ML17279A890: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}



Latest revision as of 07:01, 10 November 2019

Clarifies 880105 Application for Amend to License NPF-21 Re Tech Spec Table 3.3.2-1, Isolation Actuation Instrumentation.
ML17279A890
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/15/1988
From: Sorenson G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17279A891 List:
References
GO2-88-059, GO2-88-59, TAC-66927, NUDOCS 8803220219
Download: ML17279A890 (4)


Text

j~..

, XCCELEIVLTED DISF43UTION DEMONSTR4%)N SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

,ACCESSION NBR:8803220219 DOC.DATE: 88/03/15 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSON,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Clarifies 880105 application for amend to License NPF-21 re ~

Tech Spec Table 3.3.2-1, "Isolation Actutation...."

DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution ENCL SIZE- (4(

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTH,R 1 1 A

INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS7E4 1 1 NRR/DEST/CEB8H7 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 'RR/DOEA/TSB11F 1 1 NRg/- ILRB12 1 1 OGC 15-B-18 1 0 GF 01 1 1 RES/DE/EIB 1 1 EXTERNAL LPDR 1 1 NRC PDR NSIC 1 1 I .<

D 89

'A D

'OTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17

..lL 0

P '

4

Washington Public Power Supply System 3000George Washington Way P.O. Box968 Richland, Washington 99352-0968 (509)372-5000 March 15, 1988 G02-88-059 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 RE/VEST FOR TECHNICAL SPECIFICATION AMENDMENT TABLE 3.3.2-1, ISOLATION ACTUATION INSTRUMENTATION (ADDITIONAL CLARIFICATION)

Reference:

1) Letter, G02-88-002, GC Sorensen (SS) to NRC, same subject, dated January 5, 1988
2) Letter, G02-88-037, GC Sorensen (SS) to NRC, same subject, dated February 12, 1988 As related in a phone conversation between Messrs. R. B. Samworth of your staff and P. L. Powell (Supply System) the change to technical specification page 3/4 3-15, submitted in Reference 1) and augmented in Reference 2),

requires further administrative clarification. Accordingly the attached change is submitted. This clarification is considered editorial only and does not change the intent of the analysis provided in the referenced submittals.

Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. So ensen, Manager Regulatory Programs PLP/bk cc: JB Martin - NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams BPA/399 004 NRC Site Inspector - 901A 15 SQQ3P+QQ f 9 38Q3 Q5QQ0397 PDR ADOCK DCD

<3