ML21053A202

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021
ML21053A202
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/01/2021
From:
Detroit Edison, Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21053A202 (10)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/01/21 US 'NRC , ,,; 'J.' PAGE 1 DQCOMENT CNTRL DESK 11555,ROCKVILLE PIKE

~" ~ .~...

ROCKVILLE, MD 20852 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 124 1 IR 02/01/21 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerDS.

Ref: u06895

LICENSING DOCUMENT TRANSMITTAL

  • FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 124 dated 02/01/2021 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 123 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 123 07/13/2020 Title Page Rev 124 02/01/2021 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 123 LEP-1 through LEP-4 Rev 124 02/01/2021 07/13/2020 3.3 Instrumentation TRM 3.3-21 Rev 116 10/18 TRM 3.3-21 Rev 124 02/21 TRM 3.3-22 Rev 31 10/99 TRM 3.3-22 Rev 124 02/21 1RM 3.3-23 Rev 31 10/99 TRM 3.3-23 Rev 124 02/21 Note: The changes above reflect those justified and described in LCR# 19-039-TRM.

  • END

.J

Fermi 2 Technical Requirements Manual Volume I DTE Electric ARMS - INFORMATION DTC: 1MTRM I File: 1754 I DSN: TRM VOL I I Rev: 124 Date 02/01/2021 I Recipient q':i,..~

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

  • Page TRM i TRM ii TRM iii Revision Revision Revision Revision 106 107 105 LIST OF EFFECTIVE PAGES Page TRM TRM TRM 3.3-30 3.3-31 3.3-32 Revision Revision Revision Revision 31 31 31 TRM iv Revision 106 TRM 3.3-33 Revision 31 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 TRM 3.3-35 Revision 60 TRM 1. 0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 72 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-o Revision 106 TRM 3.3-48 Revision 31 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 'Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 31 TRM 3.3-13a Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 60 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Revision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 31 TRM 3.6-13 Revision 123
  • TRM 3.3-28 Revision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 76 TRM 3.6-14a Revision 123 TRM Vol. I LEP-1 REV 124 02/01/2021

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

  • Page TRM TRM TRM 3.6-15 3.6-16 3.6-17 Revision Revision Revision Revis.ion 123 123 123 LIST OF EFFECTIVE PAGES Paga TRM TRM TRM 3.8-9 3.8-10 3.8-11 Revis.ion Revision Revision Revision 50 50 123 TRM 3.6-18 Revis.ion 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 46 TRM 3.6-21 Revis.ion 123 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 123 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revis.ion 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revisi.on 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revi.sion 31 TRM 3.12-10 Revi.sion 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Ravi.sion 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revis.ion 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 113 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 114 TRM 3.12-30 Revision 31 TRM 3.8-8 Revis.ion 50 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 124 02/01/2021

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

  • TRM 5.0-a TRM 5.0-1 TRM 5.0-2 Revision Revision Revision Revision 105 119 105 LIST OF EFFECTIVE PAGES TRM B3.4.6-1 TRM B3.4.7-1 TRM B3.5-1 Revision Revision Revision Revision 31 31 31 TRM Bl. 0-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM B3.0-1 Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-1 Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-2o Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-1 Revision 107 TRM B3.0-6 Revisior;i 72 TRM B3.7.3-1 Revision 73 TRM B3.0-7 Revision 72 TRM B3.7.4-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.7-1 Revision 99 TRM B3.3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-1 Revision 67 TRM B3.8.1-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.3-1 Revision 96 TRM B3.3.5-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.6-1 Revision 116 TRM B3.8.6-1 Revision 43 TRM B3.3.6-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-4 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.10-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.11.1-1 Revision 31 TRM B3.3.7-2 Revision 31 TRM B3,.12 .1-1 Revision 31 TRM B3.3.7-3 Revision 106 TRM B3.12.2-1 Revision 112 TRM B3.3.8-1 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.5-1 Revision 31 TRM B3 . 3 . 11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 124 02/01/2021

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 21, Revision 0 Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 B 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 0 30 0 31 0

  • TRM Vol. I LEP-4 REV 124 02/01/2021

Primary Containme nt Isolat i on I nst r umentat i on TR 3 . 3 . 6.1

  • TR 3 . 3 TR 3.3 . 6 . 1 INSTRUMENTATION Pr i ma r y Containment Iso l ation Instrumentat i on The primary containment isolation i nstrumentation tr i p setpoints a r e listed in Table TR3 . 3.6 . l - 1.

TABLE TR3 . 3 . 6.l-l (Page 1 of 3)

Primary Containment Isolation Instrumentation RESPONSE TIME FUNCTION TRIP SETPOINT (seconds)

1. Main Steam Li ne Isola t ion
a. Reactor Vessel Water Level - Low Low Low, ~ 31. 8 inches 10

< 1 . Q (bl (cl Level 1

b. Main Steam Line Pressure - Low 1s 1 ~ 821 psig NA
c. Main Steam Line Flow - High 115 . 4 psid Q. 5 (bl (cl 2- 2-
d. Condense r Pressure - High < 6 . 85 psia NA
e. Main Steam Tunnel Temperature - High 2- 200°F NA
f. Deleted
g. Turbine Building Area Temperature - High < 200°F NA
h. Manual Initiation NA NA (continued)

(b) Isolation system instrumentation response time for MSIVs Only . No diesel generator delays assumed for MSIVs .

