|
|
(6 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 03/04/2015 | | | issue date = 03/04/2015 |
| | title = Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001 | | | title = Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001 |
| | author name = Hopper G T | | | author name = Hopper G |
| | author affiliation = NRC/RGN-II/DRP/RPB4 | | | author affiliation = NRC/RGN-II/DRP/RPB4 |
| | addressee name = Glover R M | | | addressee name = Glover R |
| | addressee affiliation = Duke Energy Carolinas, LLC | | | addressee affiliation = Duke Energy Carolinas, LLC |
| | docket = 05000261 | | | docket = 05000261 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2015 |
| [[Issue date::March 4, 2015]]
| |
|
| |
|
| Mr. Richard Michael Glover Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road Hartsville, SC 29550
| | ==SUBJECT:== |
| | ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001 |
|
| |
|
| SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001
| | ==Dear Mr. Glover:== |
| | On February 11, 2015, the NRC completed its end-of-cycle performance review of the H.B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. |
| | |
| | The NRC determined that overall, the H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. |
| | |
| | The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. |
| | |
| | We also plan on conducting the following infrequently performed inspections and temporary instructions: Operator Licensing Exams, and TI 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| ==Dear Mr. Glover:==
| | Please contact me at 404-997-4645 with any questions you may have regarding this letter. |
| On February 11, 2015, the NRC completed its end-of-cycle performance review of the H.B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, the H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
| | |
| | Sincerely, |
| | /RA/ |
| | George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 Enclosure: Robinson Inspection/Activity Plan (03/01/2015 - 06/30/2016) |
| | cc Distribution via ListServ |
|
| |
|
| We also plan on conducting the following infrequently performed inspections and temporary instructions: Operator Licensing Exams, and TI 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4645 with any questions you may have regarding this letter.
| | _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII DRP:RII SIGNATURE DXW4 JSD GTH NAME D. Jackson J. Dodson G. Hopper DATE 02/13/2015 03/04/2015 02/20/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Richard Michael Glover from George T. Hopper dated March 4, 2015. |
|
| |
|
| Sincerely,/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23
| | SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001 DISTRIBUTION: |
| | D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrRobinson Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) |
|
| |
|
| ===Enclosure:===
| | Page 1 of 2 Robinson 03/04/2015 12:10:24 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ASM EP - 2015 EP ASM & RES BASELINE 3 2 01/01/2015 12/31/2015 IP 7111406 Drill Evaluation OL RQ - REQUAL INSP 2 2 03/02/2015 03/06/2015 IP 7111111B Licensed Operator Requalification Program RP - RP OCCUPATIONAL BASELINE WEEK 1 3 2 05/11/2015 05/15/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 05/11/2015 05/15/2015 IP 71124.02 Occupational ALARA Planning and Controls 2 05/11/2015 05/15/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 05/11/2015 05/15/2015 IP 71124.04 Occupational Dose Assessment 2 05/11/2015 05/15/2015 IP 71124.05 Radiation Monitoring Instrumentation 2 05/11/2015 05/15/2015 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 05/18/2015 05/22/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2 3 2 05/18/2015 05/22/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 05/18/2015 05/22/2015 IP 71124.02 Occupational ALARA Planning and Controls 2 05/18/2015 05/22/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 05/18/2015 05/22/2015 IP 71124.04 Occupational Dose Assessment 2 05/18/2015 05/22/2015 IP 71124.05 Radiation Monitoring Instrumentation 2 05/18/2015 05/22/2015 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 2 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance EP - EP EXERCISE 7 2 07/20/2015 07/24/2015 IP 7111401 Exercise Evaluation 2 07/20/2015 07/24/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 07/20/2015 07/24/2015 IP 71151 Performance Indicator Verification MODS - PLANT MODIFICATIONS INSPECTION 3 2 10/26/2015 10/30/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2 11/16/2015 11/20/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ASM EP - 2016 EP ASM & RES BASELINE 3 2 01/01/2016 12/31/2016 IP 7111406 Drill Evaluation OL EXAM - INITIAL LICENSE EXAM PREP 3 2 01/04/2016 01/08/2016 V23459 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities. |
| Robinson Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ
| |
|
| |
|
| _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII DRP:RII SIGNATURE DXW4 JSD GTH NAME D. Jackson J. Dodson G. Hopper DATE 02/13/2015 03/04/2015 02/20/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Richard Michael Glover from George T. Hopper dated March 4, 2015.
