{{#Wiki_filter:i!ECHVEQ'BC Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99Pgf$609)873.6090 O'GIOtPg gE Docket No.50-3 7 July ll, 1985 Mr.J.B.Martin, Regional Administrator U.S.Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596  
{{#Wiki_filter:i!ECHVEQ
                                                                            'BC Washington Public Power Supply System P.O. Box 968   3000 George Washington Way Richland, Washington 99Pgf $ 609)873.6090 O'GIOtPg gE Docket No. 50-3     7 July   ll, 1985 Mr. J.B. Martin, Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION REPORT 85-20 The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated June 13, 1985.Our reply pursuant to the provisions of Section 2.201, Title, 10 Code of Federal Pegulations, consists of this letter and Appendix A (attached).
NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORT     85-20 The Washington     Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated June 13, 1985. Our reply pursuant to the provisions of Section 2.201, Title, 10 Code of Federal Pegulations, consists of this letter and Appendix A (attached).
In Appendix A, an explanation of the violation is presented, the'orrective steps taken with results achieved are outlined, and the date of full compliance is specified.
In Appendix A, an explanation of the violation is presented, the'orrective steps taken with results achieved are outlined, and the date of full compliance is specified.
Should you have any questions concerning our response, please do not hesitate to contact me.G.C.Sorensen~~Manager, Regulatory Programs GSC la Attachment se 8>ose7 pubs s07soo~cv, osooo<9 Cl t/t I-~l j\~L l I I Appendix A Appendix A Page 1 of 5 During an NRC inspection conducted on May 29-31, 1985 violations of NRC re-quirements were identified.
Should you have any questions concerning our response,           please do not hesitate to contact     me.
The violations involved adherence to Technical Specification required proedures during a maintenance outage involving posting of radiation areas, labeling of radioactive material containers, work activi-ties within the drywell and control of overtime for chemistry and health physics technicians.
G.C. Sorensen
In accordance with the"General Statement of Policy and Procedures for NRC Enforcement Actions", 10 CFR Part 2, Appendix C (1985)the violations are listed below: A.Technician Specification 6.2.2.f.2 states in part,"An individual should not be permitted to work...more than 72 hours in any 7 day period...Any deviation...shall be authorized by the plant manager...in accor-dance with written procedures and with documentation of the basis for granting the deviation".
~ ~
Procedures 1.3.27 step 5.F states in part that any deviation shall be approved and documented prior to approving the overtime.Contrary to the above requirements, two individuals each worked 84'hours in seven consecutive days prior to May 10, 1985 when the approval was documented.
Manager, Regulatory Programs GSC   la Attachment s07soo~cv, se 8>     ose7 osooo<9 pubs
In addition, the memorandum approved by the Plant Manager dated May 10, 1985 containing documentation of the approval did not pro-vide the basis for granting the deviation.
These two individuals worked 15 and 20 consecutive 12 hour days.This is a Severity Level V Violation (Supplement I).Validity of Violation The Supply System concurs with the validity of this violation.
Increased management and supervisory attention in this area is warranted.
Corrective Ste s Taken/Results Achieved o A memorandom was issued by Plant Management to all Department Managers/Supervisors reinforcing the requi rements of PPM 1.3.27.This letter specifically identified the need for prior authorization of overtime deviations and provided guidelines for proper justification.
Corrective Ste s To Be Taken@%o Plant Procedure 1.3.27,"Overtime Control" will be reviewed by the Plant Management for adequacy.
r I Date of Full Com liance Appendix A Page 2 of 5 Since issuance of the Plant Management Memorandum on overtime control, proper overtime authorization and documentation requirements have been observed.The PPM 1.3.27 review will be completed during July, 1985 and any additional corrective action identified at that time.V Technical Specification G.ll.l states in part,"procedures
...shall be prepared consistent with the requirements of 10 CFR 20 and shall be...adhered to...".Plant Procedures Manual (PPM)11.2.7.1,'Areas Post-ing'tates in part that all areas accessible to personnel with exposure rates greater than or equal to 2.5 mrem/hr shall be posted at each acces-sible perimeter with the words'CAUTION-RADIATION AREA'nd PPM 11.2.14.3,'Storage of Radioactive Material'tates in part that the storage area shall be posted at any accessible side with a"CAUTION-RADIOACTIVE MATERIAL" sign and that each container shall also be labeled with the"CAUTION-RADIOACTIVE MATERIAL" sign, the type of material and radiation levels at contact and three feet.Contrary to the above requirements on May 30, 1985 the outdoor solidifi-cation work area was being used to store radioactive material and: 1.Three steel boxes containing compressed radioactive trash were not labeled at all regarding radioactive material content;2.The storage area was not labeled at one accessible side in that the two barrier ropes on one side of the area were both down, the sign with the radioactive material posting was face down in sand and other posti ngs were not readily apparant;3.The area was not posted on any side as a radiation area'nd the measured radiation exposure rate at 18 inches from one container was 3.0 to 4.0 mr per hour.The above conditions existed for about two hours prior to discovery by the NRC Inspector.
The exceptions of 20.203 (f)(3)and 20.204 did not apply.This is a Severity Level IV Violation (Supplement IV).Validity of Violation The Supply System concurs with the violation as stated.Corrective Ste s Taken/Results Achieved o The barrier was reestablished, containers were provided with proper labels and the area was correctly posted as a radiation area.o A review of the circumstances surrounding this occurrence was in-itiated and indicated this was a singular event rather than a pro-grammatic breakdown.


