Similar Documents at Fermi |
---|
Category:Manual
MONTHYEARML23030A3402023-01-12012 January 2023 Technical Requirements Manual - Volume 1, Revision 133 ML22138A1742022-04-27027 April 2022 Technical Requirements Manual, Volume I ML22081A0282022-03-0909 March 2022 Technical Requirements Manual, Vol 1, Rev. 131 ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21362A1602021-12-0909 December 2021 Technical Requirements Manual - Volume 1, Revision 129 ML21307A0832021-10-12012 October 2021 Rev. 128 to Technical Requirements Manual Vol. I ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21230A2592021-07-29029 July 2021 Technical Requirements Manual, Vol. I ML21118A0262021-04-0101 April 2021 Technical Requirements Manual - Vol. I ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20132A1152020-04-16016 April 2020 Technical Requirements Manual, Volume 1 ML20013E5302019-12-20020 December 2019 Technical Requirements Manual, Vol 1 ML20024D8252019-12-0707 December 2019 Technical Requirements Manual - Vol 1 ML18334A0992018-11-14014 November 2018 Technical Requirements Manual, Vol. 1 ML18319A0942018-10-15015 October 2018 Technical Requirements Manual, Volume 1, Revision 117 ML18302A1162018-10-12012 October 2018 Technical Requirements Manual - Vol. 1 ML18302A1172018-10-11011 October 2018 Technical Requirement Manual - Vol. 1 ML18291A9122018-09-21021 September 2018 Technical Requirements Manual, Vol. 1 ML18262A2082018-09-0707 September 2018 Technical Requirements Manual ML18192B9842018-06-26026 June 2018 Technical Requirements Manual, Vol. 1, Revision 112 ML17305A0382017-10-16016 October 2017 Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications Bases ML17145A2862017-05-0303 May 2017 Licensing Document Transmittal - Fermi 2 Technical Requirements Manual, Vol. 1, Rev. 111 ML15351A4072015-11-20020 November 2015 Technical Requirements Manual, Volume I ML14224A0092014-07-24024 July 2014 Technical Requirements Manual, Volume I, Revision 108 ML14177A6472014-06-12012 June 2014 Technical Requirements Manual, Volume 1 ML14098A2542014-03-19019 March 2014 Transmittal of Technical Requirements Manual - Vol I, Revision 106 ML13339A3352013-11-21021 November 2013 Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I ML13079A3362013-03-0606 March 2013 Technical Requirements Manual, Vol I ML12110A0862012-04-0404 April 2012 Technical Requirements Manual Volume I ML11277A0122011-09-20020 September 2011 Technical Requirements Manual, Volume I ML11168A1322011-05-0202 May 2011 Revision 101 to Technical Requirements Manual, Volume I and Revision 1 to Core Operating Limits Report, Cycle 15 ML1032800602010-11-15015 November 2010 Technical Requirements Manual - Vol I., Rev. 100 Dated 11/12/10 ML1028104832010-09-28028 September 2010 Technical Requirements Manual, Vol 1, Revision 99 ML1015404262010-05-25025 May 2010 Technical Requirements Manual - Vol 1, Revision 98 ML1011004632010-04-0707 April 2010 Technical Requirements Manual, Vol. 1, Revision 97 ML1008301842010-03-15015 March 2010 Technical Requirements Manual, Volume 1, Revision 96 ML0912701872009-04-27027 April 2009 Technical Requirements Manual - Volume I ML0911302252009-04-15015 April 2009 Revision 94 to Technical Requirements Manual Volume I ML0908503452009-03-12012 March 2009 Revision 93 to Technical Requirements Manual, Volume I ML0823408562008-08-12012 August 2008 Technical Requirements Manual, Volume 1, Revision 91 ML0822707012008-08-0606 August 2008 Technical Requirements Manual, Title Page Rev. 90, List of Effective Pages LEP-1 Through LEP-4 Rev. 90, and Cycle 13 Rev. 1 ML0823408572008-08-0404 August 2008 Revision to Technical Requirements Manual, Volume 1 ML0816403162008-06-0505 June 2008 Licensing Document Transmittal, Technical Requirements Manual - Vol. 1, Rev. 89 ML0811306852008-04-11011 April 2008 Technical Requirements Manual, Volume I, Revision 88 NRC-08-0031, Technical Requirements Manual Offsite Dose Calculation Manual Volume II2008-01-0303 January 2008 Technical Requirements Manual Offsite Dose Calculation Manual Volume II ML0801505592008-01-0303 January 2008 Licensing Document Transmittal of Revision 87 to, Technical Requirements Manual, Volume 1 ML0732700552007-11-0808 November 2007 Revision 86 to Technical Requirements Manual, Volume I ML0732000662007-11-0707 November 2007 Revision 85 to Technical Requirements Manual, Volume I ML0722002532007-07-26026 July 2007 Technical Requirements Manual, Volume I, Revision 84 ML0615903572006-05-26026 May 2006 Technical Requirements Manual - Vol. I, Revision 82 2023-01-12
[Table view] Category:Technical Specifications
