Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML22101A0472022-04-0404 April 2022 Submittal of Application for the Renewal of National Pollutant Discharge Elimination System (NPDES) Permit NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes2021-03-31031 March 2021 License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-10-28028 October 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NRC-20-0040, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2020-06-23023 June 2020 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2020-06-0505 June 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NRC-19-0075, License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements2019-12-0606 December 2019 License Amendment Request - Proposed Revision to Technical Specifications for Secondary Containment Surveillance Requirements NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2019-11-0808 November 2019 DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-032019-09-0505 September 2019 License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 NRC-19-0001, License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation2019-02-27027 February 2019 License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation NRC-19-0002, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2019-02-0808 February 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.2017-10-0909 October 2017 License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. NRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-08-31031 August 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17237A1762017-08-24024 August 2017 License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1 Isolation Functions NRC-17-0056, Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-08-15015 August 2017 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 NRC-17-0044, License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications2017-08-14014 August 2017 License Amendment Request to Revise Technical Specification 5.5.7, Ventilation Filter Testing Program, to Be Consistent with Standard Technical Specifications NRC-17-0025, License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink2017-07-17017 July 2017 License Amendment Request to Revise Technical Specification Section 3.7.2 for Emergency Equipment Cooling Water / Emergency Equipment Service Water System and Ultimate Heat Sink NRC-17-0010, License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation2017-02-23023 February 2017 License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro2016-07-25025 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces NRC-16-0006, License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals2016-03-22022 March 2016 License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals NRC-15-0081, License Renewal Application Update for the Boraflex Monitoring Program2015-09-24024 September 2015 License Renewal Application Update for the Boraflex Monitoring Program NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-09-24024 September 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC-15-0067, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 352015-06-18018 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 35 NRC-15-0062, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 342015-06-0909 June 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 34 NRC-15-0044, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 312015-04-27027 April 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Sets 27, 28, 29 and 31 NRC-15-0030, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 222015-03-19019 March 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 NRC-15-0028, Revision to Response to License Renewal Environmental RAI SSSH-12015-02-18018 February 2015 Revision to Response to License Renewal Environmental RAI SSSH-1 NRC-15-0021, License Renewal Application - Response to LR-ISG-2013-012015-02-0505 February 2015 License Renewal Application - Response to LR-ISG-2013-01 NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan2014-10-21021 October 2014 License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan ML14121A5362014-04-24024 April 2014 Fermi 2, License Renewal Application, Page 3.3-2 Through Appendix C, Page C-13 ML14121A5352014-04-24024 April 2014 Fermi 2, License Renewal Application, Cover Through Page 3.3-1 ML14121A5382014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 ML14121A5392014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End2014-04-24024 April 2014 License Renewal Application, Appendix E, Page 10-1 Through End NRC-13-0012, License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2013-04-17017 April 2013 License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-13-0002, Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles2013-01-11011 January 2013 Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0087, License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company2012-12-21021 December 2012 License Amendment Request to Change Name of Licensee from the Detroit Edison Company to DTE Electric Company NRC-12-0083, License Amendment Request to Change Licensee Name on the Operating License2012-12-21021 December 2012 License Amendment Request to Change Licensee Name on the Operating License NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report 2023-09-28
[Table view] Category:Technical Specifications
