ML091270187

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual - Volume I
ML091270187
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/27/2009
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML091270187 (29)


Text

DETROIT EDISON _ FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 04/27/09 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 95 1 IR 04/27/09 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: e58683

(

G'70 Printed by DAZEL . Page 31 Apr 27, 2009 05:05:23 PM ED

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 95 dated 04/27/09 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 94 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 94 04/14/09 Title Page Rev 95 04/27/09 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP- 4 Rev 94 04/14/09 LEP- 1 through LEP- 4 Rev 95 04/27/09 Core Operating Limits Cycle 14, Rev 0 (22 pages) Cycle 14, Rev 1 (22 pages)

Report END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM I File: 1754 DSN: TRM VOL I I Rev: 95 Date 04/27/09 Recipient CRS

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision. Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 93 TRM 3.3-33 Revision 31 TRM iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-I REV 95 04/27/09

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 89 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 83 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 73 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 93 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 95 04/27/09

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRM B3.4.6-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.4.7-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.5-1 Revision 31 TRM 5.0-8 Revision 93 TRM B3.6.1-1 Revision 31 TRM 5.0-9 Revision 31 TRM B3.6.2-1 Revision 67 TRM B1.0-1 Revision 31 TRM B3.6.3-1 Revision 87 TRM B2.0-1 Revision 31 TRM B3.6.4-1 Revision 31 TRM B3.0-1 Revision 63 TRM B3.6.5-1 Revision 31 TRM B3.0-2 Revision 63 TRM B3.6.6-1 Revision 70 TRM B3.0-2a Revision 72 TRM B3.6.7-1 Revision 31 TRM B3. 0-2b Revision 72 TRM B3.6.8-1 Revision 31 TRM B3 .0-2c Revision 72 TRM B3.7.1-1 Revision 31 TRM B3 .0-3 Revision 31 TRM B3.7.2-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.3-1 Revision 73 TRM B3.0-5 Revision 54 TRM B3.7.4-1 Revision 31 TRM B3.0-6 Revision 72 TRM B3.7.4-2 Revision 31 TRM B3.0-7 Revision 72 TRM B3.7.5-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.7-1 Revision 91 TRM B3.3.1-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.3-1 Revision 89 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3. 8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3 9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3 11.1-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.12.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3 12.2-1 Revision 44 TRM B3.3.7-2 Revision 31 TRM B3 12.3-1 Revision 31 TRM B3.3.8-1 Revision 31 TEN B3.12.4-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.5-1 Revision 31 TRM B3.3 .10-1 Revision 56 TRM B3.12.6-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.7-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.8-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 95 04/27/09

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 14, Revision 1 Page Revision Notation Page 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 TRM Vol. I LEP-4 REV 95 04/27/09

COLR - 14 Revision 1 Page 1 of 22 FERMI 2 CORE OPERATING LIMITS REPORT CYCLE 14 REVISION 1 Prepared by:>

P. Kiel D4at Date Principal Engineer, Reactor Engineering Reviewed by:

Date Station Nuclear Engineer Date COLR Checklist Reviewer Approved by:

R. A. Gailliez Date Supervisor - Reactor Engineering April 2009

COLR - 14 Revision 1 Page 2 of 22 TABLE OF CONTENTS

1.0 INTRODUCTION

AND

SUMMARY

.............................................................. 4 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE ............................ 5 2.1 Definition .................................................................................... 5 2.2 Determination of MAPLHGR Limit .................................................. 5 2.2.1 Calculation of MAPFAC(P) .................................................... 7 2.2.2 Calculation of MAPFAC(F) ..................................................... 8 3.0 MINIMUM CRITICAL POWER RATIO .................................................. ........ 9 3.1 Definition .................................................................................. 9 3.2 Determination of Operating Limit MCPR ............................................ 9 3.3 Calculation of MCPR(P) ............................................ 10 10......................

