PNO-I-86-061, on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires

From kanterella
(Redirected from PNO-I-86-061)
Jump to navigation Jump to search
PNO-I-86-061:on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires
ML20205B030
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/07/1986
From: Norrholm L, Roxanne Summers
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-86-061, PNO-I-86-61, NUDOCS 8608110505
Download: ML20205B030 (1)


.

DCS No: 50272860806 Date: August 7, 1986 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-I-86-61 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.

Facility: Licensee Emergency Classification:

Public Service Electric & Gas Company X Notification of Unusual Event Salem Generating Station Units 1&2 Alert Hancocks Bridge, New Jersey Site Area Emergency D/Ns 50-272; 50-311 General Emergency Not Applicable

Subject:

EQUIPMENT QUALIFICATION (EQ) PROBLEM - SHUTOOWN IN EXCESS OF 72 HOURS On August 6, 1986 at 6:30 p.m., the licensee identified an EQ discrepancy with field wiring (6 wires / valve) within Limitorque valve operators located in the Units 1&2 containments, in that the qualification status of the wires is questionable. The licensee declared an unusual event at 6:30 p.m., which was suosequently terminated at 8:25 p.m.

Ths licensee elected to shutdown and cooldown both units to replace the questionable wires with qualified wires in 69 valves per unit. The outages are expected to last approximately 7 days. Shutdown and cooldown of Unit 2 was begun at 6:30 p.m. Unit I was already shutdown as a result of a reactor trip due to steam generator feed pump problems. Cooldown of Unit I was commenced at 6:35 p.m. Both units are presently in Mode 4 and on Residual Heat Removal.

The resident inspectors will follow the licensee's actions with respe~ct to the EQ wire issue and will continue to follow up on the licensee's investigation and resolution of Unit I steam generator feed pump problems.

The licensee has issued a press release.

The States of New Jersey and Delaware have been notified.

CONTACT: R. Summers L. Norrholm 488-1115 488-1114 DISTRIBUTION:

H. St. MNBB Phillips E/W Willste Mail: ADM:DMB Chairman Zech ED0 NRR IE NMSS DOT:Trans only PA OIA RES Comm. Cernthal ELD AE0D

-Comm. Roberts Comm. Asselstine ACRS Air Rights INPO JbI SECY SP NSAC! M CA PDR Regional Offices TMI Resident Section /P#1 ,

RI Resident Office Licensee: _//; / 7 (Reactor Licensees)

Region I Form 83 (Rev. July, 1986) 8608110505 860807 PDR I&E p}