ML20216J775
ML20216J775 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 10/23/1978 |
From: | Klinger G, Nolan F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
To: | |
References | |
PNO-78-180, NUDOCS 9804210480 | |
Download: ML20216J775 (1) | |
Similar Documents at Salem | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999
[Table view]PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal1998-12-0101 December 1998 PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal PNO-I-93-068, on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R)1993-12-0707 December 1993 PNO-I-93-068:on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R) PNO-I-93-062, on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan1993-11-12012 November 1993 PNO-I-93-062:on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan PNO-I-93-060, on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified1993-11-0303 November 1993 PNO-I-93-060:on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified PNO-I-92-075, upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes1992-12-15015 December 1992 PNO-I-92-075:upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes PNO-I-90-056, on 900722,potential Design Deficiency in Main Steam Isolation Sys Noted.Units Shut Down Until Final Analysis & Appropriate Corrective Actions Completed1990-07-23023 July 1990 PNO-I-90-056:on 900722,potential Design Deficiency in Main Steam Isolation Sys Noted.Units Shut Down Until Final Analysis & Appropriate Corrective Actions Completed PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom ML20217F8541987-10-27027 October 1987 PNS-I-87-017:on 871026,fireman Received Call of Bomb Threat at Plant.Search of Facility Proved Negative PNO-I-87-099, on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway1987-10-26026 October 1987 PNO-I-87-099:on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway PNO-I-87-075A, on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected Areas1987-08-13013 August 1987 PNO-I-87-075A:on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected Areas PNO-I-87-060, on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days1987-07-0606 July 1987 PNO-I-87-060:on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days PNO-I-87-059, on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc1987-06-26026 June 1987 PNO-I-87-059:on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc PNO-I-87-038, on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration1987-04-29029 April 1987 PNO-I-87-038:on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration PNO-I-86-075, on 860916,operators Removed Unit 1 from Svc to Repair Steam Leak on High Pressure Turbine Steam Return Line.Leak Caused by Steam Erosion on Section of 20-inch Pipe.Affected Section of Pipe Replaced1986-09-18018 September 1986 PNO-I-86-075:on 860916,operators Removed Unit 1 from Svc to Repair Steam Leak on High Pressure Turbine Steam Return Line.Leak Caused by Steam Erosion on Section of 20-inch Pipe.Affected Section of Pipe Replaced PNO-I-86-073, on 860911,Unit 2 Tripped from 75% Power.Caused by Loss of Reactor Coolant Pumps 22 & 23 Due to Deenergization of Two Nonvital Buses.Unit Entered Cold Shutdown on 860913.Repair Completion Expected by 8609201986-09-15015 September 1986 PNO-I-86-073:on 860911,Unit 2 Tripped from 75% Power.Caused by Loss of Reactor Coolant Pumps 22 & 23 Due to Deenergization of Two Nonvital Buses.Unit Entered Cold Shutdown on 860913.Repair Completion Expected by 860920 PNO-I-86-066, on 860826,turbine Trip/Reactor Trip & Safety Injection Occurred During Troubleshooting on Steam Generator Level Indicator 22.Natural Circulation Established & Third Vital Bus & Nonvital Loads Reenergized1986-08-26026 August 