IR 05000261/2014403

From kanterella
Jump to navigation Jump to search
IR 05000261/2014403; on 10/27/14 - 10/30/14; H. B. Robinson Steam Electric Plant Unit 2; Security (Letter)
ML14342A762
Person / Time
Site: Robinson 
Issue date: 12/08/2014
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Glover R
Duke Energy Progress
Linda K. Gruhler 404-997-4633
References
IR 2014403
Download: ML14342A762 (4)


Text

December 8, 2014

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000261/2014403

Dear Mr. Glover:

On October 30, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H.B. Robinson Nuclear Steam Electric Plant. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report (IR).

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). R. However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No. 50-261 License No. DPR-23

Enclosure:

IR 05000261/2014403, w/Attachment:

Supplementary Info (OUO)

cc: Distribution via Listserv

ML14342A762 SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR4 RII:DRS/PSB2

SIGNATURE JOB2 KXD JPT GTH1 BBD

NAME J. Brown K. Davis J. Tornow G. Hopper B. Desai

DATE 12/ 1 /2014 12/ 1 /2014 12/ 1 /2014 12/ 3 /2014 12/ 8 /2014

E-MAIL COPY YES NO YES NO YES NO YES NO YES NO R. cc:

Linwood Faulk Director, Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550

Edward T. ONeil Director, Nuclear Protective Services Duke Energy Corporation 526 South Church Street Charlotte, NC 28202