{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED IOT$2BUTION DEMONS~TION SYSTEM j REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSION NBR:9001250160 DOC.DATE-90/01/12 NOTARIZED:
IOT$2BUTION DEMONS~TION
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION BOUCHEY,G.D.
SYSTEM j REGULATORY
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
INFORMATION
 
DISTRIBUTXON
==SUBJECT:==
SYSTEM (RIDS)ACCESSION NBR:9001250160
Responds to NRC 891219 ltr re deviation noted in Insp Rept 50-397/89-31.
DOC.DATE-90/01/12 NOTARIZED:
DISTRIBUTION CODE: IE01D COPIES RECEIUED:LTR ENCL SIZE-'ITLE:
NO FACIL:50-397
General (50 Dkt)-Insp Rept/Notice of Vio ation R sponse NOTES DOCKET IF 05000397 RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DRZS/DIR NRR/PMAS/ILRB12 O~EIEBE~AN, J EG FILE GN5" TILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1-1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH, R AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DOEA DIR 11 NRR/DREP/PRPB11 NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
WPPSS Nuclear Project, Unit 2, Washington
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26  
Public Powe AUTH.NAME AUTHOR AFFILIATION
 
BOUCHEY,G.D.
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington SVay~Richland, Washington 99352 January 12, 1990 G02"90"008 Docket No.50-397 U., S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
Washington
 
Public Power Supply System RECIP.NAME
==Subject:==
RECIPIENT AFFILIATION
NUCLEAR PLANT NO.2, OPERATING LICENSE NO.NPF-21 NRC INSPECTION REPORT 89-31 RESPONSE TO NOTICE OF DEVIATION The Washington Public Power Supply System hereby replies to the Notice of Deviation contained in your letter dated December 19, 1989.Our reply, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached)..
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 891219 ltr re deviation noted in Insp Rept 50-397/89-31.
In Appendix A, the deviation is addressed with an explanation of our position regarding validity, corrective action and date of full compliance.
DISTRIBUTION
As requested in the cover letter to the inspection report, other corrective actions taken as a result of the emergency lighting review are also described in Appendix A.Very truly yours, G.D.Bouchey, Direct Licensing&Assurance'DA/bk Attachments cc: JB Hartin-NRC RV RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A NS Reynolds-BCP&R 9ppg2~pfgp pppg~~PDR AZiocv psppp-s 7 9 pp(c  
CODE: IE01D COPIES RECEIUED:LTR
 