1986 PNO-I-86-066:on 860826,turbine Trip/Reactor Trip & Safety Injection Occurred During Troubleshooting on Steam Generator Level Indicator 22.Natural Circulation Established & Third Vital Bus & Nonvital Loads Reenergized PNO-I-86-061, on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires1986-08-0707 August 1986 PNO-I-86-061:on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires PNO-I-86-054, on 860721,licensee Initiated Normal Shutdown from 100% Power to Inspect & Correct Main Generator Hydrogen Leak Into Stator Cooling Water Sys.Completion of Insp & Repairs Expected in Approx 7 Days1986-07-21021 July 1986 PNO-I-86-054:on 860721,licensee Initiated Normal Shutdown from 100% Power to Inspect & Correct Main Generator Hydrogen Leak Into Stator Cooling Water Sys.Completion of Insp & Repairs Expected in Approx 7 Days PNO-I-85-075, on 851006,plant Tripped.Caused by Condensation in Condenser Vacuum Sensing Line Reaching Sensor Causing Turbine Trip W/Automatic Reactor Trip.Plant in Cold Shutdown for Maint & Mod to Condenser1985-10-0707 October 1985 PNO-I-85-075:on 851006,plant Tripped.Caused by Condensation in Condenser Vacuum Sensing Line Reaching Sensor Causing Turbine Trip W/Automatic Reactor Trip.Plant in Cold Shutdown for Maint & Mod to Condenser PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage1985-09-27027 September 1985 PNO-I-85-071A:on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage PNO-I-85-044, on 850628,RCS Water Inventory Balance Indicated Unidentified Leak Rate Increased from 0.72 Gpm (Tech Spec Limit Is 1.0 Gpm) on 850627 & Steam Observed Leaking from Inlet Flange of Pressurizer Relief Valve PR-41985-06-28028 June 1985 PNO-I-85-044:on 850628,RCS Water Inventory Balance Indicated Unidentified Leak Rate Increased from 0.72 Gpm (Tech Spec Limit Is 1.0 Gpm) on 850627 & Steam Observed Leaking from Inlet Flange of Pressurizer Relief Valve PR-4 PNO-IV-84-007A, on 840529,health Physicist Responded to Accident Site Located About 30 Miles East of Rock Springs,Wy on Interstate Highway 80.Shipping Containers Were Found to Be Intact W/No Detectable Leakage1984-05-31031 May 1984 PNO-IV-84-007A:on 840529,health Physicist Responded to Accident Site Located About 30 Miles East of Rock Springs,Wy on Interstate Highway 80.Shipping Containers Were Found to Be Intact W/No Detectable Leakage ML20198B3651982-10-21021 October 1982 PNS-I-82-013:on 821020,employee at Plant Site Attempted Suicide at His Home Using Own .38 Caliber Handgun.Suicide Attempt Left Employee in Critical Condition as Result of Gunshot Wound to Head ML20216J7751978-10-23023 October 1978 PNO-78-180:on 781021,during Plant Startup,Shaft Seal on Number 13 RCP Failed.No Radioactivity Released in Environ. Exam & Repairs of RCP Seal in-progress.Plant Will Remain Shut Down for Estimated 3-5 Days ML20216J8701978-08-0303 August 1978 PNO-78-139:on 780802,while Operating Unit 1 Waste Evaporator & Discharging Evaporator Bottoms to Evaporator Bottoms Storage Tank,Leak Occurred in Connecting,Schedule 10,SS Piping ML20248L0611978-04-13013 April 1978 PNO-78-080:on 780413,during Conduct of Emergency Drill,Which Involved Simulated Explosion,Simulated Injury to Workers & Actual Transport of Workers to Hosp,News Media Incorrectly Assumed Actual Event Occurred ML20249A7361978-04-13013 April 1978 PNS-78-017:on 780413,member of Security Organization Received Telephone Call from an Unidentified Person Stating That Bomb Is in Const Site.Const Areas Were Evacuated & Searched.State of Nj & FBI Informed ML20248L8581978-03-16016 March 1978 PNO-78-046:on 780316,Unit 1 Shutdown to Investigate Vibration in Main Turbine Generator.Shutdown Expected to Last Min of 3 to 4 Wks ML20249A0991978-01-26026 January 1978 PNO-78-015:on 780123,unit