{{#Wiki_filter:May 3, 2019 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: CLINTON POWER STATION, UNIT 1-NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501
{{#Wiki_filter:==SUBJECT:==
CLINTON POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On March 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Clinton Power Station, Unit 1, and discussed the results of this inspection with Mr. J. Kowalski and other members of your staff. The results of this inspection are documented in the enclosed report.
On March 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Clinton Power Station, Unit 1, and discussed the results of this inspection with Mr. J. Kowalski and other members of your staff. The results of this inspection are documented in the enclosed report.


The NRC inspectors did not identify any finding or violation of more than minor significance
The NRC inspectors did not identify any finding or violation of more than minor significance.
. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding
 
."
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
/RA/ Randal D. Baker, Chief Operations Branch Docket No.: 05000461 License No
/RA/
.: NPF-62  
Randal D. Baker, Chief Operations Branch Docket No.: 05000461 License No.: NPF-62


===Enclosure:===
===Enclosure:===
I R 05000461/2019501
IR 05000461/2019501


==Inspection Report==
==Inspection Report==
Docket Number:
Docket Number: 05000461 License Number: NPF-62 Report Number: 05000461/2019501 Enterprise Identifier: I-2019-501-0014 Licensee: Exelon Generation Company, LLC Facility: Clinton Power Station Location: Clinton, IL Inspection Dates: March 18, 2019, to March 22, 2019 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Sr. Emergency Preparedness Inspector T. Ospino, Reactor Engineer F. Tran, Health Physicist (Licensing)
05000461 License Number:
Approved By: Randal D. Baker, Chief Operations Branch Division of Reactor Safety Enclosure
NPF-62 Report Number:
05000461/2019501 Enterprise Identifier:
I-2019-501-0014 Licensee: Exelon Generation Company, LLC Facility: Clinton Power Station Location: Clinton, IL Inspection Dates:
March 18, 2019
, to March 22, 2019 Inspectors:
M. Garza, Emergency Preparedness Inspector G. Hansen, Sr. Emergency Preparedness Inspector T. Ospino, Reactor Engineer F. Tran, Health Physicist (Licensing)
Approved By: Randal D. Baker, Chief Operations Branch Division of Reactor Safety
 
2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1 , in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRC's assessment are summarized in the table below.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.


List of Findings and Violations No findings were identified.
List of Findings and Violations No findings were identified.


Additional Tracking Items None.
Additional Tracking Items None.
3


=INSPECTION SCOPES=
=INSPECTION SCOPES=


Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
-Water Reactor Inspection Program - Operations Phase.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==


==71114.01 - Exercise Evaluation==
==71114.01 - Exercise Evaluation     Inspection Review (IP Section 02.01-02.11)==
{{IP sample|IP=IP 71114.01|count=1}}
 
The inspectors evaluated the biennial emergency plan exercise on March 19, 2019. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.


===Inspection Review (IP Section 02.01
==71114.08 - Exercise Evaluation Scenario Review    Inspection Review (IP Section 02.01 - 02.04)==
-02.11)===
{{IP sample|IP=IP 71114.08|count=1}}
{{IP sample|IP=IP 71114.01|count=1}}
The inspectors evaluated the biennial emergency plan exercise on March 19, 2019.


The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15,
-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram.


The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
==OTHER ACTIVITIES - BASELINE==


==71114.08 - Exercise Evaluation Scenario Review==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
Alert & Notification System Reliability (IP Section 02.14) ===
{{IP sample|IP=IP 71151|count=1}}
3rd quarter - 4th quarter 2018


===Inspection Review (IP Section 02.01
===Drill/Exercise Performance (IP Section 02.12) (1 Sample)===
- 02.04)===
3rd quarter - 4th quarter 2018
{{IP sample|IP=IP 71114.08|count=1}}
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15, 2019.


==OTHER ACTIVITIES
===ERO Drill Participation (IP Section 02.13) (1 Sample)===
- BASELINE==
3rd quarter - 4th quarter
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
Alert & Notification System Reliability (IP Section 02.14)
(1 Sample)  3rd quarter
- 4th quarter 2018 Drill/Exercise Performance (IP Section 02.12)
(1 Sample)  3rd quarter
- 4th quarter 2018 ERO Drill Participation (IP Section 02.13)
(1 Sample) 3rd quarter  
- 4th quarter 2018


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 101: Line 80:
==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
 
* On March 21, 2019, the inspector presented the NRC Emergency Preparedness Exercise Inspection results to Mr. J. Kowalski and other members of the licensee staff.
On March 2 1, 2019, the inspector presented the NRC Emergency Preparedness Exercise Inspection results to Mr. J. Kowalski and other members of the licensee staff.
 