3.3.1 Calculation of KP ........................ ..................... 11 3.3.2 Calculation of tr ............................................................... 12 3.4 Calculation of MCPR(F) ................................................................... 13 4.0 LINEAR HEAT GENERATION RATE ............................................................ 14 4.1 Definition ................................................................................. 14 4.2 Determination of LHGR Limit ....................................................... 14 4.2.1 Calculation of LHGRFAC(P) ............................................. ..... 16 4.2.2 Calculation of LHGRFAC(F) ................................................... 17 5.0 CONTROL ROD BLOCK INSTRUMENTATION ...................................... .. 18 5.1 Definition ................................................................................. 18 6.0 BACKUP STABILITY PROTECTION REGIONS ........................................... 19 6 .1 D efinition .................................................................................... 19

7.0 REFERENCES

...................................................................................... 21 7.1 Source References ...................................................................... 21 7.2 Basis References ............................................................................ 21

COLR - 14 Revision 1 Page 3 of 22 LIST OF TABLES TABLE 1 FUEL TYPE-DEPENDENT STANDARD MAPLHGR LIMITS ................... 6 TABLE 2 FLOW-DEPENDENT MAPLHGR LIMIT COEFFICIENTS ..................... 8 TABLE 3 OLMCPR1 10 5 00/o AS A FUNCTION OF EXPOSURE AND" ........................ 10 TABLE 4 FLOW-DEPENDENT MCPR LIMIT COEFFICIENTS .......................... 13 TABLE 5 STANDARD LHGR LIMITS FOR VARIOUS FUEL TYPES .................... 15 TABLE 6 FLOW-DEPENDENT LHGR LIMIT COEFFICIENTS ........................... 17 TABLE 7 CONTROL ROD BLOCK INSTRUMENTATION SETPOINTS WITH FIL TE R ..................................................................................... 18 TABLE 8 BSP REGION DESCRIPTIONS ....................................................... 19 LIST OF FIGURES FIGURE 1 BSP REGIONS FOR NOMINAL FEEDWATER TEMPERATURE ............. 20

COLR - 14 Revision 1 Page 4 of 22

1.0 INTRODUCTION

AND

SUMMARY

This report provides the cycle specific plant operating limits, which are listed below, for Fermi 2, Cycle 14, as required by Technical Specification 5.6.5. The analytical methods used to determine these core operating limits are those previously reviewed and approved by the Nuclear Regulatory Commission in GESTAR II (Reference 9).

The cycle specific limits contained within this report are valid for the full range of the licensed operating domain.

COLR - 14 Revision 1 Page 5 of 22 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE TECH SPEC IDENT OPERATING LIMIT 3.2.1 APLHGR 2.1 Definition The AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) shall be applicable to a specific planar height and is equal to the sum of the LINEAR HEAT GENERATION RATEs (LHGRs) for all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at the height.

2.2 Determination of MAPLHGR Limit The maximum APLHGR (MAPLHGR) limit is a function of reactor power, core flow, fuel type, and average planar exposure. The limit is developed, using NRC approved methodology described in References 9 and 10, to ensure gross cladding failure will not occur following a loss of coolant accident (LOCA). The MAPLHGR limit ensures that the peak clad temperature during a LOCA will not exceed the limits as specified in 10CFR50.46(b)(1) and that the fuel design analysis criteria defined in References 9 and 10 will be met.

The MAPLHGR limit during dual loop operation is calculated by the following equation:

MAPLHGRUMI = MIN (MAPLHGR (P), MAPLHGR (F))

where:

MAPLHGR (P) = MAPFAC (P) x MAPLHGRSIIJ MAPLHGR (F) = MAPFAC (F) x MAPLHGRSTD Within four hours after entering single loop operation, the MAPLHGR limit is calculated by the following equation:

MAPLHGRUM,, = MIN (MAPLHGR (P), MAPLHGR (F), MAPLHGR (SLO))

where:

MAPLHGR (SLO) = 1.0 x MAPLHGRS-h The Single Loop multiplier is 1.0 since the offrated ARTS limits bound the single loop MAPLHGR limit. (Reference 2)

