ML22032A157

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022
ML22032A157
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/19/2022
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22032A157 (11)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 01/19/22 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK 11555 ROCKVILLE PIKE ROCKVILLE, MD 20852 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 130 1 IR 01/19/22 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: u33890

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL- VOL I Revision 130 dated 01/19/2022 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 129 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 129 12/09/2021 Title Page Rev 130 01/19/2022 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 129 LEP-1 through LEP-4 Rev 130 12/09/2021 01/19/2022 3.0 Limiting Condition for Operation (TRLCO)

Applicability TRM 3.0-1 Rev 63 03/03 TRM 3.0-1 Rev 130 01/22 3.8 Electrical Power Systems TRM 3.8-4 Rev 128 10/21 TRM 3.8-4 Rev 130 01/22 3.12 Fire Protection TRM 3.12-11 Rev 127 08/21 TRM 3.12-11 Rev 130 01/22

  • B3.0 Limiting Condition for Operation (TRLCO)

Applicability TRM B3.0-2c Rev 72 12/04 TRM B3.0-2c Rev 130 01/22 Note: The changes above reflect those justified and described in LCR# 21-028-TRM.

END

Fermi 2 Technical Requirements Manual Volume I DTE Electric ARMS - INFORMATION

  • DTC: TMTRM Date 0 1/19/2022 File: 1754 DSN: TRMVO Reci ient Rev: 130

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 106 TRM 3.3-30 Revision 31 TRM ii Revision 107 TRM 3.3-31 Revision 31 TRM iii Revision 105 TRM 3.3-32 Revision 31 TRM iv Revision 106 TRM 3.3-33 Revision 125 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 TRM 3.3-35 Revision 60 TRM 1.0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 127 TRM 3.0-1 Revision 130 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-c Revision 106 TRM 3.3-48 Revision 125 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 31 TRM 3.4-2 Revision 125 TRM 3.3-6 Revision 125 TRM 3.4-3 Revision 125 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31.

TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 125 TRM 3.3-13a Revision 125 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 125 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Revision 31 TRM 3. 6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 125 TRM 3.6-13 Revision 123 TRM 3.3-28 Revision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 125 TRM 3.6-14a Revision 123 TRM Vol. I LEP-1 REV 130 01/19/2022

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-15 Revision 123 TRM 3.8-9 Revision 125 TRM 3.6-16 Revision 123 TRM 3.8-10 Revision 125 TRM 3.6-17 Revision 123 TRM 3.8-11 Revision 123 TRM 3.6-18 Revision 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 129 TRM 3.6-21 Revision 123 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 123 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 125 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 125 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision BB TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 125 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31

  • TRM TRM TRM TRM TRM TRM TRM 3.7-2 3.7-3 3.7-4 3.7-5 3.7-6 3.7-7 3.7-8 Revision Revision Revision Revision Revision Revision Revision 107 70 73 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM 3.12-4 3.12-5 3.12-6 3.12-7 3.12-8 3.12-9 3.12-10 Revision Revision Revision Revision Revision Revision Revision 102 108 53 31 127 40 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 130 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3. 7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 127 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 127 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 130 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 125 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 125 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 125 TRM 3.12-30 Revision 127 TRM 3.8-8 Revision 125 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 130 01/19/2022

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Revision Revision TRM 5.0-a Revision 105 TRM B3.4.6-1 Revision 31 TRM 5.0-1 Revision 119 TRM B3.4.7-l Revision 31 TRM 5.0-2 Revision 105 TRM B3.5-1 Revision 31 TRM Bl.0-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM B3.0-1 Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-l Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-2c Revision 130 TRM B3.6.7-l Revision 31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.l-l Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-1 Revision 107 TRM B3.0-6 Revision 72 TRM B3.7.3-l Revision 73 TRM B3.0-7 Revision 72 TRM B3.7.4-1 Revision 31 TRM B3.1-l Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.5-l Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.6-l Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.7-l Revision 99 TRM B3.3.2-l Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-1 Revision 67 TRM B3.8.l-l Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.2-l Revision 31

  • TRM TRM TRM TRM TRM TRM TRM B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 Revision Revision Revision Revision Revision Revision Revision 126 31 31 116 31 31 31 TRM TRM TRM TRM TRM TRM TRM B3.8.3-1 B3.8.4-l B3.8.5-l B3.8.6-1 B3.9.1-1 B3.9.2-1 B3.9.3-1 Revision Revision Revision Revision Revision Revision Revision 96 31 31 125 31 65 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.10-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3 .11.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-3 Revision 106 TRM B3.12.2-1 Revision 127 TRM B3.3.8-1 Revision 31 TRM- B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.5-l Revision 31 TRM B3 . 3 . 11-1 Revision 45 TRM B3.12.6-l Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.l-1 Revision 31 TRM B3.4.l-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-l Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 130 01/19/2022

