{{#Wiki_filter:/=~i RKGULIAiTOR
{{#Wiki_filter:/=~
.FOR4lATION OIISTRZBUT,IONi S~M, (RIDS)i ACCESSIOiVi iVBR: 830505015i9 DOCI.OATEI:
i                       RKGULIAiTOR     . FOR4lATION OIISTRZBUT,IONi                       S~M,                   (RIDS)i ACCESSIOiVi iVBR: 830505015i9               DOCI.OATEI: 83/05/03>>                       NOITIARZZEOI: iVOi                               DOCKEIT'.
83/05/03>>NOITIARZZEOI:
  ~FACiILi:50 397>> rtPPSS Vucil cari.P'r oil ect i Uni ti 2i Washington Pub 1-i c>> Powe
iVOi DOCKEIT'.~FACiILi:50 397>>rtPPSS Vucil cari.P'r oil ect i Uni ti 2i~Washington Pub 1-i c>>Powe 05000397>>AUTH NAi<IKI AU'THOR, AFFIILII AIT ION BOUCHEiY.G>>.
                                                                    ~                                                                        05000397>>
0..rlashinaton<
AUTH NAi<IKI               AU'THOR, AFFIILIIAIT ION BOUCHEiY.G>>. 0..
Pgb lii c<Power Suool.v Svs tern RECKPi.VA>>4IKt RKCIIPiiKNiJI AFFiILIIATIONt SCH'rlENCER.A.
RECKPi. VA>>4IKt SCH'rlENCER.A.             'li rlashinaton< Pgb lii c< Power Suool.v Svs tern RKCIIPiiKNiJI AFFiILIIATIONt censina Bt ahch 2"
'li censina Bt ahch 2" tip (W SUBJKCITi:
                                                                                                                                            ~
Fo,rwairds Vbili 4!toi"riPPSS, Nucilea'r;ProiJecti2.'ir eser vice Irl'so>>~Pr oar tatii Pilent5um~arV Reoti" documentirial comoletion oifi 8'oor ox'8'/r o.fr.voilumatr'.i c<%surface exatiis'i r eoeti'rs>8 r co<la'ceiiients<
tip (W SUBJKCITi: Fo,rwairds Vbili 4! toi "riPPSS, Nucilea'r;ProiJecti2.'ir eser vice Irl'so>>
L inciludina Reauesti foir Relii ef>>PSI~2.001,.'iISTRIBUTCout COOKli 8001S COP<KB PKCKIVEO'.L'ITR.
Pr oar tatii Pilent5um~arV Reoti" documentirial comoletion oifi 8'oor o.fr. voilumatr'.i c< % surface exatiis'i r eoeti'rs> 8 r co<la'ceiiients< L ox'8'/r inciludina Reauesti foir Relii ef>> PSI~2.
i I KIVCLI~: SIZEti C,: TiITLEI: Lticensi'na Submi tteili'PSAR/FSAR Atridts-L Reilelted Cozresponde'nce-NOiTES'KCII Pii F NiTI IDi COOEI/iV ALKI iVRR/DLv'ADLI NRR LI32: LIAI COP%F5 LITITR.ENCLI 1>>0 1.0 RKCII PiIKN TI IOI COOEi/NAMKI NRR LB2 BCI AULUCK i R'o'1>>" COP IKS LITTR EiVCLI 1 Oi 1.1 IN TKRNAI.I: KLO/HDS2'Ei/DEPKR/KPBI 36 I Ki/DKQAi/QABt 21.>>VRR'/DK>>/CEB(11>>iVRR/Di'/KQBI 13>>NRR/DE'/HGKBi 30 NRR/DK'/ATEBt 17>>NRR/DE>>/SGEBt 25(NRR/DHFS/LQBt 32;NRR/03ii/AEB(2'b NRR/DSiI/CPBt 10 NRR/08tI/ICSBi 1 b NRR/08ii/PSBi 19 NRR/08iI/RSBt 23>>RGN5<ir 3>>1>>1<2.1>>1.2.ir ir 1>>1>>1>>1r 3 IKI FiILEI I Ki/DEPER/I<lBi 35r NRR/DK</AKABt NRR/OE</KHEBI NRR/OEI/GB>>
COP<KB PKCKIVEO'.L'ITR. i I KIVCLI~: SIZEti 001,.'iISTRIBUTCout COOKli    8001S                                                                                                        C,:
28'VRR/OEi/NKBt 18'RR/DK'/SABi.
TiITLEI: Lticensi'na Submi tteili'PSAR/FSAR Atridts- L Reilelted Cozresponde'nce-NOiTES' KCIIPii F NiTI           COP%F5              RKCII PiIKN TI                                          COP  IKS IDi COOEI/iV ALKI           LITITR. ENCLI    IOI COOEi/NAMKI                                          LITTR EiVCLI iVRR/DLv'ADLI                     1>>    0    NRR LB2 BCI                                                  1      Oi NRR LI32: LIAI                   1. 0     AULUCKi                      R'o'1>>"                         1. 1 IN TKRNAI.I:                                   ir          IKI FiILEI                                                    1 KLO/HDS2'Ei/DEPKR/KPBI 36         3>>          I Ki/DEPER/I<lBi 35r                                          1.
