| issue date = 08/29/1989
| issue date = 08/29/1989
| title = Responds to NRC 890802 Ltr Re Violations Noted in Insp Rept 50-397/89-20.Corrective Action:Memo Placed in Training Audit File Notifying Lead Auditor to Include Listed Depts in Future Audits
| title = Responds to NRC 890802 Ltr Re Violations Noted in Insp Rept 50-397/89-20.Corrective Action:Memo Placed in Training Audit File Notifying Lead Auditor to Include Listed Depts in Future Audits
| author name = BOUCHEY G D
| author name = Bouchey G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000397/1989020]]


=Text=
=Text=
{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED             DISCI'RIBUTION         DEMONSTRATION             SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISCI'RIBUTION
ESSION NBR:8909050327           DOC.DATE:   89/08/29 NOTARIZED: NO               DOCKET ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public                 Powe 05000397 AUTH. NAME           'UTHOR AFFILIATION.
DEMONSTRATION
  ,BOUCHEY,G.D.           Washington Public Power Supply System RECIP.NAME       "
SYSTEM REGULATORY
RECIPIENT AFFILIATION Document Control Branch (Document       Control Desk)
INFORMATION
 
DISTRIBUTION
==SUBJECT:==
SYSTEM (RIDS)ESSION NBR:8909050327
Responds 50-397/89-20.
DOC.DATE: 89/08/29 NOTARIZED:
to NRC 890802   ltr re violations noted in Insp Rept DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR gITLE: General (50 Dkt)-Insp.Rept/Notice of Vi Llation ENCL        SIZE:
NO'DOCKET ACIL:50-397
esponse D
WPPSS Nuclear Project, Unit 2, Washington
NOTES:
Public Powe 05000397 AUTH.NAME'UTHOR AFFILIATION.,BOUCHEY,G.D.
RECIPIENT          COPIES            RECIPIENT           COPIES ID CODE/NAME        LTTR ENCL      ID  CODE/NAME         LTTR ENCL
Washington
          'D5   PD                 1      1    SAMWORTH,R              1        1 INTERNAL: ACRS                       2      2    AEOD                    1        1 AEOD/DEIIB             .1      1    AEOD/TPAD                1 1
Public Power Supply System RECIP.NAME
DEDRO                   1      1    LOIS,ERASMIA            1 NRR SHANKMAN,S           1      1    NRR/DEST DIR            1  .
" RECIPIENT AFFILIATION
1 NRR/DLPQ/PEB             1      1    NRR/DOEA DIR 11  .      1        1 NRR/DREP/EPB 10          1      1    NRR/DREP/RPB 10          2        2
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 890802 ltr re violations
            'NRR/PMAS/ILRB12         1      1    NUDOCS-ABSTRACT          1        1 OE LIEBERMAN,J           1     1     OGC/HDS2                1       1 FIL        02      1     1     RES MORISSEAU,D         1       1 GN        ILE 01        1   ~
noted in Insp Rept 50-397/89-20.
1 EXTERNAL: LPDR                        1     1     NRC PDR                  1       1 NSIC                    1     1 h
DISTRIBUTION
OTAL NUMBER OF COPIES REQUIRED: LTTR           26   ENCL   26
CODE: IE01D COPIES RECEIVED:LTR
 
L ENCL SIZE: gITLE: General (50 Dkt)-Insp.Rept/Notice
ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 August 29, 1989 G02-89-146 Docket No. 50-397 U.S. -Nuclear Regulatory Commission Attn:   Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:
of Vi lation esponse NOTES: D RECIPIENT IDCODE/NAME
 
