ML080150559

From kanterella
Jump to navigation Jump to search
Licensing Document Transmittal of Revision 87 to, Technical Requirements Manual, Volume 1
ML080150559
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/03/2008
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
00935, e58683
Download: ML080150559 (9)


Text

  • DETROIT EDISON -,FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 01/03/08 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 87 1 IR 01/03/08 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: e58683 40()

1* ,

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 87 dated 01/03/08 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 86 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 86 11/08/07 Title Page Rev 87 01/03/08 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP- 4 Rev 86 11/08/07 LEP-1 through LEP- 4 Rev 87 01/03/08 3.6 Containment Systems TRM 3.6-5, Rev 31 10/99 TRM 3.6-5, Rev 87 01/08 TRM B3.6.3-1, Rev 68 06/04 TRM B3.6.3-1, Rev 87 01/08 END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMA TION DTC: TMTRM File: 1754 DSN: TRM VOL I Rev: 87 Date 01/03/2008 Recipient l'*.*

'two, ~'. i FERMI 2 - &CHNItAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 31 TRM 3.3-33 Revision 31 TRM iv Revision 76. TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-I REV 87 01/03/08

,f FERMI 2 - 'TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Pace Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.1:23 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 83 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 73 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2. Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 87 01/03/08

FERMI 2 - I'ECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRMB3.4.6-1 Revision 31 TRM 5.0-6 Revision 31 TRMB3.4.7-1 Revision 31 TRM 5.0-7 Revision 31 TRMB3.5-1 Revision 31 TRM 5.0-8 Revision 31 TRMB3.6.1-1 Revision 31 TRM 5.0-9 Revision 31 TRMB3 .6.2-1 Revision 67 TRMBI. 0-1 Revision 31 TRMB3 .6.3-1 Revision 87 TRM B2.0-1 Revision 31 TRMB3 .6.4-1 Revision 31 TRMB3 .0-1 Revision 63 TRMB3 .6.5-1 Revision 31 TRM B3.0-2 Revision 63 TRMB3 .6.6-1 Revision 70 TRMB3. 0-2a Revision 72 TRMB3 .6.7-1 Revision 31 TRM B3. 0-2b Revision 72 TRMB3 .6.8-1 Revision 31 TRMB3.0-2c Revision 72 TRMB3 7. 1-1 Revision 31 TRMB3.0-3 Revision 31 TRM B3 .7.2-1 Revision 31 TRMB3.0-4 Revision 31 TRMB3.7.3-1 Revision 73 TRM B3 .0-5 Revision 54 TRM B3 .7.4-1 Revision 31 TRM B3 .0-6 Revision 72 TRM B3 .7.4-2 Revision 31 TRM B3.0-7 Revision 72 TRM B3 .7.5-1 Revision 31 TRMB3 .1-1 Revision 31 TRM B3 .7.6-1 Revision 31 TRM B3 .2-i Revision 31 TRM B3.7..7-1 Revision 31 TRM B3 .3.1-1 Revision 31 TRM B3 .7.8-1 Revision 31 TRM B3 .3.1-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRMB3 .3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3 .3.3-1 Revision 67 TRM B3.8.3-1 Revision 31 TRMB3 .3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.5-1 Revision 31 TRM B3.3. 5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRMB3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3. 6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3. 6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3 .3. 6-5 Revision 76 TRM B3.11.1-1 Revision 31 TRM B3 .3. 6-6 Revision 76 TRM B3.12.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.7-2 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.8-1 Revision 31 TRMB3.12.4-1 Revision 31 TRM 3 .3. 9-1 Revision 31 TRMB3.12.5-1 Revision 31 TRM B3 .3. 10-1 Revision 56 TRMB3.12.6-1 Revision 31 TRM B3.3.11-1 Revision 45 TRMB3.12.7-1 Revision 31 TRM B3.3.12-1 Revision 62 TEN B3.12.8-1 Revision 31 TRM B3 .3.13-1 Revision 31 TRMB3 .3.14-1 Revision 31 TRMB3 .4.1-1 Revision 31 TRMB3 .4.1-2 Revision 71 TRMB3.4.1-3 Revision 71 TRMB3 .4.1-4 Revision 71 TRM B3 .4.1-5 Revision 71 TRM B3 .4.2-1 Revision 31 TRM B3 .4.3-1 Revision 31 TRMB3 .4.4-1 Revision 31 TRM B3 .4.5-1 Revision 31 TRM Vol. I LEP-3 REV 87 01/03/08

FERMI 2 - IECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 13, Revision 0 Page Revision Notation Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 TRM Vol. I LEP-4 REV 87 01/03/08

/

PCIVs TR 3.6.3 TABLE TR3.6.3-I (Page 3 of 22),

Primary Containment Isolation Valves MAXIMUM ISOLATION TIME FUNCTION (seconds)"'

1. Automatic Isolation Valves(a) (continued)
f. Group 6 - High Pressure Coolant Injection (HPCI) System HPCI Turbine Steam Supply Isolation Valves Inboard: E4150-F002 15 Outboard: E4150-F003 45" HPCI Turbine Steam Supply Outboard Isolation Bypass Valve E4150-F600 15 HPCI Booster Pump Suction from Suppression Chamber Isolation Valve")

E4150-F042 60

g. Group 7 - High Pressure Coolant Injection (HPCI) Vacuum Breakers HPCI Turbine Exhaust Line Vacuum Breaker Isolation Valves E4150-F075 60 E4150-F079 60
h. Group 8 - Reactor Core Isolation Cooling (RCIC) System RCIC Steam Line Isolation Valves Inboard: E5150-F007 15 Outboard E5150-F008 15
i. Group 9 - Reactor Core Isolation Cooling (RCIC) System Vacuum Breakers RCIC Turbine Exhaust Line Vacuum Breaker Isolation Valves E5150-F062 60 E5150-F084 60 (continued)
  • E4150-F003 is required to open in less than 45 seconds to ensure HPCI delivers full rated flow within 60 seconds.

TRM Vol. I TRM 3.6-5 REV 87 01/08

Ptimary Containment Isolation Valves (PCIVs)

TR B3.6.3 TR B3.6 CONTAINMENT SYSTEMS TR B3.6.3 Primary Containment Isolation Valves (PCIVs)

BASES See Bases for Technical Specification 3.6.1.3, Primary Containment Isolation Valves (PCIVs)

TRM Vol. I TRM B3.6.3-1 REV 87 01/08