2A'VRR/DHFS/HFEBtt0 NRR/DLI/SSPBt NRR/OS I/ASSI NRR/DSI/CSBt 09 NRR/OS I/iilKITBI 12: NRR/'22vl FiIL 04'I/'cli18i 1 1.1.1>>2 1-1<<1>>1.1.1 1 1 1 1 1 Ot EXTERNALI:
I Ki/DKQAi/QABt 21.               1>>          NRR/DK</AKABt                                                1.
ACRS 4'1 r DNB/OSS (AUDITS)" LPOR 03<iVSI Cl 05i 6 1r 1<ir BNLI(Ab10ITSi ONLIY3" FK>>RA.REPi DIIVI 39 NRCI POR.02", iVT IS 1 1 1.1 TOiTALI NUMBER OFi'DPiIKi8 RKQUIRKb':
              >>VRR'/DK>>/CEB(         11>>       1<          NRR/OE</KHEBI                                                1>>
I.ITTR 54 ENCLI CP ct k th ftk r Pt K~K FK E I l f+It KK I f Nr'4 Nr f Iffy'F,''~FIF f K f" f (I ht 1 q NCr Ih grilk'I a N F Iif IU k f kl f IF e lKK K IF Ih I<Kf., f f F'l f I I='I, H~I.K.,~f ki U II Xb)'U FU F I I lh kL 4 JF IFFIF kk f K r XII 4 II X''Ith'bk.I'kt't hh S)l~)[ir'Ik)''l I 1 kl I kl I It KP lhl I Kr 8 IFF II N>>'-II Ct, F I f 0/r Washington Public Power Supply System P.O.Box 968 3000George Washington Way Richland, Washington 99352 (509)372-5000 May 3, 1983 G02-83-401 Director of Nuclear Reactor Regulation Attention:
iVRR/Di'/KQBI 13>>                 2.          NRR/OEI/GB>>                                                  2 NRR/DE'/HGKBi 30                 1>>                                                  28'VRR/OEi/NKBt 1-NRR/DK'/ATEBt 17>>                 1.                                                  18'RR/DK'/SABi.
Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, DC 20555
1<<
NRR/DE>>/SGEBt 25(                 2.                                                  2A'VRR/DHFS/HFEBtt0 1>>
NRR/DHFS/LQBt 32;                 ir          NRR/DLI/SSPBt                                                1.
NRR/03ii/AEB( 2'b                 ir          NRR/OS I/ASSI                                                1.
NRR/DSiI/CPBt 10                 1>>          NRR/DSI/CSBt 09                                              1 NRR/08tI/ICSBi 1 b                1>>           NRR/OS I/iilKITBI12:                                          1
                                                                                              '
NRR/08ii/PSBi 19                  1>>          NRR/                                   22                    1 NRR/08iI/RSBt 23>>                1r              vl FiIL                             04'                   1      1 RGN5<                            3                                        I/'cli18i                       1     Ot EXTERNALI: ACRS                     4'1 r     6            BNLI( Ab10ITSi ONLIY3" DNB/OSS       (AUDITS)"         1r           FK>>RA. REPi DIIVI                     39 LPOR                  03<        1<          NRCI POR.                             02",                   1      1 iVSI Cl                05i        ir          iVT IS                                                       1. 1 TOiTALI NUMBER     OFi'DPiIKi8 RKQUIRKb': I.ITTR           54     ENCLI                       CP


