vegetative. study be terminated based on the results of the three year study.                                                  We
We also request that the quantitative dike vegetative. study be terminated based on the results of the three year study.                                                  We woulo appreciate an answer to thir request within. two months of the date of this letter.
;'
woulo appreciate an answer to thir request within. two months of the date of this letter.
.
If you have any questions concerning this letter or the attachments, please address them to this of fice. As has been our practice with respect to Appendix A Te chnical Specifications, .two (2) copies of the attachments are submitted for your review. A copy.                                                        t 4              of these materials has also been forwarded to the Region III .Of fice
If you have any questions concerning this letter or the attachments, please address them to this of fice. As has been our practice with respect to Appendix A Te chnical Specifications, .two (2) copies of the attachments are submitted for your review. A copy.                                                        t 4              of these materials has also been forwarded to the Region III .Of fice
>              of Inspection and Enforcement.
>              of Inspection and Enforcement.
Very truly yours,
Very truly yours, 1                                                                  po                    s A                As '$ .      : :l,b L. O. DelGeorge
                                                                          ,
1                                                                  po                    s A                As '$ .      : :l,b
!
L. O. DelGeorge
!                                                                Nuclear Licensing Administrator -
!                                                                Nuclear Licensing Administrator -
i Attac.ments cc:          NRC Resident Inspector - LSCS (w/ att.)
i Attac.ments cc:          NRC Resident Inspector - LSCS (w/ att.)
,
i                            M. J. Oestmann - RIII (w/att.)
i                            M. J. Oestmann - RIII (w/att.)
R. Geckler - NRC Environmental
R. Geckler - NRC Environmental Engine 3 ring Branch) (w/stt.)
,
00228 i
Engine 3 ring Branch) (w/stt.)
t 1
!-
.
,
00228
!.
!
;
i t
1
    ._ - . -    - . . . . -      .  . - , .      . - - - . - -              .-              .      ,- .  -  . - . -          . . - . ,


ATTACHMENT 1 LaSalle County Nuclear Generating Station Units 1 and 2 Environmental Technical Specification (PROPOSE.0 )
ATTACHMENT 1 LaSalle County Nuclear Generating Station Units 1 and 2 Environmental Technical Specification (PROPOSE.0 )
l
l l
!
l
!
i i}}
i i}}

Latest revision as of 07:45, 18 February 2020

Forwards Proposed ETS (Nonradiological) for Facilities
ML19341B557
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/23/1981
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML19341B558 List:
References
0022B, 22B, NUDOCS 8102020517
Download: ML19341B557 (2)


Text

Comntnw: lth Edison ore Ers: Nateral Plaza Cmcago lii.nois Access Reply to: Post CMce Box 75?

Chicago. ! Lno s 60690 January 23, 1981  :

Mr. 8. J. Youngolood, Chief _

Licensing Bran cn No. 1 Division of Licensing ,

U.S. Nuclear Regulatory Commission Washington, DC 20555 Suoj e ct : LaSalle County Station Units 1 and 2 Environmental Tecnnical Specifications NRC Oc cxe t Nos. 50-373/374 R e f e r e n ce (1): Final Environmental Statement, NUREG-0496; LaSalle County Station Units 1 anc 2

Dear Mr. YoungDlooo:

Enclosed for your review are materials related to the environmental reviea of LaSalle County Station Units 1 and 2.

A t t a cnmen t I is the proposed Environmental Te chnical Specifications (ETS's - nonradiological) for our LaSalle County Nuclear Generating Station Units 1 ano 2. Tnese Environmental Technical Specification witn limited ex ception incorporate monitcring requirements either imposed as conditions of the construction permit or as put forth in the NRC'; Final Environmental Statement (Reference 1) . The ex ceptions concern aquatic monitoring, the cooling lake monitoring program with respect to pathogens ( Attachment 2) and monitoring the revegetation of the Armstrong Run ( Attachment 3). A t t a chment 3 also contains the results of the three-year quantitative dike vegetation study.

l Tne rationale for the aquatic monitoring provisions is the ASLAa's Yellow Creek decision as reflected in the recently issued Sequoia ETS's in which reference alone to the NPOES monitoring and reporting requirements fulfill the NRC's requirements.

The rationale for the pathogen monitoring program are in clud ed in Atta chment 2. Since the program is underway, we would appreciate a response to the changes as soon as posslDie (within two months of the date of this letter).

The rationale for mocifying the mnnitoring requirements for revegetation of the Armstrong Run as stated in 6.3.4 of the LSCS-FES is contained in At ta cnment 3. As stated therein, a (,o O l 5

^

610 2 o, o gg A

_- - . . - - _ . _ , . . . . . - _ . = . - . - . - . .

t a

3 Mr. B. J. Youngbloco, Chief January 23, 1981 ,

Page 2 4

e vegetative cover has been established on the cooling pond dike which l

,i limits the rainfall runoff to a flow lower than preconstruction i levels and inhibits oike erosion. The Armstrong Run has been Since the Armstrong cleaned and the banks reshaped and reseeded.

Run has oeen repaired and the erosive stresses reduced below preconstruction levels, we request relief from the run revegetation-monitoring requirement.

We also request that the quantitative dike vegetative. study be terminated based on the results of the three year study. We woulo appreciate an answer to thir request within. two months of the date of this letter.

If you have any questions concerning this letter or the attachments, please address them to this of fice. As has been our practice with respect to Appendix A Te chnical Specifications, .two (2) copies of the attachments are submitted for your review. A copy. t 4 of these materials has also been forwarded to the Region III .Of fice

> of Inspection and Enforcement.

Very truly yours, 1 po s A As '$ .  : :l,b L. O. DelGeorge

! Nuclear Licensing Administrator -

i Attac.ments cc: NRC Resident Inspector - LSCS (w/ att.)

i M. J. Oestmann - RIII (w/att.)

R. Geckler - NRC Environmental Engine 3 ring Branch) (w/stt.)

00228 i

t 1

ATTACHMENT 1 LaSalle County Nuclear Generating Station Units 1 and 2 Environmental Technical Specification (PROPOSE.0 )

l l

i i