COLR - 14 Revision 1 Page 6 of 22 MAPLHGRSTD, the standard MAPLHGR limit, is defined at a power of 3430 MWt and flow of 105 Mlbs/hr for each fuel type as a function of average planar exposure and is presented in Table 1. (Reference 2) When hand calculations are required, MAPLHGRSTD shall be determined by interpolation from Table 1. MAPFAC(P), the core power-dependent MAPLHGR limit adjustment factor, shall be calculated by using Section 2.2.1. MAPFAC(F),

the core flow-dependent MAPLHGR limit adjustment factor, shall be calculated by using Section 2.2.2.

TABLE 1 FUEL TYPE-DEPENDENT STANDARD MAPLHGR LIMITS GEl 1 GE14 GEl 1 Exposure MAPLHGR GE14 Exposure MAPLHGR GWD/ST KW/FT GWD/ST KW/FT 0.0 13.42 0.0 12.82 19.72 13.42 19.13 12.82 27.22 12.29 57.61 8.00 63.50 8.90 63.50 5.00 Fuel Types 19 = GE11-P9CUB408-12GZ-100T-146-T6-2604 5 = GE14-P1OCNAB381-7G6/8G4-10OT-150-T6-2877 20 = GE11-P9CUB380-12GZ-LOOT-146-T6-2605 6 = GE14-PlOCNAB381-7G5/8G4-10OT-150-T6-2869 1 = GE14-P1OCNAB400-16GZ-10OT-150-T6-2787 7 = GE14-P1OCNAB381-16G5-10OT-150-T6-2999 2 = GE14-P1OCNAB399-16GZ-10OT-150-T6-2788 8 = GE14-PlOCNAB380-4G6/9G5-10OT-150-T6-3150 3 = GE14-PlOCNAB380-10G5/4G4-1OOT-150-T6-2868 9 = GE14-PlOCNAB380-7G5/8G4-10OT-150-T6-3152 4 = GE14-PlOCNAB381-7G5/8G4-10OT-150-T6-2869 10 = GE14-PlOCNAB378-14GZ-10OT-150-T6-3151

COLR - 14 Revision 1 Page 7 of 22 2.2.1 Calculation of MAPFAC(P)

The core power-dependent MAPLHGR limit adjustment factor, MAPFAC(P) (Reference 3),

shall be calculated by one of the following equations:

For 0 < P < 25:

No thermal limits monitoring is required.

For 25 < P < 30:

With turbine bypass OPERABLE, For core flow < 50 Mlbs/hr, MAPFAC (P) = 0.606 + 0.0038 (P - 30)

For core flow > 50 Mlbs/hr, MAPFAC (P) = 0.586 + 0.0038 (P - 30)

With turbine bypass INOPERABLE, For core flow < 50 Mlbs/hr, MAPFA C(P) = 0.490 + 0. O050(P - 30)

For core flow > 50 Mlbs/hr, MAPFAC(P) = 0.438+0.O050(P-30)

For 30 < P < 100:

MAPFAC(P) = 1.0+0.005224(P-100) where: P = Core power (fraction of rated power times 100).

COLR - 14 Revision 1 Page 8 of 22 2.2.2 Calculation of MAPFAC(F)

The core flow-dependent MAPLHGR limit adjustment factor, MAPFAC(F) (Reference 3),

shall be calculated by the following equation:

WT MAPFAC(F) = MIN(].0, AFx - +BF) 100 where:

WT = Core flow (Mlbs/hr).

AF = Given in Table 2.

BF = Given in Table 2.

TABLE 2 FLOW-DEPENDENT MAPLHGR LIMIT COEFFICIENTS Maximum Core Flow*

(Mlbs/hr) AF BF 110 0.6787 0.4358 As limited by the Recirculation System MG Set mechanical scoop tube stop setting.

