{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9004200257 DOC.DATE: 90/04/05 NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
ACCESSION NBR:9004200257             DOC.DATE: 90/04/05     NOTARIZED: YES         DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public Powe             05000397 AUTH. NAME         AUTHOR AFFILIATION SORENSEN,G.C.       Washington Public Power Supply System RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Requests exemption from filing requirements of 10CFR55.45(b)(2)(iii)&(iv).DISTRIBUTION CODE: M003D COPIES RECEIVED:LTR f ENCL+SIZE: TITLE: Operator Requalification Program NOTES RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB R/~QQ/B10 REG FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL'6 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR/DLPQ/LHFB11 NUDOCS-ABSTRACT RGN5 NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
Requests exemption from filing requirements of 10CFR55. 45(b) (2) (iii) & (iv) .
PLEASE HELP US TO REDUCE WASTE!CONTACT THE, DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LIFIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 April 4, 1990 G02"90-068 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: M003D TITLE: Operator    Requalification COPIES RECEIVED:LTR Program f ENCL +   SIZE:
NOTES RECIPIENT               COPIES            RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD5 LA                                   PD5 PD SAMWORTH,R INTERNAL: ACRS                         '6          AEOD/DOA AEOD/DSP/TPAB                 1          NRR/DLPQ/LHFB11 R/~QQ/       B10           1          NUDOCS-ABSTRACT REG FILE         01         1          RGN5 EXTERNAL: LPDR                                       NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE,DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIFIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               19   ENCL
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 4,   1990 G02"90-068 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D.C.       20555 Gentlemen:


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2, OPERATING LICENSE NPF-21 RE(VEST FOR EXEMPTION FROM 10CFR55.45(b)(2)(iii)
NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RE(VEST FOR EXEMPTION FROM 10CFR55.45(b)(2)(iii)
FILING DEADLINE, AND 10CFR55.45(b)(2)(iv)
FILING DEADLINE,       AND   10CFR55.45(b)(2)(iv)


==Reference:==
==Reference:==
Letter, G02-89-148,        GC Sorensen    (SS) to KE Perkins (NRC),
              "Operator Licensing Examinations (Generic Letter 89-12)",
dated August 30, 1989 The Washington      Public Power Supply System (Supply System) hereby requests an exemption from the filing requirements of 10CFR55.45(b)(2)(iii) to allow for our submittal of NRC Form-474, "Simulation Facility Certification" after the Harch 26, 1991 deadline provided in the rule. Additionally, we further request an exemption from the requirements of 10CFR55.45(b)(2)(iv) to allow us to continue to administer the simulation facility portion of the operating tests                      on the current WNP-2 simulator as upgraded.
It  is the Supply System's intent to          comply with 10CFR55.45(b) by certifying a plant referenced simulator          facility    in accordance with 10CFR55.45(b)(1)(ii).
In the fall of 1988, after assessing the capabilities of our present simulator pursuant to the requirements for its certification, the Supply System elected to replace its current simulator. Even though the existing simulator could have been extensively upgraded to meet minimum requirements, the decision was made to purchase a state of the art simulator, at significant expense, in order to be able to provide our operations personnel with the best training available, both now and for future expansion as needed.                On January 16, 1989, the Supply System entered        into contract with Westinghouse Electric Corporation for construction of a certifiable plant referenced simulator.
This request provides only temporary              relief  from the regulatory requirement.
Even though we have made a good          faith effort to      comply, based upon the current development schedule, the testing of our replacement simulator will not be complete by the Harch 26, 1991 filing deadline. For this reason we will not have sufficient information to attest to the new simulator's performance by the required deadline. It is the Supply System's intent to file for certification following the satisfactory completion of all acceptance testing.
9004200257 900405 PDR      ADOCK 05000397                                                      p9 V
PDC py  t p
I I n
I
- Page Two                    t REQUEST FOR EXEMPTION FROM 10CFR55.45(B)(2)(III)
FILING DEADLINE, AND 10CFR55.45(B) (2) (IV)
In August, 1989 in        its  response to Generic Letter 89-12, the Supply System indicated    its'ntent    to certify the plant referenced simulator under develop-ment. Our purpose remains as stated then; to have our new simulator certified prior to use for operator exams in Harch 1992. We continue to expect completion of the new simulator in July of 1991.
To  require    WNP-2 to comply with the current schedule for certification would result in    undue hardship and expense.      The present schedule for the new simulator has been accelerated as much as was reasonably achievable.                To attempt to accelerate even more would be at great expense and probably counter-productive relative to the quality of the final product. Sending the WNP-2 operators to another facility for simulator training would not only be expensive but the training they would likely receive would be deficient relative to the use of our own plant-specific simulator given the success              of our upgrade program as discussed    below.
Approval    of these exemption requests will not endanger the public health and safety. During the past year the Supply System has performed upgrades to its existing simulator facility to support its continued use until receipt of its new simulator. We have replaced the simulator's boiler and recirculation models to allow training on an increased number of transient and off-normal operating conditions. Significant changes were also made to key main energy loop models to support the simulator's improved malfunction response.
Based on the above arguments and      in accordance with the provisions of 10CFR50. 12, the Supply System requests the following exemptions:
: 1)      A  specific exemption to defer the filing requirements          of  10CFR55.45 (b)(2)(iii) to    submit  NRC  Form-474 no  later than December 31, 1991, and
: 2)      A  specific exemption to 10CFR55.45(b)(2)(iv) to allow us to continue to use    the existing simulator, as upgraded; until the new simulator's certification is complete.
We  believe that our actions attest to our determination to meet the requirements pursuant to simulator certification. We believe that the development schedule represents unique circumstances, such as those recognized by the Commission in the Supplementary Information Published with the Final Rule to 10CFR55.45 (52 FR 9453) to allow deviation from the time requirements established by the rule.
Should you have any questions regarding this matter, please feel free to contact me  or D.W. Fraley, Manager, Simulator Projects at (509) 377-8166.
Very cz.e-G. C.
f~ ~
truly yours, Sorensen, Regulatory Programs Manager CC:    JB  Hartin -  NRC RV NS  Reynolds -  BCP&R RB  Samworth -  NRC DL  Williams - BPA/399 NRC Site Inspector - 901A