ENCL SIZE-'ITLE:
APPENDIX A During any NRC inspection conducted on October 2-November 12, 1989 a deviation from a commitment to the NRC was identified.
General (50 Dkt)-Insp Rept/Notice
In accordance with the"General Statement of policy and procedure for NRC Enforcement Actions," 10CFR Part 2, Appendix C (1988), the deviation is listed below: The WNP-2 Final Safety Analysis Report, Amendment No.36, dated December, 1985, Table 9.5-8, Locations of Emer enc Li htin shows normal AC lighting being provided to Residual Heat Removal (RHR)Valve Room Pl, located on elevation 471'f the reactor building.Contrary to the above, all lights in this room were burned out on October 31, 1989;thus no normal AC lighting was provided to it.This is a Deviation.
of Vio ation R sponse NOTES DOCKET IF 05000397 RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB
Validit of Deviation The Supply System acknowledges the validity of this deviation.
DEDRO NRR/DLPQ/LPEB10
The reason for the deviation was that a formal process had not been established for identifying and replacing the defective lighting units described in the inspection report.Furthermore, the Area/Floor Coordinator tour process was not as effective as anticipated for identifying and'correcting defective lighting units.Corrective Ste s Taken Results Achieved 2.3.4.The burned out lights in the Residual Heat Removal (RHR)valve room were replaced.A walkdown of all Plant lighting was performed and any discrepancies noted were addressed by means of the Maintenance Work Request (MWR)process for resolution.
NRR/DREP/PEPB9D
Blue stickers were placed on all accessible"Normal Emergency" and"Emergency Reserve Ballast" lighting units to distinguish them from the normal lighting (fluorescent units)in the Plant.These lights require immediate action if they are found to be defective.
NRR/DRZS/DIR
A letter was issued to all Plant personnel which explained this differentiation and requested, that, if defective units are noted, personnel should contact either the appropriate Area/Floor Coordinator or the Electrical Maintenance shop for action.
NRR/PMAS/ILRB12
Appendix A Page 2 of 2 Corrective Action to be Taken Plant Procedure (PPH)10.25.64,"Emer'gency Ballast Lights", is currently in the process of being expanded to provide a formal process for the inspection of lighting units.The purpose of the procedure, which is being re-titled,"Normal and Emergency Lighting", is to ensure uniform inspections are performed and records are maintained for Normal AC Lighting, Normal-Emergency AC Lighting, DC Lights and Battery-Powered (Ballast type)Emergency Lighting.In addition, the monitoring of Plant lighting will be the respon-sibility of the Area/Floor Coordinators, Health Physics personnel (in radiation areas they normally tour)and all personnel in the performance of their daily tasks.The procedure will also explain that the lights with blue stickers require immediate action if found to be defective.
O~EIEBE~AN, J EG FILE GN5" TILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1-1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH, R AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DOEA DIR 11 NRR/DREP/PRPB11
2.PPH 10.25.63,"Emergency Lighting Inspection," is also currently in the process of being expanded.The purpose of this procedure is to provide instructions and check sheets necessary to ensure uniform inspections and records for battery-powered emergency lighting.Changes to the procedure include 1)defining each battery unit type and the inspections that are required, and 2)emphasizing the requirement to verify that water levels are between the upper and lower marks for non-maintenance free batteries.
NRR/DST/DIR
3.In addition to the changes to PPMs 10.25.63 and 10,25.64, the Electrical Maintenance Shop Practices Manual is currently being revised to provide guidance for Electrical Shop personnel to check Plant lighting as part of shift assignments.
8E2 NUDOCS-ABSTRACT
Date of Full Com liance The revisions to PPHs 10.25.63, 10.25.64 and the Electrical Maintenance Shop Practices Manual will be issued by February 28, 1990.}}
OGC/HDS2 RES MORISSEAU,D
NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISIS FOR DOCUMENTS YOU DON'T NEED!OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26  
WASHINGTON
PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington
SVay~Richland, Washington
99352 January 12, 1990 G02"90"008
Docket No.50-397 U., S.Nuclear Regulatory
Commission
Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
Subject: NUCLEAR PLANT NO.2, OPERATING LICENSE NO.NPF-21 NRC INSPECTION
REPORT 89-31 RESPONSE TO NOTICE OF DEVIATION The Washington
Public Power Supply System hereby replies to the Notice of Deviation contained in your letter dated December 19, 1989.Our reply, pursuant to the provisions
of Section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached)..
In Appendix A, the deviation is addressed with an explanation
of our position regarding validity, corrective
action and date of full compliance.
As requested in the cover letter to the inspection
report, other corrective
actions taken as a result of the emergency lighting review are also described in Appendix A.Very truly yours, G.D.Bouchey, Direct Licensing&Assurance'DA/bk Attachments
cc: JB Hartin-NRC RV RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A NS Reynolds-BCP&R 9ppg2~pfgp
pppg~~PDR AZiocv psppp-s 7 9 pp(c  
APPENDIX A During any NRC inspection
conducted on October 2-November 12, 1989 a deviation from a commitment
to the NRC was identified.
In accordance
with the"General Statement of policy and procedure for NRC Enforcement
Actions," 10CFR Part 2, Appendix C (1988), the deviation is listed below: The WNP-2 Final Safety Analysis Report, Amendment No.36, dated December, 1985, Table 9.5-8, Locations of Emer enc Li htin shows normal AC lighting being provided to Residual Heat Removal (RHR)Valve Room Pl, located on elevation 471'f the reactor building.Contrary to the above, all lights in this room were burned out on October 31, 1989;thus no normal AC lighting was provided to it.This is a Deviation.
Validit of Deviation The Supply System acknowledges
the validity of this deviation.
The reason for the deviation was that a formal process had not been established
for identifying
and replacing the defective lighting units described in the inspection
report.Furthermore, the Area/Floor
Coordinator
tour process was not as effective as anticipated
for identifying
and'correcting
defective lighting units.Corrective
Ste s Taken Results Achieved 2.3.4.The burned out lights in the Residual Heat Removal (RHR)valve room were replaced.A walkdown of all Plant lighting was performed and any discrepancies
noted were addressed by means of the Maintenance
Work Request (MWR)process for resolution.
Blue stickers were placed on all accessible"Normal Emergency" and"Emergency
Reserve Ballast" lighting units to distinguish
them from the normal lighting (fluorescent
units)in the Plant.These lights require immediate action if they are found to be defective.
A letter was issued to all Plant personnel which explained this differentiation
and requested, that, if defective units are noted, personnel should contact either the appropriate
Area/Floor
Coordinator
or the Electrical
Maintenance
shop for action.  
Appendix A Page 2 of 2 Corrective
Action to be Taken Plant Procedure (PPH)10.25.64,"Emer'gency
Ballast Lights", is currently in the process of being expanded to provide a formal process for the inspection
of lighting units.The purpose of the procedure, which is being re-titled,"Normal and Emergency Lighting", is to ensure uniform inspections
are performed and records are maintained
for Normal AC Lighting, Normal-Emergency
AC Lighting, DC Lights and Battery-Powered (Ballast type)Emergency Lighting.In addition, the monitoring
of Plant lighting will be the respon-sibility of the Area/Floor
Coordinators, Health Physics personnel (in radiation areas they normally tour)and all personnel in the performance
of their daily tasks.The procedure will also explain that the lights with blue stickers require immediate action if found to be defective.
2.PPH 10.25.63,"Emergency
Lighting Inspection," is also currently in the process of being expanded.The purpose of this procedure is to provide instructions
and check sheets necessary to ensure uniform inspections
and records for battery-powered
emergency lighting.Changes to the procedure include 1)defining each battery unit type and the inspections
that are required, and 2)emphasizing
the requirement
to verify that water levels are between the upper and lower marks for non-maintenance
free batteries.
3.In addition to the changes to PPMs 10.25.63 and 10,25.64, the Electrical
Maintenance
Shop Practices Manual is currently being revised to provide guidance for Electrical
Shop personnel to check Plant lighting as part of shift assignments.
Date of Full Com liance The revisions to PPHs 10.25.63, 10.25.64 and the Electrical
Maintenance
Shop Practices Manual will be issued by February 28, 1990.
}}