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML22032A1572022-01-19019 January 2022 Technical Requirements Manual - Vol. 1 Revision 130 Dated 01/19/2022 ML21251A1602021-08-17017 August 2021 Technical Requirements Manual - Vol 1 - (Revision 127 Dated 08/17/2021) ML21053A2022021-02-0101 February 2021 Technical Requirements Manual, Vol 1 - Revision 124 Dated 02/01/2021 ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML16270A5312016-12-15015 December 2016 Fermi, Unit 2, Preoperational Test, Startup Tests and Other Items ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML16039A1212016-02-18018 February 2016 Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) NRC-14-0049, Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries2014-06-19019 June 2014 Supplement to License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate2013-02-0707 February 2013 License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process2013-01-11011 January 2013 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process NRC-12-0037, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0037, Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report2012-12-21021 December 2012 Fermi 2, Proposed License Amendment to Relocate Pressure and Temperature Curves to a Pressure Temperature Limits Report NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2012-11-13013 November 2012 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process NRC-12-0005, Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.22012-01-10010 January 2012 Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 NRC-12-0004, Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves2012-01-10010 January 2012 Proposed License Amendment to Modify Technical Specification Surveillance Requirements for Safety Relief Valves NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.2011-12-20020 December 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. NRC-11-0030, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2011-08-12012 August 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0808 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1013408512010-05-14014 May 2010 Revised Clean TS Pages NRC-10-0003, Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.62010-01-0404 January 2010 Proposed License Amendment to Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests SR 3.5.1.8 and SR 3.5.2.6 NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification2009-06-10010 June 2009 Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification NRC-08-0061, Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification2008-09-12012 September 2008 Proposed License Amendment to Remove Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specification ML0812808342008-06-25025 June 2008 Tech Spec Pages for Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0807900262008-03-17017 March 2008 Issuance of Amendment Technical Specification Change to Emergency Diesel Generator Surveillance Requirements NRC-08-0001, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-01-15015 January 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0721404442007-08-0101 August 2007 Tech Spec Pages for Amendment Consolidated Line Item Improvement Process (Cllip) for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation (LCO) 30.9 Regarding the Unavailability of Barriers ML0721407632007-08-0101 August 2007 Technical Specification 3.8.1 Extension of the Completion Time for an Inoperable Diesel Generator Amendment ML0715002322007-04-12012 April 2007 Technical Specifications, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process NRC-07-0012, Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements2007-03-19019 March 2007 Proposed License Amendment to Revise the Minimum Emergency Diesel Generator Voltage in Technical Specification 3.8.1 Surveillance Requirements NRC-07-0001, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2007-01-26026 January 2007 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML0622004402006-08-0707 August 2006 Technical Specifications, Changes to Address Issues Related to an Inconsistency That Was Inadvertently Introduced During Conversion to Improved TSs When 1 Per Room Replaced 2 as the Required Channels Per Trip System NRC-06-0044, Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation2006-07-12012 July 2006 Response to Request for Additional Information for Revision to License Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation NRC-06-0040, Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator2006-07-12012 July 2006 Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator ML0604800392006-02-15015 February 2006 Tech Spec Pages for Amendment 172 Regarding Consolidated Line Item Improvement for Snubbers ML0603704972006-02-0606 February 2006 Tech Spec Pages for Amendment 171 Allowed Outage Time Extension for Emergency Diesel Generator 12 for One Specific Incident 2023-09-18
[Table view] |
Text
Joseph if. Plona Site Vice President 6400 N.Dixie Highway, Newport, MI 48166 Tel: 734.586.5 9 10 Fax: 734.586.4172 10 CFR 50.90 January 10, 2012 NRC-12-0005 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Proposed License Amendment to Revise the Residual Heat Removal Suppression Pool Cooling Flow Rate in Technical Specification Surveillance Requirement 3.6.2.3.2 Pursuant to 10 CFR 50.90, Detroit Edison hereby proposes to amend the Fermi 2 Plant Operating License, Appendix A, Technical Specifications (TS), to revise the Residual Heat Removal (RHR) Suppression Pool Cooling Surveillance Requirement (SR) 3.6.2.3.2 flow requirement from greater than or equal to 10,000 gallons per minute (gpm) to greater than or equal to 9,250 gpm. This change is consistent with the RHR suppression pool cooling flow rate associated with the RHR heat exchanger minimum thermal performance requirements. Additionally, this proposed license amendment clarifies that SR 3.6.2.3.2 applies only to pumps required for meeting the Limiting Condition of Operation (LCO).
