ML081640316

From kanterella
Jump to navigation Jump to search
Licensing Document Transmittal, Technical Requirements Manual - Vol. 1, Rev. 89
ML081640316
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/05/2008
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML081640316 (9)


Text

DETROIT-EDISON L FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CbOTROL LIST 06/05/08, To: 00935 US NRC PAGE 2 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvi Date Sec Status TMTRM TRM VOL I 89 1 IR 06/05/08 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 4orD

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAICREQUIREMENTS MANUAL - VOL I Revision 89 dated 06/05/08 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 88 has been inserted prior to inserting these pages.

...- oatin**

w, Remove Insert

'In Fr6ont0o.,TRM Manuaal' .-Title. Page&-Rev 88 04/11/08 Title Page Rev 89 06/05/08-Immediately following. List of Effective Pages List of Effective Pages

. Title Page LEP-1 through LEP- 4 Rev 88 04/11/08 LEP-1 through LEP- 4 Rev 89 06/05/08, 3.12 Fire.Protection. TRM 3.12-4, Rev 53 02/02 TRM 3.12-4, Rev 89 06/08 B3.8 Electrical Power TRM B3.8.3-1, Rev 31 10/9*9 TRM B3.8.3-1, Rev 89 06/08 Systems END

Fermi 2

~Technical Requirements Manual L

Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM j File: 1754 DSN: TRM VOL I I Rev: 89 Date 06/05/088 Recipient *35

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I AqLIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31

.- :Revision TRM iii :Revision 31 TRM 3.3-33 Revision 31 TRM iv 76 TRM 3.3-34 Revision 31 TRM v

  • Revision 79 TRM 3.3-35 Revision 60 Revision TRM vi

ý": Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a 31 TRM 3.3-37 Revision 72

  • Revision TRM 1.0-1
  • Revision 31 TRM 3.3-38 Revision 31 TRM ,2.0-1 'Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a 31 TRM. 3.3-40 Revision 56 TEN,"3 . 0I* .- Revision 63. TRM 3.3-41 Revision 56

.TEN ,3.0 - Revision 72 TRM 3.3-42 Revision 45 TEN 3'. 0-;3!. Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision .72 TRM,3.3-44 Revision 72-,

"TEN 3 .1-a;
  • Revision 3.1 TRM 3.3-45 Revision 31 TRM 3.1-1 .'" 41kRevision 31 TRM 3.3-46 Revision 31 TRm 3.2-1, Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TEN. 3-b. Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31

'31 TRM 3.3-d TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-.2 ý,Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-13 .'.Revision 31 TRM 3.4-2 Revision 31 TRM 3".3-4* 4' Revision 31 TRM 3.4-3 Revision 31 Revision TRM 3.3-L5. . Revision 3 31 TRM 3.4-4 Revision 31 TRM 3..3--6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 -Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 . Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision -31 TRM 3.4-10 Revision 31 TRM 3.3-12 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15. Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM3.6-17 Revision 31 Revision TRM 3.3-30 31 TRM3.6-18 Revision 31 TRM Vol. I ýLEP-I REV 89 06/05/08

4: .3, -

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

- LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM .3.8-14 Revision 46

- TRM 3.6-21 Revision 31 TRM3.8-15 Revision 31.:

TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31' TRM3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM3.9-a Reyision .31 TRM 3.6-26 Revision 31 TRM3.9-1 Revision'-31 TRM 3.6-27 -Revision 31 TRM 3.9-2 Revision :650 TRM 3.6-28 Revision 31 TRM3.9-3". Revision .80 3.9-4K

  • TRM 3.6-29 *Revision 31 TRM Revision8,81 8, TRM 3.6-30 Revision 31 TRM3.9-5S Revis.ion q31:.

TRM 3.6-31 Revision 31 TRM 3.10-1

- TRM 3.6-32 Revision 70 TRM 3.11-a. Revis'ion 317 '

TRM 3.6-33 Revision 31 TRM3.11-1 Revision 31, TRM3.6-34 Revision 31 TRM 3.12-a Revision .31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM3.12-2 Revision531 TRM3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Rev.ision.389-TRM 3.7-2 Revision 70 TRM 3.12-5 Revisi on 53 .5 -

TRM3.7-3 Revision. 70 TRM 3.12-6 Revision -,53 TEN 3.7-4 Revision 73 TRM 3.12-7 Rev-ision 9-31 TRM3.7-5 Revision 31- TRM 3.12-8 Revision *5 TRM3.7-6 Revision 31 TRM 3.12-9 Revision ,30.