'D5 PD INTERNAL: ACRS AEOD/DEIIB
==Subject:==
DEDRO NRR SHANKMAN,S
NUCLEAR PLANT NO- 2 LICENSE NO. NPF-21 NRC INSPECTION REPORT 89"20 RESPONSE TO NOTICE OF VIOLATION The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated August 2, 1989. Our reply, pursuant to the provisions of Section 2.201-, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached).
NRR/DLPQ/PEB
In Appendix A, the violation is addressed with an explanation of our position regarding validity, corrective action and date of full compliance.
NRR/DREP/EPB
Very truly yours, i
10'NRR/PMAS/ILRB12
        ~ C/~
OE LIEBERMAN,J
goal.
FIL 02 GN ILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1~1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R
G. D. Bouchey, Director Licensing   & Assurance JDA/bk Attachments cc:   JB Martin -   NRC RV NS Reynolds   - BCP8R RB Samworth -   NRC DL Williams -   BPA/399 NRC Site Inspector -     901A
AEOD AEOD/TPAD LOIS,ERASMIA
                                                              <C~l
NRR/DEST DIR NRR/DOEA DIR 11.NRR/DREP/RPB
 
10 NUDOCS-ABSTRACT
APPENDIX A During an NRC inspection conducted on July 10 - 14,         1989, two violations of NRC requirements were identified.           In accordance with   the "General Statement of Policy and Procedure for NRC Enforcement Actions,"           10 CFR Part 2, Appendix C, (1988), as modified by 53 Fed. Reg. 40019 (October           13, 1988), the violation is listed below:
OGC/HDS2 RES MORISSEAU,D
A. Technical     Specification     6.5. 2,   Cor orate Nuclear Safet   Review Board, states in part:
NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1'1.1 1 1 2 2 1 1 1 1 1 1 1 1 h OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26  
            "Audits of unit activities shall be performed under the cognizance of the   CNSRB. These audits shall encompass:
ti WASHINGTON
: b. The performance,     training and qualifications   of the entire unit staff at least   once per 12 months."
PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington
Contrary to the above, as o'f July 10, 1989, an audit of the performance, training and qualifications of the entire unit staff had not been conduc-ted for a period of 21 months, in that Equipment Operators were excluded as part of the regularly scheduled audit of 1988, having specifi-'ally been last reported as audited on October 9, 1987.
Way~Richland, Washington
This is   a Severity Level IV violation (Supplement VII).
99352 August 29, 1989 G02-89-146
Validit of Violation The Supply System acknowledges         the validity of this violation. The reason for the violation is that, during the audit, the team leader made the decision to concentrate efforts on the review of licensed operations personnel and outage personnel, and not review non-licensed operations personnel.     This decision was based upon the knowledge that previous audits have found that equipment operators were properly trained and qualified.
Docket No.50-397 U.S.-Nuclear Regulatory
The plan   for Audit   88-453 was developed to include a sampling of members from each department of the unit staff.                 The scope included Health Physics/Chemistry, Maintenance, Plant Technical (Shift Technical Advisors) and Operations     (licensed and non-licensed). Also included for review, were Nondestructive     Examination and Inspection personnel, and non-Supply System outage   craft   personnel.     These two, latter groups are not defined as members   of the unit staff.
Commission
 
Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
Appendix A Page 2= of 2 Corrective Ste   s Taken/Results Achieved
Subject: NUCLEAR PLANT NO-2 LICENSE NO.NPF-21 NRC INSPECTION
: 1)   A 100K review of the training, qualification and performance records for all Equipment Operators (EOs) was conducted on July 17 18, 1989 and no -discrepancies were noted.     Records show that at least five EOs are assigned to each shift that are certified to perform the duties of a Reactor Building/Radwaste Operator and Radwaste Control Room Operator. Currently, 29 EOs are fully certified for these two areas.
REPORT 89"20 RESPONSE TO NOTICE OF VIOLATION The Washington
Records also show that the same EOs were certified at the time Audit 884 53 was performed in September, 1988.
Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated August 2, 1989.Our reply, pursuant to the provisions
: 2)   A memo   has   been   placed in the training audit file notifying the lead auditor to include the following departments in future audits:
of Section 2.201-, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached).
a)   Maintenance (Mechanical,     Electrical and Instrument and Controls) b)    Health Physics/Chemistry     (including HP/Chem Support) c)    Operations (Licensed and Non-Licensed personnel) d)    Plant Technical (all disciplines, including Shift Technical Advisors)
In Appendix A, the violation is addressed with an explanation
Corrective Action to     be Taken No further corrective action is planned.
of our position regarding validity, corrective
Date of Full   Com   liance The Supply System     is currently in full compliance.}}
action and date of full compliance.
Very truly yours, i~goal.C/~G.D.Bouchey, Director Licensing&Assurance JDA/bk Attachments
cc: JB Martin-NRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A<C~l  
APPENDIX A During an NRC inspection
conducted on July 10-14, 1989, two violations
of NRC requirements
were identified.
In accordance
with the"General Statement of Policy and Procedure for NRC Enforcement
Actions," 10 CFR Part 2, Appendix C, (1988), as modified by 53 Fed.Reg.40019 (October 13, 1988), the violation is listed below: A.Technical Specification
6.5.2, Cor orate Nuclear Safet Review Board, states in part: "Audits of unit activities
shall be performed under the cognizance
of the CNSRB.These audits shall encompass:
b.The performance, training and qualifications
of the entire unit staff at least once per 12 months." Contrary to the above, as o'f July 10, 1989, an audit of the performance, training and qualifications
of the entire unit staff had not been conduc-ted for a period of 21 months, in that Equipment Operators were specifi-'ally
excluded as part of the regularly scheduled audit of 1988, having been last reported as audited on October 9, 1987.This is a Severity Level IV violation (Supplement
VII).Validit of Violation The Supply System acknowledges
the validity of this violation.
The reason for the violation is that, during the audit, the team leader made the decision to concentrate
efforts on the review of licensed operations
personnel and outage personnel, and not review non-licensed
operations
personnel.
This decision was based upon the knowledge that previous audits have found that equipment operators were properly trained and qualified.
The plan for Audit 88-453 was developed to include a sampling of members from each department
of the unit staff.The scope included Health Physics/Chemistry, Maintenance, Plant Technical (Shift Technical Advisors)and Operations (licensed and non-licensed).
Also included for review, were Nondestructive
Examination
and Inspection
personnel, and non-Supply
System outage craft personnel.
These two, latter groups are not defined as members of the unit staff.  
Appendix A Page 2=of 2 Corrective
Ste s Taken/Results
Achieved 1)A 100K review of the training, qualification
and performance
records for all Equipment Operators (EOs)was conducted on July 17-18, 1989 and no-discrepancies
were noted.Records show that at least five EOs are assigned to each shift that are certified to perform the duties of a Reactor Building/Radwaste
Operator and Radwaste Control Room Operator.Currently, 29 EOs are fully certified for these two areas.-Records also show that the same EOs were certified at the time Audit 884 53 was performed in September, 1988.2)A memo has been placed in the training audit file notifying the lead auditor to include the following departments
in future audits: a)b)c)d)Maintenance (Mechanical, Electrical
and Instrument
and Controls)Health Physics/Chemistry (including
HP/Chem Support)Operations (Licensed and Non-Licensed
personnel)
Plant Technical (all disciplines, including Shift Technical Advisors)Corrective
Action to be Taken No further corrective
action is planned.Date of Full Com liance The Supply System is currently in full compliance.
}}

Latest revision as of 07:59, 4 February 2020

Responds to NRC 890802 Ltr Re Violations Noted in Insp Rept 50-397/89-20.Corrective Action:Memo Placed in Training Audit File Notifying Lead Auditor to Include Listed Depts in Future Audits
ML17285A701
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/29/1989
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-146, NUDOCS 8909050327
Download: ML17285A701 (4)


Text

ACCELERATED DISCI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8909050327 DOC.DATE: 89/08/29 NOTARIZED: NO DOCKET ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME 'UTHOR AFFILIATION.