Enclosure 1 provides an evaluation of the proposed license amendment, including an analysis of the issue of significant hazards consideration using the standards of 10 CFR 50.92. Detroit Edison has concluded that the change proposed in this submittal does not result in a significant hazards consideration. Enclosure 2 provides a marked up page of the existing Technical Specifications to show the proposed change. Enclosure 3 provides a typed version of the affected Technical Specifications page with the proposed change incorporated. Enclosure 4 provides a copy of the current Technical Specification Bases page associated with this change for information only.
Detroit Edison has reviewed the proposed change against the criteria of 10 CFR 51.22 and has concluded that it meets the criteria provided in 10 CFR 51.22(c)(9) for a
USNRC NRC-12-0005 Page 2 categorical exclusion from the requirements for an Environmental Impact Statement or an Environmental Assessment.
Detroit Edison requests NRC approval of this license amendment by January 15, 2013 with an implementation date within 60 days of NRC approval.
No new commitments are being made in this submittal.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Michigan State Official.
Should you have any questions or require additional information, please contact Mr. Rodney W. Johnson of my staff at (734) 586-5076.
Sincerely,
Enclosures:
- 1. Evaluation of Proposed License Amendment
- 2. Markup of Existing TS Pages
- 3. Revised (Clean) TS Pages
- 4. Markup of Existing TS Bases Pages (For Information Only) cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 4, Region III Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission
USNRC NRC-12-0005 Page 3 I, Joseph H. Plona, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
Joseph H. Plona Site Vice President, Nuclear Generation On this day of , 2012 before me personally appeared Joseph H. Plona, being first duly swo and says that he executed the foregoing as his free act and deed.
oM A C ONE Nota Public
Enclosure 1 to NRC-12-0005 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Proposed License Amendment To Revise The Residual Heat Removal Suppression Pool Cooling Flow Rate In Technical Specification Surveillance Requirement 3.6.2.3.2 Evaluation Of The Proposed License Amendment
Enclosure to NRC-12-0005 Page 1 Evaluation of the Proposed License Amendment 1.0 Description The proposed amendment would modify Fermi 2 Plant Operating License, Appendix A, Technical Specifications (TS) Surveillance Requirement (SR) 3.6.2.3.2 in TS 3.6.2.3, "RHR Suppression Pool Cooling." This proposed amendment would align the Residual Heat Removal (RHR) Suppression Pool Cooling flow rate in the SR with the required flow associated with the RHR heat exchanger minimum thermal performance requirements as defined in the plant design basis documents. This change is requested to increase the operating margin to the RHR Suppression Pool Cooling SR. This proposed amendment also clarifies that SR 3.6.2.3.2 applies only to RHR pumps required for meeting Limiting Condition of Operation (LCO) 3.6.2.3.
2.0 Proposed Change Current Fermi 2 TS Surveillance Requirement 3.6.2.3.2 requires verifying that each RHR pump develops a flow through the associated heat exchanger while operating in the Suppression Pool Cooling mode. The proposed SR flow value is revised from greater than or equal to 10,000 gallons per minute (gpm) to greater than or equal to 9,250 gpm.
Additionally, the SR 3.6.2.3.2 wording "Verify each RHR pump develops a flow..." would be revised to "Verify each required RHR pump develops a flow..." to clarify that the SR only applies to RHR pumps that are required for a suppression pool cooling subsystem to be OPERABLE.
3.0 Background Following a Design Basis Accident (DBA), the RHR Suppression Pool Cooling System removes heat from the suppression pool. The suppression pool is designed to absorb the sudden input of heat from the primary system. In the long term, the pool continues to absorb residual heat generated by fuel in the reactor core. Pursuant to 10 CFR 50, Appendix A, General Design Criteria (GDC) 38, a means must be provided to remove heat from the suppression pool so that the temperature inside the primary containment remains within design limits. This function is provided by two redundant RHR suppression pool cooling subsystems.