M Appendix A Page 3 of 5 The Health Physics (HP)Department employee responsible for these discrepancies was counselled on the necessity to follow Plant.Procedures.
Cl t /   t I
The individual was also reinstructed on radioactive material and area labeling/posting requirements.
j  l
Corrective Ste s To Be Taken~'Additionally the radioactive material and area labeling/posting requirements will be reemphasized during a training cycle for Health Physics Technicians.
        - ~l         I
Date of Full Com liance The plant'is now in full compliance and a six week training cycle for Health Physics Technicians has commenced.
            \~      I L
Tnis training cycle is sched-uled for completion by August 16, 1985 and will reemphasize labeling and posting requirements.
C.Technical Specification 6.8.1 states in part,"Written procedures shall be established, implemented and maintained covering the activities re-ferenced below: a.Regulatory Guide 1.33...g.Fire Protection Pro-gram Implementation".
RG 1.33 Appendix A, Item 9.C lists examples of safety related equipment for which procedures should be prepared prior to beginning work.PPM 1.3.18,'Tool and Equipment Control Around Open Plant Systems's identified by the licensee as a safety related procedure.
Tnis proce-dure, step 1.3.18.4.C states that use of this procedure is mandatory for components of the primary system when components are opened for rework.Step 1.3.18.7, Procedure, states that tools shall be inventoried and logged in and out oust e work area and that all tools and equipment shall be equipped with a lanyard.PPM 1.3.19, a licensee designated safety related procedure prohibits the use of clay mineral sorbants in the power block (reactor building, tur-bine building).
Contrary to the above: l.On May 29, 1985, between 3PM and 5PM, work in progress on an open safety related portion of the primary system (inboard main feedwater check valve)was conducted without following procedure 1.3.18 in that tools were not logged, lanyarded or otherwi'se controlled.
2.On May 29 and May 30, 1985, the use of prohibited material (clay mineral absorbant) was observed on the 572 foot elevation of the reactor building.This is a Severity Level IV Violation (Supplement I).