==Dear Mr.Schwencer:==
ct  k th    ftk  r      Pt    K          ~
K FK KK I E
I l f                                        +It Ih f  K                                                                a                            e lKK        K f Nr'4 Nr    F,''~FIF f          f" f                        ht 1 (I
q NCr    grilk'I                F N
kl  f Iffy'                                                                                          Iif IU k  f              IF IF                                                                                                                        I='    I,    H Ih I      <Kf  .,      f f    F'l f  I
                                                                                                                                      ~ I.K.,~  f ki U II Xb )'U FU F
I kL 4  JF IFFIF K    r XII II
                                                                                                                          't
                                                                                                                      'bk. I 4
X''Ith I lh                                                              kk f                          'kt S)l
                            ~ )[ir        'Ik)  ''l                                          I N>>'-
hh                                                                  1 kl I    It  KP                                                      lhl I kl I Kr  8  IFF                                                                  II Ct, F
II                                                                            I
 
f 0
  /
r Washington Public Power Supply System P.O. Box 968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 May  3, 1983 G02-83-401 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No.      2 Division of Licensing U. S. Nuclear    Regulatory Commission Washington,    DC  20555
 
==Dear Mr. Schwencer:==


==Subject:==
==Subject:==
NUCLEAR PROJECT NO.2, CPPR-93, PRESERVICE INSPECTION PROGRAM PLAN, VOLUME NO.4,"PRESERVICE INSPECTION
NUCLEAR PROJECT   NO. 2, CPPR-93,   PRESERVICE INSPECTION PROGRAM PLAN, VOLUME NO. 4, "PRESERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
REPORT"  
REPORT"


==References:==
==References:==
a)  G02-79-54,  dated March 28, 1979 b)  G02-79-89,  dated May 9, 1979 c)  G02-80-311,  dated December 31, 1980 d)  G02-81-565,  dated December 30, 1981 The Washington    Public Power Supply System herewith submits five (5) copies of the Preservice Inspection      Summary Report designated Volume 4 of the Preservice Inspection Program Plan. Five (5) copies of the Program Plan and Amendments 1, 2 and 3 were originally submitted to you via the refer-enced  letters.
The Summary Report documents the =-Supply System's completion of approxi-mately 98% of the volumetric and surface examinations committed to in the Preservice Inspection Program Plan. Also submitted as part of the Summary Report are 23, NIS-2 Owner's Report of Repair or Replacement forms for repairs or replacements completed to March 31, 1983.
In addition to documenting the volumetric and surface examinations and repairs and replacements, the Summary Report includes Request for Relief PSI-2-001. This section of the report documents all areas the Supply Sys-tem found that could not be fully examined to the ASME Section XI Code.
The Request for Relief contains only a few welds, all of which received a partial code examination. It is anticipated that no additional welds will be added to this request for relief.
goo    I
                                                                                          'ls 8305050i59 830503 PDR ADDCK    05000397
[ 0                  PDR
(g If f
Mr. A. Schwencer,    NRC Page Two A  supplement to this Summary Report will be submitted within 90 days after  commercial operation. This supplement will contain a summary of the results of the remaining surface, visual and volumetric examinations.
Also contained in this supplement will be NIS-2 Owner's Reports for all repairs and replacements completed from March 31, 1983 to commercial operations and the NIS-1 Owner's Data Report for the Preservice Inspec-tion.
Very  truly yours, G. D. Bouchey,  340 Manager, Nuclear Safety and Regulatory Programs GDB:DPR:st Attachment cc:  R. Auluck, NRC, w/o M. S. Chin, BPA, w/o R. H. Engelken, NRC ROY, w/a M. R. Humm, NRC, w/o A. Toth, NRC  Site, w/o


