ML17285B232: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.ACCELERATOR)
{{#Wiki_filter:. ACCELERATOR) DISHUBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)
DISHUBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)ESSION NBR:9005020002 DOC.DATE: 90/04/25 NOTARIZED:
ESSION NBR:9005020002             DOC.DATE: 90/04/25         NOTARIZED: NO       DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe                   05000397 AUTH. NAME         AUTHOR AFFILIATION BOUCHEY,G.D.       Washington Public Power Supply System RECIP.NAME         RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION BOUCHEY,G.D.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Provides addi response to violations noted in Insp Repts 50-397/89-06
Provides addi response to violations noted in Insp Repts 50-397/89-06     &   50-397/89-17.
&50-397/89-17.
DISTRIBUTION CODE: IE01D         COPIES RECEIVED:LTR             ENCL     SIZE:
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: DOCKET 05000397 RECIPXENT ID CODE/NAME PD5 PD INTERNAL ACRS AEOD/DEXIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES/DSR/HFB/HFS RNAL: LPDR NSIC COPIES LTTR ENCL 2 1 1 1 1 1 1 1.1 1 1 RECIPIENT XD CODE/NAME SAMWORTH,R AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE D~RE G FI!TW'RC PDR COPIES LTTR ENCL NOIR TO ALL"RIDS" RECIPIEKIS:
TITLE: General   (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
P~HELP US TO REDUCE WASIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 April 25, 1990 G02-90-080 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.Gentlemen:
RECIPXENT               COPIES            RECIPIENT              COPIES ID CODE/NAME           LTTR ENCL        XD CODE/NAME          LTTR ENCL PD5 PD                                   SAMWORTH,R INTERNAL ACRS                           2            AEOD AEOD/DEXIB                 1            AEOD/TPAD DEDRO                       1            NRR SHANKMAN,S NRR/DLPQ/LPEB10             1            NRR/DOEA DIR 11 NRR/DREP/PEPB9 D           1            NRR/DRIS/DIR NRR/DST/DIR 8E2             1            NRR/PMAS/ILRB12 NUDOCS-ABSTRACT             1            OE D OGC/HDS2                   1          ~RE G FI RES/DSR/HFB/HFS           .1                     !TW'RC RNAL: LPDR                        1                PDR NSIC                        1 NOIR TO ALL "RIDS" RECIPIEKIS:
P~     HELP US TO REDUCE WASIZl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISHUBUTION TAL NUMBER OF COPIES REQUIRED: LTTR             24   ENCL
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 25,   1990 G02-90-080 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.
Gentlemen:


==Subject:==
==Subject:==
NUCLEAR PLANT NO. 2, LICENSE NO. NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-17 ADDITIONAL RESPONSE TO NOTICES OF VIOLATION


==Reference:==
==Reference:==
 
: 1)     Letter, G02-89-202,         GD Bouchey (SS) to NRC nNRC   Inspection Reports 89-06       and 89-13", dated October 31, 1989
1)2)NUCLEAR PLANT NO.2, LICENSE NO.NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-17 ADDITIONAL RESPONSE TO NOTICES OF VIOLATION Letter, G02-89-202, GD Bouchey (SS)to NRC nNRC Inspection Reports 89-06 and 89-13", dated October 31, 1989'Letter, G02-89-147, GD Bouchey (SS)to NRC"NRC Inspec'tion Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs)89-06 and 89-17.The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.
: 2)    'Letter, G02-89-147,         GD Bouchey (SS)     to   NRC "NRC   Inspec'tion Report 89-17", dated August 29, 1989 The purpose   of this letter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs) 89-06 and 89-17. The reason for the revised schedule is that completing the commitments has taken longer than   was   originally anticipated.
In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required.In the letter it was stated that formal changes to the process would be accomplished by February 1, 1990.Although the changes to Plant Procedure (PPM)1.3.7,"Maintenance Work Request", have been made, this procedure will not be implemented until after the upcoming maintenance and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990.Accordingly, it is now anticipated that the procedure will be implemented by August 1, 1990.'s'005020002 5'00425 F DR AOOCK 0bt.t00397 Poi-}}
In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required. In the letter it was stated that formal changes to the process would be accomplished by February 1, 1990. Although the changes to Plant Procedure (PPM) 1.3.7, "Maintenance Work Request", have been made, this procedure will not be implemented until after the upcoming maintenance and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990. Accordingly,                 it is now anticipated that the procedure will be implemented by August 1, 1990.
          's'005020002       5'00425 F DR     AOOCK     0bt.t00397 Poi-}}

Latest revision as of 14:23, 29 October 2019

Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17
ML17285B232
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/25/1990
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-080, GO2-90-80, NUDOCS 9005020002
Download: ML17285B232 (3)


Text

. ACCELERATOR) DISHUBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)

ESSION NBR:9005020002 DOC.DATE: 90/04/25 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BOUCHEY,G.D. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)

SUBJECT:

Provides addi response to violations noted in Insp Repts 50-397/89-06 & 50-397/89-17.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPXENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD5 PD SAMWORTH,R INTERNAL ACRS 2 AEOD AEOD/DEXIB 1 AEOD/TPAD DEDRO 1 NRR SHANKMAN,S NRR/DLPQ/LPEB10 1 NRR/DOEA DIR 11 NRR/DREP/PEPB9 D 1 NRR/DRIS/DIR NRR/DST/DIR 8E2 1 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT 1 OE D OGC/HDS2 1 ~RE G FI RES/DSR/HFB/HFS .1 !TW'RC RNAL: LPDR 1 PDR NSIC 1 NOIR TO ALL "RIDS" RECIPIEKIS:

P~ HELP US TO REDUCE WASIZl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISHUBUTION TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 25, 1990 G02-90-080 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.

Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, LICENSE NO. NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-17 ADDITIONAL RESPONSE TO NOTICES OF VIOLATION

Reference:

1) Letter, G02-89-202, GD Bouchey (SS) to NRC nNRC Inspection Reports 89-06 and 89-13", dated October 31, 1989
2) 'Letter, G02-89-147, GD Bouchey (SS) to NRC "NRC Inspec'tion Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs) 89-06 and 89-17. The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.

In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required. In the letter it was stated that formal changes to the process would be accomplished by February 1, 1990. Although the changes to Plant Procedure (PPM) 1.3.7, "Maintenance Work Request", have been made, this procedure will not be implemented until after the upcoming maintenance and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990. Accordingly, it is now anticipated that the procedure will be implemented by August 1, 1990.

's'005020002 5'00425 F DR AOOCK 0bt.t00397 Poi-