ML17272A625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:W RF 8 S Washington Public Power Supply System'.A JOINT OPERATING AGENCY P.O.BOX 968 3000 GEO.WASHINGTON WAY RICHLAND, WASHINGTON 09352 PHONE (509)946 968 I August 7, 1979 G02-79-138 Nuclear Regulatory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N.Calitornia Boulevard Walnut Creek, California 94596 Attention:
{{#Wiki_filter:W Washington Public Power Supply System RF                              '. A JOINT OPERATING AGENCY 8
Hr.R.H.Engelken, Director$102~)<G
S            P. O. BOX 968     3000 GEO. WASHINGTON WAY RICHLAND, WASHINGTON 09352 PHONE   (509) 946 968 I August 7, 1979 G02-79-138 Nuclear Regulatory Commission Region V Office of Inspection         and Enforcement Suite 202, Walnut Creek Plaza                                                           $
102 1900 N. Calitornia Boulevard                                                 ~) <G Walnut Creek, California 94596 Attention:           Hr. R. H. Engelken, Director


==Subject:==
==Subject:==
tJPPSS NUCLEAR PROJECT NO.2 DOCKET NU>1BER 50-397, CPPR-93 REPORTABLE DEFICIENCY
tJPPSS NUCLEAR PROJECT NO. 2 DOCKET NU>1BER 50-397, CPPR-93 REPORTABLE DEFICIENCY - 10CFR50.55               e
-10CFR50.55 e  


==Dear Nr.Engelken:==
==Dear Nr. Engelken:==
In accordance with the provisions of lOCFR50.55(e), your staff was informed by telephone on July 16, 1979, of a reportable condition involving the improper installation of anchor bolts.by the Haldinger Corporation.
 
Attached is our report of this deficiency.
In accordance with the provisions of lOCFR50.55(e), your staff was informed by telephone on July 16, 1979, of a reportable condition involving the improper installation of anchor bolts. by the Haldinger Corporation.
Please contact us if you have additional questions.
Attached is our report of           this deficiency.
Yery truly yours, DLR/RPS/ln
Please contact us       if you     have   additional questions.
Yery truly yours, D. L. RENBERGER Assistant Director Technology DLR/RPS/ln


==Attachment:==
==Attachment:==
 
As stated cc: JJ Yerderber - BRR, w/att JJ Byrnes     - BSR, w/att C   Bryant   -   BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att MNP-2 Files, w/att}}
As stated D.L.RENBERGER Assistant Director Technology cc: JJ Yerderber-BRR, w/att JJ Byrnes-BSR, w/att C Bryant-BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att MNP-2 Files, w/att}}

Revision as of 16:49, 29 October 2019

Forwards Deficiency Rept from 790716
ML17272A625
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A626 List:
References
GO2-79-138, NUDOCS 7909100286
Download: ML17272A625 (1)


Text

W Washington Public Power Supply System RF '. A JOINT OPERATING AGENCY 8

S P. O. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND, WASHINGTON 09352 PHONE (509) 946 968 I August 7, 1979 G02-79-138 Nuclear Regulatory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza $

102 1900 N. Calitornia Boulevard ~) <G Walnut Creek, California 94596 Attention: Hr. R. H. Engelken, Director

Subject:

tJPPSS NUCLEAR PROJECT NO. 2 DOCKET NU>1BER 50-397, CPPR-93 REPORTABLE DEFICIENCY - 10CFR50.55 e

Dear Nr. Engelken:

In accordance with the provisions of lOCFR50.55(e), your staff was informed by telephone on July 16, 1979, of a reportable condition involving the improper installation of anchor bolts. by the Haldinger Corporation.

Attached is our report of this deficiency.

Please contact us if you have additional questions.

Yery truly yours, D. L. RENBERGER Assistant Director Technology DLR/RPS/ln

Attachment:

As stated cc: JJ Yerderber - BRR, w/att JJ Byrnes - BSR, w/att C Bryant - BPA, w/att JG Davis, Director, NRC, Washington, D.C., w/att MNP-2 Files, w/att