Each RHR suppression pool cooling subsystem takes suction from the suppression pool, pumps the water through the associated divisional RHR heat exchanger and returns the water to the suppression pool via the divisional RHR test return lines. Portions of the supply piping are also used in supporting the higher flow requirements of the Low Pressure Coolant Injection function of the RHR and are necessarily of large diameter. In order to maintain the flow through the RHR heat exchanger within the design maximum values, the RHR suppression pool cooling test return piping is fitted with multi-stage orifices sized to deliver flow near to the current 10,000 gpm suppression pool cooling subsystem flow requirement. While the heat transfer capacity of each RHR heat exchanger has significant demonstrated margin, typical recorded flow results for TS SR 3.6.2.3.2 are near this required value. Because the Suppression Pool Cooling System return
Enclosure to NRC-12-0005 Page 2 lines were designed to deliver approximately 10,000 gpm and the TS SR requires the same 10,000 gpm, the SR currently specified in the TS is not able to make use of other system margins to optimize flow testing margins.
Additionally, it was identified in the corrective action program that the calibration of the flow element used to measure RHR flow is based on higher post-accident fluid temperatures during testing. As a result, indicated flows during surveillance tests performed under cooler test fluid conditions are biased upwards by approximately 200 gpm. Correction for the known calibration bias effectively eliminates all remaining operating margin to the TS SR required minimum flow.
Although the TS SR requires a measured flow of 10,000 gpm, the analytical requirement has been established based on 9,250 gpm. System performance relative to the proposed SR flow is sufficient to account for factors such as test instrument uncertainty, allowed pump degradation, and Emergency Diesel Generator (EDG) frequency tolerances. The requested change to TS SR 3.6.2.3.2 to a flow value of greater than or equal to 9,250 gpm is consistent with demonstration that the identified design and operating considerations are satisfied without unnecessarily challenging operability under the Technical Specifications.
Each of the two divisions of the RHR system contains two pumps and one heat exchanger. The two suppression pool cooling subsystems perform the suppression pool cooling function by circulating water from the suppression pool through the RHR heat exchangers and returning it to the suppression pool. RHR Service Water (RHRSW), circulating through the tube side of the heat exchangers, exchanges heat with the suppression pool water and discharges this heat to the RHR reservoir, the Fermi 2 ultimate heat sink.
The heat removal capability of a single RHR pump in a single suppression pool cooling subsystem is sufficient to meet the overall post-accident suppression pool cooling requirements.
The LCO section of TS 3.6.2.3 Bases states that an RHR suppression pool cooling subsystem is OPERABLE when one of the pumps, the heat exchanger, and associated piping, valves, instrumentation, and controls are OPERABLE. Although each RHR suppression pool cooling subsystem requires only one pump to meet the post-accident cooling requirement, the current wording in SR 3.6.2.3.2 requires verifying that each pump achieves the specified flow to meet the SR. Failure of one pump in one subsystem to meet the SR in Modes 1, 2 or 3 would imply that LCO 3.6.2.3 is not met.
4.0 Technical Analysis Following a DBA, the RHR Suppression Pool Cooling System removes heat from the suppression pool. The suppression pool is designed to absorb the sudden input of heat from the primary system as the reactor pressure vessel is depressurized. In the long term, the pool continues to absorb residual heat generated by fuel in the reactor core. RHR suppression pool cooling is the means provided to remove heat from the suppression pool so that the temperature inside the primary containment remains within design limits.
Enclosure to NRC-12-0005 Page 3 The post DBA-Loss of Coolant Accident (LOCA) long-term suppression pool temperature response analyzed using the approved General Electric-Hitachi SHEX model yields a peak post DBA/LOCA pool temperature of 196.5°F. This temperature shows that margin remains to the controlling limit of 198°F. RHR system thermal performance in SHEX is represented by a single coefficient (referred to as the K-factor) having units of btu/sec/°F multiplied by the difference in the inlet temperatures between RHR and RHRSW fluids. The heat removed from the suppression pool varies with the changing temperature profiles of RHR and RHRSW.
