PNO-I-86-066, PNO-I-86-66, NUDOCS 8608280134
Download: ML20212N227 (1)


. - . - - - - - - - - . . - - . . - - .- - _ - . - - . _ . .

I DCS No: 50311082686 Date: August 26, 1986

  • PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-I-86-66 This preliminary' notification constitutes EARLY notice of events of POSSIBLE safety or p::blic interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.

Facility: Sales 2 Licensee Emergency Classification:

Public Service Electric ~~

X Notification of Unusual Event and Gas A lert Salem, New Jersey Site Area Emergency  !

DN 50-311 General Emergency Not Applicable

Subject:

REACTOR TRIP, SAFETY INJECTION At 8:30 a.m. with the unit at 100% power, Salem Unit 2 experienced a turbine I trip / reactor trip and safety injection apparently resulting from troubleshooting being conducted on No. 22 steam generator level indication. Approximately 30 seconds later, a station blackout signal was received causing the vital busses to strip their loads, i

Component Cooling Water Pumps were stripped; control room operators then tripped all four reactor coolant pumps. Two out of three vital buses were picked up by the station cmergency diesel generators (EOG). One EDG was out of service for preventive maintenance. The SI and Unusual Event were terminated at 8:35 a.m..

Natural circulation was established followir.g the loss of the reactor coolant pumps and subsequently the third vital bus and nonvital loads were reenergized from offsite power. The plant is presently in a Hot Standby condition, with two reactor coolant pumps returned to service. The resident inspector is on site and following licensee actions. Two additional inspect.,rs and a manager have been dispatched from Region I to  ;

the site.

The state of New Jersey has been notified.

Tha information'in this preliminary notification is current as of 11:00 a.m., ,

August 26, 1986. .

1 CONTACT: R. Gallo 488-1225 DISTRIBUTION:

H. St. MNBB Phillips E/W W111ste Mail: ADM:DMB Chairman Zech E00 NRR TE~ NMSS 00T:Trans only Comm. Bernthal PA OIA RES Comm. Roberts ELD AE00 Comm. Asselstine Ccom. Carr ACRS Air Rights INPO O SECY SP NSAC J- # E CA POR Regional Offices TMI Resident Section /! G8 RI Resident Office yp e60W6 Licensee:

PNO-1-86-AA PDR (Reactor Licensees)

Region I Form 83 (Rev. July 1986)

_ _ _ _ _ _-_- _