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML16270A5312016-12-15015 December 2016 Fermi, Unit 2, Preoperational Test, Startup Tests and Other Items ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML16039A1212016-02-18018 February 2016 Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) NRC-14-0049, Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-06-19019 June 2014 Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2012-11-13013 November 2012 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process NRC-12-0005, Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.22012-01-10010 January 2012 Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 NRC-12-0004, Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves2012-01-10010 January 2012 Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.2011-12-20020 December 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. NRC-11-0030, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2011-08-12012 August 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0808 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1013408512010-05-14014 May 2010 Revised Clean TS Pages NRC-10-0003, Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.62010-01-0404 January 2010 Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.6 NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification2009-06-10010 June 2009 Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification NRC-08-0061, Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification2008-09-12012 September 2008 Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification ML0812808342008-06-25025 June 2008 Tech Spec Pages for Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0807900262008-03-17017 March 2008 Issuance of Amendment Technical Specification Change to Emergency Diesel Generator Surveillance Requirements NRC-08-0001, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0721404442007-08-0101 August 2007 Tech Spec Pages for Amendment Consolidated Line Item Improvement Process (Cllip) for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation (LCO) 30.9 Regarding the Unavailability of Barriers ML0721407632007-08-0101 August 2007 Technical Specification 3.8.1 Extension of the Completion Time for an Inoperable Diesel Generator Amendment ML0715002322007-04-12012 April 2007 Technical Specifications, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-07-0012, Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements2007-03-19019 March 2007 Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements NRC-07-0001, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2007-01-26026 January 2007 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0622004402006-08-0707 August 2006 Technical Specifications, Changes to Address Issues Related to an Inconsistency That Was Inadvertently Introduced During Conversion to Improved TSs When 1 Per Room Replaced 2 as the Required Channels Per Trip System NRC-06-0044, Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation2006-07-12012 July 2006 Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation NRC-06-0040, Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator2006-07-12012 July 2006 Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator ML0604800392006-02-15015 February 2006 Tech Spec Pages for Amendment 172 Regarding Consolidated Line Item Improvement for Snubbers ML0603704972006-02-0606 February 2006 Tech Spec Pages for Amendment 171 Allowed Outage Time Extension for Emergency Diesel Generator 12 for One Specific Incident 2023-09-18
[Table view] |
Text
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/01/21 US 'NRC , ,,; 'J.' PAGE 1 DQCOMENT CNTRL DESK 11555,ROCKVILLE PIKE
~" ~ .~...
ROCKVILLE, MD 20852 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 124 1 IR 02/01/21 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerDS.
Ref: u06895
LICENSING DOCUMENT TRANSMITTAL
- FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 124 dated 02/01/2021 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 123 has been inserted prior to inserting these pages.
SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 123 07/13/2020 Title Page Rev 124 02/01/2021 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 123 LEP-1 through LEP-4 Rev 124 02/01/2021 07/13/2020 3.3 Instrumentation TRM 3.3-21 Rev 116 10/18 TRM 3.3-21 Rev 124 02/21 TRM 3.3-22 Rev 31 10/99 TRM 3.3-22 Rev 124 02/21 1RM 3.3-23 Rev 31 10/99 TRM 3.3-23 Rev 124 02/21 Note: The changes above reflect those justified and described in LCR# 19-039-TRM.