Validity of Violation Appendix A Page 4 of 5 The Inspector was correct in his findings concerning compliance with Plant Procedure'1.3.18 and 1.3.19.The cause of these instances of non-compliance was a fundamental lack of awareness of the procedural require-ments by the personnel involved.This occurred because of minimal emphasis on these procedures during previous training.Corrective Ste s Taken/Results Achieved o As stated in the body of the inspection report..."The Foreman took immediate steps to remove loose material from the vicinity of the work".In addition the Foreman initiated a"WNP-2 Tool and Equip-ment Inventory/Inspection Sheet".This inventory/inspection sheet was utilized for the remainder of the job resulting in the open sys-tem being"buttoned up" with assurance that system cleanliness had been maintained.
Appendix A Page 1 of 5 Appendix A During an NRC inspection conducted on May 29-31, 1985 violations of NRC re-quirements were identified. The violations involved adherence to Technical Specification required proedures during a maintenance outage involving posting of radiation areas, labeling of radioactive material containers, work activi-ties within the drywell and control of overtime for chemistry and health physics technicians.      In accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions", 10 CFR Part 2, Appendix C (1985) the violations are listed below:
o The clay mineral sorbent was removed from the Reactor Building.The sorbent was being used during operation of a pipethreader and crafts using the pipethreader were retrai ned on keeping sorbents out of the reactor building.Tnis requirement was also clarified with all other crafts.o Plant Management has contacted the Support Service Contractor Man-agement to ensure that this issue receives proper emphasis by all craft organizations.
A. Technician Specification 6.2.2.f.2 states in part, "An individual should not be permitted to work ... more than 72 hours in any 7 day period ...
Corrective Ste s To Be Taken o Work instructions contained in Maintenance Work Request'(MWR) pack-ages are the Plant's primary method of implementing tnese types of procedural requirements.
Any deviation ... shall be authorized by the plant manager ... in accor-dance with written procedures and with documentation of the basis for granting the deviation". Procedures 1.3.27 step 5.F states in part that any deviation shall be approved and documented prior to approving the overtime.
It is the Supply System's perception that engineers preparing the MWR work instructions have not fully in-corporated these types of procedural requirements into the MWR.Therefore, a multi-organization committee has been instructed to evaluate the Plant procedure governing MWR preparation for possible improvements with regard to work instruction preparation guidelines.
Contrary to the above requirements, two individuals each worked 84 'hours in seven consecutive days prior to May 10, 1985 when the approval was documented. In addition, the memorandum approved by the Plant Manager dated May 10, 1985 containing documentation of the approval did not pro-vide the basis for granting the deviation. These two individuals worked 15 and 20 consecutive 12 hour days.
o Knowledgeable craft personnel working to MWR instructions are a second check for ensuring compliance with these procedural require-ments.Therefore, all Plant Maintenance and Support Services Con-tractor craft personnel will be retrained in the requirements of PPM's 1.3.18 and 1.3.19.o Both subjects discussed in this violation are considered"skill of the craft" knowledge wnich is proceduralized (Volume 10.2 series procedures
This is  a  Severity Level  V Violation (Supplement  I).
).Therefore, interfacing generic procedures (e.g., PPM 10.2.7, Valve Troubleshooting, Handling and Repairs)will be reviewed for adequate cross referencing of PPM's 1.3.18 and 1.3.19..  
Validity of Violation The Supply System concurs    with the validity of this violation. Increased management and supervisory      attention in this area is warranted.
Corrective Ste    s  Taken/Results Achieved o    A memorandom was    issued by Plant Management to all Department Managers/  Supervisors  reinforcing the requi rements of PPM 1.3.27.
This letter specifically identified the need for prior authorization of overtime deviations and provided guidelines for proper justification.
Corrective Ste  s To Be Taken                            @%
o    Plant Procedure 1.3.27, "Overtime Control" will      be reviewed by the Plant Management for adequacy.
 