5


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Procedure Type Designation
Inspection Type           Designation   Description or Title                                   Revision or
Description or Title
Procedure                                                                                        Date
Revision or Date 71114.01 Corrective Action Documents AR 0231242
71114.01 Corrective Action AR 0231242   NOS ID: A Used Protective Clothing Container Not Staged 03/19/19
NOS ID: A Used Protective Clothing Container Not Staged
Documents
03/19/19 71114.01 Corrective Action Documents AR 03985112
71114.01 Corrective Action AR 03985112   EP Drill Critique Items                                 03/14/17
EP Drill Critique Items
Documents
03/14/17 71114.01 Corrective Action Documents AR 04007063
71114.01 Corrective Action AR 04007063   EP Drill Evaluation Results                             05/05/17
EP Drill Evaluation Results
Documents
05/05/17 71114.01 Corrective Action Documents AR 04067474
71114.01 Corrective Action AR 04067474   Drive In Drill Critique Items                           09/27/17
Drive In Drill Critique Items
Documents
09/27/17 71114.01 Corrective Action Documents AR 04074715
71114.01 Corrective Action AR 04074715   Clinton 2017 NRC EP Exercise EOF ERO Performance       11/14/17
Clinton 2017 NRC EP Exercise EOF ERO Performance Demonstration Criteria Failures
Documents                    Demonstration Criteria Failures
11/14/17 71114.01 Corrective Action Documents AR 04130446
71114.01 Corrective Action AR 04130446   EP Drill Critique Items                                 04/24/18
EP Drill Critique Items
Documents
04/24/18 71114.01 Corrective Action Documents AR 04168991
71114.01 Corrective Action AR 04168991   Clinton EP Off-Year Exercise - CR Simulator Performance 08/28/18
Clinton EP Off
Documents                    Issues
-Year Exercise  
71114.01 Corrective Action AR 04179787   CPS Off-Year Exercise: Other Issues Identified         08/28/18
- CR Simulator Performance Issues 08/28/18 71114.01 Corrective Action Documents AR 04179787 CPS Off-Year Exercise: Other Issues Identified
Documents
08/28/18 71114.01 Corrective Action Documents AR 04204932
71114.01 Corrective Action AR 04204932   Gaitronics Speaker Volume Too Low                       12/20/18
Gaitronics Speaker Volume Too Low
Documents
2/20/18 71114.01 Corrective Action Documents AR 04224505
71114.01 Corrective Action AR 04224505   EPID: 2/19/19 EP Exercise: SIM/MCR Failed Demonstration 02/19/19
EPID: 2/19/19 EP Exercise: SIM/MCR Failed Demonstration Criteria 02/19/19 71114.01 Corrective Action Documents AR 04230949
Documents                    Criteria
Procedure Enhancement for 4110.10
71114.01 Corrective Action AR 04230949   Procedure Enhancement for 4110.10                       03/19/19
03/19/19 71114.01 Corrective Action Documents AR 04230961
Documents
PA Announcement not Immediately Heard 781 Aux During Drill 03/19/19 71114.01 Corrective Action Documents AR 04231080
71114.01 Corrective Action AR 04230961   PA Announcement not Immediately Heard 781 Aux During   03/19/19
EP ID: PA Announcements Not Heard in OCC
Documents                    Drill
03/19/19 71114.01 Miscellaneous
71114.01 Corrective Action AR 04231080   EP ID: PA Announcements Not Heard in OCC               03/19/19
2018 Off-Year Exercise Clinton 2018 Off Year Exercise Evaluation Report
Documents
08/28/18 71114.01 Miscellaneous
71114.01 Miscellaneous     2018 Off-Year  Clinton 2018 Off Year Exercise Evaluation Report       08/28/18
2019 Pre-Exercise Evaluation
Exercise
Clinton 2019 Pre-Exercise Evaluation Report
71114.01   Miscellaneous   2019 Pre-     Clinton 2019 Pre-Exercise Evaluation Report             02/19/19
2/19/19 71114.01 Miscellaneous
Exercise
PowerPoint Clinton Biennial Exercise  
Evaluation
- Exercise Evaluation Results
71114.01   Miscellaneous   PowerPoint   Clinton Biennial Exercise - Exercise Evaluation Results 03/21/19
03/21/19
Inspection Type         Designation   Description or Title                                       Revision or
Inspection Procedure Type Designation
Procedure                                                                                        Date
Description or Title
Presentation
Revision or Date Presentation
71114.01   Procedures   EP-AA-1000   Exelon Nuclear Standardized Radiological Emergency Plan   29
71114.01 Procedures
71114.01   Procedures   EP-AA-1003   Exelon Nuclear Radiological Emergency Plan Annex for       28
EP-AA-1000 Exelon Nuclear Standardized Radiological Emergency Plan
Clinton Station
71114.01 Procedures
71114.01   Procedures   EP-AA-1003,   Clinton Station On-Shift Staffing Technical Basis         1
EP-AA-1003 Exelon Nuclear Radiological Emergency Plan Annex for Clinton Station
Addendum 1
71114.01 Procedures
71114.01   Procedures   EP-AA-1003,   Exelon Nuclear Emergency Action Levels for Clinton Station 2
EP-AA-1003, Addendum 1
Addendum 3
Clinton Station On
71114.01   Procedures   EP-AA-110-200 Dose Assessment                                           12
-Shift Staffing Technical Basis
71114.01   Procedures   EP-AA-110-301 Core Damage Assessment (BWR)                               10
71114.01 Procedures
71114.01   Procedures   EP-AA-111     Emergency Classification and Protective Action             21
EP-AA-1003, Addendum 3
Recommendations
Exelon Nuclear Emergency Action Levels for Clinton Station
71114.01   Procedures   EP-AA-112     Emergency Response Organization (ERO)/Emergency           20
71114.01 Procedures
Response Facility Activation and Operation
EP-AA-110-200 Dose Assessment
71114.01   Procedures   EP-AA-113     Personnel Protective Actions                               13
71114.01 Procedures
71114.01   Procedures   EP-AA-114     Notifications                                             13
EP-AA-110-301 Core Damage Assessment (BWR)
71114.08   Miscellaneous RS-19-007     Clinton 2019 NRC Graded Exercise Manual                   01/17/19
71114.01 Procedures
71151     Miscellaneous NEI 99-02     Regulatory Assessment Performance Indicator Guideline     7
EP-AA-111 Emergency Classification and Protective Action Recommendations
71151     Miscellaneous NRC PI Data   NRC Indicator ANS Reliability                             07/01/18 -
71114.01 Procedures
Sheets                                                                  12/31/18
EP-AA-112 Emergency Response Organization (ERO)/Emergency Response Facility Activation and Operation
71151     Miscellaneous NRC PI Data   ERO Readiness                                             07/01/18 -
71114.01 Procedures
Sheets                                                                  12/31/18
EP-AA-113 Personnel Protective Actions
71151     Miscellaneous NRC PI Data   Drill/Exercise Performance                                 07/01/18 -
71114.01 Procedures
Sheets                                                                  12/31/18
EP-AA-114 Notifications
6
71114.08 Miscellaneous
RS-19-007 Attachment
Clinton 2019 NRC Graded Exercise Manual
01/17/19 71151 Miscellaneous
NEI 99-02 Regulatory Assessment Performance Indicator Guideline
71151 Miscellaneous
NRC PI Data Sheets NRC Indicator ANS Reliability
07/01/18 - 12/31/18 71151 Miscellaneous
NRC PI Data Sheets ERO Readiness
07/01/18 - 12/31/18 71151 Miscellaneous
NRC PI Data Sheets Drill/Exercise Performance
07/01/18 - 12/31/18
}}
}}