Letter, G02-89-148, GC Sorensen (SS)to KE Perkins (NRC),"Operator Licensing Examinations (Generic Letter 89-12)", dated August 30, 1989 The Washington Public Power Supply System (Supply System)hereby requests an exemption from the filing requirements of 10CFR55.45(b)(2)(iii) to allow for our submittal of NRC Form-474,"Simulation Facility Certification" after the Harch 26, 1991 deadline provided in the rule.Additionally, we further request an exemption from the requirements of 10CFR55.45(b)(2)(iv) to allow us to continue to administer the simulation facility portion of the operating tests on the current WNP-2 simulator as upgraded.It is the Supply System's intent to comply with 10CFR55.45(b) by certifying a plant referenced simulator facility in accordance with 10CFR55.45(b)(1)(ii).
Exemption from 10CFR55.45(b)(2)(iii)
In the fall of 1988, after assessing the capabilities of our present simulator pursuant to the requirements for its certification, the Supply System elected to replace its current simulator.
. STATE OF WASHINGTON       )                
Even though the existing simulator could have been extensively upgraded to meet minimum requirements, the decision was made to purchase a state of the art simulator, at significant expense, in order to be able to provide our operations personnel with the best training available, both now and for future expansion as needed.On January 16, 1989, the Supply System entered into contract with Westinghouse Electric Corporation for construction of a certifiable plant referenced simulator.
This request provides only temporary relief from the regulatory requirement.
Even though we have made a good faith effort to comply, based upon the current development schedule, the testing of our replacement simulator will not be complete by the Harch 26, 1991 filing deadline.For this reason we will not have sufficient information to attest to the new simulator's performance by the required deadline.It is the Supply System's intent to file for certification following the satisfactory completion of all acceptance testing.9004200257 900405 PDR ADOCK 05000397 py p9 V PDC t p I I'n I t-Page Two REQUEST FOR EXEMPTION FROM 10CFR55.45(B)(2)(III)
FILING DEADLINE, AND 10CFR55.45(B)
(2)(IV)In August, 1989 in its response to Generic Letter 89-12, the Supply System indicated its'ntent to certify the plant referenced simulator under develop-ment.Our purpose remains as stated then;to have our new simulator certified prior to use for operator exams in Harch 1992.We continue to expect completion of the new simulator in July of 1991.To require WNP-2 to comply with the current schedule for certification would result in undue hardship and expense.The present schedule for the new simulator has been accelerated as much as was reasonably achievable.
To attempt to accelerate even more would be at great expense and probably counter-productive relative to the quality of the final product.Sending the WNP-2 operators to another facility for simulator training would not only be expensive but the training they would likely receive would be deficient relative to the use of our own plant-specific simulator given the success of our upgrade program as discussed below.Approval of these exemption requests will not endanger the public health and safety.During the past year the Supply System has performed upgrades to its existing simulator facility to support its continued use until receipt of its new simulator.
We have replaced the simulator's boiler and recirculation models to allow training on an increased number of transient and off-normal operating conditions.
Significant changes were also made to key main energy loop models to support the simulator's improved malfunction response.Based on the above arguments and in accordance with the provisions of 10CFR50.12, the Supply System requests the following exemptions:
1)A specific exemption to defer the filing requirements of 10CFR55.45 (b)(2)(iii) to submit NRC Form-474 no later than December 31, 1991, and 2)A specific exemption to 10CFR55.45(b)(2)(iv) to allow us to continue to use the existing simulator, as upgraded;until the new simulator's certification is complete.We believe that our actions attest to our determination to meet the requirements pursuant to simulator certification.
We believe that the development schedule represents unique circumstances, such as those recognized by the Commission in the Supplementary Information Published with the Final Rule to 10CFR55.45 (52 FR 9453)to allow deviation from the time requirements established by the rule.Should you have any questions regarding this matter, please feel free to contact me or D.W.Fraley, Manager, Simulator Projects at (509)377-8166.Very truly yours, cz.e-f~~G.C.Sorensen, Manager Regulatory Programs CC: JB Hartin-NRC RV NS Reynolds-BCP&R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A
.STATE OF WASHINGTON
))COUNTY OF BENTON)Exemption from 10CFR55.45(b)(2)(iii)


