ML17278A470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I REGULATO~INFO'TION DISTR I BUT ION STEM (R IDS)ACCESSION NBR: B511110262 DOC.DATE: 85/11/01 NOTARI ED: NO DOCKET 8 FAC IL: 50-397 WPPSS Nuclear Pro Jecti Unit 2>Washington Public Pore 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSENI G.C.Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION BUTLERI W.R.Licensing Branch 2  
{{#Wiki_filter:REGULATO~ INFO'TION I          DISTR I BUT   ION   STEM ( R IDS )
ACCESSION NBR: B511110262           DOC. DATE: 85/11/01       NOTARI ED: NO           DOCKET 8 FAC IL: 50-397   WPPSS   Nuclear Pro Jecti Unit 2> Washington Public Pore           05000397 AUTH. NAME             AUTHOR   AFFILIATION SORENSENI G. C.       Washington Public Power Supply System RECIP. NAME           RECIPIENT AFFILIATION BUTLERI W. R.             Licensing Branch 2


==SUBJECT:==
==SUBJECT:==
Forwards"CRDR'5 Emergency Procedure Functional Task Analgsis Summary Rept" 9~emergency operating proceduresi including Rev 1 to,Procedure 5.0.OI"Emergencu Procedure General Precautions.
Forwards   "CRDR '5 Emergency Procedure       Functional Task Analgsis   Summary Rept" 9~ emergency       operating proceduresi including Rev 1 to,Procedure       5. 0. OI "Emergencu Procedure General Precautions. "
" DISTRIBUTION CODE: AOOBD COPIEB RECEIVED: LTR+ENCL~BIIE: TITLE: OR/Licensing Submittal:
DISTRIBUTION CODE: AOOBD         COPIEB RECEIVED: LTR     +ENCL ~BIIE:
Supp I 1 to NUREQ-0737(Generic Ltr 82-33)NOTES QL: 12/20/83 05000397 REC IP IENT ID CODE/NAME NRR LB2 BC COPIES LTTR ENCL 7 7 RECIPIENT ID CODE/NAME COPIES LTTR ENCL , INTERNAL: ADM/LFMB NRR PAULSONI N NRR/DHFS/PSRB NRR/DL/QRB5 NRR/DSI/ICSB
TITLE: OR/Licensing Submittal: Supp I         1   to NUREQ-0737(Generic Ltr 82-33)
~l NRaj B ES EXTERNAL: 24X NRC PDR 1 0 1 1 2 2 5 5 1 1 1 1 1 1 IE/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR/DS I/CPB NRR/DSI/METH NRR/DS I/RSB RGN5 LPDR NSI C 3 3 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 TOTAL NUMBER OF CQP IES REQUIRED: LTTR 36 ENCL 35 I/0 V(h I'J"$I 6 Ih,'I''hQ t,'Q I'F I 1 t~j.~V W II<I" t V h J-"L II",'~I'"W, Y;Qy;::l.I>>.'l g,ll hw~~ltll'I),)II , II V h Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 ss~s~x02m ss>ioi PDR ADOCK 05000397 F PDR November 1, 1985 G02-85-758 Docket No.50-397 Director of Nuclear Reactor Regulation Attention:
NOTES                                                                                 05000397 QL: 12/20/83 REC IP IENT         COPIES            RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL       ID CODE/NAME         LTTR ENCL NRR LB2 BC                  7  7 INTERNAL: ADM/LFMB                     1  0      IE/DEPER/EPB              3      3 NRR PAULSONI N             1  1      NRR/DHFS/HFEB              5      5 NRR/DHFS/PSRB              2  2      NRR/DL/ORAB                1       1 NRR/DL/QRB5                5  5      NRR /DS I /CPB                     1 NRR/DSI/ICSB                1  1      NRR /DSI/METH             1      1
Mr.W.R.Butler, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
~l NRaj          B            1  1      NRR /DS I /RSB           1       1 ES                1   1     RGN5                      1       1 EXTERNAL: 24X                                      LPDR                      1       1 NRC PDR                                NSI C                      1       1 TOTAL NUMBER OF CQP IES REQUIRED: LTTR           36   ENCL       35


==Dear Mr.Butler:==
I
          /
0                                            V(
h I'J
                                                "    $    I 6                      Ih,'I ''hQ t,'Q I'F  I 1 t
    ~ j. ~
V W II                                                  < I" t
g,ll hw
                                                                ~~ltll h J-"L II
                                        ",'~  I'"W,  Y;Qy V                                                      'I), )
                                                  ;::l .I >>. 'l II
                                                                    , II V
h
 
Washington Public Power Supply System P.O. Box 968  3000 George Washington Way Richland, Washington 99352  (509) 372-5000 ss~s~x02m ss>ioi05000397 PDR    ADOCK F                    PDR November    1, 1985 G02-85-758 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. W. R. Butler, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.      20555
 
==Dear Mr. Butler:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)
NUCLEAR PLANT NO. 2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)