Latest revision as of 13:01, 18 December 2019

NRC Emergency Preparedness Exercise Inspection; Inspection Report 05000461/2019501 (DRS-G.Hansen)
ML19126A076
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/03/2019
From: Randy Baker
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019501
Download: ML19126A076 (8)


Text

SUBJECT:

CLINTON POWER STATION, UNIT 1NRC EMERGENCY PREPAREDNESS EXERCISE INSPECTION; INSPECTION REPORT 05000461/2019501

Dear Mr. Hanson:

On March 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Clinton Power Station, Unit 1, and discussed the results of this inspection with Mr. J. Kowalski and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Randal D. Baker, Chief Operations Branch Docket No.: 05000461 License No.: NPF-62

Enclosure:

IR 05000461/2019501

Inspection Report

Docket Number: 05000461 License Number: NPF-62 Report Number: 05000461/2019501 Enterprise Identifier: I-2019-501-0014 Licensee: Exelon Generation Company, LLC Facility: Clinton Power Station Location: Clinton, IL Inspection Dates: March 18, 2019, to March 22, 2019 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Sr. Emergency Preparedness Inspector T. Ospino, Reactor Engineer F. Tran, Health Physicist (Licensing)

Approved By: Randal D. Baker, Chief Operations Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC Emergency Preparedness Exercise Inspection at Clinton Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations No findings were identified.