r I
 
Appendix A Page 2 of 5 Date  of Full    Com liance Since issuance    of the Plant Management Memorandum on overtime control, proper overtime authorization and documentation requirements have been observed.      The PPM 1.3.27 review will be completed during July, 1985 and any  additional    corrective action identified at that time.
V Technical Specification G.ll.l states in part, "procedures ... shall be prepared consistent with the requirements of 10 CFR 20 and shall be ...
adhered to ... " . Plant Procedures Manual (PPM) 11.2.7.1, 'Areas Post-ing'tates in part that all areas accessible to personnel with exposure rates greater than or equal to 2.5 mrem/hr shall be posted at each acces-sible perimeter with the words 'CAUTION - RADIATION AREA'nd PPM 11.2.14.3, 'Storage of Radioactive Material'tates in part that the storage area shall be posted at any accessible side with a "CAUTION-RADIOACTIVE MATERIAL" sign and that each container shall also be labeled with the "CAUTION - RADIOACTIVE MATERIAL" sign, the type of material and radiation levels at contact and three feet.
Contrary to the above requirements on May 30, 1985 the outdoor solidifi-cation work area was being used to store radioactive material and:
: 1. Three steel boxes containing compressed        radioactive trash were not labeled at all regarding radioactive material content;
: 2. The  storage area was not labeled at one accessible side in that the two  barrier  ropes on one side of the area were both down, the sign with the    radioactive  material posting was face down in sand and other posti ngs    were not  readily apparant;
: 3. The area was    not posted  on any  side as  a  radiation area'nd the measured    radiation exposure rate at    18 inches  from one container was 3.0 to 4.0 mr per hour.
The above    conditions existed for about two hours prior to discovery by the NRC Inspector.      The exceptions of 20.203 (f)(3) and 20.204 did not apply.
This is  a  Severity Level IV Violation (Supplement IV).
Validity of Violation The Supply System concurs      with the violation    as stated.
Corrective Ste    s Taken/Results Achieved o    The  barrier  was  reestablished,  containers were provided with proper labels and the area was      correctly posted    as a  radiation area.
o    A  review of the circumstances      surrounding this occurrence was in-itiated    and indicated this  was a  singular event rather than a pro-grammatic breakdown.
 
M Appendix A Page 3 of 5 The Health Physics (HP) Department employee responsible for these discrepancies was counselled on the necessity to follow Plant.
Procedures.      The individual was also reinstructed on radioactive material and area labeling/posting requirements.
Corrective Ste    s To Be Taken
                                                              ~'
Additionally the radioactive material      and area    labeling/posting requirements will be reemphasized      during a training cycle for Health Physics Technicians.
Date  of Full  Com  liance The plant 'is now in full compliance and a six week training cycle for Health Physics Technicians has commenced.        Tnis training cycle is sched-uled for completion by August 16, 1985 and will reemphasize labeling and posting requirements.
C. Technical Specification 6.8.1 states in part, "Written procedures shall be  established, implemented and maintained covering the activities re-ferenced below: a. Regulatory Guide 1.33 ... g. Fire Protection Pro-gram Implementation".      RG 1.33 Appendix A, Item 9.C lists examples of safety related equipment for which procedures should be prepared prior to beginning work.
PPM  1.3.18, 'Tool and Equipment Control Around Open Plant Systems's identified  by the licensee as a safety related procedure.        Tnis proce-dure, step 1.3.18.4.C states that use of this procedure is mandatory for components of the primary system when components are opened for rework.
Step 1.3.18.7, Procedure, states that tools shall be inventoried and logged in and out oust e work area and that all tools and equipment shall be equipped  with  a  lanyard.
PPM  1.3.19,  a  licensee designated safety related procedure prohibits the use  of clay mineral sorbants in the    power block (reactor building, tur-bine building).
Contrary to the above:
: l. On May  29, 1985, between 3PM and 5PM, work in progress on an open safety related portion of the primary system (inboard main feedwater check valve) was conducted without following procedure 1.3.18 in that tools were not logged, lanyarded or otherwi'se controlled.
: 2. On May 29 and May 30, 1985, the use of prohibited material (clay mineral absorbant) was observed on the 572 foot elevation of the reactor building.
This is  a  Severity Level IV Violation (Supplement      I).
 