COLR - 14 Revision 1 Page 9 of 22 3.0 MINIMUM CRITICAL POWER RATIO TECH SPEC IDENT OPERATING LIMIT 3.2.2 MCPR 3.1 Definition The MINIMUM CRITICAL POWER RATIO (MCPR) shall be the smallest Critical Power Ratio (CPR) that exists in the core for each type of fuel. The CPR is that power in the assembly that is calculated by application of the appropriate correlation(s) to cause some point in the assembly to experience boiling transition, divided by the actual assembly operating power.

3.2 Determination of Operating Limit MCPR The required Operating Limit MCPR (OLMCPR). (Reference 2) at steady-state rated power and flow operating conditions is derived from the established fuel cladding integrity Safety Limit MCPR and an analysis of abnormal operational transients. To ensure that the Safety Limit MCPR is not exceeded during any anticipated abnormal operational transient, the most limiting transients have been analyzed to determine which event will cause the largest reduction in CPR. Three different core average exposure conditions are evaluated. The result is an Operating Limit MCPR which is a function of exposure and 'r. 'Cis a measure of scram speed, and is defined in Section 3.3.2. Cycle 14 operating limits are based on the Dual Loop SLMCPR of 1.08.

The OLMCPR shall be calculated by the following equation:

OLMCPR = MAX(MCPR(P), MCPR(F))

MCPR(P), the core power-dependent MCPR operating limit, shall be calculated using Section 3.3.

MCPR(F), the core flow-dependent MCPR operating limit, shall be calculated using Section 3.4.

In case of Single Loop Operation, the Safety Limit MCPR (Reference 2) is increased to account for increased uncertainties in core flow measurement and TIP measurement. However, OLMCPR is not increased when operating in single loop due to inherent conservatism.

COLR - 14 Revision 1 Page 10 of 22 3.3 Calculation of MCPR(P)

MCPR(P), the core power-dependent MCPR operating limit (Reference 3), shall be calculated by the following equation:

MCPR(P) = Kp x OLMCPR 1 oo 1 1 os KP, the core power-dependent MCPR Operating Limit adjustment factor, shall be calculated by using Section 3.3.1.

OLMCPR1 0o 1 00 5 shall be determined by interpolation from Table 3 (Reference 2), and "r shall be calculated by using Section 3.3.2.

TABLE 3 OLMCPR1 o/o10 5 AS A FUNCTION OF EXPOSURE AND TC EXPOSURE

-(MWD/ST) (MWDST)OLMCPR CONDITION 1 00/105 Both Turbine Bypass and Two Loop Single Loop Moisture Separator Reheater OPERABLE BOC to 6990 t0 1.36 1.36 1.47 1.47 6990 to 8490 1.38 1.38 1.49 1.49 8490 to EOC =0 1.44 1.44 1.61 1.61 Either Turbine Bypass or Moisture Separator Reheater INOPERABLE BOC to EOC T= 0 1.47 1.47 1.64 1.64 Both Turbine Bypass and Moisture Separator Reheater INOPERABLE BOC to EOC 1.50 1.50 1.67 1.67

COLR - 14 Revision 1 Page 11 of 22 3.3.1 Calculation of K, The core power-dependent MCPR operating limit adjustment factor, K, (Reference 3), shall be calculated by using one of the following equations:

For 0 < P < 25 :

No thermal limits monitoring is required.

For 25 < P < 30 When turbine bypass is OPERABLE, Kp (KBYP + (0. 03 2 x (30 - P)))

OLMCPRo01105 where: KBYP = 2.16 for core flow < 50 Mlbs/hr

= 2.44 for core flow > 50 Mlbs/hr When turbine bypass is INOPERABLE, Kp (KBYP+ (0.076 x(30 - P)))

OLMCPRioolm where: KBYP = 2.61 for core flow < 50 Mlbs/hr

= 3.34 for core flow > 50 Mlbs/hr For 30 < P < 45 Kp = 1.28 + (0.0134 x (45- P))

For 45 < P < 60 :

Kp = 1.15 + (0.00867 x (60-P))

For 60 < P < 100:

Kp = 1.0 + (0.00375 x (100-P))

where: P = Core power (fraction of rated power times 100).