,BOUCHEY,G.D. Washington Public Power Supply System RECIP.NAME "

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds 50-397/89-20.

to NRC 890802 ltr re violations noted in Insp Rept DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR gITLE: General (50 Dkt)-Insp.Rept/Notice of Vi Llation ENCL SIZE:

esponse D

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

'D5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 2 2 AEOD 1 1 AEOD/DEIIB .1 1 AEOD/TPAD 1 1

DEDRO 1 1 LOIS,ERASMIA 1 NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 .

1 NRR/DLPQ/PEB 1 1 NRR/DOEA DIR 11 . 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2

'NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE LIEBERMAN,J 1 1 OGC/HDS2 1 1 FIL 02 1 1 RES MORISSEAU,D 1 1 GN ILE 01 1 ~

1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 h

OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 August 29, 1989 G02-89-146 Docket No. 50-397 U.S. -Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO- 2 LICENSE NO. NPF-21 NRC INSPECTION REPORT 89"20 RESPONSE TO NOTICE OF VIOLATION The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated August 2, 1989. Our reply, pursuant to the provisions of Section 2.201-, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached).

In Appendix A, the violation is addressed with an explanation of our position regarding validity, corrective action and date of full compliance.

Very truly yours, i

~ C/~

goal.

G. D. Bouchey, Director Licensing & Assurance JDA/bk Attachments cc: JB Martin - NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A

<C~l

APPENDIX A During an NRC inspection conducted on July 10 - 14, 1989, two violations of NRC requirements were identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, (1988), as modified by 53 Fed. Reg. 40019 (October 13, 1988), the violation is listed below:

A. Technical Specification 6.5. 2, Cor orate Nuclear Safet Review Board, states in part:

"Audits of unit activities shall be performed under the cognizance of the CNSRB. These audits shall encompass:

b. The performance, training and qualifications of the entire unit staff at least once per 12 months."

Contrary to the above, as o'f July 10, 1989, an audit of the performance, training and qualifications of the entire unit staff had not been conduc-ted for a period of 21 months, in that Equipment Operators were excluded as part of the regularly scheduled audit of 1988, having specifi-'ally been last reported as audited on October 9, 1987.

This is a Severity Level IV violation (Supplement VII).

Validit of Violation The Supply System acknowledges the validity of this violation. The reason for the violation is that, during the audit, the team leader made the decision to concentrate efforts on the review of licensed operations personnel and outage personnel, and not review non-licensed operations personnel. This decision was based upon the knowledge that previous audits have found that equipment operators were properly trained and qualified.

The plan for Audit 88-453 was developed to include a sampling of members from each department of the unit staff. The scope included Health Physics/Chemistry, Maintenance, Plant Technical (Shift Technical Advisors) and Operations (licensed and non-licensed). Also included for review, were Nondestructive Examination and Inspection personnel, and non-Supply System outage craft personnel. These two, latter groups are not defined as members of the unit staff.

Appendix A Page 2= of 2 Corrective Ste s Taken/Results Achieved

1) A 100K review of the training, qualification and performance records for all Equipment Operators (EOs) was conducted on July 17 18, 1989 and no -discrepancies were noted. Records show that at least five EOs are assigned to each shift that are certified to perform the duties of a Reactor Building/Radwaste Operator and Radwaste Control Room Operator. Currently, 29 EOs are fully certified for these two areas.

Records also show that the same EOs were certified at the time Audit 884 53 was performed in September, 1988.

2) A memo has been placed in the training audit file notifying the lead auditor to include the following departments in future audits:

a) Maintenance (Mechanical, Electrical and Instrument and Controls) b) Health Physics/Chemistry (including HP/Chem Support) c) Operations (Licensed and Non-Licensed personnel) d) Plant Technical (all disciplines, including Shift Technical Advisors)

Corrective Action to be Taken No further corrective action is planned.

Date of Full Com liance The Supply System is currently in full compliance.