ML23030A340

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual - Volume 1, Revision 133
ML23030A340
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/12/2023
From:
Detroit Edison, Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23030A340 (1)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 01/12/23 To : 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK 11555 ROCKVILLE PIKE ROCKVILLE, MD 208 52 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 133 1 IR 01/11/23 AFC Please destroy or mark all revised , superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586 - 4338 OR (734) 586 - 4061 for questions or concerns .

Ref: u33890

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 133 dated 01/11/2023 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 132 has been inserted prior to inserting these pages.

SECTION REMOVE and DESTROY INSERT In Front ofTRM Manual Title Page Rev 132 04/27/2022 Title Page Rev 133 01/11/2023 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 132 LEP-1 through LEP-4 Rev 133 04/27/2022 01/11/2023 3.12 Fire Protection TRM 3.12-10 Rev 31 10/99 TRM 3.12-10 Rev 133 01/23 Note: The changes above reflect those justified and described in LCR# 21-037-TRM.

END

  • I ..

T .

  • Fermi 2 Technical Requirements Manual Volume I DTE Electric CONTROLLED X.t1 Z3/ 2.:3

~

ARMS - INFORMATION DTC: TMTRM I File: 1754 DSN: TRM VOL I I Rev: 133 Date 01/11 /2023 Recipient nn r

-,JJ

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • Page TRM i TRM ii TRM iii TRM iv Revision Revision 106 Revision 107 Revision 105 Revision 106 Page TRM 3.3-30 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 Revision Revision 31 Revision 31 Revision 31 Revision 132 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 TRM 3.3-35 Revision 60 TRM 1.0-1 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 127 TRM 3.0-1 Revision 130 TRM 3.3-39 Revision 31 TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 132 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31

'TRM 3.3-c Revision 106 TRM 3.3-48 Revision 132 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-2 Revision 116 TRM 3.4-1 Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 132 TRM 3.4-2 Revision 125 TRM 3.3-6 Revision 125 TRM 3.4-3 Revision 132 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31*

TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 RM-3-;-3-9 Rev:i:-s*:i:-on-31 TRM-3--;--4*-6 Rev+/-s+/-on TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-9 Revision 31 TRM 3.3-13 Revision 74 TRM 3.4-10 Revision 125 TRM 3.3-13a Revision 125 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 125 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3--17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 ;Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Revision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 132 TRM 3.6-13 Revision 123

  • TRM 3.3-28 TRM 3.3-29 TRM Vol. I Revision 76 Revision 125 LEP-1 TRM 3.6-14 TRM 3.6-14a Revision 123 Revision 123 REV 133 01/11/2023

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • Page TRM 3.6-15 TRM 3.6-16 TRM 3.6-17 TRM 3.6-18 Revision Revision 123 Revision 123 Revision 123 Revision 123 Page TRM 3.8-9 TRM 3.8-10 TRM 3. 8-11 TRM 3.8-12 Revision Revision 125 Revision 125 Revision 123 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Reyision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 129 TRM 3.6-21 Revision 123 TRM 3;8-15 Revision 31 TRM 3.6-22 Revision 123 TRM 3.8-16 -Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 125 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 125 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 125 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3 .11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 132 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 127 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 RM-3---;-'7--8 Rev+/-s+/-on RM-3-;--1-2-1:-0--Rev+/-si*on --133 -

TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 130 TRM 3.7-10 Revision 44 TRM .3.12-12 Revision 31 TRM 3.7-11 Revisi*on 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 127 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 127 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3. 8-a, Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM .3 .12-26 Revision 75 TRM 3.8-4 Revision 130 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 125 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 125 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 125 TRM 3.12-30 Revision 127 TRM 3.8-8 Revision 125 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 133 01/11/2023

'__J FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • TRM 5.0-a TRM TRM TRM 5.0-1 5.0-2 Bl.0-1 Revision Revision Revision Revision Revision 105 119 105 31 TRM TRM TRM TRM B3.4.6-1 B3.4.7-l B3.5-1 B3.6.l-l Revision Revision Revision Revision Revision 31 31 31 31 TRM B2.0-1 Revision 31 TRM B3.6.2-l Revision 67 TRM B3.0-l Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-l Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-2c Revision 130 TRM B3.6.7-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM.B3.7.1-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-1 Revision 107 TRM B3.0-6 Revision 72 TRM B3.7.3-1 Revision. 73 TRM B3.0-7 Revision 72 TRM B3.7.4-l Revision 31 TRM B3.1-l Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-l Revision 31 TRM B3.7.5-l Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.7-1 Revision 99 TRM B3.3.2-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-1 Revision 67 TRM B3.8.1-1 Revision 31 TRM B3.3.4-l Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.4-2 Revision 126 TRM B3.8.3-l Revision 96 TRM B3.3.5-1 Revision 31 TRM B3.8.4-l Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.5-1 Revision 31 TRM B3.3.6-1 Revision 116 TRM B3.8.6-1 Revision 125 TRM B3.3.6-2 Revision 31 TRM B3.9.1-l Revision 31 TRM B3 .. 3. 6-3 Revision 31 TRM B3.9.2-1 Revision 65 TRM--B3 .. -3. 6-4 -Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76
  • TRM B3.10-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.ll.1-l Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.1-l Revision 31 TRM B3.3.7-3 Revision 106 TRM B3.12.2-l Revision 127 TRM B3.3.8-l Revision 31 TRM B3.12.3-l Revision 31-TRM B3.3.9-l Revision 31 TRM B3.12.4-l Revision 31 TRM B3.3.10-l Revision 56 TRM B3.12.5-l Revision 31

. TRM B3.3.11-1 Revision 45 TRM B3.12. 6-1 Revision 31 TRM B3.3.12-l Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-l Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.l-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-l Revisio~ 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 133 01/11/2023

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • CORE OPERATING LIMITS REPORT COLR 22, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 O*

8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 0 30 0

  • TRM Vol. I LEP-4 REV 133 01/11/2023

Fire Suppression Water System TR 3.12.2

  • SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY TRSR 3.12.2.7 Verify the diesel-driven fire suppression 31 days pump fuel storage tank contains at least 195 gallons of fuel.

TRSR 3.12.2.8 Start the diesel-driven fire suppression 31 days pump from ambient conditions and operate for> 30 minutes on recirculation flow.

TRSR 3.12.2.9 --------------------NOTE-------------------

Obtain the sample of diesel fuel in accordance with ASTM-D270-65 (reapproved 1980}.

Verify that a sample of diesel fuel from 92 days the diesel-driven fire suppression pump fuel storage tank is within the acceptable limits specified in ~able 1 of ASTM-D975-77 when checked for viscosity, water and sediment.

TRSR 3.12.2.10 Perform a fire suppression water system 12 months flush.

TRSR 3 .12. 2 .11 --------,--------_-NOTE--------------------

For valves that are not accessible during unit operation, not required to be performed in MODES 1, 2, and 3, or MODE 4 of< 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Cycle each testable valve in the flow path 12 months through at least one complete cycle of full travel.

TRSR 3.12.2.12 Perform a system functional test which 18 months includes simulated automatic actuation of the system throughout its operating sequence.

( continued)

TRM Vol. I TRM 3.12-10 REV 133 01/23