.J
Fermi 2 Technical Requirements Manual Volume I DTE Electric ARMS - INFORMATION DTC: 1MTRM I File: 1754 I DSN: TRM VOL I I Rev: 124 Date 02/01/2021 I Recipient q':i,..~
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I
- Page TRM i TRM ii TRM iii Revision Revision Revision Revision 106 107 105 LIST OF EFFECTIVE PAGES Page TRM TRM TRM 3.3-30 3.3-31 3.3-32 Revision Revision Revision Revision 31 31 31 TRM iv Revision 106 TRM 3.3-33 Revision 31 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 TRM 3.3-35 Revision 60 TRM 1. 0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-o Revision 106 TRM 3.3-48 Revision 31 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 'Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 31 TRM 3.3-13a Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Revision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 31 TRM 3.6-13 Revision 123
- TRM 3.3-28 Revision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 76 TRM 3.6-14a Revision 123 TRM Vol. I LEP-1 REV 124 02/01/2021
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I
- Page TRM TRM TRM 3.6-15 3.6-16 3.6-17 Revision Revision Revision Revis.ion 123 123 123 LIST OF EFFECTIVE PAGES Paga TRM TRM TRM 3.8-9 3.8-10 3.8-11 Revis.ion Revision Revision Revision 50 50 123 TRM 3.6-18 Revis.ion 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 46 TRM 3.6-21 Revis.ion 123 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 123 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revis.ion 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revisi.on 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revi.sion 31 TRM 3.12-10 Revi.sion 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Ravi.sion 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revis.ion 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 113 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 114 TRM 3.12-30 Revision 31 TRM 3.8-8 Revis.ion 50 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 124 02/01/2021
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I
- TRM 5.0-a TRM 5.0-1 TRM 5.0-2 Revision Revision Revision Revision 105 119 105 LIST OF EFFECTIVE PAGES TRM B3.4.6-1 TRM B3.4.7-1 TRM B3.5-1 Revision Revision Revision Revision 31 31 31 TRM Bl. 0-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM B3.0-1 Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-1 Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-2o Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-1 Revision 107 TRM B3.0-6 Revisior;i 72 TRM B3.7.3-1 Revision 73 TRM B3.0-7 Revision 72 TRM B3.7.4-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.7-1 Revision 99 TRM B3.3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-1 Revision 67 TRM B3.8.1-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.3-1 Revision 96 TRM B3.3.5-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.6-1 Revision 116 TRM B3.8.6-1 Revision 43 TRM B3.3.6-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-4 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.10-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3,.12 .1-1 Revision 31 TRM B3.3.7-3 Revision 106 TRM B3.12.2-1 Revision 112 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.5-1 Revision 31 TRM B3 . 3 . 11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 124 02/01/2021
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 21, Revision 0 Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 B 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 0 30 0 31 0
- TRM Vol. I LEP-4 REV 124 02/01/2021
Primary Containme nt Isolat i on I nst r umentat i on TR 3 . 3 . 6.1
- TR 3 . 3 TR 3.3 . 6 . 1 INSTRUMENTATION Pr i ma r y Containment Iso l ation Instrumentat i on The primary containment isolation i nstrumentation tr i p setpoints a r e listed in Table TR3 . 3.6 . l - 1.
TABLE TR3 . 3 . 6.l-l (Page 1 of 3)
Primary Containment Isolation Instrumentation RESPONSE TIME FUNCTION TRIP SETPOINT (seconds)
- 1. Main Steam Li ne Isola t ion
- a. Reactor Vessel Water Level - Low Low Low, ~ 31. 8 inches 10
< 1 . Q (bl (cl Level 1
- b. Main Steam Line Pressure - Low 1s 1 ~ 821 psig NA
- c. Main Steam Line Flow - High 115 . 4 psid Q. 5 (bl (cl 2- 2-
- d. Condense r Pressure - High < 6 . 85 psia NA
- e. Main Steam Tunnel Temperature - High 2- 200°F NA
- f. Deleted
- g. Turbine Building Area Temperature - High < 200°F NA
- h. Manual Initiation NA NA (continued)
(b) Isolation system instrumentation response time for MSIVs Only . No diesel generator delays assumed for MSIVs .
(c) Except for Function 1 Main Steam Line Isolation Instrumentat i on DC Output Re l ays , the sensor and relays/logic respons e time need not be measured and may be assumed to be the design sensor response time . Prior to return to service of a new transmitter/relay or following refurbishment of a transmitter (e.g. , sensor cell or variable damper components/relay), a response time test will be performed to determine an initial sensor/relay- specific response time value .