a)G02-79-54, dated March 28, 1979 b)G02-79-89, dated May 9, 1979 c)G02-80-311, dated December 31, 1980 d)G02-81-565, dated December 30, 1981 The Washington Public Power Supply System herewith submits five (5)copies of the Preservice Inspection Summary Report designated Volume 4 of the Preservice Inspection Program Plan.Five (5)copies of the Program Plan and Amendments 1, 2 and 3 were originally submitted to you via the refer-enced letters.The Summary Report documents the=-Supply System's completion of approxi-mately 98%of the volumetric and surface examinations committed to in the Preservice Inspection Program Plan.Also submitted as part of the Summary Report are 23, NIS-2 Owner's Report of Repair or Replacement forms for repairs or replacements completed to March 31, 1983.In addition to documenting the volumetric and surface examinations and repairs and replacements, the Summary Report includes Request for Relief PSI-2-001.
0
This section of the report documents all areas the Supply Sys-tem found that could not be fully examined to the ASME Section XI Code.The Request for Relief contains only a few welds, all of which received a partial code examination.
    'P Cj l}}
It is anticipated that no additional welds will be added to this request for relief.I goo'ls 8305050i59 830503 PDR ADDCK 05000397[0 PDR (g If f Mr.A.Schwencer, NRC Page Two A supplement to this Summary Report will be submitted within 90 days after commercial operation.
This supplement will contain a summary of the results of the remaining surface, visual and volumetric examinations.
Also contained in this supplement will be NIS-2 Owner's Reports for all repairs and replacements completed from March 31, 1983 to commercial operations and the NIS-1 Owner's Data Report for the Preservice Inspec-tion.Very truly yours, G.D.Bouchey, 340 Manager, Nuclear Safety and Regulatory Programs GDB:DPR:st Attachment cc: R.Auluck, NRC, w/o M.S.Chin, BPA, w/o R.H.Engelken, NRC ROY, w/a M.R.Humm, NRC, w/o A.Toth, NRC Site, w/o 0'P Cj l}}

Revision as of 14:58, 29 October 2019

Forwards Vol 4 to Wppss Nuclear Project 2 Preservice Insp Program Plan,Summary Rept, Documenting Completion of Approx 98% of Volumetric & Surface Exams,Repairs & Replacements & Including Request for Relief PSI-2-001
ML17277A566
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/03/1983
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A567 List:
References
GO2-83-401, NUDOCS 8305050159
Download: ML17277A566 (6)


Text

/=~

i RKGULIAiTOR . FOR4lATION OIISTRZBUT,IONi S~M, (RIDS)i ACCESSIOiVi iVBR: 830505015i9 DOCI.OATEI: 83/05/03>> NOITIARZZEOI: iVOi DOCKEIT'.

~FACiILi:50 397>> rtPPSS Vucil cari.P'r oil ect i Uni ti 2i Washington Pub 1-i c>> Powe

~ 05000397>>

AUTH NAi<IKI AU'THOR, AFFIILIIAIT ION BOUCHEiY.G>>. 0..

RECKPi. VA>>4IKt SCH'rlENCER.A. 'li rlashinaton< Pgb lii c< Power Suool.v Svs tern RKCIIPiiKNiJI AFFiILIIATIONt censina Bt ahch 2"

~

tip (W SUBJKCITi: Fo,rwairds Vbili 4! toi "riPPSS, Nucilea'r;ProiJecti2.'ir eser vice Irl'so>>

Pr oar tatii Pilent5um~arV Reoti" documentirial comoletion oifi 8'oor o.fr. voilumatr'.i c< % surface exatiis'i r eoeti'rs> 8 r co<la'ceiiients< L ox'8'/r inciludina Reauesti foir Relii ef>> PSI~2.

COP<KB PKCKIVEO'.L'ITR. i I KIVCLI~: SIZEti 001,.'iISTRIBUTCout COOKli 8001S C,:

TiITLEI: Lticensi'na Submi tteili'PSAR/FSAR Atridts- L Reilelted Cozresponde'nce-NOiTES' KCIIPii F NiTI COP%F5 RKCII PiIKN TI COP IKS IDi COOEI/iV ALKI LITITR. ENCLI IOI COOEi/NAMKI LITTR EiVCLI iVRR/DLv'ADLI 1>> 0 NRR LB2 BCI 1 Oi NRR LI32: LIAI 1. 0 AULUCKi R'o'1>>" 1. 1 IN TKRNAI.I: ir IKI FiILEI 1 KLO/HDS2'Ei/DEPKR/KPBI 36 3>> I Ki/DEPER/I<lBi 35r 1.

I Ki/DKQAi/QABt 21. 1>> NRR/DK</AKABt 1.

