{{#Wiki_filter:ge CELERATED DISTRIBUTION DEMONSTRATION SYSTEM REoozaTog zNzoamTzoN ozsTRzaoTzoN esTzm{Rzos)'ACCESSION NBR:8901190116 DOC.DATE: 89/01/06 NOTARIZED:
{{#Wiki_filter:ge CELERATED           DISTRIBUTION         DEMONSTRATION SYSTEM REoozaTog zNzoamTzoN ozsTRzaoTzoN esTzm {Rzos)
NO DOCKET N FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
ACCESSION NBR:8901190116           DOC.DATE: 89/01/06     NOTARIZED: NO         DOCKET N FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION SORENSEN,G.C.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Provides quarterly rept re installation of fully qualified neutron flux monitoring instrumentation sys.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR (ENCL 0 SIZE: TITLE: OR Submittal:
Provides quarterly rept re installation of fully qualified neutron flux monitoring instrumentation sys.
General Distribution NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB ll OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 6 1 1 1 1 II 1 RECIPIENT ID CODE/NAME PD5 PD ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL NOTE'IO ALL i RIDSzz RECIPXEPIS PIZASE HELP US IO RZZQCE HASTE!CXRKKCT THE DOCUMÃZ CONSOL DESK, ROCN P1-37 (EXT.20079)m EZZMZKQZ YOUR MHE Hm DIPIVGBUTIGN LISTS FOR DOCllMENTS YOU DONiT NEED)0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 January 6, 1989 G02-89"004 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: A001D         COPIES RECEIVED:LTR     ( ENCL   0 SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT             COPIES          RECIPIENT        COPIES ID CODE/NAME          LTTR ENCL      ID CODE/NAME     LTTR ENCL PD5 LA                               PD5 PD SAMWORTH,R INTERNAL: ACRS                         6          ARM/DAF/LFMB NRR/DEST/ADS 7E           1          NRR/DEST/CEB 8H NRR/DEST/ESB 8D           1          NRR/DEST/MTB 9H NRR/DEST/SICB NRR/DEST/RSB 8E NRR/DOEA/TSB OGC/HDS2 ll      1 1
II NUDOCS-ABSTRACT RES/DSIR/EIB               1 EXTERNAL: LPDR                                   NRC PDR NSIC NOTE 'IO ALL i RIDSzz RECIPXEPIS PIZASE HELP US IO RZZQCE HASTE! CXRKKCT THE DOCUMÃZ CONSOL DESK, ROCN P1-37 (EXT. 20079) m EZZMZKQZ YOUR MHE Hm DIPIVGBUTIGN LISTS FOR DOCllMENTS YOU DONiT NEED) 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR           25   ENCL
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968   ~ 3000 George Washington Way ~ Richland, Washington 99352 January 6, 1989 G02-89"004 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:


==Subject:==
==Subject:==
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF"21 LICENSE CONDITION 2.C.(16), ATTACHMENT 2 ITEM 3(b) WIDE RANGE NEUTRON MONITOR,


==Reference:==
==Reference:==
: 1)    Letter,  R8  Samworth (NRC)  to  GC  Sorensen  (SS)
                        "Issuance of Amendment No. 60 to Facility Operating License No. NPF-21 WPPSS Nuclear, Project No. 2 (TAC No. 66889)", dated June 10, 1988
: 2)    Letter,, G02-88-167, GC Sorensen (SS) to        NRC, same subject, dated July 29, 1988
: 3)    Letter, G02-88-213,    GC  Sorensen    (SS) to  NRC,
                      ~
same  subject, dated October-6;      1988 In Reference 1) the Supply System was required                to report to the NRC on the status  of the subject monitor by July 29, 1988            and  quarterly thereafter. The purpose was to report actions taken to ensure                the installation of a fully qualified neutron flux monitoring instrumentation            system to be completed at the earliest possible date. In References 2) and 3)            the Supply System provided the initial  and  first    quarterly reports.      The purpose    of this letter is to provide the next quarterly report as required.
During the last quarter the Supply System received a number of test reports from Gamma-Metrics.          These test reports are presently being reviewed by the Supply System staff. There is a possibility that some additional testing may be required on the amplifier, located in secondary containment.                This may delay the Supply System's final acceptance of the Wide Range Neutron Monitor system beyond the present commitment date.            The final results of this review will be discussed in our next quarterly report.
8901i90ii6 890i06 PDR oo(
ADQCK    05000397 R                      PNU                                                    Iy
Page Two LICENSE CONDITION 2.C(16), ATIACHMENT 2 ITEM 3(b) WIDE RANGE NEUTRON MONITOR During the next quarter the Supply System's efforts will also be focused on preparation of the necessary in-house test procedures/instructions that must be performed to confirm the acceptability of the Wide Range Neutron Monitoring equipment installed at WNP-2.      The next required quarterly report will be submitted by April 7, 1989.
Very tr,uly your.s, G. C. S  .ensen, Manager, Regulatory Programs HLA/bk cc:  JB  Martin -  NRC RV NS  Reynolds  - BCP8R RB  Samworth  NRC DL Williams  BPA/399 NRC  Site Inspector, - 901A


