{{#Wiki_filter:ACCELERATED D UTION DEMONS ION SYSTEM S A REGULATORY INEORMATION DISTRIBUTION SYSTEM (RIDS)~p ACCESSION NBR:9003290244 DOC.DATE: 90/03/21 NOTARIZED:
{{#Wiki_filter:ACCELERATED D                           UTION DEMONS                 ION SYSTEM S
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
A REGULATORY INEORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
                                  ~p ACCESSION NBR:9003290244               DOC.DATE: 90/03/21     NOTARIZED: NO         DOCKET FACIL:50-397     WPPSS   Nuclear Project, Unit 2, Washington Public Powe             05000397 AUTH. NAME           AUTHOR AFFILIATION SORENSEN,G.C.         Washington Public Power Supply System RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Applies for amend to TS Table 4.3.6-1, SRM/IRM Detector Not-Full-In Functional Test." DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR Q ENCL t SIZE:~+W TITLE: OR Submittal:
Applies for amend to TS Table 4.3.6-1, SRM/IRM Detector Not-Full-In Functional Test."
General Distribution NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SELB SD NRR/DST/SRXB SE OC L G F 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 6 6 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/ECMB 9H NRR/DST SE2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: AOOID             COPIES RECEIVED:LTR     Q ENCL   t   SIZE: ~ +W TITLE: OR   Submittal: General Distribution NOTES:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25 WASHINGTON PUBLIC POWER SUPPLY SYSTEM F.O.Box 968~3000 George Washington Way~Richland, Washington 9935Z Docket No.50-397 March 21, 1990 G02-90-058 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT                COPIES            RECIPIENT         COPIES ID CODE/NAME             LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD5 LA                         1    1      PD5 PD                1    1 SAMWORTH,R                     5    5 INTERNAL: ACRS                           6    6      NRR/DET/ECMB 9H        1    1 NRR/DOEA/OTSB11               1    1      NRR/DST      SE2      1    1 NRR/DST/SELB SD               1    1      NRR/DST/SICB 7E        1     1 NRR/DST/SRXB SE                1    1      NUDOCS-ABSTRACT       1    1 OC  L                        1    0      OGC/HDS2               1    0 G F            01        1    1      RES/DSIR/EIB           1     1 EXTERNAL: LPDR                            1     1     NRC PDR                1     1 NSIC                          1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 27   ENCL   25
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM F.O. Box 968 ~ 3000 George Washington Way   ~ Richland, Washington 9935Z March 21, 1990 G02-90-058 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D.C.     20555 Gentlemen:


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION TABLE 4.3.6-1, SRH/IRH DETECTOR NOT-FULL-IN FUNCTIONAL TEST%PROPOSED BASES  
NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION TABLE 4.3.6-1, SRH/IRH DETECTOR NOT-FULL-IN FUNCTIONAL TEST% PROPOSED BASES