Tripped from 100% Power,Due to Control Problem in Electrohydraulic Sys.During Outage Unit Was Cooled Down to Repair Steam Leaks in Two Steam Generator Manway Covers.State of Nj Informed ML20249A0451978-01-12012 January 1978 PNO-78-005:on 780111,orderly Unit Shutdown Because of Debris Accumulation & Icing of Circulating Water Intake Screens. Screens cleaned,de-iced & Preparations Made for Startup.Leak in Bonnet Gasket.Unit Maintained in Cold Shutdown Condition ML20151X9721977-10-18018 October 1977 PNO-77-186:on 771018,welding Cables in Contact with Cable Tray Located in Auxiliary Building Shorted,Caught Fire & Caused Damage to Cable Tray.Fire Extinguished by Site Personnel.Press Release Not Planned ML20151Y1231977-10-11011 October 1977 PNO-77-179:on 771009,due to Erroneous Valve lineup,600 Gallons of Liquid Waste Dumped to Circulating Water Discharge Pipe Instead of Tank Truck.Unit in Outage & Circulating Water Sys Shut Down.New Jersey State Notified ML20126D1901977-08-12012 August 1977 PNO-77-143:Pacific Pump Co Supplied Facilities W/Production Lot of 40 Pumps Mfg Using Shafts Made of Inferior Matl. Cause Unstated.All Utils W/Pumps Were Notified.Nrc Headquarters Notified on 770812 ML20151X6551977-07-11011 July 1977 PNO-77-125:on 770708,plant Was Shutdown When Packing Leak Occurred on 2 Auxiliary Spray Valve Inside Containment. Leak Was Measured at 11 Gpm & 13,000 Gallons of Primary Coolant Was Released to Containment ML20151X5421977-06-27027 June 1977 PNO-77-115:flashover Occurred When Planned Generator Trip Test from 100% Power Was Initiated by Manually Opening Two Generator Output Breakers.Investigation of Breaker Malfunction Will Be Made.Occurrence Was Reported on 770626 ML20151U9571977-06-0606 June 1977 PNO-77-097:on 770604,reactor Tripped from 100% Power on Low Flow Due to Loss of Rcp.Unit Placed in Cold Shutdown Mode. No Personnel Overexposures or Releases to Environ Occurred ML20151U1281977-04-13013 April 1977 PNO-77-054:on 770412,following Startup RCP (One of Four) Tripped When Power Was Lost to 4160 V Bus.Reactor Was Operated W/Three RCPs for Thirty Minutes ML20249A8941977-04-0707 April 1977 PNS-77-016:on 770406,Woodstown-Salem,NJ Radio Station Wjic Received Telcon from Unidentified Male Caller,Who Advised That Plant Going to Blow Baby. Threat Reported to Police Dept Who Advised Licensee.Search Produced Negative Results ML20151U3931977-02-24024 February 1977 PNO-77-032:on 770224,minor Radioactive Spill Occurred,When Valve line-up Error in Unit 1 Waste Holdup Sys Resulted in Floor Drain Backup.Roving Watch Found Leak & Personnel Dispatched to Correct Valve Lineup ML20236L1471977-01-17017 January 1977 PNO-77-011:on 770115,high Pressure Hydraulic Line on Number 12 MSIV Failed While Reactor Was Critical in Mode 2.Oil from Failed Line Sprayed on Insulation & Small Fire Resulted. Similar Line on Number 11 MSIV Failed on 770116.No Damage ML20236F3091976-12-30030 December 1976 PNO-76-226:on 761229,hydraulic Oil Line on 12 MSIV Severed During Attempts to Open Valve W/Reactor Critical in Startup Mode.Recovery from Inadvertent Safety Injection & Cleanup After Fire Proceeding Routinely.State of Nj Informed ML20236J6771976-12-22022 December 1976 PNS-76-068:on 761221,strike by Security Force Conducted. Strike Occurred Because of Dissatisfaction W/Progress of Contract Negotiation ML20236F3311976-12-13013 December 1976 PNO-76-213:on 761211,initial Criticality Achieved.Region I Inspectors at Site Report That Actual Plant Parameters Were in Close Agreement W/Predicted Values.Media Interest Expected Because of Significance of Milestone ML20249C8011976-12-0202 December 1976 PNO-76-204:on 761130 & 1201,three Inadvertent Safety Injections Occurred.Reactor in Mode 3 During Each Occurrence.State of Nj Informed 1999-09-16 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999
