ML19257B791: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
      .
  ..
J
J
                                                                          "
                                                                         .      TOLEDO Docket No. 50-346 License No. NPF-3                                                      A > sac P C=osst vu pe, em Serial No. 575                                                          N="
                                                                         .      TOLEDO Docket No. 50-346 License No. NPF-3                                                      A > sac P C=osst vu pe, em Serial No. 575                                                          N="
ma' res uri January 10, 1980 Director of Nuclear Reactor Fegulation Attention:    Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Co==ission Washington, D. C. 20555
ma' res uri January 10, 1980 Director of Nuclear Reactor Fegulation Attention:    Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Co==ission Washington, D. C. 20555

Latest revision as of 23:45, 1 February 2020

Forwards Application to Amend License NPF-3 by Revising Tech Specs to Delay Reactor Vessel Internal Vent Valve Testing.Also Forwards Tech Specs & Safety Evaluation
ML19257B791
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/10/1980
From: Crouse R
TOLEDO EDISON CO.
To: Reed R
Office of Nuclear Reactor Regulation
Shared Package
ML19257B792 List:
References
575, NUDOCS 8001180346
Download: ML19257B791 (1)


Text

J

. TOLEDO Docket No. 50-346 License No. NPF-3 A > sac P C=osst vu pe, em Serial No. 575 N="

ma' res uri January 10, 1980 Director of Nuclear Reactor Fegulation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Co==ission Washington, D. C. 20555

Dear Mr. Reid:

L. 9 r separate cover, we are transmitting three (3) original and forty (40) confomed copies of an application for Amendment to Facility Operating License No. NPF- 3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Sesse Nuclear Power Station Unit 1 Technical Specification, Appendix A, be revised to reficct the change attached.

This proposed change allows a delay in the testing of the reactor vessel internal vent valves.

This c=endment request involves a single change of the Class III type. It is therefore determined to be a Class III amendment. Enclosed is $4,000.00 as required by 10CFR170.

The attachment identifies the proposed change, its safety evaluation and schedule required to implement the change af ter NRC approval.

Very t ruly yours, RPC:FRM: cts Attachments 1770 323 THE TOLEDO ED: SON COMPANY EC' SON PLAZA 300 MAO: SON AVENUE TOLEDO. OHIO 43552 6001180.St(