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 21, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 0 30 0 31 0

  • TRM Vol. I LEP-4 REV 130 01/19/2022

Applicability TR 3.0

  • TR 3.0 TRLCO 3.0.1 LIMITING CONDITION FOR OPERATION (TRLCO) APPLICABILITY TRLCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in TRLCO 3.0.2 and TRLCO 3.0.5.

TRLCO 3.0.2 Upon discovery of a failure to meet a TRLCO, the Required Actions of the associated Conditions shall be met, except as provided in TRLCO 3.0.5.

If the TRLCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.

TRLCO 3.0.3 Noncompliance with a Technical Requirement shall exist when the TRLCO and associated ACTION statement(s) are not met within the specified time intervals.

Once a degraded or nonconforming condition of specific SSCs is identified, an operability determination should be made as soon as possible consistent with the safety importance of the SSC affected. In most cases, i t is expected that the decision can be made immediately (e.g., loss of motive power, etc.).

In other cases it is expected the decision can be made within approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery even though complete information may not be available. Some few exceptional cases may take longer. Engineering judgement must be used to determine safety significance. The decision should be based on the best information available and must be predicated on the licensee's reasonable expectation that the SSC is operable and that the prompt determination process will support that expectation. When reasonable expectation does not exist, the SSC should be declared inoperable and the safe course of action should be taken.

Conditions of noncompliance are to be documented and evaluated via the corrective action program to determine operability status. If the TRLCO is restored prior to expiration of the specified time intervals, completion of the ACTION statement(s) is not required.

(continued)

  • TRM Vol. I TRM 3.0-1 REV 130 01/22

AC Sources TR 3.8.3

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.8.3.1 DELETED DELETED TRSR 3.8.3.2 Verify that the following diesel generator 24 months -

lockout features prevent diesel generator Staggered starting only when required:

a. 4160-volt ESF bus lockout;
b. Differential trip; and
c. Shutdown relay trip.

TRSR 3.8.3.3 Verify that the auto-connected loads to 24 months -

each diesel generator do not exceed the Staggered 2000-hour rating of 3100 kW .

  • TRSR 3.8.3.4 Drain each fuel oil storage tank, remove the accumulated sediment and clean the tank using sodium hypochlorite solution .

10 years

  • TRM Vol. I TRM 3.8-4 REV 130 01/22

Fire Suppression Water System TR 3.12.2

  • SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY TRSR 3.12.2.13 --------------------NOTE-------------------

Measured performance shall be recorded at minimum and rated loads.

Verify that each fire pump develops a 18 months minimum calculated value of 2500 gpm at 150 psig at the discharge flange of the pump adjusted for the minimum allowed lake level of 562'-0".

TRSR 3. 12. 2. 14 DELETED DELETED TRSR 3.12.2.15 Verify that each fire suppression pump 18 months starts sequentially to maintain the fire suppression water system pressure~ 105 psig .

TRSR 3.12.2.16 Inspect the diesel of the diesel-driven fire suppression pump to an inspection in accordance with procedures prepared in conjunction with its manufacturer's 18 months recommendations for the class of service.

TRSR 3.12.2.17 Verify the diesel-driven fire pump starting 18 months 24-volt battery bank battery and battery racks, show no visual indication of physical damage or abnormal deterioration.

(continued)

  • TRM Vol. I TRM 3.12-11 REV 130 01/22

TRLCO Applicability TR B3.0

  • BASES TRLCO 3.0.5 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when i t has been removed from service or declared inoperable to comply with ACTIONS.

The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action(s)) to allow the performance of required testing to demonstrate:

a. The OPERABILITY of the equipment being returned to service; or
b. The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary.

to perform the required testing to demonstrate OPERABILITY. This Specification does not provide time to perform any other preventive or corrective maintenance.

An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Required Actions and must be reopened to perform the required testing.

An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to prevent the trip function from occurring during the performance of required testing on another channel in the other trip system. A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of required testing on another channel in the same trip system .

  • TRM Vol. I TRM B3.0-2c REV 130 01/22