ML101540426

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual - Vol 1, Revision 98
ML101540426
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/25/2010
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101540426 (9)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 05/25/10 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 98 1 IR 05/24/10 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 400 I

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 98 dated 05/24/10 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 97 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 97 03/31/10 Title Page Rev 98 05/24/10 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 97 03/31/10 LEP-1 through LEP-4 Rev 98 05/24/10 3.7 Plant Systems Page TRM 3.7-15 Rev 83 07/06 Page TRM 3.7-15 Rev 98 05/10 3.12 Fire Protection Page TRM 3.12-4 Rev 97 03/10 Page TRM 3.12-4 Rev 98 05/10 END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM IFile: 1754 I DSN: TRMVOLI I Rev: 98 Date 05/24/10 Recipient S

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 93 TRM 3.3-33 Revision 31 TRM iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49. Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP- 1 REV 98 05/24/10

a FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 600 TRM 3.12-4 Revision 98 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRE 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 98 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 93 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 98 05/24/10

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31* TRMB3.4.6-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.4.7-1 Revision 31 TRM 5.0-7 Revision 31 TRMB3.5-1 Revision 31 TRM 5.0-8 Revision 93 TRMB3.6.1-1 Revision 31 TRM 5.0-9 Revision 31 TRMB3.6.2-1 Revision 67 TRMB1.0-1 Revision 31 TRMB3.6.3-1 Revision 87 TRMB2.0-1 Revision 31 TRMB3.6.4-1 Revision 31 TRMB3.0-1 Revision 63 TRMB3.6.5-1 Revision 31 TRMB3.0-2 Revision 63 TRMB3.6.6-1 Revision 70 TEN B3.0-2a Revision 72 TRMB3.6.7-1 Revision 31 TRM B3.0-2b Revision 72 TRMB3.6.8-1 Revision 31 TRMB3.0-2c Revision 72 TRMB3.7.1-1 Revision 31 TRMB3.0-3 Revision 31 TRMB3.7.2-1 Revision 31 TRMB3.0-4 Revision 31 TRMB3.7.3-1 Revision 73 TRMB3.0-5 Revision 54 TRMB3.7.4-1 Revision 31 TRMB3.0-6 Revision 72 TRMB3.7.4-2 Revision 31 TRM B3.0-7 Revision 72 TRM B3.7.5-1 Revision 31 TRMB3.1-1 Revision 31 TRMB3.7.6-1 Revision 31 TRMB3.2-1 Revision 31 TRMB3.7.7-1 Revision 91 TRM B3.3.1-1 Revision 31 TRMB3.7.8-1 Revision 31 TRM B3.3.1-2 Revision 31 TRMB3.7.9-1 Revision 79 TRM B3.3.2-1 Revision 31 TRMB3.8.1-1 Revision 31 TRMB3.3.2-2 Revision 31 TRMB3.8.2-1 Revision 31 TRMB3.3.3-1 Revision 67 TRMB3.8.3-1 Revision 96 TRMB3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRMB3.3.4-2 Revision 84 TRMB3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRE B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRMB3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRMB3.9.4-1 Revision 31 TRMB3.3.6-4 Revision 31 TRMB3. 10-1 Revision 31 TRMB3.3.6-5 Revision 76 TRMB3.11.1-1 Revision 31 TRM B3.3.6-6 Revision 76 TRMB3.12.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRMB3.12.2-1 Revision 44 TRM B3.3.7-2 Revision 31 TRMB3.12.3-1 Revision 31 TRM B3.3.8-1 Revision 31 TRMB3.12.4-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.5-1 Revision 31 TRM B3.3.10-1 Revision 56 TRMB3.12.6-1 Revision 31 TRMB3.3.11-1 Revision 45 TRMB3.12.7-1 Revision 31 TRMB3.3.12-1 Revision 62 TRM B3.12.8-1 Revision 31 TRM B3.3.13-1 Revision 31 TRMB3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRMB3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRMB3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRMB3.4.4-1 Revision 31 TRMB3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 98 05/24/10

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 14, Revision 1 Page Revision Notation Page 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 ii 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 TRM Vol. I LEP-4 REV 98 05/24/10

Appendix R Alternative Shutdown Auxiliary Systems TR 3.7.7 TABLE TR3.7.7-1 (Page 1 of 4)

Appendix R Alternative Shutdown Control Circuits FUNCTION CONTROL CIRCUIT SWITCH LOCATION

1. EF2 Supervisor Control Transfer H21-P623
2. EF2 System Transfer Transfer H21-P623
3. Voltage Control Control H21-P623
4. Governor Control Control H21-P623
5. CTG 11 Unit 1 Control Status CMC H21-P623
6. 120 KV Position GM Breaker Control Control H21-P623
7. 120 KV Position GK Breaker Control Control H21-P623
8. 120 KV Position GH Breaker Control Control H21-P623
9. 120 KV Position GD Breaker Control Control H21-P623
10. CTG 11 Position A2 Breaker Control CMC H21-P623
11. 13.2 KV Position A7 Outbuilding - TSC FD Breaker Control CMC H21-P623
12. 13.2 KV Position A6 SS64 Alternate Feeder Breaker CMC H21-P623 Control
13. SS64 Primary Position D Breaker Control CMC H21-P623
14. SS66 Primary Position C Breaker Control CMC H21-P623
15. SS68 Primary Position B Breaker Control CMC H21-P623
16. Transfer 1 sec Position A Breaker Control CMC H21-P623
17. SBFW Pump A Breaker Control CMC H21-P623 18 SBFW Pump B Breaker Control CMC H21-P623
19. 4160V Position V1 Breaker Control CMC H21-P623
20. 4160V Position V3 Breaker Control CMC H21-P623
21. 4160V Position W5 Breaker Control CMC H21-P623
22. SBFW Flow Control N21-F002 Push-button H21-P623
23. SBFW Flow Control N21-F003 Push-button H21-P623
24. SBFW Isolation Valve N21-FOOl Push-button H21-P623
25. SRV Line B B21-F013 G Push-button H21-P623 (continued)

TRM Vol. I TRM 3.7-15 REV 98 05/10

Fire Detection Instrumentation TR 3.12.1 TABLE TR3.12.1-1 (Page I of 3)

Fire Detection Instrumentation FIRE TOTAL NUMBER OF INSTRUMENTS(a)

DETECTION IONIZATION PHOTOELECTRIC THERMAL INFRARED FUNCTION ZONE (X/Y) (X/Y) (X/Y) (X/Y)

I. Reactor Building(b)

a. Torus area 1 8/0
b. NW corner rooms 2 4/0 RHR pump
c. SW corner rooms 3 4/0 RHR pump
d. SE corner rooms 4 9/0 CRD HPCI
e. NE corner rooms 5 5/0 RCIC
f. First floor 7 31/0 8/0
g. EECW system area 10 21/0 second floor
h. Third floor 15 15/0
i. Fourth floor 17 22/0 2/0
j. Refueling area, 17 1/0 10/0 fifth floor
2. Auxiliary Building
a. Basement N 6/0 control air equipment
b. Corridors, 5 2/0 2/0 562,ft, 563 ft
c. First floor 17/0 mezzanine cable tray, 583 ft, 603 ft
d. Switchgear room, 10/0 corridor area second floor
e. Cable tunnel 9 10/0 (continued)

(a) (X/Y) X is number of Function A (early-warning fire detection and notification only) instruments.

Y is number of Function B (actuation of fire suppression system and early warning and notification) instruments.

(b) The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

TRM Vol1. I TRM 3.12-4 REV 98 05/10