Appendix A Page 4  of  5 Validity of Violation The Inspector was correct in his findings concerning compliance with Plant Procedure '1.3.18 and 1.3.19. The cause of these instances of non-compliance was a fundamental lack of awareness of the procedural require-ments by the personnel involved. This occurred because of minimal emphasis on these procedures during previous training.
Corrective Ste   s Taken/Results Achieved o   As stated in the body of the inspection report   ... "The Foreman took immediate steps to remove loose material from the     vicinity of the work". In addition the Foreman initiated a "WNP-2 Tool and Equip-ment Inventory/Inspection Sheet". This inventory/inspection sheet was utilized for the remainder of the job resulting in the open sys-tem being "buttoned up" with assurance that system cleanliness had been maintained.
o   The clay mineral sorbent was removed from the Reactor Building. The sorbent was being used during operation of a pipethreader and crafts using the pipethreader were retrai ned on keeping sorbents out of the reactor building. Tnis requirement was also clarified with all other crafts.
o   Plant   Management has contacted the Support Service Contractor Man-agement to ensure that this issue receives proper emphasis by all craft organizations.
Corrective Ste   s To Be Taken o   Work   instructions contained in Maintenance Work Request'(MWR) pack-ages are   the Plant's primary method of implementing tnese types of procedural requirements. It is the Supply System's perception that engineers preparing the MWR work instructions have not fully in-corporated these types of procedural requirements into the MWR.
Therefore, a multi-organization committee has been instructed to evaluate the Plant procedure governing MWR preparation for possible improvements with regard to work instruction preparation guidelines.
o   Knowledgeable craft personnel working to MWR instructions are a second check for ensuring compliance with these procedural require-ments. Therefore, all Plant Maintenance and Support Services Con-tractor craft personnel will be retrained in the requirements of PPM's   1.3.18 and 1.3.19.
o   Both subjects discussed in this violation are considered "skill of the craft" knowledge wnich is proceduralized (Volume 10.2 series procedures ). Therefore, interfacing generic procedures (e.g., PPM 10.2.7, Valve Troubleshooting, Handling and Repairs) will be reviewed for adequate cross referencing of PPM's 1.3.18 and 1.3.19..
 
~ ~
Appendix A Page 5 of 5 A plant procedure is currently being developed  for control of chemicals in the plant. It is envisioned that this procedure will include  an  adequate control mechanism that will help preclude future violations of this nature.
o    The need  for supervision to conduct more frequent Plant inspections during outages will be discussed during the "Lessons Learned" ses-sions,to be held following completion of the current maintenance outage.
Date of Full  Com  liance o    All identified actions will  be completed by 9/1/85.


~~Appendix A Page 5 of 5 A plant procedure is currently being developed for control of chemicals in the plant.It is envisioned that this procedure will include an adequate control mechanism that will help preclude future violations of this nature.o The need for supervision to conduct more frequent Plant inspections during outages will be discussed during the"Lessons Learned" ses-sions,to be held following completion of the current maintenance outage.Date of Full Com liance o All identified actions will be completed by 9/1/85.
~, t'}}
~, t'}}

Latest revision as of 14:27, 29 October 2019

Responds to NRC 850613 Ltr Re Violations Noted in Insp Rept 50-397/85-20.Corrective Actions:Procedure 1.3.27, Overtime Control Will Be Reviewed for Adequacy & Radioactive Matl & Area Labeling/Posting Requirements Will Be Reemphasized
ML17278A301
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/11/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17278A300 List:
References
NUDOCS 8507300259
Download: ML17278A301 (12)


Text

i!ECHVEQ

'BC Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99Pgf $ 609)873.6090 O'GIOtPg gE Docket No. 50-3 7 July ll, 1985 Mr. J.B. Martin, Regional Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORT 85-20 The Washington Public Power Supply System hereby replies to the Notice of Violation contained in your letter dated June 13, 1985. Our reply pursuant to the provisions of Section 2.201, Title, 10 Code of Federal Pegulations, consists of this letter and Appendix A (attached).

In Appendix A, an explanation of the violation is presented, the'orrective steps taken with results achieved are outlined, and the date of full compliance is specified.

Should you have any questions concerning our response, please do not hesitate to contact me.

G.C. Sorensen

~ ~

Manager, Regulatory Programs GSC la Attachment s07soo~cv, se 8> ose7 osooo<9 pubs

Cl t / t I

j l

- ~l I

\~ I L

Appendix A Page 1 of 5 Appendix A During an NRC inspection conducted on May 29-31, 1985 violations of NRC re-quirements were identified. The violations involved adherence to Technical Specification required proedures during a maintenance outage involving posting of radiation areas, labeling of radioactive material containers, work activi-ties within the drywell and control of overtime for chemistry and health physics technicians. In accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions", 10 CFR Part 2, Appendix C (1985) the violations are listed below:

A. Technician Specification 6.2.2.f.2 states in part, "An individual should not be permitted to work ... more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period ...