>>VRR'/DK>>/CEB( 11>> 1< NRR/OE</KHEBI 1>>

iVRR/Di'/KQBI 13>> 2. NRR/OEI/GB>> 2 NRR/DE'/HGKBi 30 1>> 28'VRR/OEi/NKBt 1-NRR/DK'/ATEBt 17>> 1. 18'RR/DK'/SABi.

1<<

NRR/DE>>/SGEBt 25( 2. 2A'VRR/DHFS/HFEBtt0 1>>

NRR/DHFS/LQBt 32; ir NRR/DLI/SSPBt 1.

NRR/03ii/AEB( 2'b ir NRR/OS I/ASSI 1.

NRR/DSiI/CPBt 10 1>> NRR/DSI/CSBt 09 1 NRR/08tI/ICSBi 1 b 1>> NRR/OS I/iilKITBI12: 1

'

NRR/08ii/PSBi 19 1>> NRR/ 22 1 NRR/08iI/RSBt 23>> 1r vl FiIL 04' 1 1 RGN5< 3 I/'cli18i 1 Ot EXTERNALI: ACRS 4'1 r 6 BNLI( Ab10ITSi ONLIY3" DNB/OSS (AUDITS)" 1r FK>>RA. REPi DIIVI 39 LPOR 03< 1< NRCI POR. 02", 1 1 iVSI Cl 05i ir iVT IS 1. 1 TOiTALI NUMBER OFi'DPiIKi8 RKQUIRKb': I.ITTR 54 ENCLI CP

ct k th ftk r Pt K ~

K FK KK I E

I l f +It Ih f K a e lKK K f Nr'4 Nr F,~FIF f f" f ht 1 (I

q NCr grilk'I F N

kl f Iffy' Iif IU k f IF IF I=' I, H Ih I <Kf ., f f F'l f I

~ I.K.,~ f ki U II Xb )'U FU F

I kL 4 JF IFFIF K r XII II

't

'bk. I 4

XIth I lh kk f 'kt S)l

~ )[ir 'Ik) l I N>>'-

hh 1 kl I It KP lhl I kl I Kr 8 IFF II Ct, F

II I

f 0

/

r Washington Public Power Supply System P.O. Box 968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 May 3, 1983 G02-83-401 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO. 2, CPPR-93, PRESERVICE INSPECTION PROGRAM PLAN, VOLUME NO. 4, "PRESERVICE INSPECTION

SUMMARY

REPORT"

References:

a) G02-79-54, dated March 28, 1979 b) G02-79-89, dated May 9, 1979 c) G02-80-311, dated December 31, 1980 d) G02-81-565, dated December 30, 1981 The Washington Public Power Supply System herewith submits five (5) copies of the Preservice Inspection Summary Report designated Volume 4 of the Preservice Inspection Program Plan. Five (5) copies of the Program Plan and Amendments 1, 2 and 3 were originally submitted to you via the refer-enced letters.

The Summary Report documents the =-Supply System's completion of approxi-mately 98% of the volumetric and surface examinations committed to in the Preservice Inspection Program Plan. Also submitted as part of the Summary Report are 23, NIS-2 Owner's Report of Repair or Replacement forms for repairs or replacements completed to March 31, 1983.

In addition to documenting the volumetric and surface examinations and repairs and replacements, the Summary Report includes Request for Relief PSI-2-001. This section of the report documents all areas the Supply Sys-tem found that could not be fully examined to the ASME Section XI Code.

The Request for Relief contains only a few welds, all of which received a partial code examination. It is anticipated that no additional welds will be added to this request for relief.

goo I

'ls 8305050i59 830503 PDR ADDCK 05000397

[ 0 PDR

(g If f

Mr. A. Schwencer, NRC Page Two A supplement to this Summary Report will be submitted within 90 days after commercial operation. This supplement will contain a summary of the results of the remaining surface, visual and volumetric examinations.

Also contained in this supplement will be NIS-2 Owner's Reports for all repairs and replacements completed from March 31, 1983 to commercial operations and the NIS-1 Owner's Data Report for the Preservice Inspec-tion.

Very truly yours, G. D. Bouchey, 340 Manager, Nuclear Safety and Regulatory Programs GDB:DPR:st Attachment cc: R. Auluck, NRC, w/o M. S. Chin, BPA, w/o R. H. Engelken, NRC ROY, w/a M. R. Humm, NRC, w/o A. Toth, NRC Site, w/o

0

'P Cj l