TRM 3.7-7 Revision 31 TRM 3.12-10 Revision _31.

TRM3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM3.7-91 Revision 31 TRM 3.12-12 Revision-31.

TRM3.7-10 Revision 44 TRM 3.12-13 Revision T75 TRM3.7-11 Revision 31 TRM3.12-14 Revision 31 TRM 3 .7-12 Revision 72 TRM 3.12-15 Revision 3-1 TRM3.7-13 Revision 31 TRM 3.12-16 Revision T5 TRM3.7-14 Revision 31 TRM 3.12-17 Revision-,31 TRM3.7-15 Revision 83 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM3.7-17

  • Revision 31 TRM 3.12-20 Revision :75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 3-1 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 73 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM3.8-7 Revision 50 TRM4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM5.0-a Revision 31 TRM3.8-9 Revision 50 TRM5.0-1 Revision 31 TRM3.8-10 Revision 50 TRM5.0-2 Revision 31 TRM3.8-11 Revision 50 TRM5.0-3 Revision 31 TRM3.8-12 Revision 31 TRM5.0-4 Revision 31 TRM Vol. I LEP-2 REV 89 06/05/08

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM5.0-5 Revision 31 TRM B3.4.6-1 Revision 31 TRM5.0-6 Revision 31 TRMB3.4.7-1 Revision 31

.... TRM 5:.0-7 Revision 31 TRM33.5-1 Revision 31

. TRM 5ý. 0- 8 Revision 31 TRM33.6.1-1 Revision 31 TRM 5.0-9 Revision 31 TRM 33.6.2-1 Revision 67 TRM B1.0-1 31 TRMB3.6.3-1 Revision 87 TRME B2.0-1 Revision 31 TRM33.6.4-1 Revision 31 TRME B3.0-1 63 TRM33.6.5-1 Revision 31 TRM Revisi,3-On B3. 0-2 63 TRM B33 6.6-1 Revision 70

,TEN- 33.0-2a-ý.i:,,;.Re~vislion 72:;- TRM B3.6.7-1 Revision 31 TRM.. 33'.0-2b': :"*'*??Revisi"on *,72 ,.I TRM 33.6. 8-'1. Revision 31 TRM. B3.0 -2C.:.. I.: Revis4ion.72 TRM 33.7.1-1 Revision 31 TRM 33. 0-3  :.Re'v is-in 3'i - TRM B3.7.2-1 Revision 31 TRMEB3.0-4 Revision .3 1 TRM B3.7.3-1 Revision 713 TEN` I33. 0-5 Revisi.on -54 TRM B3.7.4-1 Revision 31 TRME B3.0-6 Revision".72 TRM B3.7.4-2 Revision 31 TRME B3.0-7 Revision 72 TRM 33.7.5-1 Revision 31 TRM B3.1-1 Revision 31 TRM 33.7.6-1 Revision 31 TRMB3.2-1 Revision"31_. TRM B3.7.7-1 Revision 31 TRM B3.3.1-1 Revisi6n: 31 TRM 33.7.8-1 Revision 31 TRM' 33.3.1-2 Revision.31, TRM 33.7.9-1 Revision 79 TRMB3.3.2-1 -Reviaion 3 TRM B3.8.1-1 Revision 31 7` TRMEN'B33.3.2 -2.,:";.: Revision .31 TRM B3.8.2-1 Revision 31 TRMN B3.3.3-1lh' Revision 67 TRM B3.8.3-1 Revision 89 TRMEN B3.3 4 -1, Revisiion, 31: TRM B3.8.4-1 Revision. 31 TRM ýB343.3 4 -2 Revis~ion -84 TRM 33.8.5-1 Revision 31 TRMEN B3. 3.5- 1** Revision 31 TRM 33.8.6-1 Revision 43 TRMENB3.3.5-2-.r-, Revision. 31 TRM B3.9.1-1 Revision. 31 TRM..B3 3.6--1 Revision 31 TRM B3.9.2-1 Revision 65 TRE B3.3.6-2. Revision 31 TRM B3.9.3-1 Revision 31 TREN B333.6-3. Revision 31 TRM 33.9.4-1 Revision 31 TRM 33.3.6 Revision 31 TRMB3. 10-1 Revision 31 TRM, B3.3.6-5 Revision 76','- TRMB3.11.1-1 Revision 31 TRMEN33.3.6-67.. Revision 76 , TRMB3.12. 1-1 Revision 31 TRM B3.3.7-1. Revision 31 TRMB3.12.2-1 Revision 44 TRMEB3.3.7-2 .l Revision 70 - TRMB3.12.3-1 Revision 31 TRM 33.3.8-1, Revision 31 TRMB3.12.4-1 Revision 31 TRMB3N .3.9-1 Revision 31 TRM33.12.5-I Revision 31 TRM 33.3.10-1 Revision 56 TRMB3.12.6-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.7-1 Revision 31 TRMEB33.3.12-1 ..Revision 62 TRM B3.12.8 -1 Revision 31 TRM 33.3.13-1 .Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM 33.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM 33.4.5-1 Revision 31 TRM Vol. I LEP- 3 REV 89 06/05/08