Any deviation ... shall be authorized by the plant manager ... in accor-dance with written procedures and with documentation of the basis for granting the deviation". Procedures 1.3.27 step 5.F states in part that any deviation shall be approved and documented prior to approving the overtime.

Contrary to the above requirements, two individuals each worked 84 'hours in seven consecutive days prior to May 10, 1985 when the approval was documented. In addition, the memorandum approved by the Plant Manager dated May 10, 1985 containing documentation of the approval did not pro-vide the basis for granting the deviation. These two individuals worked 15 and 20 consecutive 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> days.

This is a Severity Level V Violation (Supplement I).

Validity of Violation The Supply System concurs with the validity of this violation. Increased management and supervisory attention in this area is warranted.

Corrective Ste s Taken/Results Achieved o A memorandom was issued by Plant Management to all Department Managers/ Supervisors reinforcing the requi rements of PPM 1.3.27.

This letter specifically identified the need for prior authorization of overtime deviations and provided guidelines for proper justification.

Corrective Ste s To Be Taken @%

o Plant Procedure 1.3.27, "Overtime Control" will be reviewed by the Plant Management for adequacy.

r I

Appendix A Page 2 of 5 Date of Full Com liance Since issuance of the Plant Management Memorandum on overtime control, proper overtime authorization and documentation requirements have been observed. The PPM 1.3.27 review will be completed during July, 1985 and any additional corrective action identified at that time.

V Technical Specification G.ll.l states in part, "procedures ... shall be prepared consistent with the requirements of 10 CFR 20 and shall be ...

adhered to ... " . Plant Procedures Manual (PPM) 11.2.7.1, 'Areas Post-ing'tates in part that all areas accessible to personnel with exposure rates greater than or equal to 2.5 mrem/hr shall be posted at each acces-sible perimeter with the words 'CAUTION - RADIATION AREA'nd PPM 11.2.14.3, 'Storage of Radioactive Material'tates in part that the storage area shall be posted at any accessible side with a "CAUTION-RADIOACTIVE MATERIAL" sign and that each container shall also be labeled with the "CAUTION - RADIOACTIVE MATERIAL" sign, the type of material and radiation levels at contact and three feet.

Contrary to the above requirements on May 30, 1985 the outdoor solidifi-cation work area was being used to store radioactive material and:

1. Three steel boxes containing compressed radioactive trash were not labeled at all regarding radioactive material content;
2. The storage area was not labeled at one accessible side in that the two barrier ropes on one side of the area were both down, the sign with the radioactive material posting was face down in sand and other posti ngs were not readily apparant;
3. The area was not posted on any side as a radiation area'nd the measured radiation exposure rate at 18 inches from one container was 3.0 to 4.0 mr per hour.

The above conditions existed for about two hours prior to discovery by the NRC Inspector. The exceptions of 20.203 (f)(3) and 20.204 did not apply.

This is a Severity Level IV Violation (Supplement IV).

Validity of Violation The Supply System concurs with the violation as stated.

Corrective Ste s Taken/Results Achieved o The barrier was reestablished, containers were provided with proper labels and the area was correctly posted as a radiation area.

o A review of the circumstances surrounding this occurrence was in-itiated and indicated this was a singular event rather than a pro-grammatic breakdown.

M Appendix A Page 3 of 5 The Health Physics (HP) Department employee responsible for these discrepancies was counselled on the necessity to follow Plant.

Procedures. The individual was also reinstructed on radioactive material and area labeling/posting requirements.

Corrective Ste s To Be Taken

~'

Additionally the radioactive material and area labeling/posting requirements will be reemphasized during a training cycle for Health Physics Technicians.