| | This report shows only on-site and announced inspection procedures. Enclosure |
|
| |
|
| SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrRobinson Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
| | Page 2 of 2 Robinson 03/04/2015 12:10:24 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP PUBLIC RAD SAFETY BASELINE 2 2 01/25/2016 01/29/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 01/25/2016 01/29/2016 IP 71124.07 Radiological Environmental Monitoring Program 2 01/25/2016 01/29/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 2 02/01/2016 02/12/2016 V23459 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 2 03/07/2016 03/11/2016 IP 71152B Problem Identification and Resolution 2 03/21/2016 03/25/2016 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 2 2 06/20/2016 06/24/2016 IP 7111402 Alert and Notification System Testing 2 06/20/2016 06/24/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 06/20/2016 06/24/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 06/20/2016 06/24/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 06/20/2016 06/24/2016 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. |
| Page 1 of 203/04/201512:10:24Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinsonInspection / Activity Plan03/01/2015-06/30/2016ASM EP-2015 EP ASM & RES BASELINE32 IPDrill Evaluation711140601/01/201512/31/2015OL RQ-REQUAL INSP22 IPLicensed Operator Requalification Program7111111B03/02/201503/06/2015RP-RP OCCUPATIONAL BASELINE WEEK 132 IPRadiological Hazard Assessment and Exposure Controls71124.0105/11/201505/15/20152 IPOccupational ALARA Planning and Controls71124.0205/11/201505/15/20152 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/11/201505/15/20152 IPOccupational Dose Assessment71124.0405/11/201505/15/20152 IPRadiation Monitoring Instrumentation71124.0505/11/201505/15/20152 IPPerformance Indicator Verification7115105/11/201505/15/2015ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM22 IPInservice Inspection Activities - PWR7111108P05/18/201505/22/2015RP-RP OCCUPATIONAL BASELINE WEEK 232 IPRadiological Hazard Assessment and Exposure Controls71124.0105/18/201505/22/20152 IPOccupational ALARA Planning and Controls71124.0205/18/201505/22/20152 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/18/201505/22/20152 IPOccupational Dose Assessment71124.0405/18/201505/22/20152 IPRadiation Monitoring Instrumentation71124.0505/18/201505/22/20152 IPPerformance Indicator Verification7115105/18/201505/22/2015HS-TRIENNIAL HEAT SINK PERFORMANCE12 IPHeat Sink Performance7111107T07/06/201507/10/2015EP-EP EXERCISE72 IPExercise Evaluation711140107/20/201507/24/20152 IPEmergency Action Level and Emergency Plan Changes711140407/20/201507/24/20152 IPPerformance Indicator Verification7115107/20/201507/24/2015MODS-PLANT MODIFICATIONS INSPECTION32 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T10/26/201510/30/20152 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/16/201511/20/2015ASM EP-2016 EP ASM & RES BASELINE32 IPDrill Evaluation711140601/01/201612/31/2016OL EXAM-INITIAL LICENSE EXAM PREP32 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2345901/04/201601/08/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |
|
| |
|
| Page 2 of 203/04/201512:10:24Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinsonInspection / Activity Plan03/01/2015-06/30/2016RP-RP PUBLIC RAD SAFETY BASELINE2 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0601/25/201601/29/2016 2 IPRadiological Environmental Monitoring Program71124.0701/25/201601/29/2016 2 IPPerformance Indicator Verification7115101/25/201601/29/2016OL EXAM-INITIAL LICENSE EXAM3 2 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2345902/01/201602/12/2016PI&R-PROBLEM IDENTIFICATION AND RESOLUTION4 2 IPProblem Identification and Resolution71152B03/07/201603/11/2016 2 IPProblem Identification and Resolution71152B03/21/201603/25/2016EP-EP PROGRAM INSPECTION2 2 IPAlert and Notification System Testing711140206/20/201606/24/2016 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/20/201606/24/2016 2 IPEmergency Action Level and Emergency Plan Changes711140406/20/201606/24/2016 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/20/201606/24/2016 2 IPPerformance Indicator Verification7115106/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | This report shows only on-site and announced inspection procedures. |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24047A0162024-02-15015 February 2024 2024 Rpn - CGD Inspection Information Request ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21295A2992021-10-22022 October 2021 