Additional Tracking Items None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation Inspection Review (IP Section 02.01-02.11)

The inspectors evaluated the biennial emergency plan exercise on March 19, 2019. The exercise scenario simulated an event at the Clinton Power Station that initiated with the declaration and notification of an Alert in response to abnormal plant conditions that caused the on-shift crew to initiate a manual scram that resulted in an Anticipated Transient Without Scram. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08 - Exercise Evaluation Scenario Review Inspection Review (IP Section 02.01 - 02.04)

The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 15,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

Alert & Notification System Reliability (IP Section 02.14) ===

3rd quarter - 4th quarter 2018

Drill/Exercise Performance (IP Section 02.12) (1 Sample)

3rd quarter - 4th quarter 2018

ERO Drill Participation (IP Section 02.13) (1 Sample)

3rd quarter - 4th quarter

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 21, 2019, the inspector presented the NRC Emergency Preparedness Exercise Inspection results to Mr. J. Kowalski and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71114.01 Corrective Action AR 0231242 NOS ID: A Used Protective Clothing Container Not Staged 03/19/19

Documents

71114.01 Corrective Action AR 03985112 EP Drill Critique Items 03/14/17

Documents

71114.01 Corrective Action AR 04007063 EP Drill Evaluation Results 05/05/17

Documents

71114.01 Corrective Action AR 04067474 Drive In Drill Critique Items 09/27/17

Documents

71114.01 Corrective Action AR 04074715 Clinton 2017 NRC EP Exercise EOF ERO Performance 11/14/17

Documents Demonstration Criteria Failures

71114.01 Corrective Action AR 04130446 EP Drill Critique Items 04/24/18

Documents

71114.01 Corrective Action AR 04168991 Clinton EP Off-Year Exercise - CR Simulator Performance 08/28/18

Documents Issues

71114.01 Corrective Action AR 04179787 CPS Off-Year Exercise: Other Issues Identified 08/28/18

Documents

71114.01 Corrective Action AR 04204932 Gaitronics Speaker Volume Too Low 12/20/18

Documents

71114.01 Corrective Action AR 04224505 EPID: 2/19/19 EP Exercise: SIM/MCR Failed Demonstration 02/19/19

Documents Criteria

71114.01 Corrective Action AR 04230949 Procedure Enhancement for 4110.10 03/19/19

Documents

71114.01 Corrective Action AR 04230961 PA Announcement not Immediately Heard 781 Aux During 03/19/19

Documents Drill

71114.01 Corrective Action AR 04231080 EP ID: PA Announcements Not Heard in OCC 03/19/19

Documents

71114.01 Miscellaneous 2018 Off-Year Clinton 2018 Off Year Exercise Evaluation Report 08/28/18

Exercise

71114.01 Miscellaneous 2019 Pre- Clinton 2019 Pre-Exercise Evaluation Report 02/19/19

Exercise

Evaluation

71114.01 Miscellaneous PowerPoint Clinton Biennial Exercise - Exercise Evaluation Results 03/21/19

Inspection Type Designation Description or Title Revision or

Procedure Date

Presentation

71114.01 Procedures EP-AA-1000 Exelon Nuclear Standardized Radiological Emergency Plan 29

71114.01 Procedures EP-AA-1003 Exelon Nuclear Radiological Emergency Plan Annex for 28

Clinton Station

71114.01 Procedures EP-AA-1003, Clinton Station On-Shift Staffing Technical Basis 1

Addendum 1

71114.01 Procedures EP-AA-1003, Exelon Nuclear Emergency Action Levels for Clinton Station 2

Addendum 3

71114.01 Procedures EP-AA-110-200 Dose Assessment 12

71114.01 Procedures EP-AA-110-301 Core Damage Assessment (BWR) 10

71114.01 Procedures EP-AA-111 Emergency Classification and Protective Action 21

Recommendations

71114.01 Procedures EP-AA-112 Emergency Response Organization (ERO)/Emergency 20

Response Facility Activation and Operation

71114.01 Procedures EP-AA-113 Personnel Protective Actions 13

71114.01 Procedures EP-AA-114 Notifications 13

71114.08 Miscellaneous RS-19-007 Clinton 2019 NRC Graded Exercise Manual 01/17/19

71151 Miscellaneous NEI 99-02 Regulatory Assessment Performance Indicator Guideline 7

71151 Miscellaneous NRC PI Data NRC Indicator ANS Reliability 07/01/18 -

Sheets 12/31/18

71151 Miscellaneous NRC PI Data ERO Readiness 07/01/18 -

Sheets 12/31/18

71151 Miscellaneous NRC PI Data Drill/Exercise Performance 07/01/18 -

Sheets 12/31/18

6