ML21053A202

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021
ML21053A202
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/01/2021
From:
Detroit Edison, Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21053A202 (10)


Text

US 'NRC,

'J.'

DQCOMENT CNTRL DESK 11555,ROCKVILLE PIKE

~" ~.. ~

ROCKVILLE, MD 20852 Media: 8 1/2 X 11 DETROIT EDISON -

FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/01/21 PAGE 1

DTC Doc. Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 124 1

IR 02/01/21 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerDS.

Ref: u06895

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 124 dated 02/01/2021 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 123 has been inserted prior to inserting these pages.

SECTION In Front of TRM Manual Immediately following Title Page 3.3 Instrumentation REMOVE and DESTROY Title Page Rev 123 07/13/2020 List of Effective Pages LEP-1 through LEP-4 Rev 123 07/13/2020 TRM 3.3-21 Rev 116 10/18 TRM 3.3-22 Rev 31 10/99 1RM 3.3-23 Rev 31 10/99 INSERT Title Page Rev 124 02/01/2021 List of Effective Pages LEP-1 through LEP-4 Rev 124 02/01/2021 TRM 3.3-21 Rev 124 02/21 TRM 3.3-22 Rev 124 02/21 TRM 3.3-23 Rev 124 02/21 Note: The changes above reflect those justified and described in LCR# 19-039-TRM.

END

.J

DTC: 1MTRM I File: 1754 Date 02/01/2021 ARMS - INFORMATION Fermi 2 Technical Requirements Manual Volume I DTE Electric I DSN: TRM VOL I I Rev: 124 I Recipient q':i,..~

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 106 TRM 3.3-30 Revision 31 TRM ii Revision 107 TRM 3.3-31 Revision 31 TRM iii Revision 105 TRM 3.3-32 Revision 31 TRM iv Revision 106 TRM 3.3-33 Revision 31 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 TRM 3.3-35 Revision 60 TRM 1. 0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-o Revision 106 TRM 3.3-48 Revision 31 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1

'Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 31 TRM 3.3-13a Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Revision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 31 TRM 3.6-13 Revision 123 TRM 3.3-28 Revision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 76 TRM 3.6-14a Revision 123 TRM Vol. I LEP-1 REV 124 02/01/2021

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Paga Revis.ion TRM 3.6-15 Revision 123 TRM 3.8-9 Revision 50 TRM 3.6-16 Revision 123 TRM 3.8-10 Revision 50 TRM 3.6-17 Revis.ion 123 TRM 3.8-11 Revision 123 TRM 3.6-18 Revis.ion 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 46 TRM 3.6-21 Revis.ion 123 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 123 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revis.ion 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revisi.on 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revi.sion 31 TRM 3.12-10 Revi.sion 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Ravi.sion 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revis.ion 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 113 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 114 TRM 3.12-30 Revision 31 TRM 3.8-8 Revis.ion 50 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 124 02/01/2021