Date of Full Com liance The plant 'is now in full compliance and a six week training cycle for Health Physics Technicians has commenced. Tnis training cycle is sched-uled for completion by August 16, 1985 and will reemphasize labeling and posting requirements.

C. Technical Specification 6.8.1 states in part, "Written procedures shall be established, implemented and maintained covering the activities re-ferenced below: a. Regulatory Guide 1.33 ... g. Fire Protection Pro-gram Implementation". RG 1.33 Appendix A, Item 9.C lists examples of safety related equipment for which procedures should be prepared prior to beginning work.

PPM 1.3.18, 'Tool and Equipment Control Around Open Plant Systems's identified by the licensee as a safety related procedure. Tnis proce-dure, step 1.3.18.4.C states that use of this procedure is mandatory for components of the primary system when components are opened for rework.

Step 1.3.18.7, Procedure, states that tools shall be inventoried and logged in and out oust e work area and that all tools and equipment shall be equipped with a lanyard.

PPM 1.3.19, a licensee designated safety related procedure prohibits the use of clay mineral sorbants in the power block (reactor building, tur-bine building).

Contrary to the above:

l. On May 29, 1985, between 3PM and 5PM, work in progress on an open safety related portion of the primary system (inboard main feedwater check valve) was conducted without following procedure 1.3.18 in that tools were not logged, lanyarded or otherwi'se controlled.
2. On May 29 and May 30, 1985, the use of prohibited material (clay mineral absorbant) was observed on the 572 foot elevation of the reactor building.

This is a Severity Level IV Violation (Supplement I).

Appendix A Page 4 of 5 Validity of Violation The Inspector was correct in his findings concerning compliance with Plant Procedure '1.3.18 and 1.3.19. The cause of these instances of non-compliance was a fundamental lack of awareness of the procedural require-ments by the personnel involved. This occurred because of minimal emphasis on these procedures during previous training.

Corrective Ste s Taken/Results Achieved o As stated in the body of the inspection report ... "The Foreman took immediate steps to remove loose material from the vicinity of the work". In addition the Foreman initiated a "WNP-2 Tool and Equip-ment Inventory/Inspection Sheet". This inventory/inspection sheet was utilized for the remainder of the job resulting in the open sys-tem being "buttoned up" with assurance that system cleanliness had been maintained.

o The clay mineral sorbent was removed from the Reactor Building. The sorbent was being used during operation of a pipethreader and crafts using the pipethreader were retrai ned on keeping sorbents out of the reactor building. Tnis requirement was also clarified with all other crafts.

o Plant Management has contacted the Support Service Contractor Man-agement to ensure that this issue receives proper emphasis by all craft organizations.

Corrective Ste s To Be Taken o Work instructions contained in Maintenance Work Request'(MWR) pack-ages are the Plant's primary method of implementing tnese types of procedural requirements. It is the Supply System's perception that engineers preparing the MWR work instructions have not fully in-corporated these types of procedural requirements into the MWR.

Therefore, a multi-organization committee has been instructed to evaluate the Plant procedure governing MWR preparation for possible improvements with regard to work instruction preparation guidelines.

o Knowledgeable craft personnel working to MWR instructions are a second check for ensuring compliance with these procedural require-ments. Therefore, all Plant Maintenance and Support Services Con-tractor craft personnel will be retrained in the requirements of PPM's 1.3.18 and 1.3.19.

o Both subjects discussed in this violation are considered "skill of the craft" knowledge wnich is proceduralized (Volume 10.2 series procedures ). Therefore, interfacing generic procedures (e.g., PPM 10.2.7, Valve Troubleshooting, Handling and Repairs) will be reviewed for adequate cross referencing of PPM's 1.3.18 and 1.3.19..

~ ~

Appendix A Page 5 of 5 A plant procedure is currently being developed for control of chemicals in the plant. It is envisioned that this procedure will include an adequate control mechanism that will help preclude future violations of this nature.

o The need for supervision to conduct more frequent Plant inspections during outages will be discussed during the "Lessons Learned" ses-sions,to be held following completion of the current maintenance outage.

Date of Full Com liance o All identified actions will be completed by 9/1/85.

~, t'