ML17285A842: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
See also: [[see also::IR 05000397/1989006]]


=Text=
=Text=
{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION
ACCESSION NBR:8911130295               DOC.DATE:   89/10/31   NOTARIZED: NO         DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME             AUTHOR AFFILIATION SORENSEN,G.C.         Washington Public Power'Supply System RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DEMONSTRATION
 
SYSTEM REGULATORY
==SUBJECT:==
INFORMATION
Responds to NRC 890821 6 0728 ltrs re violations noted in Insp Repts 50-397/89-06 & 50-397/89-13.
DISTRIBUTION
SIZE:
SYSTEM (RIDS)ACCESSION NBR:8911130295
l DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR                   ENCL TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
DOC.DATE: 89/10/31 NOTARIZED:
RECIPIENT              COPIES            RECIPIENT         COPIES ID   CODE/NAME           LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD5 PD                                     SAMWORTH,R INTERNAL: ACRS                                         AEOD                  1 AEOD/DEIIB                                 AEOD/TPAD              1 DEDRO                                      NRR SHANKMAN,S        1
NO FACIL:50-397
          . NRR/DEST DIR                               NRR/DLPQ/PEB          1 NRR/DOEA DIR 11                           NRR/DREP/EPB 10        1 NRR/DREP/RPB 10                           NRR/DRIS/DIR          1 NRR/PMAS/ILRB12                           NUDOCS-ABSTRACT        1 OE L             N,J                       OGC/HDS2              1 G   FILE       02                     RES MORISSEAU 1 D      1 RGN5         LE   01 EXTERNAL: LPDR                                         NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:
WPPSS Nuclear Project, Unit 2, Washington
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
Public Powe AUTH.NAME AUTHOR AFFILIATION
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 26   ENCL   Zb
SORENSEN,G.C.
 
Washington
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George ll'ashington N'ay ~ Richland, ll'ashington 99352 October 31, 1989 G02-89-202 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:
Public Power'Supply
 
System RECIP.NAME
==Subject:==
RECIPIENT AFFILIATION
NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORTS     89-06 AND   89-13
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 890821 6 0728 ltrs re violations
 
noted in Insp Repts 50-397/89-06
==Reference:==
&50-397/89-13.
Letter, G02-89-143,     GD Bouchey (SS) to NRC "NRC Inspection Report 89-06", dated August 21, 1989
l DISTRIBUTION
: 2)    Letter, G02-89-129, GD Bouchey (SS) to NRC "NRC Inspection Report 89-13", dated July 28, 1989 The purpose     of this let'ter is to provide revised scheduled completion dates for commitments     made in response     to Notices of Violation (NOVs) 89-06-09 and 89-13-05.       The reason     for the revised schedule is that completing the commitments     has taken longer than was originally anticipated.
CODE: IE01D COPIES RECEIVED:LTR
In Reference     1), the Supply System committed to a complete review, of its work practices,     including any necessary tr aining required.               The action was to be completed in two parts.         The review was to be done by November 1, 1989 and the formal programmatic changes were to be accomplished by January 1, 1990. These two dates have been changed to December 1, 1989 and February 1, 1990, respec-tively.
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
In Reference 2), the Supply System committed to discuss the application of 10CFR 50.73(a)(2)(v), as it applies to single-train systems, during Licensed Operator Requalification Training (Requalification Cycle 89-06, September 4 - October 6, 1989). Although this was presented as part of reportabi lity/compliance issue training briefings during Requalification Cycle 89-05 (July 31 - September 2, 1989)', lesson plans have since been prepared and it is now anticipated that the training will be completed by November 30, 1989.
of Violation Response NOTES: DOCKET 05000397 RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB
Very truly yours, G. C. Sorensen,   Manager Regulatory Programs JDA/bk cc:   JB Martin   , NRC RV RB Samworth,   NRC NS Reynolds,   BCP8R DL Williams, BPA/399 NRC Site Inspector -     901A}}
DEDRO.NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB
10 NRR/PMAS/ILRB12
OE L N,J G FILE 02 RGN5 LE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME SAMWORTH,R
AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DLPQ/PEB
NRR/DREP/EPB
10 NRR/DRIS/DIR
NUDOCS-ABSTRACT
OGC/HDS2 RES MORI SSEAU 1 D NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL Zb  
WASHINGTON
PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George ll'ashington
N'ay~Richland, ll'ashington
99352 October 31, 1989 G02-89-202
U.S.Nuclear Regulatory
Commission
Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
Subject: NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION
REPORTS 89-06 AND 89-13 Reference:
2)Letter, G02-89-143, GD Bouchey (SS)to NRC"NRC Inspection
Report 89-06", dated August 21, 1989 Letter, G02-89-129, GD Bouchey (SS)to NRC"NRC Inspection
Report 89-13", dated July 28, 1989 The purpose of this let'ter is to provide revised scheduled completion
dates for commitments
made in response to Notices of Violation (NOVs)89-06-09 and 89-13-05.The reason for the revised schedule is that completing
the commitments
has taken longer than was originally
anticipated.
In Reference 1), the Supply System committed to a complete review, of its work practices, including any necessary tr aining required.The action was to be completed in two parts.The review was to be done by November 1, 1989 and the formal programmatic
changes were to be accomplished
by January 1, 1990.These two dates have been changed to December 1, 1989 and February 1, 1990, respec-tively.In Reference 2), the Supply System committed to discuss the application
of 10CFR 50.73(a)(2)(v), as it applies to single-train
systems, during Licensed Operator Requalification
Training (Requalification
Cycle 89-06, September 4-October 6, 1989).Although this was presented as part of reportabi lity/compliance
issue training briefings during Requalification
Cycle 89-05 (July 31-September 2, 1989)', lesson plans have since been prepared and it is now anticipated
that the training will be completed by November 30, 1989.Very truly yours, G.C.Sorensen, Manager Regulatory
Programs JDA/bk cc: JB Martin , NRC RV RB Samworth, NRC NS Reynolds, BCP8R DL Williams, BPA/399 NRC Site Inspector-901A
}}