(c) Except for Function 1 Main Steam Line Isolation Instrumentat i on DC Output Re l ays , the sensor and relays/logic respons e time need not be measured and may be assumed to be the design sensor response time . Prior to return to service of a new transmitter/relay or following refurbishment of a transmitter (e.g. , sensor cell or variable damper components/relay), a response time test will be performed to determine an initial sensor/relay- specific response time value .

(f) As refer e nced to instrument zero Top of Active Fuel (TAF) .

(g) The method for determining the Nominal Trip Setpoints, as-found tolerances and as-left tolerances for this funct i on are conta i ned i n Fermi 2 setpoint calculat i ons. Setpo i nt calculat i ons for this function are in accordance with the methods described in GEH Licensing Topical Reports NEDC-31336P - A, "General Electric Instrument Setpoint Methodology , " September 1996 and NEDE-33633P-A, "GEH Methodology for Implementing TSTF-493 Revision 4," January 2014 .

  • TRM Vol. I TRM 3 . 3 - 21 REV 124 02/21

Primary Conta i nment Isolation Instrumentation TR 3 . 3 . 6 . 1

  • TABLE TR3.3.6.l-1 (Page 2 of 3)

Primary Containment Isolation Instrumentation TRIP SETPOINT RESPONSE TIME (seconds)

FUNCTION

2. Primary Containment Isolation
a. Reactor Vessel Water Level - Low, Level 3 ~ 173.4 inches <<! NA
b. Reactor Vessel Water Level - Low Low, Level 2 ~ ll0 . 8 inches <<! NA
c. Drywell Pressure - High ~ 1. 68 psig NA
d. Main Steam Line Radiat i on - High < 3 . 0 X full power NA background f
  • I
e. Manual Initiation NA NA
3. High Pressure Coolant Injection (HPCI) System Isolation
a. HPCI Steam Line Flow - High ~ 395 inches of NA water wi th time delay of 3 seconds
b. HPCI Steam Supply Line Pressure - Low ~ 100 psig NA
  • c.

d.

e.

f .

HPCI Turbine Exhaust Diaphragm Pressure - High HPCI Equipment Room Temperature - High Drywell Pressure - High Manual Initiation

~ 10 psig

~ 154°F

~ 1. 68 psig NA NA NA NA NA

4. Reactor Core Isolation Cooling (RCIC) System Isolation
a. RCIC Steam Line Flow-High < 87.0 inches of NA water with a time delay of 3 seconds
b. RCIC Steam Supply Line Pressure - Low > 62 psig NA
c. RCIC Turbine Exhaust Diaphragm Pressure - High ~ 10 psig NA
d. RCIC Equipment Room Temperature - High ~ 154°F NA
e. Drywell Pressure - High ~ 1. 68 psig NA
f. Manual Initiation NA NA (continued)

(e) A new "full power background" level is established for hydrogen water chemistry based on 100 %

power operation with the established hydrogen injection rate . Actual background radiation levels may be less depending on actual power level or hydrogen injection rate .

Setpoint adjustment is not necessary for variations in power or hydrogen injection rate, including interruptions in hydrogen flow .

The setpoint associated with this function also trips and isolates the mechanical vacuum pumps (MVPs) and trips the gland seal exhausters (GSEs) .

(f) As referenced to instrument zero Top of Active Fuel (TAF).

TRM Vol. I TRM 3.3-22 REV 124 02/21

Primary Containment Isolation Instrumentati on TR 3 . 3 . 6 . 1 TABLE TR3.3 . 6.1-1 (Pa ge 3 of 3)

Primary Containment Isolation Instrumentation RESPONS E TIME FUNCTION TRIP SETPOINT (seco nds)

5. Reactor Water Cleanup (RWCU) System Isola t ion
a. Differential Flow - High fdl 5- 55.1 gpm NA
b. Area Temperature - High 5- 17 5°F NA
c. Area Ventilation Differential Temperature - 5- 50°F NA High
d. SLC System Initiation NA NA
e. Reactor Vessel Water Level - Low Low, Level 2 ~ 110 . 8 inches ffl NA
f. Manual Initiation NA NA
6. Shutdown Cooling System Isolation
a. Reacto r Steam Dome Pressure - High 5_ 89 .5 psig f*I NA
b. Reactor Vessel Water Level - Low , Level 3 ~ 173 . 4 inches ffl NA
c. Manual Initiation NA NA (a) Represents steam dome pressure; actual trip setpoint is corrected for cold water head with reactor vessel flooded .

(d) With time delay of 45 seconds .

(f) As referenced to instrument zero Top of Active Fuel (TAF) .

  • TRM Vol. I TRM 3.3 - 23 REV 124 02/21