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 ML20191A2192020-07-0909 July 2020 Notification of Conduct of a Fire Protection Team Baseline Inspection U.S. Nuclear Regulatory Commission Inspection Report No. 05000261/2020012 ML19347D1072019-12-13013 December 2019 Plan - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20190052019-08-28028 August 2019 Updated Inspection Plan for H.B. Robinson Steam Electric Plant, Unit 2 - (Report 05000261/2019005) ML19232A4172019-08-20020 August 2019 Radiation Safety Baseline Inspection RFI 2019-004 IR 05000261/20180062019-03-0404 March 2019 Annual Assessment Letter for H. B. Robinson Steam Electric Plant, Unit 2 - Report 05000261/2018006, Report 05000261/2018402, Report 05000261/2018501 IR 05000261/20180052018-08-23023 August 2018 Updated Inspection Plan for H.B. Robinson Steam Electric Plant Unit 2 (Inspection Report 05000261/2018005) ML18215A1352018-08-0303 August 2018 U2 Baseline In-Service Inspection 2018003 Public ML18172A1142018-06-20020 June 2018 Radiation Safety Baseline Inspection Emailed Initial Information Request 2018003 ML18115A0512018-04-25025 April 2018 RP Inspect Info & Doc Request IR 05000261/20170062018-02-28028 February 2018 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261/2017006, Report 05000261/2017402, Report 05000261/2017501 IR 05000261/20170052017-08-28028 August 2017 Updated Inspection Plan for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2017005 IR 05000261/20160062017-03-0101 March 2017 Annual Assessment Letter for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016006 ML17021A0042017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000261/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for H.B Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016005 ML16092A2002016-03-29029 March 2016 Notification of H.B. Robinson Steam Electric Plant - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000261/2016008 IR 05000261/20150062016-03-0202 March 2016 Annual Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015006 IR 05000261/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015005 IR 05000261/20140012015-03-0404 March 2015 Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001 ML14245A1732014-09-0202 September 2014 Mid-Cycle Ltr 2014 ML14063A1832014-03-0404 March 2014 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant ML13246A0682013-09-0303 September 2013 Mid Cycle Assessment Letter ML13224A3172013-08-12012 August 2013 Notification of Inspection and Request for Information ML13085A1272013-03-26026 March 2013 Notification of Inspection and Request for Information IR 05000261/20120012013-03-0404 March 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant (NRC Inspection Report 05000261/2012001) ML12248A1642012-09-0404 September 2012 Mid Cycle Assessment Letter Robinson 2012 ML12209A3772012-07-27027 July 2012 IR 05000261-12-008, on 01/01/2012, H.B. Robinson Steam Electric Plant-Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML1206504242012-03-0505 March 2012 End of Cycle Assessment Report 22 IR 05000261/20110012011-03-0404 March 2011 Annual Assessment Letter (Report 05000261/2011001) ML1024405952010-09-0101 September 2010 Report 22 - 2010 Mid Cycle Inspection/Activity Plan ML1006209802010-03-0303 March 2010 Report 22 - 2010001 Inspection/Activity Plan ML0924405542009-09-0101 September 2009 Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010 RNP-RA/09-0067, Nickel-Alloy Nozzles and Penetrations Program Inspection Plan2009-07-29029 July 2009 Nickel-Alloy Nozzles and Penetrations Program Inspection Plan ML0824610022008-09-0202 September 2008 Inspection / Activity Plan, 09/01/2008 - 12/31/2009, Report 22 IR 05000261/20080012008-03-0303 March 2008 Annual Assessment Letter (IR 05000261-08-001) ML0724306772007-08-31031 August 2007 Mid-Cycle 2007 Report ML0724702262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - H.B. Robinson Steam Electric Plant Unit 2 ML0706001892007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 - Report 22 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001
Dear Mr. Glover:
On February 11, 2015, the NRC completed its end-of-cycle performance review of the H.B. Robinson Steam Electric Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, the H.B. Robinson Steam Electric Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at H.B. Robinson Steam Electric Plant during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting the following infrequently performed inspections and temporary instructions: Operator Licensing Exams, and TI 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4645 with any questions you may have regarding this letter.