The ability to achieve the specified K-factor is a function of the physical characteristics of the RHR heat exchanger (i.e. number and dimensions of the tubes and shell-side configuration) and fluid operating conditions (i.e. overall unit fouling, fluid temperatures, and specified RHR and RHRSW flow rates). Actual Fermi 2 RHR heat exchanger thermal performance is periodically evaluated against the minimum thermal performance assumed in the containment analysis. Each one of the two divisional RHR heat exchangers is tested every other refueling outage while operating in the RHR system shutdown cooling mode. Testing consists of measuring heat exchanger inlet and outlet fluid temperatures and flows and using these results to determine an overall heat exchanger performance (fouling factor) based on standard heat exchanger modeling methods. This fouling factor is used to extrapolate unit thermal performance to specified design accident conditions to demonstrate that the heat exchanger meets the minimum required thermal performance needed to satisfy the containment cooling safety analysis.
Currently, measured RHR heat exchanger thermal performance is extrapolated to the following accident conditions:
Process Stream RHR (Shell Side) RHRSW (Tube Side)
Fluid Quantity, Total (GPM) 9,250 8,250 Number of Active Tubes N/A 1015 (design assumes 51 tubes plugged)
Design Q (MBTU/hr) 147.6 147.6 Inlet Temperature (°F) 196.5 89.0 These conditions impose a minimum required thermal performance greater than that assumed in the original containment safety analysis, and thereby allow for less shell side flow with no loss in the design rate of heat exchange. Whereas the original RHR heat exchanger design was based on nominal RHR flow of 10,000 gpm and RHRSW flow of 9,000 gpm, the test extrapolation assumes reduced heat exchanger flows that have the effect of imposing a stricter control on overall unit fouling in order to meet the required minimum thermal performance. This license amendment proposes that the flow rate requirement in TS SR 3.6.2.3.2 be reduced from greater than or equal to 10,000 gpm to greater than or equal to 9,250 gpm, consistent with the value assumed for extrapolation of measured thermal performance to accident conditions.
In practice the acceptance criteria in the procedure used to perform this surveillance test must include corrections to account for allowable pump degradation, EDG frequency tolerance, test instrument accuracy, and temperature-flow bias, such that the ability to meet the TS SR required
Enclosure to NRC-12-0005 Page 4 value is always assured under accident conditions. Therefore, the surveillance procedure acceptance criterion used to demonstrate compliance with the proposed TS SR value of 9,250 gpm is necessarily greater than 9,250 gpm and is defined in the RHR system hydraulic design basis documentation.
This evaluation provides the technical basis to support a revision of Fermi 2 TS SR 3.6.2.3.2 to reduce the required flow that each required RHR pump operating in suppression pool cooling must provide from greater than or equal to 10,000 gpm to greater than or equal to 9,250 gpm.
The containment analysis is not impacted because the reduced flow rate is consistent with that assumed for analysis during periodic verification of actual RHR heat exchanger thermal performance against the minimum performance assumed in the analysis of maximum post-accident suppression pool temperature.
The proposed change in the wording of the SR from "each RHR pump" to "each required RHR pump" is justified based on the definition of each subsystem of the RHR Suppression Pool Cooling System in TS 3.6.2.3.2 Bases. This change will restore consistency with the requirement for OPERABILITY of a subsystem as defined in the TS Bases.