[Table view]PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000272/19990011999-04-0101 April 1999 Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal1998-12-0101 December 1998 PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects ML20217E7851997-07-25025 July 1997 Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept ML20202D0971997-03-31031 March 1997 Investigation Rept 1-95-013 on 970331.No Noncompliance Noted.Major Areas Investigated:Allegation Re Pse&G Intentionally Operated Outside Design Basis & Failed to Make Timely Notification to Nrc,Per 10CFR50.72 ML20137B6021997-03-18018 March 1997 Notice of Violation Identified in Correspondence Between 961105 & 970212.Violations Noted:Conducted Requalification Program Such That Annual Operating Test Not Provided for Fourteen Plant Licensed Operators in CY96 IR 05000272/19970031997-02-0505 February 1997 Attachment to Insp Repts 50-272/97-03 & 50-311/97-03 ,consisting of 970205 Slide Presentation Inadvertently Omitted from Repts ML20134B6741997-01-27027 January 1997 Notice of Violation from Insp on 961110-1221.Violations Noted:Vital Area Access Control & Badge Sys Requirements of Util Security Plan Were Not Implemented for Listed Examples IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan ML20133A4491996-12-11011 December 1996 Notice of Violation from Insp on 960815-0903.Violation Noted:On 960814,vital Area Access Not Physically Controlled in That Positive Access Control Over Photobadge Keycards Compromised,Creating Opportunity for Unauthorized Access ML20133A4341996-12-11011 December 1996 Notice of Violation from Investigation Repts 1-94-006R & 1-94-053 on 940218-960430 & 941121-960425.Violation Noted: Licensee Through Former Manager of Nsr,Discriminated in Nov 93 & May 94 Against Former Onsite Safety Review Engineer IR 05000272/19960131996-12-0303 December 1996 Insp Repts 50-272/96-13 & 50-311/96-13 on 960812-0920. Violations Noted.Major Areas Inspected:Engineering Performance Issues That Require Resolution Prior to Plant Restart ML20135B2681995-04-11011 April 1995 Notice of Violation from Investigation 1-93-021R.Violation Noted:C Vondra Deliberately Caused Pse&G to Violate 10CFR50.7 by Discriminating Against Two Employees for Engaging in Protected Activities ML20135A9461994-03-0909 March 1994 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:On 931012,maint on Breaker for electro-hydraulic Pump Was Conducted W/O Supervisor Ensuring Equipment Was Tagged & Safe to Work on PNO-I-93-068, on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R)1993-12-0707 December 1993 PNO-I-93-068:on 931203,ALCO Emergency Diesel Generator Cylinder Cracking Discovered.Health Physics Technician Noticed Coolant Leaking from Number 3 Cylinder Sleeve on Right Bank of Cylinders (3R) PNO-I-93-062, on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan1993-11-12012 November 1993 PNO-I-93-062:on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan PNO-I-93-060, on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified1993-11-0303 November 1993 PNO-I-93-060:on 931102,fire Reported in 230 Volt Lighting Transformer in Turbine Bldg.Caused by Loose Electrical Connection.State of Nj Has Been Notified ML20058P9361993-10-15015 October 1993 Notice of Violation from Insp on 920614-0725.Violation Noted:Licensee Determined Several Instances in Which Personnel Assigned to Fire Watch Patrols Failed to Perform or Complete Function as Required by TS & Falsified Records IR 05000272/19910991993-07-29029 July 1993 Initial Draft SALP Repts 50-272/91-99,50-311/91-99 & 50-354/91-99 for 911229-930619 IR 05000272/19920211993-01-27027 January 1993 Exam Repts 50-272/92-21OL & 