PNO-77-115:flashover Occurred When Planned Generator Trip Test from 100% Power Was Initiated by Manually Opening Two Generator Output Breakers.Investigation of Breaker Malfunction Will Be Made.Occurrence Was Reported on 770626
ML20151X542
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/27/1977
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-115, NUDOCS 9809170143
Download: ML20151X542 (1)


Text

Pi)L NdOJOV4L Q OP3 PU TRELIMINARY NOTIFICATION T hfh O /

June 27, 1977 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-PNO 115 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The inforn tion presented is as initittlly received without verification or evaluation

_and is basically all that is known by IE staff on this date.

Facility: Public Service Electric & Gas Company .

Salem Unit No. 1 ,

Lower Alloways Creek New Jersey l (DN50-272)

Subject:

Breaker Malfunction During Generator Trip Test

. When the planned generator trip test from 100 percent power was initiated ,

by manually opening the two generator output breakers, flashover occurred '

in one or both breakers. This flashover resulted in relay protective  ;

actions which caused a turbine and reactor trip, a loss of one offsite '

power line, a loss of two 4160V non-vital plant bases and tiripping of two reactor coolant pumps (RCP's). The other two RCP's remained in operation. The reactor was placed in the hot standby condition.

REtor to returning the plant to pcaer operation, a thorough investigation of the breaker malfunction will be made and a safety evaluation completed.

Any corrective action required will be taken prior to power operation.

Gil Media interest is expected.because of close attention given to operating i problems at Salem Huclear Power Station. The State of New Jersay has l been informed. A press release is not planned.

NRC, Region I, (Philadelphia) received notification of this occurrence

. by telephone from an NRC inspector who was onsite to witness the test at 12:15 p.m. June 26, 1977.

.^

The information.is current as of 9:30 a.m., June 27, 1977.

Contact:

GKlingler, IE x27451 FNolan, IE x27451 JSniezek, IE x27451~

Distribution: TransmittedHSt)., '

Chairman Rowden C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy S. J. Chilk, SECY H. H. Whiteside, SCNR Commissioner Gilinsky H. R. Myers, HCEE Transmitted: MNB.B3 ' 00 P Bldg 1.' k SS Bldg M V 8 L. V. Gossick, EDO E. G. Case, NRR C. V. Smith, NMSS S. H. Hanauer, ED0 .

J. A. Harris, PA W. G. Mcdonald, MIPC Luge (MAIL) E. Volgenau IE R. G. Ryan, OSP T. J. McTiernan, DIA Region f ",Lif1 '

H. K. Shapar, ELD 3 7 ,p : o PRELIMINARY NOTIFICATION q 9809170'143 770627' PDR I&E C f=Q 7 PNG-77-115 PDR ,

l