COLR - 14 Revision 1 Page 12 of 22 3.3.2 Calculation of T The value of t, which is a measure of the conformance of the actual control rod scram times to the assumed average control rod scram time in the reload licensing analysis (Reference 4),

shall be calculated by using the following equation:

(rave -T-B)

T'A T-B where: TA= 1.096 seconds N,

TB 0.830 + 0.019 x 1.65 -* seconds Fi=I n

ZNv ae ZNi i=1 n = number of surveillance tests performed to date in cycle, N= number of active control rods measured in the i? surveillance test, Ti = average scram time to notch 36 of all rods measured in the ith surveillance test, and N, total number of active rods measured in the initial control rod scram time test for the cycle (Technical Specification Surveillance Requirement 3.1.4.4).

The value of -r shall be calculated and used to determine the applicable OLMCPR1 0O/ 105 value from Table 3 within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the conclusion of each control rod scram time surveillance test required by Technical Specification Surveillance Requirements 3.1.4.1, 3.1.4.2, and 3.1.4.4. Prior to performance of the initial scram time measurements for the cycle, a T value of 1.0 shall be used to determine the applicable OLMCPR1 o,, 105 value from Table 3.

COLR - 14 Revision 1 Page 13 of 22 3.4 Calculation of MCPR(F)

MCPR(F), the core flow-dependent MCPR operating limit (Reference 3), shall be calculated by using the following equation:

MCPR(F)= MAX(1.25,(AFX WT + BF))

100 where:

WT = Core flow (Mlbs/hr).

A F = Given in Table 4.

BF = Given in Table 4.

TABLE 4 FLOW-DEPENDENT MCPR LIMIT COEFFICIENTS Maximum Core Flow*

(Mlbs/hr) AF BF Single or Two Loop 110 -0.601 1.743 As limited by the Recirculation System MG Set mechanical scoop tube stop setting.

COLR - 14 Revision 1 Page 14 of 22 4.0 LINEAR HEAT GENERATION RATE TECH SPEC IDENT OPERATING LIMIT 3.2.3 LHGR 4.1 Definition The LINEAR HEAT GENERATION RATE (LHGR) shall be the heat generation rate per unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length. By maintaining the operating LHGR below the applicable LHGR limit, it is assured that all thermal-mechanical design bases and licensing limits for the fuel will be satisfied.

4.2 Determination of LHGR Limit The maximum LHGR limit is a function of reactor power, core flow, fuel and rod type, and fuel rod nodal exposure. The limit is developed, using NRC approved methodology described in References 9 and 10, to ensure the cladding will not exceed its yield stress and that fuel thermal-mechanical design criteria will not be violated during any postulated transient events.

The LHGR limit ensures the fuel mechanical design requirements as defined in Reference 1 will be met.

The LHGR limit during dual loop operation is calculated by the following equation:

LHGRL,,,,M = MIN (LHGR (P), LHGR (F))

where:

LHGR (P) = LHGRFA C (P) x LHGR,,D LHGR (F)= LHGRFAC (F) x LHGRD LHGRSTD, the standard LHGR limit, is defined at a power of 3430 MWt and flow of 105 Mlbs/hr for each fuel and rod type as a function of fuel rod nodal exposure and is presented in Table 5. Table 5 contains only the most limiting Gadolinia LHGR limit for the maximum' allowed Gadolinia concentration of the applicable fuel product line. (Reference 1) When hand calculations are required, LHGRSTD shall be determined by interpolation from Table 5.

LHGRFAC(P), the core power-dependent LHGR limit adjustment factor, shall be calculated by using Section 4.2.1. LHGRFAC(F), the core flow-dependent LHGR limit adjustment factor, shall be calculated by using Section 4.2.2.