50-311/92-21OL on 921214-17.Exam Results:All Six SRO Candidates Passed All Portions of Exam & Issued Licenses PNO-I-92-075, upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes1992-12-15015 December 1992 PNO-I-92-075:upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes PNO-I-90-056, on 900722,potential Design Deficiency in Main Steam Isolation Sys Noted.Units Shut Down Until Final Analysis & Appropriate Corrective Actions Completed1990-07-23023 July 1990 PNO-I-90-056:on 900722,potential Design Deficiency in Main Steam Isolation Sys Noted.Units Shut Down Until Final Analysis & Appropriate Corrective Actions Completed ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000311/19870291988-03-23023 March 1988 Enforcement Conference Rept 50-311/87-29 on 880212. Violations Noted.Major Areas Discussed:Insp Rept 50-311/87-29 Re Safe Shutdown in Event of Fire IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness IR 05000354/19860991988-03-0404 March 1988 SALP Rept 50-354/86-99 on 861201-880115 PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom IR 05000272/19860991988-02-0505 February 1988 SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987 IR 05000254/19870251987-11-23023 November 1987 Insp Repts 50-254/87-25 & 50-265/87-25 on 870922-1105. Violations Noted.Major Areas Inspected:Licensee Implementation of Generic Ltr 85-06 Re ATWS Mitigation Sys (25020) & Onsite Followup Events IR 05000272/19870261987-11-0909 November 1987 Exam Repts 50-272/87-26OL & 50-311/87-26OL on 870915-17.Exam Results:All Four Senior Reactor Operator Candidates Passed Written & Operating Exams ML20217F8541987-10-27027 October 1987 PNS-I-87-017:on 871026,fireman Received Call of Bomb Threat at Plant.Search of Facility Proved Negative PNO-I-87-099, on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway1987-10-26026 October 1987 PNO-I-87-099:on 871023,licensee Notified Region I of Addl Uncertainties in Onsite Electrical Distribution Sys Design W/Potential for Breaker Coordination Problems.Unit Shutdown Commenced on 871023.Analysis Underway IR 05000272/19870271987-10-20020 October 1987 Insp Rept 50-272/87-27 on 870921-25.No Violations Noted. Major Areas inspected:post-mod Test Program for Forthcoming Refueling Outage,Including Engineering Change (1EC) Packages,Mod Test Procedures & Test Specs IR 05000272/19870211987-08-17017 August 1987 Requalification Evaluation Repts 50-272/87-21OL & 50-311/87-26OL on 870615-19.Exam Results:Two Senior Reactor Operators & Three Reactor Operators Passed All Portions of Exam.Program Found Unsatisfactory,Per NUREG-1021 PNO-I-87-075A, on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected Areas1987-08-13013 August 1987 PNO-I-87-075A:on 870812,visual Insp Identified No Significant Corrosion of Reactor Vessel Studs After Finding Leak on 870807.Further Insp of Degraded Vessel Components Will Be Formalized After Cleaning Affected Areas PNO-I-87-060, on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days1987-07-0606 July 1987 PNO-I-87-060:on 870703,unit Removed from Svc to Make Repairs to Low Pressure Turbines 21 & 22.Unit Being Maintained in Hot Shutdown.Licensee Expects to Complete Turbine Gasket Repairs within 14 Days PNO-I-87-059, on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc1987-06-26026 June 1987 PNO-I-87-059:on 870626,operators Received High Vibration Alarm on Bearing 6 of Low Pressure Turbine 22.Bearing Vibration Increased & High Pitched Noise Discovered.Licensee Elected to Remove Unit from Svc ML20154D4561987-06-15015 June 1987 Notice of Violation from Insp on 831205-06 & 840116-20. Violations Noted:Fire Protection Features Not Provided for Certain Redundant Trains of Equipment &/Or Cabling Located Outside Primary Containment