(f) As refer e nced to instrument zero Top of Active Fuel (TAF) .
(g) The method for determining the Nominal Trip Setpoints, as-found tolerances and as-left tolerances for this funct i on are conta i ned i n Fermi 2 setpoint calculat i ons. Setpo i nt calculat i ons for this function are in accordance with the methods described in GEH Licensing Topical Reports NEDC-31336P - A, "General Electric Instrument Setpoint Methodology , " September 1996 and NEDE-33633P-A, "GEH Methodology for Implementing TSTF-493 Revision 4," January 2014 .
- TRM Vol. I TRM 3 . 3 - 21 REV 124 02/21
Primary Conta i nment Isolation Instrumentation TR 3 . 3 . 6 . 1
- TABLE TR3.3.6.l-1 (Page 2 of 3)
Primary Containment Isolation Instrumentation TRIP SETPOINT RESPONSE TIME (seconds)
FUNCTION
- 2. Primary Containment Isolation
- a. Reactor Vessel Water Level - Low, Level 3 ~ 173.4 inches <<! NA
- b. Reactor Vessel Water Level - Low Low, Level 2 ~ ll0 . 8 inches <<! NA
- c. Drywell Pressure - High ~ 1. 68 psig NA
- d. Main Steam Line Radiat i on - High < 3 . 0 X full power NA background f
- e. Manual Initiation NA NA
- 3. High Pressure Coolant Injection (HPCI) System Isolation
- a. HPCI Steam Line Flow - High ~ 395 inches of NA water wi th time delay of 3 seconds
- b. HPCI Steam Supply Line Pressure - Low ~ 100 psig NA
d.
e.
f .
HPCI Turbine Exhaust Diaphragm Pressure - High HPCI Equipment Room Temperature - High Drywell Pressure - High Manual Initiation
~ 10 psig
~ 154°F
~ 1. 68 psig NA NA NA NA NA
- 4. Reactor Core Isolation Cooling (RCIC) System Isolation
- a. RCIC Steam Line Flow-High < 87.0 inches of NA water with a time delay of 3 seconds
- b. RCIC Steam Supply Line Pressure - Low > 62 psig NA
- c. RCIC Turbine Exhaust Diaphragm Pressure - High ~ 10 psig NA
- d. RCIC Equipment Room Temperature - High ~ 154°F NA
- e. Drywell Pressure - High ~ 1. 68 psig NA
- f. Manual Initiation NA NA (continued)
(e) A new "full power background" level is established for hydrogen water chemistry based on 100 %
power operation with the established hydrogen injection rate . Actual background radiation levels may be less depending on actual power level or hydrogen injection rate .
Setpoint adjustment is not necessary for variations in power or hydrogen injection rate, including interruptions in hydrogen flow .
The setpoint associated with this function also trips and isolates the mechanical vacuum pumps (MVPs) and trips the gland seal exhausters (GSEs) .
(f) As referenced to instrument zero Top of Active Fuel (TAF).
TRM Vol. I TRM 3.3-22 REV 124 02/21
Primary Containment Isolation Instrumentati on TR 3 . 3 . 6 . 1 TABLE TR3.3 . 6.1-1 (Pa ge 3 of 3)
Primary Containment Isolation Instrumentation RESPONS E TIME FUNCTION TRIP SETPOINT (seco nds)
- 5. Reactor Water Cleanup (RWCU) System Isola t ion
- a. Differential Flow - High fdl 5- 55.1 gpm NA
- b. Area Temperature - High 5- 17 5°F NA
- c. Area Ventilation Differential Temperature - 5- 50°F NA High
- d. SLC System Initiation NA NA
- e. Reactor Vessel Water Level - Low Low, Level 2 ~ 110 . 8 inches ffl NA
- f. Manual Initiation NA NA
- 6. Shutdown Cooling System Isolation
- a. Reacto r Steam Dome Pressure - High 5_ 89 .5 psig f*I NA
- b. Reactor Vessel Water Level - Low , Level 3 ~ 173 . 4 inches ffl NA
- c. Manual Initiation NA NA (a) Represents steam dome pressure; actual trip setpoint is corrected for cold water head with reactor vessel flooded .
(d) With time delay of 45 seconds .
(f) As referenced to instrument zero Top of Active Fuel (TAF) .
- TRM Vol. I TRM 3.3 - 23 REV 124 02/21