COLR - 14 Revision 1 Page 15 of 22 TABLE 5 STANDARD LHGR LIMITS FOR VARIOUS FUEL TYPES GEl 1 Most Limiting GEl 1 Uranium Only Fuel Rods Gadolinia Bearing Fuel Rods Exposure LHGR Exposure LHGR GWD/ST KW/FT GWD/ST KW/FT 0.0 14.40 0.0 12.74 13.24 14.40 10.59 12.74 27.22 12.29 23.99 10.87 63.50 8.90 58.81 7.88 GE 14 MostLimiting GEl4 Uranium Only Fuel Rods Gadolinia Bearing Fuel Rods Exposure LHGR Exposure LHGR GWD/ST KW/FT GWD/ST KW/FT 0.0 13.40 0.0 12.26 14.51 13.40 12.28 12.26 57.61 8.00 55.00 7.32 63.50 5.00 60.84 4.57 uel Types 19 = GE11-P9CUB408-12GZ-10OT-146-T6-2604 5 = GE14-PlOCNAB381-7G6/8G4-10OT-150-T6-2877 20 = GE11-P9CUB380-12GZ-10OT-146-T6-2605 6 = GE14-PlOCNAB381-7G5/8G4-lOOT-150-T6-2869 1 = GE14-P1OCNAB400-16GZ-10OT-150-T6-2787 7 = GE14-PlOCNAB381-16G5-10OT-150-T6-2999 2 = GE14-P1OCNAB3 99-16GZ-100T-150-T6-2788 8 = GE14-P1OCNAB380-4G6/9G5-10OT-150-T6-3150 3 = GE14-P1OCNAB380-10G5/4G4-10OT-150-T6-2868 9 = GE14-P1OCNAB380-7G5/8G4-lOOT-150-T6-3152 4 = GE14-P1OCNAB381-7G5/8G4-10OT-150-T6-2869 10 = GE14-PlOCNAB378-14GZ-100T-150-T6-3151

COLR - 14 Revision 1 Page 16 of 22 4.2.1 Calculation of LHGRFAC(P)

The core power-dependent LHGR limit adjustment factor, LHGRFAC(P) (Reference 3), shall be calculated by one of the following equations:

For 0 < P < 25:

No thermal limits monitoring is required.

For 25 < P < 30:

With turbine bypass OPERABLE, For core flow < 50 Mlbs/hr, LHGRFAC(P) = 0.606 + 0.0038 (P - 30)

For core flow > 50 Mlbs/hr, LHGRFAC (P) = 0.586 + 0.0038 (P - 30)

With turbine bypass INOPERABLE, For core flow < 50 Mlbs/hr, LHGRFAC(P)= 0.490 + 0.0050(P- 30)

For core flow > 50 Mlbs/hr, LHGRFA C(P)= 0. 438 +'0. 0050(P- 30)

For 30 < P < 100:

LHGRFAC(P)= 1.0 + 0. 005224(P- 100) where: P = Core power (fraction of rated power times 100).

COLR - 14 Revision 1 Page 17 of 22 4.2.2 Calculation of LHGRFAC(F)

The core flow-dependent LHGR limit adjustment factor, LHGRFAC(F) (Reference 3), shall be calculated by the following equation:

WT LHGRFAC(F)= MIN (1.0, AF X + BF) 100 where:

WT = Core flow (Mlbs/hr).

AF = Given in Table 6.

BF = Given in Table 6.

TABLE 6 FLOW-DEPENDENT LHGR LIMIT COEFFICIENTS Maximum Core Flow*

(Mlbs/hr) AF BF 110 0.6787 0.4358 As limited by the Recirculation System MG Set mechanical scoop tube stop setting.

COLR - 14 Revision 1 Page 18 of 22 5.0 CONTROL ROD BLOCK INSTRUMENTATION TECH SPEC IDENT SETPOINT 3.3.2.1 RBM 5.1 Definition The nominal trip setpoints and allowable values of the control rod withdrawal block instrumentation are shown in Table 7. These values are consistent with the bases of the APRM Rod Block Technical Specification Improvement Program (ARTS) and the MCPR operating limits. (References 2, 6, 7, & 16).