PNO-I-87-038, on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration1987-04-29029 April 1987 PNO-I-87-038:on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration IR 05000272/19870051987-03-23023 March 1987 Insp Repts 50-272/87-05 & 50-311/87-07 on 870224-27.No Violations Identified.Major Areas Inspected:Control of Internal Exposures,Processing of Routine Survey Data, Organization & Staffing & Control of Radioactive Matl ML20207S4181987-03-12012 March 1987 Notice of Violation from Insp on 870127-0223 IR 05000272/19870031987-03-11011 March 1987 Insp Repts 50-272/87-03 & 50-311/87-04 on 870127-0223. Violation Noted:Control & Testing of Containment Boundary Valves Incomplete IR 05000311/19870051987-03-10010 March 1987 Insp Rept 50-311/87-05 on 870203-06.No Violations Identified.Major Areas Inspected:Cycle 4 Startup Physics Testing Program,Precritical Tests,Low Power Physics Tests & Power Ascension Tests IR 05000311/19870061987-03-0909 March 1987 Exam Rept 50-311/87-06OL on 870213.Exam Results:One Candidate Administered Oral Exam Failed Due to Lack of Knowledge of Tech Specs Unique to Unit 2 IR 05000272/19860231987-03-0404 March 1987 Mgt Meeting Repts 50-272/86-23 & 50-311/86-23 on 870203. Major Areas Discussed:Findings Re Equipment Qualification Insp,Including Equipment Qualification of Limitorque Operators & Exo Sensors Hydrogen Analyzers IR 05000272/19850981987-02-27027 February 1987 Corrected SALP Repts 50-272/85-98 & 50-311/85-98 for Oct 1985 - Sept 1986 ML20212B9751987-02-20020 February 1987 Notice of Violation from Insp on 870112-16 1999-09-16 |
Text
f b p 0.v W I
.O ;f PRELIMINARY NOTIFICATION +1 ,-
O October 23, 1978 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-180 This )reliminary notification constitutes EARLY notice of an event of POSS13LE safety or public interest significance. The informatica p_ resented is as initially received without verification or evaluation
, and is basically all that is known by IE staff on this date.
Facility: Public Service Electric'and Gas Company'(New Jersey)
Salem Nuclear Generating Station, Unit 1 l Hancocks Bridge, New Jersey l (DN50-272) l
Subject:
REACTOR COOLANT PUMP SEAL FAILURE 1
During a plant startup at 8:30'a.m. on Oct 9r 21,1978, the shaft seal l l on the No. 13 Reactor Coolant Pump (RCP) 1... led. The reactor coolant l system was at a pressure of 850 pounds per square inch and a temperature of 320 degrees F. Approximately 15,000 gallons of water leaked to the l containment before the plant could be depressurized. No radioactivity
! l was released to the environment. !
l . Examination and repairs of the RCP seal are in-progress. The plant will remain shut down for an estimated 3-5 days. MI l S This PN is issued foc 'informati~on'only. ~The Resident Inspector is on 1
l
} site following up on the repair work.
i Media interest has been indicated.' Coverage occurred on local TV and in !
I newspapers on October 22, 1978. The' Sta't e of New Jersey j been informed. A press release was issued by the license.._. e. .
NRC, Region I. (Philadelphia) received notification of this occurrence by telephone from the station's Chief Engineer at 1:00 p.m., October 21,
, 1978.
Contact:
GKlingler, IE x?fd19 FNolan, IE x28019 Distribution: TransmittedHStfIN Chairman Hendrie Commissicrdr Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer CA Commissioner Gilinsky (For Distribution)
Transmitted: MNBB! E J. G. Da is, IE L. V. Gossick, EDO ' P.Bldgf~
H. R. Den ton,MRR Region O lM/
S. H. Hanauer EDO R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Italler, MPA s V. Stello, URR (MAIL)
- 0. GT tbston, OIA
~~
R. G. Ryan, OSP .J- R. S. Boyd, NRR H. K. Shapar, ELD .' ' SS Bldg f h 5 R. Minogue, SD oj C. V. Smith MSS
- , =
PREL D']MRY N01IrirAT10N j /p
)