TRM 5.0-a TRM 5.0-1 TRM 5.0-2 TRM Bl. 0-1 TRM B2.0-1 TRM B3.0-1 TRM B3.0-2 TRM B3.0-2a TRM B3.0-2b TRM B3.0-2o TRM B3.0-3 TRM B3.0-4 TRM B3.0-5 TRM B3.0-6 TRM B3.0-7 TRM B3.1-1 TRM B3.2-1 TRM B3.3.1-1 TRM B3.3.1-2 TRM B3.3.2-1 TRM B3.3.2-2 TRM B3.3.3-1 TRM B3.3.4-1 TRM B3.3.4-2 TRM B3.3.5-1 TRM B3.3.5-2 TRM B3.3.6-1 TRM B3.3.6-2 TRM B3.3.6-3 TRM B3.3.6-4 TRM B3.3.6-5 TRM B3.3.6-6 TRM B3.3.7-1 TRM B3.3.7-2 TRM B3.3.7-3 TRM B3.3.8-1 TRM B3.3.9-1 TRM B3.3.10-1 TRM B3. 3. 11-1 TRM B3.3.12-1 TRM B3.3.13-1 TRM B3.3.14-1 TRM B3.4.1-1 TRM B3.4.1-2 TRM B3.4.1-3 TRM B3.4.1-4 TRM B3.4.1-5 TRM B3.4.2-1 TRM B3.4.3-1 TRM B3.4.4-1 TRM B3.4.5-1 TRM Vol. I FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I Revision Revision 105 Revision 119 Revision 105 Revision 31 Revision 31 Revision 63 Revision 63 Revision 72 Revision 72 Revision 72 Revision 31 Revision 31 Revision 54 Revisior;i 72 Revision 72 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 31 Revision 84 Revision 31 Revision 31 Revision 116 Revision 31 Revision 31 Revision 31 Revision 76 Revision 76 Revision 31 Revision 31 Revision 106 Revision 31 Revision 31 Revision 56 Revision 45 Revision 62 Revision 31 Revision 31 Revision 31 Revision 71 Revision 71 Revision 71 Revision 71 Revision 31 Revision 31 Revision 31 Revision 31 LIST OF EFFECTIVE PAGES TRM B3.4.6-1 TRM B3.4.7-1 TRM B3.5-1 TRM B3.6.1-1 TRM B3.6.2-1 TRM B3.6.3-1 TRM B3.6.4-1 TRM B3.6.5-1 TRM B3.6.6-1 TRM B3.6.7-1 TRM B3.6.8-1 TRM B3.7.1-1 TRM B3.7.2-1 TRM B3.7.3-1 TRM B3.7.4-1 TRM B3.7.4-2 TRM B3.7.5-1 TRM B3.7.6-1 TRM B3.7.7-1 TRM B3.7.8-1 TRM B3.7.9-1 TRM B3.8.1-1 TRM B3.8.2-1 TRM B3.8.3-1 TRM B3.8.4-1 TRM B3.8.5-1 TRM B3.8.6-1 TRM B3.9.1-1 TRM B3.9.2-1 TRM B3.9.3-1 TRM B3.9.4-1 TRM B3.10-1 TRM B3.11.1-1 TRM B3,.12.1-1 TRM B3.12.2-1 TRM B3.12.3-1 TRM B3.12.4-1 TRM B3.12.5-1 TRM B3.12.6-1 TRM B3.12.7-1 TRM B3.12.8-1 Revision Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 87 Revision 31 Revision 31 Revision 70 Revision 31 Revision 31 Revision 31 Revision 107 Revision 73 Revision 31 Revision 31 Revision 31 Revision 31 Revision 99 Revision 31 Revision 79 Revision 31 Revision 31 Revision 96 Revision 31 Revision 31 Revision 43 Revision 31 Revision 65 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 112 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 118 LEP-3 REV 124 02/01/2021

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I CORE OPERATING LIMITS REPORT COLR 21, Revision 0 LIST OF EFFECTIVE PAGES Revision Notation Page 1

0 2

0 3

0 4

0 5

0 6

0 7

0 B

0 9

0 10 0

11 0

12 0

13 0

14 0

15 0

16 0

17 0

18 0

19 0

20 0

21 0

22 0

23 0

24 0

25 0

26 0

27 0

28 0

29 0

30 0

31 0

TRM Vol. I LEP-4 REV 124 02/01/2021

Primary Containment Isolat i on I nst r umentat i on TR 3. 3. 6.1 TR 3. 3 INSTRUMENTATION TR 3.3. 6. 1 Pri mar y Containment Isol ation Instrumentat i on The primary containment isolation i nstrumentation tri p setpoints a r e listed in Table TR3. 3.6. l - 1.

TABLE TR3. 3. 6.l-l (Page 1 of 3)

Primary Containment Isolation Instrumentation FUNCTION 1.

Main Steam Li ne Isolat ion a.

Reactor Vessel Water Level -

Low Low Low, Level 1 b.

Main Steam Line Pressure -

Low 1s1 c.

Main Steam Line Flow -

High d.

Condenser Pressure -

High e.

Main Steam Tunnel Temperature -

High

f.

Deleted

g.

Turbine Building Area Temperature -

High

h.

Manual Initiation TRIP SETPOINT

~ 31. 8 inches 10

~ 821 psig 2-115. 4 psid

< 6. 85 psia 2-200°F

< 200°F NA NA 2-NA NA NA NA RESPONSE TIME (seconds) 1. Q (bl (cl Q. 5 (bl (cl (continued)

(b)

Isolation system instrumentation response time for MSIVs Only.

No diesel generator delays assumed for MSIVs.

(c)

Except for Function 1 Main Steam Line Isolation Instrumentat i on DC Output Re l ays, the sensor and relays/logic respons e time need not be measured and may be assumed to be the design sensor response time.