Several Boiling Water Reactors (BWRs) have TS SR 3.6.2.3.2, already worded with "each required RHR pump," such as:
" James A. Fitzpatrick Nuclear Power Plant
" Dresden Generating Station, Units 2 and 3
" Edwin I. Hatch Nuclear Plant, Units 1 and 2
" LaSalle County Generating Station, Units 1 and 2
" Monticello Nuclear Generating Plant
" Nine Mile Point Nuclear Station, Unit 2
" Peach Bottom Atomic Power Station, Units 2 and 3
" Quad Cities Generating Station, Units 1 and 2 5.0 Regulatory Safety Analysis 5.1 No Significant Hazards Consideration In accordance with 10 CFR 50.92, Detroit Edison has made a determination that the proposed amendment involves no significant hazards consideration. The proposed change to the RHR suppression pool cooling pump required flow in Technical Specification (TS) Surveillance Requirement (SR) 3.6.2.3.2 from greater than or equal to 10,000 gallons per minute (gpm) to greater than or equal to 9,250 gpm and the change in the applicability of the surveillance to each required RHR pump does not involve a significant hazards consideration for the following reasons:
Enclosure to NRC-12-0005 Page 5
- 1. The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed TS SR 3.6.2.3.2 minimum flow of greater than or equal to 9,250 gpm is consistent with that assumed for accident extrapolation calculations of measured thermal performance obtained during RHR heat exchanger testing. This testing is performed to periodically demonstrate that the actual heat exchanger thermal performance exceeds that assumed for establishing the maximum post-accident bulk average suppression pool temperature. Therefore, the change in required RHR suppression pool cooling flow will not result in any increase in post-accident suppression pool temperature above that already evaluated for demonstrating adequate Net Pump Suction Head (NPSH) for any Emergency Core Cooling System (ECCS) pump. The change in the applicability of the surveillance to each required RHR pump provides consistency with the design of the system and maintains full capability of each RHR suppression pool cooling subsystem to provide post accident design basis cooling.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed change revises TS SR 3.6.2.3.2 for RHR suppression pool cooling flow to be consistent with that assumed for evaluating measured heat exchanger thermal performance against the minimum requirements of the plant safety analysis. Changing the applicability of the surveillance to each required RHR pump is consistent with the system design requirement and maintains full capability of each RHR suppression pool cooling subsystem to provide the post accident cooling function. No physical changes are being made to the installed RHR system or the manner in which it is operated. No new or different accident scenarios are created by this change.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. The proposed change does not involve a significant reduction in the margin of safety.
The RHR system has historically been capable of meeting TS SR 3.6.2.3.2. This Surveillance requires demonstration of a system flow, in conjunction with a prescribed RHR heat exchanger capacity that ensures the overall suppression pool cooling capacity meets the requirements of the safety analysis. However, the lack of available operating margin inherent in the design orifices of the RHR suppression pool cooling test return line and identification of a non-conservative bias in the test flow instrument calibration have eroded the flow test margin such that it is possible that the TS SR may not be satisfied in the future even though a large margin is maintained compared to the minimum performance assumed in the containment safety analyses. The proposed change makes the
Enclosure to NRC-12-0005 Page 6 margin between TS SR 3.6.2.3.2 and the performance assumed in the plant safety analyses available as a design and operating margin. This is ensured by establishing a higher level of required heat exchanger performance, where ample margin is available. Heat exchanger testing is conducted in accordance with existing testing standards as prescribed by EPRI TR-107397, Service Water Heat Exchanger Testing Guidelines. The minimum required flow rate necessary to satisfy RHR suppression pool cooling TS SR 3.6.2.3.2 will be documented in the plant design basis with the minimum required flow adjusted upward as necessary to account for instrument uncertainty and bias as well as differences between assumed accident and actual test operating conditions.
The change in the applicability of the surveillance to each required RHR pump is consistent with the design basis of the plant and maintains full capability of the system to provide its safety related cooling function following a design basis accident. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Detroit Edison has determined that the proposed license amendment does not involve a significant hazards consideration.
5.2 Applicable Regulatory Requirements The design of the containment heat removal system is required to meet the requirements of 10 CFR 50 Appendix A, General Design Criterion (GDC) 38, "Containment Heat Removal."
A system to remove heat from the reactor containment shall be provided. The system safety function shall be to reduce rapidly, consistent with the functioning of other associated systems, the containment pressure and temperature following any loss-of-coolant accident and maintain them at acceptably low levels.
In the event of a Loss of Coolant Accident (LOCA) within the reactor containment, the pressure suppression system will rapidly condense the steam to prevent containment overpressure. The containment feature of pressure suppression employs two separate compartmented sections of the primary containment: the drywell that houses the nuclear system and the suppression chamber containing a large volume of water. Any increase in pressure in the drywell from a leak in the nuclear system is relieved below the surface of the suppression chamber water pool by connecting vent lines, thereby condensing steam being released to the drywell. Any pressure buildup in the suppression chamber is equalized with the drywell by a vent line and vacuum breaker arrangement. Cooling systems remove heat from the reactor core, the drywell, and water in the suppression pool during accident conditions. Thus, continuous cooling of the primary containment is provided.