==Subject:==
==Subject:==
and 10CFR55.45(b)(2)(iv)
and 10CFR55.45(b)(2)(iv)
I, A.G.HOSLER, being duly sworn, subscribe to and say that I am the Manager, l<NP-2 Licensing, for the WASHINGTON PUBLIC POHER SUPPLY SYSTEM, the applicant herein;that I have full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.DATE~P<'1990 A.G.HOSL R, Manager HNP-2 Licensing On this day personally appeared before me A.G.HOSLER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
                            )
GIVEN under my hand and seal this day of ,1990.No y Pu)c sn an or t e State of l<ashington Residing at 0~W I I"J/M gC r}}
COUNTY OF BENTON          )
I, A. G. HOSLER, being duly sworn, subscribe         to and say   that I am the Manager, l<NP-2   Licensing, for the   WASHINGTON PUBLIC POHER     SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements     made in it are true.
DATE   ~P<'                     1990 A. G. HOSL R, Manager HNP-2 Licensing On   this   day personally appeared before me A. G. HOSLER to me known to be the individual     who executed the foregoing instrument and acknowledged that he signed the   same as his free act and deed for the uses and purposes herein mentioned.
GIVEN   under my hand and seal this         day of                       ,1990.
No   y Pu )c sn an       or t e State of l<ashington Residing at
 
0         ~ W I
I "J
        /M gC r}}

Latest revision as of 06:54, 4 February 2020

Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively
ML17285B182
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/05/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-068, GO2-90-68, NUDOCS 9004200257
Download: ML17285B182 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004200257 DOC.DATE: 90/04/05 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests exemption from filing requirements of 10CFR55. 45(b) (2) (iii) & (iv) .

DISTRIBUTION CODE: M003D TITLE: Operator Requalification COPIES RECEIVED:LTR Program f ENCL + SIZE:

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD SAMWORTH,R INTERNAL: ACRS '6 AEOD/DOA AEOD/DSP/TPAB 1 NRR/DLPQ/LHFB11 R/~QQ/ B10 1 NUDOCS-ABSTRACT REG FILE 01 1 RGN5 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE,DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIFIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 4, 1990 G02"90-068 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RE(VEST FOR EXEMPTION FROM 10CFR55.45(b)(2)(iii)

FILING DEADLINE, AND 10CFR55.45(b)(2)(iv)

Reference:

Letter, G02-89-148, GC Sorensen (SS) to KE Perkins (NRC),

"Operator Licensing Examinations (Generic Letter 89-12)",

dated August 30, 1989 The Washington Public Power Supply System (Supply System) hereby requests an exemption from the filing requirements of 10CFR55.45(b)(2)(iii) to allow for our submittal of NRC Form-474, "Simulation Facility Certification" after the Harch 26, 1991 deadline provided in the rule. Additionally, we further request an exemption from the requirements of 10CFR55.45(b)(2)(iv) to allow us to continue to administer the simulation facility portion of the operating tests on the current WNP-2 simulator as upgraded.

