Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries
ML14170B201
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/19/2014
From: Conner J
DTE Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-14-0049
Download: ML14170B201 (7)


Text

J. Todd Conner Site Vice President DTE Energy Company 6400 N Dido Highway, Newport, MI 4816 Tel: 734.586.4849 Fax: 734.586.5295 Emai: connerj@dt eeeryco PTE Energy-10 CFR 50.90 June 19, 2014 NRC-14-0049 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) DTE Electric Company Letter to NRC, "License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries," dated April, 23, 2014

Subject:

Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries In Reference 2, DTE Electric Company (DTE) submitted a License Amendment Request (LAR) to revise Technical Specifications (TS) Surveillance Requirements (SR) associated with TS 3.8.4, "DC Sources - Operating" and TS 3.8.6, "Battery Cell Parameters." During a telephone conversation with NRC staff on June 2, 2014, it was determined that a clarification was needed to align the TS markup and revision for SR 3.8.4.2 with the changes proposed in Enclosure 1 of Reference 2. of this letter provides a revised TS markup page to replace Reference 2, , TS page 3.8-17. Enclosure 2 of this letter provides a revised clean TS page to replace Reference 2, Enclosure 3, TS page 3.8-17.

Should you have any questions or require additional information, please contact Mr.

Zackary W. Rad of my staff at (734) 586-5076.

Sincerely,

USNRC NRC-14-0049 Page 2

Enclosures:

- Marked-Up Page of Existing Fermi 2 TS Page 3.8-17 - Clean Page of Fermi 2 TS with Changes Incorporated TS Page 3.8-17 cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)

USNRC NRC-14-0049 Page 3 I, J. Todd Conner, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

T dd Conner Vice President, Nuclear Generation On this 19th day of June 2014 before me personally appeared J. Todd Conner, being first duly sworn and says that he executed the foregoing as his free act and deed.

Notary Public SHARON S. MARSHALL NOTARY PUBLIC, STATE OF MI COUNTY OF MONROE MYCC EXPIRES Jun 14, 2019 ACY1N COU~y O.k0 'x tr

Enclosure 1 to NRC-14-0049 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Marked-Up Page of Existing Fermi 2 TS TS Page 3.8-17

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days

> 125.7 V on float charge.

SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

OR Verify each battery:

a. eCell-to-cell and terminal connection resistance is 1.5E-4 ohm.; and
b. Total cell-to-cell and terminal connection resistance is 5 2.7E-3 ohm.

SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.

SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.

SR 3.8.4.5 Verify each battery: 18 months

a. eCell-to-cell and terminal connection resistance is < 1.5E-4 ohm.; and
b. Total cell-to-cell and terminal connection resistance is : 2.7E-3 ohm.

SR 3.8.4.6 Verify each required battery charger 18 months supplies > 100 amps at > 124.7 V for

> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

(continued)

FERMI - UNIT 2 3.8-17 Amendment No. 4, 136

Enclosure 2 to NRC-14-0049 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Clean Page of Fermi 2 TS with Changes Incorporated TS Page 3.8-17

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days

> 125.7 V on float charge.

SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

OR Verify each battery:

a. Cell-to-cell and terminal connection resistance is < 1.5E-4 ohm; and
b. Total cell-to-cell and terminal connection resistance is < 2.7E-3 ohm.

SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.

SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.

SR 3.8.4.5 Verify each battery: 18 months

a. Cell-to-cell and terminal connection resistance is < 1.5E-4 ohm; and
b. Total cell-to-cell and terminal connection resistance is 5 2.7E-3 ohm.

SR 3.8.4.6 Verify each required battery charger 18 months supplies > 100 amps at > 124.7 V for

> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

(continued)

FERMI - UNIT 2 3.8-17 Amendment No. /U$A, 143