TABLE 7 CONTROL ROD BLOCK INSTRUMENTATION SETPOINTS WITH FILTER Setpoint Trip Setpoint Allowable Value LPSP 27.0 28.4 IPSP 62.0 63.4 HPSP 82.0 83.4 LTSP 117.0 118.9 ITSP 112.2 114.1 HTSP 107.2 109.1 DTSP 94.0 92.3 where:

LPSP Low power setpoint; Rod Block Monitor (RBM) System trip automatically bypassed below this level IPSP Intermediate power setpoint HPSP High power setpoint LTSP Low trip setpoint ITSP Intermediate trip setpoint HTSP High trip setpoint DTSP Downscale trip setpoint

COLR - 14 Revision 1 Page 19 of 22 6.0 BACKUP STABILITY PROTECTION REGIONS TECH SPEC REFERENCE OPERATING LIMIT 3.3.1.1 Action Condition J Alternate method to detect and suppress thermal hydraulic instability oscillations TRM REFERENCE OPERATING LIMIT 3.4.1.1 Scram, Exit, and Stability Awareness Regions 6.1 Definition The Backup Stability Protection (BSP) Regions are an integral part of the Tech Spec required alternative method to detect and suppress thermal hydraulic instability oscillations in that they identify areas of the power/flow map where there is an increased probability that the reactor core could experience a thermal hydraulic instability. Regions are identified (refer to Table 8 and Figure 1) that are either excluded from planned entry (Scram Region), or where specific actions are required to be taken to immediately leave the region (Exit Region). A region is also identified where operation is allowed provided that additional monitoring is performed to verify that the reactor core is not exhibiting signs of core thermal hydraulic instability (Stability Awareness Region). (Reference 5)

The boundaries of these regions are established on a cycle specific basis based upon core decay ratio calculations performed using NRC approved methodology. The Cycle 14 regions are valid to a cycle exposure of 11,399 MWd/st. (Reference 5)

These regions are only applicable when the Upscale Trip function of the Oscillation Power Range Monitoring System (OPRM) is inoperable. It must be noted that the Cycle 14 region boundaries defined in Table 8 and illustrated in Figure 1 are not applicable to operation with Feedwater Heaters Out-Of-Service (FWHOOS) or with Final Feedwater Temperature Reduction (FFWTR).

TABLE 8 BSP REGION DESCRIPTIONS Scram Region: > 96% Rod Line, < 43% Core Flow

> 67 % Rod Line, < 41% Core Flow Exit Region: > 77 % Rod Line, < 48 % Core Flow Not in Scram Region -and- > 103% Rod Line, < 50% Core Flow

> 62 % Rod Line, < 46 % Core Flow Stability Awareness Region > 72 % Rod Line, < 53 % Core Flow Not in Scram or Exit Region > 98 % Rod Line, < 55 % Core Flow

COLR - 14 Revision 1 Page 20 of 22 FIGURE 1 - BSP REGIONS FOR NOMINAL FEEDWATER TEMPERATURE 0.

0 30 40 50 60 Percent (%) of Rated Core Flow

COLR - 14 Revision 1 Page 21 of 22

7.0 REFERENCES

7.1 SOURCE REFERENCES

1. "Fuel Bundle Information Report for Enrico Fermi 2 Reload 13 Cycle 14," Global Nuclear Fuel, 0000-0082-2481-FIBR, Revision 0, December 2008 (LHGR Limits)
2. "Supplemental Reload Licensing Report for Enrico Fermi 2 Reload 13 Cycle 14," Global Nuclear Fuel, 0000-0082-2481 -SRLR, Revision 0, December 2008 (MAPLHGR Limits, SLO Multiplier, MCPR Limits, SLMCPR)
3. "GE14 Fuel Cycle-Independent Analyses for Fermi Unit 2", GE-NE-0000-0025-3282-00 dated November 2004 (ARTS Limits)
4. Letter from Greg Porter to B. L. Myers, "Scram Times for Improved Tech Specs." GP-99014, October 22, 1999 containing DRF A12-00038-3, Vol. 4 information from G. A. Watford, GE, to Distribution,