Latest revision as of 14:31, 29 October 2019

Responds to NRC 890821 & 0728 Ltrs Re Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-13.Completion Dates Revised.Review of Work Practices Will Be Done by 900201 & single-train Sys Lesson Plans to Be Complete by 891130
ML17285A842
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-202, NUDOCS 8911130295
Download: ML17285A842 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8911130295 DOC.DATE: 89/10/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power'Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 890821 6 0728 ltrs re violations noted in Insp Repts 50-397/89-06 & 50-397/89-13.

SIZE:

l DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD SAMWORTH,R INTERNAL: ACRS AEOD 1 AEOD/DEIIB AEOD/TPAD 1 DEDRO NRR SHANKMAN,S 1

. NRR/DEST DIR NRR/DLPQ/PEB 1 NRR/DOEA DIR 11 NRR/DREP/EPB 10 1 NRR/DREP/RPB 10 NRR/DRIS/DIR 1 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT 1 OE L N,J OGC/HDS2 1 G FILE 02 RES MORISSEAU 1 D 1 RGN5 LE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL Zb

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George ll'ashington N'ay ~ Richland, ll'ashington 99352 October 31, 1989 G02-89-202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-13

Reference:

Letter, G02-89-143, GD Bouchey (SS) to NRC "NRC Inspection Report 89-06", dated August 21, 1989

2) Letter, G02-89-129, GD Bouchey (SS) to NRC "NRC Inspection Report 89-13", dated July 28, 1989 The purpose of this let'ter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs) 89-06-09 and 89-13-05. The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.

In Reference 1), the Supply System committed to a complete review, of its work practices, including any necessary tr aining required. The action was to be completed in two parts. The review was to be done by November 1, 1989 and the formal programmatic changes were to be accomplished by January 1, 1990. These two dates have been changed to December 1, 1989 and February 1, 1990, respec-tively.

In Reference 2), the Supply System committed to discuss the application of 10CFR 50.73(a)(2)(v), as it applies to single-train systems, during Licensed Operator Requalification Training (Requalification Cycle 89-06, September 4 - October 6, 1989). Although this was presented as part of reportabi lity/compliance issue training briefings during Requalification Cycle 89-05 (July 31 - September 2, 1989)', lesson plans have since been prepared and it is now anticipated that the training will be completed by November 30, 1989.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs JDA/bk cc: JB Martin , NRC RV RB Samworth, NRC NS Reynolds, BCP8R DL Williams, BPA/399 NRC Site Inspector - 901A