ML082340856

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Volume 1, Revision 91
ML082340856
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/12/2008
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML082340856 (8)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 08/12/08 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 91 1 IR 08/08/08 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461

~40o/

LICENSING DOCUMENTF TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL 1 Revision 91 dated 08/08/08 imrmediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroyv the removed pages. Be sure that Revision 90 has been inserted prior to insertin, these pages.

LoiCatioh Remove Insert In Front of T.RMN Manual Title Pace Rev 90 08/04/08 7FitI:ý.WP'__l1'ýx 91 0' 81."08 _____

Immnediately following List of'Effe~ctive Pages- List 01 Lfh ý:2-,

Tite Page L..EP-1 through LEP- 4 Rev 90 08/04.0W ILFI1. th~rou~h. I I P' 4 Revý- 91I 08/08/,08 B3.7 Plant Systems Puo'e1-T.RM W.'7,7-.L Rev 31 10'99 PaeT'R Rev 91 08f/08 1,____

EN D

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARRAS - IA,"F()RA14 770A.'

DTC: 1 .TR.M IFile 754

'.1 ýDSN: T R]M VOL I Rev: 91 Datl- 08/0811' 008 Recipient C?3e w

FER41 2 - TECHNICAL REQUIREMENTS M.ANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 31 TRM 3.3-33 Revision: 31 TRX iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRH 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRH 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31. TR! 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRH 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRH 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 THE 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRE 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TR4 3.3-6 Revision 31 TRM 3.4-5 Revision 31 THM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 THM 3.4-8 Revision 31 THE 3.3-10 Revision 31 TRM 3.4-9 Revision 31 THE 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRH 3.5-1 Revision 31 TRY 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRH 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRY 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRE 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRE 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TPR 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 THR 3.6-18 Revision 31 TRM Vol. I LEP-1 REV 91 08/08/08

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRIA 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a -Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM* 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision. 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TP14 3.7-1 Revision 60 TRM 3.12-4 Revision 89 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3. Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision'31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRS! 3.7-9 Revision 31 TRiM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRS! 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRm 3.12-17 Revision 31 TRM 3.7-15 Revision 83 TRM 3.12-18 .. Revision 75 TM! 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRm 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TI*R 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRm 3.8-1 Revision 31 TRIM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TIRS! 3.8-3 Revision 73 TRM 3.12-27 Revision 31 TRY! 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRIM 3,12-30 Revision 31 TRY 3.8-7 Revision 50 TRM! 4.0-1 Revision 31 T'IM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRSM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 91 08/08/08

FERMI 2 2 TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision - Page Revision TFM 5.0-5 Revision 31 TRM B3.4,6-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.4.7-1 Revision 31 TEM 5.0-7 Revision 31 TEM B3.5-1 Revision 31 TEN 5,0-8 Revision 31 TEN B3. 6 1-I Revision 31 5.0-9 Revision 31 TENMB3.6.2-1 Revision 67 TRM TEN* B3.6.3-1 B1. 0-1 Revision 31 Revision 87 TRM TEN* B3.6.4-1 B2. 0-1 Revision 31 Revision 31 TRM TRE B3. 0-1 Revision 63 B3.6.5-1 Revision 31 TRM TRM B3,0-2 Revision 63 B3,6,6-1 Revision 70 TRM TEM B3.0-2a Revision 72 B3,6.7-1 Revision 31 TRM TRE B3.0-2b Revision 72 B3.6.8-1 Revision 31 TRE TEM B3. 0-2c Revision 72 B3.7.1-1 Revision 31 TRM TEM TRE B3.0-3 Revision 31 TEN Revision 31 B3.0-4 Revision 31 Revision 73 TRM TRM B3.7.4-1 B3.0-5 Revision 54 Revision 31 TRM B3.0-6 Revision 72 TR/ B3.7.4-2 Revision 31 TRM B3.*0-7 Revision 72 TRM B3.7.5-1 Revision 31 TRM B3.1-1 Revision 31 TR B3.7.6-1 Revision 31 TRM B3.2-1 Revision 31 TRE B3.7.7-1 Revision 91 TRM B333.1-1 Revision 31 TEM B3.7.8-1 Revision 31 TRM B3.3.1-2 Revision 31 TEN B3,7.9-1 Revision 79 TRE B3.3. 2-1 Revision 31 TEM B3.8.1-1 Revision 31 TRE B33.3,2-2 Revision 31 TEM B3.8,2-1 Revision 31 TEM B3.3.3-1 Revision 67 TEM B3.8.3-1 Revision 89 TRM B33.34-1 Revision 31 TEM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 84 TRE B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TEN B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRN B3.9.2-1 Revision 65 TEN B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TEM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TEN B3.3.6-4 Revision 31 TRM B3. 10-1 Revision 31 TRM B3.3.6-5 Revision 76 B3.11.1-1 Revision 31 TRM B3.3.6-6 Revision 76 B3.12.1-1 Revision 31 TRM TENM B3.3.7-1 Revision 31 TEM 33.12.2-1 Revision 44 TRM TEN B3.3.7-2 Revision 70 TEM B3.12.3-1 Revision 31 TEM B3.3.8-1 Revision 31 B3.12.4-1 Revision 31 TRM B3.3.9-1 Revision 31 B3.12.5-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.6-1 Revision 31 TRM B3.3. 11-1 Revision 45 TEN B3,12.7-1 Revision 31 TEM TEN B3.3.12-1 Revision 62 TEN B3.12.8-1 Revision.