Subject:

Scram Times versus Notch Position (TAU Calculation)

5. Evaluation Report, "Fermi Cycle 14 BSP Analysis," Revision 0, November 2008 (BSP Limits)
6. CSCCD-C51 K622/C51 R809C Revision 2, "Programming for Rod Block Monitor (RBM-A)

PIS # C51K622 and Operator Display Assembly (ODA) PIS # C51R809C" (RBM A Setpoints)

7. CSCCD-C51 K623/C51 R809D Revision 2, "Programming for Rod Block Monitor (RBM-B)

PIS # C51K623 and Operator Display Assembly (ODA) PIS # C51R809D" (RBM B Setpoints)

8. Cycle Management Report for Fermi 2 Cycle 14, DRF 0000-0100-7199-CMR, Revision 0, April 2009.

7.2 BASIS REFERENCES

9. "General Electric Standard Application for Reactor Fuel (GESTAR II)," NEDE-24011-P-A, Revision 16 with amendments
10. "The GESTR-LOCA and SAFER Models for the Evaluation of the Loss-of-Coolant Accident - SAFER/GESTR Application Methodology," NEDE 23785-1-PA, Revision 1, October 1984
11. "Fermi-2 SAFER/GESTR-LOCA, Loss-of-Coolant Accident Analysis," NEDC-31982P, July 1991, and Errata and Addenda No. 1, April 1992
12. "DTE Energy Enrico Fermi 2 SAFER/GESTR Loss of Coolant Accident Analysis for GE14 Fuel" GE-NE-0000-0030-6565 Revision 1 dated June 2008
13. "DTE Energy Enrico Fermi 2 SAFER/GESTR Loss of Coolant Accident Analysis for GEl 1 Fuel" GE-NE-0000-0047-1716 Revision 1 dated June 2008

COLR - 14 Revision 1 Page 22 of 22 7.2 BASIS REFERENCES

14. Letter from T. G. Colburn to W. S. Orser, "Fermi Amendment No. 87 to Facility Operating License No. NPF-43 (TAC NO. M82102)," September 9, 1992
15. Letter from J. F. Stang to W. S. Orser, "Amendment No. 53 to Facility Operating License No. NPF-43: (TAC No. 69074)," July 27, 1990
16. "Maximum Extended Operating Domain Analysis for Detroit Edison Company Enrico Fermi Energy Center Unit 2," GE Nuclear Energy, NEDC-31843P, July 1990
17. "Power Range Neutron Monitoring System," DC-4608, Vol. XI DCD, Rev. B and DC-4608 Vol. I Rev. D.
18. Methodology and Uncertainties for Safety Limit MCPR Evaluations, NEDC-32601P-A, August 1999
19. Power Distribution Uncertainties for Safety Limit MCPR Evaluation, NEDC-32694P-A, August 1999
20. R-Factor Calculation Method for GEl1, GE12, and GE13 Fuel, NEDC-32505P-A, Revision 1, July 1999
21. "Improved LHGR Limits (designated as "GE 1l/ 13-UPGRADE") for GE 11 Fuel in Fermi,"

Global Nuclear Fuel, GNF-J1 103057-265, August 2001

22. "Turbine Control Valve Out-Of-Service for Enrico Fermi Unit-2," GE - Nuclear Energy, GE-NE-J1 1-03920-07-01, October 2001
23. Licensing Topical Report, "Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors," Volume 1, NEDO-24154-A 78NED290R1, August 1986
24. Letter from David P. Beaulieu (USNRC) to William T. O'Connor, Jr. (Detroit Edison),

"Fermi Issuance of Amendment RE: Changes to the Safety Limit Minimum Critical Power Ratio (TAC NO. MC4748)," dated November 30, 2004 (SLMCPR Limit)