NUCLEAR PLANT NO.2 OPERATING LICENSE NPF"21 LICENSE CONDITION 2.C.(16), ATTACHMENT 2 ITEM 3(b)WIDE RANGE NEUTRON MONITOR, 1)Letter, R8 Samworth (NRC)to GC Sorensen (SS)"Issuance of Amendment No.60 to Facility Operating License No.NPF-21 WPPSS Nuclear, Project No.2 (TAC No.66889)", dated June 10, 1988 2)Letter,, G02-88-167, GC Sorensen (SS)to NRC, same subject, dated July 29, 1988 3)Letter, G02-88-213, GC Sorensen (SS)to NRC,~same subject, dated October-6; 1988 In Reference 1)the Supply System was required to report to the NRC on the status of the subject monitor by July 29, 1988 and quarterly thereafter.
p 1
The purpose was to report actions taken to ensure the installation of a fully qualified neutron flux monitoring instrumentation system to be completed at the earliest possible date.In References 2)and 3)the Supply System provided the initial and first quarterly reports.The purpose of this letter is to provide the next quarterly report as required.During the last quarter the Supply System received a number of test reports from Gamma-Metrics.
'1}}
These test reports are presently being reviewed by the Supply System staff.There is a possibility that some additional testing may be required on the amplifier, located in secondary containment.
This may delay the Supply System's final acceptance of the Wide Range Neutron Monitor system beyond the present commitment date.The final results of this review will be discussed in our next quarterly report.8901i90ii6 890i06 PDR ADQCK 05000397 R PNU oo(Iy Page Two LICENSE CONDITION 2.C(16), ATIACHMENT 2 ITEM 3(b)WIDE RANGE NEUTRON MONITOR During the next quarter the Supply System's efforts will also be focused on preparation of the necessary in-house test procedures/instructions that must be performed to confirm the acceptability of the Wide Range Neutron Monitoring equipment installed at WNP-2.The next required quarterly report will be submitted by April 7, 1989.Very tr,uly your.s, G.C.S.ensen, Manager, Regulatory Programs HLA/bk cc: JB Martin-NRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector,-901A p 1'1}}

Latest revision as of 08:05, 4 February 2020

Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 890407
ML17285A189
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/06/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-89-004, GO2-89-4, TAC-63934, TAC-66889, NUDOCS 8901190116
Download: ML17285A189 (4)


Text

ge CELERATED DISTRIBUTION DEMONSTRATION SYSTEM REoozaTog zNzoamTzoN ozsTRzaoTzoN esTzm {Rzos)

ACCESSION NBR:8901190116 DOC.DATE: 89/01/06 NOTARIZED: NO DOCKET N FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides quarterly rept re installation of fully qualified neutron flux monitoring instrumentation sys.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ( ENCL 0 SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD SAMWORTH,R INTERNAL: ACRS 6 ARM/DAF/LFMB NRR/DEST/ADS 7E 1 NRR/DEST/CEB 8H NRR/DEST/ESB 8D 1 NRR/DEST/MTB 9H NRR/DEST/SICB NRR/DEST/RSB 8E NRR/DOEA/TSB OGC/HDS2 ll 1 1

II NUDOCS-ABSTRACT RES/DSIR/EIB 1 EXTERNAL: LPDR NRC PDR NSIC NOTE 'IO ALL i RIDSzz RECIPXEPIS PIZASE HELP US IO RZZQCE HASTE! CXRKKCT THE DOCUMÃZ CONSOL DESK, ROCN P1-37 (EXT. 20079) m EZZMZKQZ YOUR MHE Hm DIPIVGBUTIGN LISTS FOR DOCllMENTS YOU DONiT NEED) 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 January 6, 1989 G02-89"004 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF"21 LICENSE CONDITION 2.C.(16), ATTACHMENT 2 ITEM 3(b) WIDE RANGE NEUTRON MONITOR,

Reference:

1) Letter, R8 Samworth (NRC) to GC Sorensen (SS)

"Issuance of Amendment No. 60 to Facility Operating License No. NPF-21 WPPSS Nuclear, Project No. 2 (TAC No. 66889)", dated June 10, 1988

2) Letter,, G02-88-167, GC Sorensen (SS) to NRC, same subject, dated July 29, 1988
3) Letter, G02-88-213, GC Sorensen (SS) to NRC,

~

same subject, dated October-6; 1988 In Reference 1) the Supply System was required to report to the NRC on the status of the subject monitor by July 29, 1988 and quarterly thereafter. The purpose was to report actions taken to ensure the installation of a fully qualified neutron flux monitoring instrumentation system to be completed at the earliest possible date. In References 2) and 3) the Supply System provided the initial and first quarterly reports. The purpose of this letter is to provide the next quarterly report as required.

During the last quarter the Supply System received a number of test reports from Gamma-Metrics. These test reports are presently being reviewed by the Supply System staff. There is a possibility that some additional testing may be required on the amplifier, located in secondary containment. This may delay the Supply System's final acceptance of the Wide Range Neutron Monitor system beyond the present commitment date. The final results of this review will be discussed in our next quarterly report.

8901i90ii6 890i06 PDR oo(

ADQCK 05000397 R PNU Iy

Page Two LICENSE CONDITION 2.C(16), ATIACHMENT 2 ITEM 3(b) WIDE RANGE NEUTRON MONITOR During the next quarter the Supply System's efforts will also be focused on preparation of the necessary in-house test procedures/instructions that must be performed to confirm the acceptability of the Wide Range Neutron Monitoring equipment installed at WNP-2. The next required quarterly report will be submitted by April 7, 1989.

Very tr,uly your.s, G. C. S .ensen, Manager, Regulatory Programs HLA/bk cc: JB Martin - NRC RV NS Reynolds - BCP8R RB Samworth NRC DL Williams BPA/399 NRC Site Inspector, - 901A