B3.3.13-1 Revision 31 TEN B3.3.14-1 Revision 31 TRM B3. 4. 1-1 Revision 31 TEM B3.4.1-2 Revision 71 TEN B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM TEM B3.4.1-5 Revision 71 B3.4.2-1 Revision 31 B3.4.3-1 Revision 31 B3.4.4-1 Revision 31 TEN 83.4.5-1 Revision 31 TIRM Vol. I REV 91 08/08/08

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 13, Revision I Page Revision Notation Page 23 3

5 10 6

7 8

14 9

10 12 13 14

-5 16 17 18 19 20 21 22 TRM Vol. I REV 91 08/08/08

Appendix R Alt:ernative ShuTdown. Auxili.ary Syst:'ems TR B3.7.7 TR B3.,7 .PLANT SYSTEMS TR B3.7.7 Appendix R Alternative Shutdown Auxiliary Systems BASES The systuems identifi.e in this section are those ut:i..i..lized for Appendi.x R Alternative shutdown but no: included in other sections c tihe Technical Specifications and Technical Requirements 1Msnal. The ACT1ON statements assure that the auxiliary systems will be OPERABLE or that acceptable alternative means are established ,:> achieve the same objective.

There are four independent Combustion T7rbine-Generator units onsite. CTG 11 Unit . has a dieselo engine starter and thus can be stated independentl,y from of.s-te Power. CTG Uitns 2, 3 and 4 have AC-motor starters and rely on a 480-volt AC feed. The phrase "alternative source power", as used in TM..

Specification 3.7.7, Required Action C.2.2, is defined as a source of power that is ntri-o.,s-e power for starting (if required) or,.pe.ratng (if 1

aleadoy running) and capable-of suplying the requ ired loads on the 4160-volt busses associated with the Alternative Shutdown System.

One of the two 0s= ai Stan.0ey Feedwater Pumps a.nd one o the two listed Drywel l Cooling Units are necessary for Appendix R Alterative shucdown_

Therefore uniimited oeatiorn wON one of the two components inoperable is justified provid .--

increas ed surveilance is perf. med orn th components which.

remain OPEPABLE.

The SBFW pump pe-forums a function for AppendixR Alternactve .h..dow analogous t.o RCIC for Remote i t, own. As such the S-FW iu' - Ilane n KRequirent; are patterned. after RCIC Surveillance Requirements, includino the flow test capacity requirement. The specified flow value includes an allowance for normal instrument tolerance above the minimum flow required for adequate core cooling.

The controls for CTG Unit , the Standby Feedwater Pums., and Drrwe.i Cooling Units I. and 2 are only required when the respective equipment is OPERABLE. The power supplies

. oi BOP Battery Chargers 2C-2 and 2Ci-2 are req*i-red to support OPERABILITY of the respective control circuits.

TRM Vo