It is the Supply System's intent to comply with 10CFR55.45(b) by certifying a plant referenced simulator facility in accordance with 10CFR55.45(b)(1)(ii).

In the fall of 1988, after assessing the capabilities of our present simulator pursuant to the requirements for its certification, the Supply System elected to replace its current simulator. Even though the existing simulator could have been extensively upgraded to meet minimum requirements, the decision was made to purchase a state of the art simulator, at significant expense, in order to be able to provide our operations personnel with the best training available, both now and for future expansion as needed. On January 16, 1989, the Supply System entered into contract with Westinghouse Electric Corporation for construction of a certifiable plant referenced simulator.

This request provides only temporary relief from the regulatory requirement.

Even though we have made a good faith effort to comply, based upon the current development schedule, the testing of our replacement simulator will not be complete by the Harch 26, 1991 filing deadline. For this reason we will not have sufficient information to attest to the new simulator's performance by the required deadline. It is the Supply System's intent to file for certification following the satisfactory completion of all acceptance testing.

9004200257 900405 PDR ADOCK 05000397 p9 V

PDC py t p

I I n

I

- Page Two t REQUEST FOR EXEMPTION FROM 10CFR55.45(B)(2)(III)

FILING DEADLINE, AND 10CFR55.45(B) (2) (IV)

In August, 1989 in its response to Generic Letter 89-12, the Supply System indicated its'ntent to certify the plant referenced simulator under develop-ment. Our purpose remains as stated then; to have our new simulator certified prior to use for operator exams in Harch 1992. We continue to expect completion of the new simulator in July of 1991.

To require WNP-2 to comply with the current schedule for certification would result in undue hardship and expense. The present schedule for the new simulator has been accelerated as much as was reasonably achievable. To attempt to accelerate even more would be at great expense and probably counter-productive relative to the quality of the final product. Sending the WNP-2 operators to another facility for simulator training would not only be expensive but the training they would likely receive would be deficient relative to the use of our own plant-specific simulator given the success of our upgrade program as discussed below.

Approval of these exemption requests will not endanger the public health and safety. During the past year the Supply System has performed upgrades to its existing simulator facility to support its continued use until receipt of its new simulator. We have replaced the simulator's boiler and recirculation models to allow training on an increased number of transient and off-normal operating conditions. Significant changes were also made to key main energy loop models to support the simulator's improved malfunction response.

Based on the above arguments and in accordance with the provisions of 10CFR50. 12, the Supply System requests the following exemptions:

1) A specific exemption to defer the filing requirements of 10CFR55.45 (b)(2)(iii) to submit NRC Form-474 no later than December 31, 1991, and
2) A specific exemption to 10CFR55.45(b)(2)(iv) to allow us to continue to use the existing simulator, as upgraded; until the new simulator's certification is complete.

We believe that our actions attest to our determination to meet the requirements pursuant to simulator certification. We believe that the development schedule represents unique circumstances, such as those recognized by the Commission in the Supplementary Information Published with the Final Rule to 10CFR55.45 (52 FR 9453) to allow deviation from the time requirements established by the rule.

Should you have any questions regarding this matter, please feel free to contact me or D.W. Fraley, Manager, Simulator Projects at (509) 377-8166.

Very cz.e-G. C.

f~ ~

truly yours, Sorensen, Regulatory Programs Manager CC: JB Hartin - NRC RV NS Reynolds - BCP&R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A

Exemption from 10CFR55.45(b)(2)(iii)

. STATE OF WASHINGTON )

Subject:

and 10CFR55.45(b)(2)(iv)

)

COUNTY OF BENTON )

I, A. G. HOSLER, being duly sworn, subscribe to and say that I am the Manager, l<NP-2 Licensing, for the WASHINGTON PUBLIC POHER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE ~P<' 1990 A. G. HOSL R, Manager HNP-2 Licensing On this day personally appeared before me A. G. HOSLER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this day of ,1990.

No y Pu )c sn an or t e State of l<ashington Residing at

0 ~ W I

I "J

/M gC r