FERMI 2 - oTECHNICAL'REQUIREMENTS MANUAL VOL I Ab)LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 13, Revision 0 Page Revision Notation Page 0

12 0 3

0 4-0 t

0 6

0 7

.0 0

9 15 0 0

0 12 00 13 0

14-0 15 0

16,

  • . 17
  • 0~

18*

~0

.0

'19 0

20 0

21 0

22, TRM Vol. I LEP-4 REV 89 06/05/08

Fire Detection Instrumentation ATR 3.12.1 TABLE TR3.12.1-1 (Page 1 of 3)

Fire Detection Instrumentation FIRE ....... TOTAL NUMBER OF INSTRUMENTS(a)

DETECTION -IONIZATION PHOTOELECTRIC THERMAL INFRARED FUNCTION ZONE WYy). (X/Y) (X/Y) (X/Y)

I. Reactor Building,(b) * .

a. Torus area 1 8/0
b. NW corner'rooms.

RHR pump.-..... .*

2..... ... ,.:...: 4/*0*i] "*

c. SW corner.rooms. 3. 4/.0, 4

RHR pump

4 .:- 9/"0... *  :
d. SE corner rooms CRD HPCI
e. NE corner rooms 5 5/0 RCIC f.. First floor 7 2"770 ':; 8/0
g. EECW system area 10 21/0 ,.

second floor

h. Third floor 15 l5/O
i. Fourth floor...:J .. 17 2./ 0
17 .', "*"
j. Refueling area,.. 10/0 fifth floor
2. Auxiliary Building:.
a. Basement N .4  :, 6/0.

control air equipment

b. Corridors, 5 . ...2/0:.... ' o 2/0 562 ft, 563 ft,
c. First floor 6 lI-mezzanine cable.

tray, 583 ft, 603 ft

d. Switchgear room, 9 10/0 corridor area second, floor
e. Cable tunnel 9 10/0 (continued)

(a) (xlY) X is number of Function A (early-warning fire detection and notification only) instruments.

Y is number of Function B (actuation of fire suppression system and early warning and notification) instruments.

(b) The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

TRM Vol. I TRM 3.12-4 REV 89 06/08

AC Sources TR B3.8.3 I

TR B3.8 ELECTRICAL POWER SYSTEMS

-:--__.-TR B3;8.;3 AC Sources BASES See Bases for Technical Specification 3.8.1, AC Sources - Operating and 3.8.2,._AC

- Sources- Shutdown.

-- TRSR 3.8.3.1 requires performing periodic Preventive Maintenance (PM) inspection of the diesel generator in accordance with established site procedures.' The' PM'

-"procedhues are established in association with manufacturer's recommendations-fbr' performing periodic' inspection. Industry and plant-specific operating experience-historical equipment testing and performance, and other information or analyse-<s may *beused to justify plant-specific differences from manufacturer's

.:recommendations in performing the inspection. Differences must be documented ýand

. supported by soun'd technical bases.

TRM Vol.I TRM B3.8.3-1 REV. 89 06/08