Sincerely,
/RA/
George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23 Enclosure: Robinson Inspection/Activity Plan (03/01/2015 - 06/30/2016)
cc Distribution via ListServ
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE DRP:RII DRP:RII DRP:RII SIGNATURE DXW4 JSD GTH NAME D. Jackson J. Dodson G. Hopper DATE 02/13/2015 03/04/2015 02/20/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Richard Michael Glover from George T. Hopper dated March 4, 2015.
SUBJECT: ANNUAL ASSESSMENT LETTER FOR H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2014001 DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrRobinson Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 2 Robinson 03/04/2015 12:10:24 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ASM EP - 2015 EP ASM & RES BASELINE 3 2 01/01/2015 12/31/2015 IP 7111406 Drill Evaluation OL RQ - REQUAL INSP 2 2 03/02/2015 03/06/2015 IP 7111111B Licensed Operator Requalification Program RP - RP OCCUPATIONAL BASELINE WEEK 1 3 2 05/11/2015 05/15/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 05/11/2015 05/15/2015 IP 71124.02 Occupational ALARA Planning and Controls 2 05/11/2015 05/15/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 05/11/2015 05/15/2015 IP 71124.04 Occupational Dose Assessment 2 05/11/2015 05/15/2015 IP 71124.05 Radiation Monitoring Instrumentation 2 05/11/2015 05/15/2015 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 05/18/2015 05/22/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2 3 2 05/18/2015 05/22/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 05/18/2015 05/22/2015 IP 71124.02 Occupational ALARA Planning and Controls 2 05/18/2015 05/22/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 05/18/2015 05/22/2015 IP 71124.04 Occupational Dose Assessment 2 05/18/2015 05/22/2015 IP 71124.05 Radiation Monitoring Instrumentation 2 05/18/2015 05/22/2015 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 2 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance EP - EP EXERCISE 7 2 07/20/2015 07/24/2015 IP 7111401 Exercise Evaluation 2 07/20/2015 07/24/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 07/20/2015 07/24/2015 IP 71151 Performance Indicator Verification MODS - PLANT MODIFICATIONS INSPECTION 3 2 10/26/2015 10/30/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2 11/16/2015 11/20/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ASM EP - 2016 EP ASM & RES BASELINE 3 2 01/01/2016 12/31/2016 IP 7111406 Drill Evaluation OL EXAM - INITIAL LICENSE EXAM PREP 3 2 01/04/2016 01/08/2016 V23459 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Robinson 03/04/2015 12:10:24 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP PUBLIC RAD SAFETY BASELINE 2 2 01/25/2016 01/29/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 01/25/2016 01/29/2016 IP 71124.07 Radiological Environmental Monitoring Program 2 01/25/2016 01/29/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 2 02/01/2016 02/12/2016 V23459 ROBINSON/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 2 03/07/2016 03/11/2016 IP 71152B Problem Identification and Resolution 2 03/21/2016 03/25/2016 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 2 2 06/20/2016 06/24/2016 IP 7111402 Alert and Notification System Testing 2 06/20/2016 06/24/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 06/20/2016 06/24/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 06/20/2016 06/24/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 06/20/2016 06/24/2016 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.