ML081280834

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements
ML081280834
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/25/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Chernoff M, NRR/DORL, 415-4041
Shared Package
ML081280800 List:
References
TAC MD6076
Download: ML081280834 (3)


Text

PAM Instrumentati on 3.3.3.1 SURVEILLANCE REQUIREMENTS NOTE ......

These SRs apply to each Function in Table 3.3.3.1-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days SR 3.3.3.1.2 Perform CHANNEL CALIBRATION. 18 months FERMI - UNIT 2 3.3-26 Amendment No.. *, .*180