==SUMMARY==
==SUMMARY==
REPORT, SUBMITTAL OF Licensing Condition (16)Attachment 2, Requirement 1, to the WNP-2 Operating License, requires submittal of a Detailed Control Room Design Review (DCRDR)Summary Report,"not later than six months prior to the first refueling outage".Accordingly, the attached report is submitted.
REPORT, SUBMITTAL OF Licensing Condition (16) Attachment 2, Requirement 1, to the WNP-2 Operating License, requires submittal of a Detailed Control Room Design Review (DCRDR)
Copies of the WNP-2 Emergency Operating Procedures (EOPs)that were utilized in the preparation of this report have been included as an additional attach-ment (No.2).With this submittal, the Supply System considers Licensing Condition (16}Attachment 2, Requirement 1, to be satisfied.
Summary Report, "not later than six months prior to the first refueling outage".
Should you have any further questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.
Accordingly, the attached report is submitted.
Very truly yours, G.C.S ensen, Manager Regulatory Programs PLP kit Attachments (2}cc: RC Barr-BPA JO Bradfute-NRC JB Martin-NRC RV E.Revell-BPA AD Toth-NRC Site NS Reynolds-BLCP8R y0@~t b J~I'}}
Copies   of the   WNP-2 Emergency   Operating Procedures (EOPs) that were utilized in the preparation of this report have been included as an additional attach-ment (No. 2). With this submittal, the Supply System considers Licensing Condition (16} Attachment 2, Requirement 1, to be satisfied.
Should you have any     further questions, please contact       Mr. P. L. Powell, Manager, WNP-2 Licensing.
Very truly yours, G. C. S     ensen, Manager Regulatory Programs PLP kit Attachments     (2}
cc:   RC Barr       - BPA JO Bradfute   - NRC JB Martin     - NRC RV E. Revell     - BPA AD Toth       - NRC Site                             y0@~
BLCP8R                                    t b NS  Reynolds
 
J~
I'}}

Latest revision as of 07:29, 4 February 2020

Forwards Crdr & Emergency Procedure Functional Task Analysis Summary Rept & Emergency Operating Procedures, Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions.
ML17278A470
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/01/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML17278A471 List:
References
GO2-85-758, NUDOCS 8511110262
Download: ML17278A470 (4)


Text

REGULATO~ INFO'TION I DISTR I BUT ION STEM ( R IDS )

ACCESSION NBR: B511110262 DOC. DATE: 85/11/01 NOTARI ED: NO DOCKET 8 FAC IL: 50-397 WPPSS Nuclear Pro Jecti Unit 2> Washington Public Pore 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSENI G. C. Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION BUTLERI W. R. Licensing Branch 2

SUBJECT:

Forwards "CRDR '5 Emergency Procedure Functional Task Analgsis Summary Rept" 9~ emergency operating proceduresi including Rev 1 to,Procedure 5. 0. OI "Emergencu Procedure General Precautions. "

DISTRIBUTION CODE: AOOBD COPIEB RECEIVED: LTR +ENCL ~BIIE:

TITLE: OR/Licensing Submittal: Supp I 1 to NUREQ-0737(Generic Ltr 82-33)

NOTES 05000397 QL: 12/20/83 REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR LB2 BC 7 7 INTERNAL: ADM/LFMB 1 0 IE/DEPER/EPB 3 3 NRR PAULSONI N 1 1 NRR/DHFS/HFEB 5 5 NRR/DHFS/PSRB 2 2 NRR/DL/ORAB 1 1 NRR/DL/QRB5 5 5 NRR /DS I /CPB 1 NRR/DSI/ICSB 1 1 NRR /DSI/METH 1 1

~l NRaj B 1 1 NRR /DS I /RSB 1 1 ES 1 1 RGN5 1 1 EXTERNAL: 24X LPDR 1 1 NRC PDR NSI C 1 1 TOTAL NUMBER OF CQP IES REQUIRED: LTTR 36 ENCL 35

I

/

0 V(

h I'J

" $ I 6 Ih,'I hQ t,'Q I'F I 1 t

~ j. ~

V W II < I" t

g,ll hw

~~ltll h J-"L II

",'~ I'"W, Y;Qy V 'I), )

l .I >>. 'l II

, II V

h

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 ss~s~x02m ss>ioi05000397 PDR ADOCK F PDR November 1, 1985 G02-85-758 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. W. R. Butler, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Butler:

Subject:

NUCLEAR PLANT NO. 2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)

SUMMARY

REPORT, SUBMITTAL OF Licensing Condition (16) Attachment 2, Requirement 1, to the WNP-2 Operating License, requires submittal of a Detailed Control Room Design Review (DCRDR)

Summary Report, "not later than six months prior to the first refueling outage".

Accordingly, the attached report is submitted.

Copies of the WNP-2 Emergency Operating Procedures (EOPs) that were utilized in the preparation of this report have been included as an additional attach-ment (No. 2). With this submittal, the Supply System considers Licensing Condition (16} Attachment 2, Requirement 1, to be satisfied.

Should you have any further questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. S ensen, Manager Regulatory Programs PLP kit Attachments (2}

cc: RC Barr - BPA JO Bradfute - NRC JB Martin - NRC RV E. Revell - BPA AD Toth - NRC Site y0@~

BLCP8R t b NS Reynolds

J~

I'