==Reference:==
==Reference:==
 
Letter, G02-89-214,     GC Sorensen   (SS) to NRC, same subject, dated   November 29, 1989 The reference requested a change to the subject functional test when in operation condition 5. The request proposed that with adequate compensatory actions, the subject test could be deferred for a 92 day period. In order to perform the subject test the SRH/IRH cabling must be laid out throughout the under core region as it would be during plant operation. The present weekly test creates an unnecessary burden in that during an outage, when in operational condition 5, a significant amount of work is planned for this same area. In order to avoid excessive damage to the cables, with workers in the area, the cables are tied up into the overhead.       As stated in the reference, the weekly testing requires the cables to be untied, laid out, rolled-up and retied on a weekly frequency, This perturbs the cables, causes unnecessary radiation exposure during the weekly untie/retie, and stops work in the area during cable manipulation. As a result the Supply System proposed compensatory hction, in the reference, to avoid this situation.
Letter, G02-89-214, GC Sorensen (SS)to NRC, same subject, dated November 29, 1989 The reference requested a change to the subject functional test when in operation condition 5.The request proposed that with adequate compensatory actions, the subject test could be deferred for a 92 day period.In order to perform the subject test the SRH/IRH cabling must be laid out throughout the under core region as it would be during plant operation.
In recent discussions between Messrs R. Samworth (NRR) and P. Powell (SS) with regard to the bases for this section         it was recognized that a description, in the bases, of the conditions for the special test exception would be beneficial.
The present weekly test creates an unnecessary burden in that during an outage, when in operational condition 5, a significant amount of work is planned for this same area.In order to avoid excessive damage to the cables, with workers in the area, the cables are tied up into the overhead.As stated in the reference, the weekly testing requires the cables to be untied, laid out, rolled-up and retied on a weekly frequency, This perturbs the cables, causes unnecessary radiation exposure during the weekly untie/retie, and stops work in the area during cable manipulation.
Accordingly, the attached bases change is provided by the Supply System to describe the 'special circumstances pertaining to this test exception.
As a result the Supply System proposed compensatory hction, in the reference, to avoid this situation.
  ~>o Very  truly yours,
In recent discussions between Messrs R.Samworth (NRR)and P.Powell (SS)with regard to the bases for this section it was recognized that a description, in the bases, of the conditions for the special test exception would be beneficial.
~RA HOL Yi0 OO OUi   G. C,   orensen,   Manager
Accordingly, the attached bases change is provided by the Supply System to describe the'special circumstances pertaining to this test exception.
,+O Regulatory Programs
~>o~RA HOL Yi0 OO OUi ,+O<O C4D OA'&cK bl tC9 OK OA Q 0 Very truly yours, G.C, orensen, Manager Regulatory Programs cc: JB Martin-NRC RV NS Reynolds-BCP&R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A C Eschels-EFSEC ,oi}}
  <O C4D  cc:   JB Martin -
OA NRC RV bl cK        NS Reynolds - BCP&R tC9            RB Samworth - NRC OK          DL Williams - BPA/399                                                         ,oi OA Q 0          NRC Site Inspector - 901A C Eschels   - EFSEC}}

Latest revision as of 07:54, 4 February 2020

Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception
ML17285B131
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/21/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17285B132 List:
References
GO2-90-058, GO2-90-58, NUDOCS 9003290244
Download: ML17285B131 (2)


Text

ACCELERATED D UTION DEMONS ION SYSTEM S

A REGULATORY INEORMATION DISTRIBUTION SYSTEM (RIDS)

~p ACCESSION NBR:9003290244 DOC.DATE: 90/03/21 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Applies for amend to TS Table 4.3.6-1, SRM/IRM Detector Not-Full-In Functional Test."

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR Q ENCL t SIZE: ~ +W TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 SAMWORTH,R 5 5 INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST SE2 1 1 NRR/DST/SELB SD 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB SE 1 1 NUDOCS-ABSTRACT 1 1 OC L 1 0 OGC/HDS2 1 0 G F 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25

WASHINGTON PUBLIC POWER SUPPLY SYSTEM F.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 9935Z March 21, 1990 G02-90-058 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION TABLE 4.3.6-1, SRH/IRH DETECTOR NOT-FULL-IN FUNCTIONAL TEST% PROPOSED BASES

Reference:

Letter, G02-89-214, GC Sorensen (SS) to NRC, same subject, dated November 29, 1989 The reference requested a change to the subject functional test when in operation condition 5. The request proposed that with adequate compensatory actions, the subject test could be deferred for a 92 day period. In order to perform the subject test the SRH/IRH cabling must be laid out throughout the under core region as it would be during plant operation. The present weekly test creates an unnecessary burden in that during an outage, when in operational condition 5, a significant amount of work is planned for this same area. In order to avoid excessive damage to the cables, with workers in the area, the cables are tied up into the overhead. As stated in the reference, the weekly testing requires the cables to be untied, laid out, rolled-up and retied on a weekly frequency, This perturbs the cables, causes unnecessary radiation exposure during the weekly untie/retie, and stops work in the area during cable manipulation. As a result the Supply System proposed compensatory hction, in the reference, to avoid this situation.

In recent discussions between Messrs R. Samworth (NRR) and P. Powell (SS) with regard to the bases for this section it was recognized that a description, in the bases, of the conditions for the special test exception would be beneficial.

Accordingly, the attached bases change is provided by the Supply System to describe the 'special circumstances pertaining to this test exception.

~>o Very truly yours,

~RA HOL Yi0 OO OUi G. C, orensen, Manager

,+O Regulatory Programs

<O C4D cc: JB Martin -

OA NRC RV bl cK NS Reynolds - BCP&R tC9 RB Samworth - NRC OK DL Williams - BPA/399 ,oi OA Q 0 NRC Site Inspector - 901A C Eschels - EFSEC