Revision as of 12:12, 17 August 2019

Responds to NRC 891219 Ltr Re Deviation Noted in Insp Rept 50-397/89-31.Corrective Actions:Burned Out Lights in RHR Valve Room Replaced & Blue Stickers Placed on All Accessible Normal Emergency & Emergency Reserve Ballast Lighting Units
ML17285A966
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/12/1990
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-008, GO2-90-8, NUDOCS 9001250160
Download: ML17285A966 (7)


Text

ACCELERATED IOT$2BUTION DEMONS~TION SYSTEM j REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSION NBR:9001250160 DOC.DATE-90/01/12 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION BOUCHEY,G.D.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 891219 ltr re deviation noted in Insp Rept 50-397/89-31.

DISTRIBUTION CODE: IE01D COPIES RECEIUED:LTR ENCL SIZE-'ITLE:

General (50 Dkt)-Insp Rept/Notice of Vio ation R sponse NOTES DOCKET IF 05000397 RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DRZS/DIR NRR/PMAS/ILRB12 O~EIEBE~AN, J EG FILE GN5" TILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1-1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH, R AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DOEA DIR 11 NRR/DREP/PRPB11 NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington SVay~Richland, Washington 99352 January 12, 1990 G02"90"008 Docket No.50-397 U., S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:

Subject:

NUCLEAR PLANT NO.2, OPERATING LICENSE NO.NPF-21 NRC INSPECTION REPORT 89-31 RESPONSE TO NOTICE OF DEVIATION The Washington Public Power Supply System hereby replies to the Notice of Deviation contained in your letter dated December 19, 1989.Our reply, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A (attached)..