The Emergency Core Cooling System (ECCS) is actuated to provide core cooling in the event of a LOCA. Low water level in the reactor pressure vessel or high pressure in the drywell will initiate the ECCS to prevent excessive fuel temperature. Sufficient water is provided in the suppression pool to accommodate the initial energy that can transiently be released into the drywell from the postulated pipe failure.
Enclosure to NRC-12-0005 Page 7 The suppression chamber is sized to contain this water, in addition to the water displaced from the reactor primary system, together with the free air initially contained in the drywell.
Either or both RHR suppression pool cooling subsystems, which include the heat exchangers, can be manually activated to remove energy from the containment. The redundancy and capability of the offsite and onsite electric power systems to provide power for the RHR system are presented in the Criterion 34, "Conformance Evaluation," and provide assurance that system safety functions can be accomplished.
6.0 Environmental Considerations Detroit Edison has reviewed the proposed change against the criteria of 10 CFR 51.22 for environmental considerations. The proposed change does not involve a significant hazards consideration, nor does it significantly change the types or significantly increase the amounts of effluents that may be released offsite. The proposed change does not significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, Detroit Edison concludes that the proposed change meets the criteria provided in 10 CFR 51.22(c)(9) for a categorical exclusion from the requirements for an Environmental Impact Statement or an Environmental Assessment.
Enclosure 2 to NRC-12-0005 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Proposed License Amendment To Revise The Residual Heat Removal Suppression Pool Cooling Flow Rate In Technical Specification Surveillance Requirement 3.6.2.3.2 Marked-Up TS Page 3.6-34
RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool 31 days cooling subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.
SR 3.6.2.3.2 Verify each required RHR pump In develops a flow rate _ , gpm accordance through the associated eat with the exchanger while opera ng in the Inservice suppression pool coo ng mode. Testing Program 9,250 FERMT - UNIT 2 3.6-34 Amendment No. 134
Enclosure 3 to NRC-12-0005 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Proposed License Amendment To Revise The Residual Heat Removal Suppression Pool Cooling Flow Rate In Technical Specification Surveillance Requirement 3.6.2.3.2 Clean TS Page 3.6-34
RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool 31 days cooling subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.
SR 3.6.2.3.2 Verify each required RHR pump In develops a flow rate 9,250 gpm accordance through the associated heat with the exchanger while operating in the Inservice suppression pool cooling mode. Testing Program FERMI - UNIT 2 3.6-34 Amendment No. 134
Enclosure 4 to NRC-12-0005 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Proposed License Amendment To Revise The Residual Heat Removal Suppression Pool Cooling Flow Rate In Technical Specification Surveillance Requirement 3.6.2.3.2 TS Bases Page (For Information Only)
B 3.6.2.3-4
RHR Suppression Pool Cooling B 3.6.2.3 BASES SURVEILLANCE REQUIREMENTS (continued) manually initiated. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.
The Frequency of 31 days is justified because the valves are operated under procedural control, improper valve position would affect only a single subsystem, the probability of an event requiring initiation of the system is low, and the subsystem is a manually initiated system. This Frequency has been shown to be acceptable based on operating experience.
required SR 3.6.2.3.2 9,250 Verifying that each HR pump develops a flow rate
- 8 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that pump performance has not degraded during the cycle. Flow is a normal test of centrifugal pump performance required by ASME Code,Section XI (Ref. 2).
This test confirms one point on the pump design curve, and the results are indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is in accordance with the Inservice Testing Program.
REFERENCES 1. UFSAR, Section 6.2.
- 2. ASME, Boiler and Pressure Vessel Code,Section XI.
FERMI - UNIT 2 B 3.6.2.3-4 Revision 0