Prior to return to service of a new transmitter/relay or following refurbishment of a transmitter (e.g., sensor cell or variable damper components/relay), a response time test will be performed to determine an initial sensor/relay-specific response time value.

(f)

As refere nced to instrument zero Top of Active Fuel (TAF).

(g)

The method for determining the Nominal Trip Setpoints, as-found tolerances and as-left tolerances for this funct i on are contai ned i n Fermi 2 setpoint calculat i ons.

Setpoi nt calculati ons for this function are in accordance with the methods described in GEH Licensing Topical Reports NEDC-31336P-A, "General Electric Instrument Setpoint Methodology, " September 1996 and NEDE-33633P-A, "GEH Methodology for Implementing TSTF-493 Revision 4," January 2014.

TRM Vol. I TRM 3. 3-21 REV 124 02/21

Primary Contai nment Isolation Instrumentation TR 3. 3. 6. 1 TABLE TR3.3.6.l-1 (Page 2 of 3)

Primary Containment Isolation Instrumentation FUNCTION 2.

Primary Containment Isolation a.

Reactor Vessel Water Level -

Low, Level 3 b.

Reactor Vessel Water Level -

Low Low, Level 2 c.

Drywell Pressure -

High

d.

Main Steam Line Radiat i on -

High e.

Manual Initiation 3.

High Pressure Coolant Injection (HPCI) System Isolation a.

HPCI Steam Line Flow -

High b.

HPCI Steam Supply Line Pressure -

Low

c.

HPCI Turbine Exhaust Diaphragm Pressure -

High

d.

HPCI Equipment Room Temperature -

High e.

Drywell Pressure -

High f.

Manual Initiation 4.

Reactor Core Isolation Cooling (RCIC) System Isolation

a.

RCIC Steam Line Flow-High

b.

RCIC Steam Supply Line Pressure -

Low

c.

RCIC Turbine Exhaust Diaphragm Pressure -

High d.

RCIC Equipment Room Temperature -

High

e.

Drywell Pressure -

High

f.

Manual Initiation TRIP SETPOINT

~ 173.4 inches <<!

~ ll0. 8 inches <<!

~ 1. 68 psig

< 3. 0 X full power background f* I NA

~ 395 inches of water wi th time delay of 3 seconds

~ 100 psig

~ 10 psig

~ 154°F

~ 1. 68 psig NA

< 87.0 inches of water with a time delay of 3 seconds

> 62 psig

~ 10 psig

~ 154°F

~ 1. 68 psig NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA RESPONSE TIME (seconds)

(continued)

(e)

A new "full power background" level is established for hydrogen water chemistry based on 100%

power operation with the established hydrogen injection rate.

Actual background radiation levels may be less depending on actual power level or hydrogen injection rate.

Setpoint adjustment is not necessary for variations in power or hydrogen injection rate, including interruptions in hydrogen flow.

The setpoint associated with this function also trips and isolates the mechanical vacuum pumps (MVPs) and trips the gland seal exhausters (GSEs).

(f)

As referenced to instrument zero Top of Active Fuel (TAF).

TRM Vol. I TRM 3.3-22 REV 124 02/21

Primary Containment Isolation Instrumentation TR 3. 3. 6. 1 TABLE TR3.3. 6.1-1 (Page 3 of 3)

Primary Containment Isolation Instrumentation FUNCTION 5.

Reactor Water Cleanup (RWCU) System Isolat ion a.

Differential Flow -

High fdl b.

Area Temperature -

High

c.

Area Ventilation Differential Temperature -

High d.

SLC System Initiation

e.

Reactor Vessel Water Level -

Low Low, Level 2

f.

Manual Initiation

6.

Shutdown Cooling System Isolation a.

Reactor Steam Dome Pressure -

High b.

Reactor Vessel Water Level -

Low, Level 3

c.

Manual Initiation TRIP SETPOINT 5-55.1 gpm 5-17 5°F 5-50°F NA

~ 110. 8 inches ffl NA 5_ 89.5 psig f*I

~ 173. 4 inches ffl NA NA NA NA NA NA NA NA NA NA RESPONSE TIME (seconds)

(a)

Represents steam dome pressure; actual trip setpoint is corrected for cold water head with reactor vessel flooded.

(d)

With time delay of 45 seconds.

(f)

As referenced to instrument zero Top of Active Fuel (TAF).

TRM Vol. I TRM 3.3-23 REV 124 02/21