In Appendix A, the deviation is addressed with an explanation of our position regarding validity, corrective action and date of full compliance.

As requested in the cover letter to the inspection report, other corrective actions taken as a result of the emergency lighting review are also described in Appendix A.Very truly yours, G.D.Bouchey, Direct Licensing&Assurance'DA/bk Attachments cc: JB Hartin-NRC RV RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A NS Reynolds-BCP&R 9ppg2~pfgp pppg~~PDR AZiocv psppp-s 7 9 pp(c

APPENDIX A During any NRC inspection conducted on October 2-November 12, 1989 a deviation from a commitment to the NRC was identified.

In accordance with the"General Statement of policy and procedure for NRC Enforcement Actions," 10CFR Part 2, Appendix C (1988), the deviation is listed below: The WNP-2 Final Safety Analysis Report, Amendment No.36, dated December, 1985, Table 9.5-8, Locations of Emer enc Li htin shows normal AC lighting being provided to Residual Heat Removal (RHR)Valve Room Pl, located on elevation 471'f the reactor building.Contrary to the above, all lights in this room were burned out on October 31, 1989;thus no normal AC lighting was provided to it.This is a Deviation.

Validit of Deviation The Supply System acknowledges the validity of this deviation.

The reason for the deviation was that a formal process had not been established for identifying and replacing the defective lighting units described in the inspection report.Furthermore, the Area/Floor Coordinator tour process was not as effective as anticipated for identifying and'correcting defective lighting units.Corrective Ste s Taken Results Achieved 2.3.4.The burned out lights in the Residual Heat Removal (RHR)valve room were replaced.A walkdown of all Plant lighting was performed and any discrepancies noted were addressed by means of the Maintenance Work Request (MWR)process for resolution.

Blue stickers were placed on all accessible"Normal Emergency" and"Emergency Reserve Ballast" lighting units to distinguish them from the normal lighting (fluorescent units)in the Plant.These lights require immediate action if they are found to be defective.

A letter was issued to all Plant personnel which explained this differentiation and requested, that, if defective units are noted, personnel should contact either the appropriate Area/Floor Coordinator or the Electrical Maintenance shop for action.

Appendix A Page 2 of 2 Corrective Action to be Taken Plant Procedure (PPH)10.25.64,"Emer'gency Ballast Lights", is currently in the process of being expanded to provide a formal process for the inspection of lighting units.The purpose of the procedure, which is being re-titled,"Normal and Emergency Lighting", is to ensure uniform inspections are performed and records are maintained for Normal AC Lighting, Normal-Emergency AC Lighting, DC Lights and Battery-Powered (Ballast type)Emergency Lighting.In addition, the monitoring of Plant lighting will be the respon-sibility of the Area/Floor Coordinators, Health Physics personnel (in radiation areas they normally tour)and all personnel in the performance of their daily tasks.The procedure will also explain that the lights with blue stickers require immediate action if found to be defective.

2.PPH 10.25.63,"Emergency Lighting Inspection," is also currently in the process of being expanded.The purpose of this procedure is to provide instructions and check sheets necessary to ensure uniform inspections and records for battery-powered emergency lighting.Changes to the procedure include 1)defining each battery unit type and the inspections that are required, and 2)emphasizing the requirement to verify that water levels are between the upper and lower marks for non-maintenance free batteries.

3.In addition to the changes to PPMs 10.25.63 and 10,25.64, the Electrical Maintenance Shop Practices Manual is currently being revised to provide guidance for Electrical Shop personnel to check Plant lighting as part of shift assignments.

Date of Full Com liance The revisions to PPHs 10.25.63, 10.25.64 and the Electrical Maintenance Shop Practices Manual will be issued by February 28, 1990.