ML17285A318: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/1989
| issue date = 03/06/1989
| title = Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
| title = Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000397/1987019]]


=Text=
=Text=
{{#Wiki_filter:A.CCELEPXrED
{{#Wiki_filter:A.CCELEPXrED           Dl<HKBt-'zos            DE)do>STR~Tlos             SY~Hzx REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Dl<HKBt-'z
CCESSION NBR:8903140431         DOC.DATE: 89/03/06       NOTARIZED: NO             DOCKET g FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington .Public           Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION SORENSEN,G.C.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document         Control Desk)
os DE)do>STR~Tlos
 
SY~Hzx REGULATORY
==SUBJECT:==
INFORMATION
Responds     to NRC 880727   &   890203 ltrs re violations noted in Insp Repts 50-397/87-19         S 50-397/88-41.
DISTRIBUTION
DISTRIBUTION CODE: IEOID       COPIES RECEIVED:LTR       1 ENCL   ~ SIZE:
SYSTEM (RIDS)CCESSION NBR:8903140431
TITLE: General     (50 Dkt)-Insp Rept/Notice of Violation Response NOTES RECIPIENT           COPIES              RECIPIENT          COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME       LTTR ENCL PD5 PD                   1      1      SAMWORTH,R              1    1 INTERNAL: ACRS                       2      2      AEOD                    1    1 AEOD/DEIIB               1      1      DEDRO                  1    1 NRR SHANKMAN,S           1      1      NRR/DEST DIR            1    1 NRR/DLPQ/PEB 11           1      1      NRR/DLPQ/QAB 10         1     1 NRR/DOEA DIR 11          1      1      NRR/DREP/EPB 10         1    1 NRR/DREP/RPB 10           2      2      NRR/DRIS DIR 9A         1     1 NRR/PMAS/ILRB12          1     1     NUDOCS-ABSTRACT          1     1 1     1     OGC/HDS2                1     1 1     1     RGN5    FILE  01      1     1 EXTERNAL: LPDR                      1     1     NRC PDR                  1     1 NSIC                      1     1 R
DOC.DATE: 89/03/06 NOTARIZED:
I D
NO DOCKET g FACIL:50-397
S NOrE 'IO ALL "RIDS RZCIPIENIS ~
WPPSS Nuclear Project, Unit 2, Washington.Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION
PLEASE HELP US TO REDUCE WASTE     CONIACI %HE DOCUMENT CONGEAL DESK~
SORENSEN,G.C.
ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR KkK FBQM DZPHKBVTIGN LISTS FOR DOCUMENIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR             25   ENCL   25
Washington
 
Public Power Supply System RECIP.NAME
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George 11'ashington 1Vay ~   Richland, 11'ashington 99352 March 6, 1989 G02-89-035 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn;   Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:
RECIPIENT AFFILIATION
 
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 880727&890203 ltrs re violations
==Subject:==
noted in Insp Repts 50-397/87-19
NUCLEAR PLANT NO. 2 ADDITIONAL RESPONSE TO NOTICE OF VIOLATIONS 87-19-29 AND 88-41-03
S 50-397/88-41.
 
DISTRIBUTION
==Reference:==
CODE: IEOID COPIES RECEIVED:LTR
: 1)   Letter, G02-88-168,     GC Sorensen     (SS) to NRC, "NRC Inspection Report 87-19 Item 29 Instrument i                    2)
1 ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
Rack Terminations", dated July 29, 1988 Letter, G02-89-014,     GC Sorensen     (SS) to NRC, "NRC Inspection Report 88-41 Response to Notice of Violation", dated February 3,           1989 The   purpose   of this letter is to provide revised scheduled completion dates associated with commitments made in response to Notice of Violations (NOVs) 87-19-29 and 88-41-03.       The reason for the following revised schedule is that completing   the commitments   has taken longer than anticipated when the original responses   were submitted.
of Violation Response NOTES RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB
: 1)   NOV 87-19-29 (Violation C.3) it In the referenced letter (1), the Supply System committed to revise Plant Procedure     (PPM)   10.25. 19, "Termination and Splicing Instruction", to include examples of acceptable crimp configurations. This action was to be completed by March 15, 1989.         The revised procedure is currently in the procedure review process and will now be issued by April 17, 1989.
NRR SHANKMAN,S
 
NRR/DLPQ/PEB
Page Two ADDITIONAL RESPONSE TO NOTICE OF VIOLATIONS 87-19-29   AND 88-41-03
11 NRR/DOEA DIR 11 NRR/DREP/RPB
: 2)   NOV 88-41-03 (Violation B)
10 NRR/PMAS/ILRB12
In the referenced letter (2), the Supply System committed to make a pro-grammatic change to the ALARA process to reduce the threshold of those Radiation Work Permits (RWPs) which require a pre-job briefing. This action was also to be completed by March 15, 1989.         Plant Procedure 11.2. 1.2, "Al ARA Program Implementation", is currently in the process of being revised and now will be issued by April 17, 1989.
EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R
Very truly yours,
AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB
            ~(
10 NRR/DREP/EPB
G. C. Sorensen,   Manager Regulatory Programs JDA/bk Martin -
10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT
i cc:   JB NS Reynolds NRC RY
OGC/HDS2 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R I D S NOrE'IO ALL"RIDS RZCIPIENIS
                      - BCP8R RB Samwor .h NRC   =
~PLEASE HELP US TO REDUCE WASTE CONIACI%HE DOCUMENT CONGEAL DESK~ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR KkK FBQM DZPHKBVTIGN
DL Williams - BPA/399 HRC Site Inspector -   901A}}
LISTS FOR DOCUMENIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25  
WASHINGTON
PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George 11'ashington
1Vay~Richland, 11'ashington
99352 March 6, 1989 G02-89-035
Docket No.50-397 U.S.Nuclear Regulatory
Commission
Attn;Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
Subject: NUCLEAR PLANT NO.2 ADDITIONAL
RESPONSE TO NOTICE OF VIOLATIONS
87-19-29 AND 88-41-03 i Reference:
1)Letter, G02-88-168, GC Sorensen (SS)to NRC,"NRC Inspection
Report 87-19 Item 29 Instrument
Rack Terminations", dated July 29, 1988 2)Letter, G02-89-014, GC Sorensen (SS)to NRC,"NRC Inspection
Report 88-41 Response to Notice of Violation", dated February 3, 1989 The purpose of this letter is to provide revised scheduled completion
dates associated
with commitments
made in response to Notice of Violations (NOVs)87-19-29 and 88-41-03.The reason for the following revised schedule is that completing
the commitments
has taken longer than anticipated
when the original responses were submitted.
1)NOV 87-19-29 (Violation
C.3)it In the referenced
letter (1), the Supply System committed to revise Plant Procedure (PPM)10.25.19,"Termination
and Splicing Instruction", to include examples of acceptable
crimp configurations.
This action was to be completed by March 15, 1989.The revised procedure is currently in the procedure review process and will now be issued by April 17, 1989.  
Page Two ADDITIONAL
RESPONSE TO NOTICE OF VIOLATIONS
87-19-29 AND 88-41-03 i 2)NOV 88-41-03 (Violation
B)In the referenced
letter (2), the Supply System committed to make a pro-grammatic change to the ALARA process to reduce the threshold of those Radiation Work Permits (RWPs)which require a pre-job briefing.This action was also to be completed by March 15, 1989.Plant Procedure 11.2.1.2,"Al ARA Program Implementation", is currently in the process of being revised and now will be issued by April 17, 1989.Very truly yours,~(G.C.Sorensen, Manager Regulatory
Programs JDA/bk cc: JB Martin-NRC RY NS Reynolds-BCP8R RB Samwor.h-NRC=DL Williams-BPA/399 HRC Site Inspector-901A
}}

Latest revision as of 14:42, 29 October 2019

Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
ML17285A318
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/06/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-035, GO2-89-35, TAC-63528, NUDOCS 8903140431
Download: ML17285A318 (4)


Text

A.CCELEPXrED Dl<HKBt-'zos DE)do>STR~Tlos SY~Hzx REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8903140431 DOC.DATE: 89/03/06 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington .Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 880727 & 890203 ltrs re violations noted in Insp Repts 50-397/87-19 S 50-397/88-41.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR 1 ENCL ~ SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 2 2 AEOD 1 1 AEOD/DEIIB 1 1 DEDRO 1 1 NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PEB 11 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 1 1 OGC/HDS2 1 1 1 1 RGN5 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I D

S NOrE 'IO ALL "RIDS RZCIPIENIS ~

PLEASE HELP US TO REDUCE WASTE CONIACI %HE DOCUMENT CONGEAL DESK~

ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR KkK FBQM DZPHKBVTIGN LISTS FOR DOCUMENIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George 11'ashington 1Vay ~ Richland, 11'ashington 99352 March 6, 1989 G02-89-035 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn; Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 ADDITIONAL RESPONSE TO NOTICE OF VIOLATIONS 87-19-29 AND 88-41-03

Reference:

1) Letter, G02-88-168, GC Sorensen (SS) to NRC, "NRC Inspection Report 87-19 Item 29 Instrument i 2)

Rack Terminations", dated July 29, 1988 Letter, G02-89-014, GC Sorensen (SS) to NRC, "NRC Inspection Report 88-41 Response to Notice of Violation", dated February 3, 1989 The purpose of this letter is to provide revised scheduled completion dates associated with commitments made in response to Notice of Violations (NOVs) 87-19-29 and 88-41-03. The reason for the following revised schedule is that completing the commitments has taken longer than anticipated when the original responses were submitted.

1) NOV 87-19-29 (Violation C.3) it In the referenced letter (1), the Supply System committed to revise Plant Procedure (PPM) 10.25. 19, "Termination and Splicing Instruction", to include examples of acceptable crimp configurations. This action was to be completed by March 15, 1989. The revised procedure is currently in the procedure review process and will now be issued by April 17, 1989.

Page Two ADDITIONAL RESPONSE TO NOTICE OF VIOLATIONS 87-19-29 AND 88-41-03

2) NOV 88-41-03 (Violation B)

In the referenced letter (2), the Supply System committed to make a pro-grammatic change to the ALARA process to reduce the threshold of those Radiation Work Permits (RWPs) which require a pre-job briefing. This action was also to be completed by March 15, 1989. Plant Procedure 11.2. 1.2, "Al ARA Program Implementation", is currently in the process of being revised and now will be issued by April 17, 1989.

Very truly yours,

~(

G. C. Sorensen, Manager Regulatory Programs JDA/bk Martin -

i cc: JB NS Reynolds NRC RY

- BCP8R RB Samwor .h NRC =

DL Williams - BPA/399 HRC Site Inspector - 901A