ML100830184

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Volume 1, Revision 96
ML100830184
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/15/2010
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
00935, cb1461
Download: ML100830184 (10)


Text

DETROIT EDISON'- FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 03/15/10 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRIl VOL I 96 1 IR 03/15/10 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: cb1461 Printed by DAZEL Page 30 Mar 15, 2010 05:04:51 PM ED

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 96 dated 03/15/10 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 95 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Page Rev 95 04/27/09 Title Page Rev 96 03/15/10 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP- 4 Rev 95 04/27/09 LEP-1 through LEP- 4 Rev 96 03/15/10 3.8 Electrical Power Page TRM 3.8-3 Rev 73 01105 Page TRM 3.8-3 Rev 96 03/10 Systems Page TRM 3.8-4 Rev 31 10/99 Page TRM 3.8-4 Rev 96 03/10 B3.8 Electrical Power Systems Page TRM B3.8.3-1 Rev 89 06/08 Page TRM B3.8.3-1 Rev 96 03/10 END

Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM I File: 1754 I DSN: TRM VOL I Rev: 96 Date 03/15/10 Recipient

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 93 TRM 3.3-33 Revision 31 TRM iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 41 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 52 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-I REV 96 03/15/10

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 89 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 83 TRM 3.12-18, Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 93 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM Vol. I LEP-2 REV 96 03/15/10

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-5 Revision 31 TRM B3.4.6-1 Revision 31 TRM 5.0-6 Revision 31 TRM B3.4.7-1 Revision 31 TRM 5.0-7 Revision 31 TRM B3.5-1 Revision 31 TRM 5.0-.8 Revision 93 TRM B3.6.1-1 Revision 31 TRM 5.0-9 Revision 31 TRM B3.6.2-1 Revision 67 TRM B1.0-1 Revision 31 TRM B3.6.3-1 Revision 87 TRM B2.0-1 Revision 31 TRM B3.6.4-1 Revision 31 TRM B3.0-1 Revision 63 TRM B3.6.5-1 Revision 31 TRM B3.0-2 Revision 63 TRM B3.6.6-1 Revision 70 TRM B3.0-2a Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.8-1 Revision 31 TRM B3.0-2c Revision 72 TRM B3.7.1-1 Revision 31 TRM B3.0-3 Revision 31 TRM B3.7.2-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.3-1 Revision 73 TRM B3.0-5 Revision 54 TRM B3.7.4-1 Revision 31 TRM B3.0-6 Revision 72 TRM B3.7.4-2 Revision 31 TRM B3.0-7 Revision 72 TRM B3.7.5-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.6-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.7-1 Revision 91 TRM B3.3.1-1 Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.1-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.2-1 Revision 31 TRM B3.8.1-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.3-1 Revision 96 TRM B3.3.4-1 Revision 31 TRM B3.8.4-1 Revision 31 TRM B3.3.4-2 Revision 84 TRM B3.8.5-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.6-1 Revision 43 TRM B3.3.5-2 Revision 31 TRM B3.9.1-1 Revision 31 TRM B3.3.6-1 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-2 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.4-1 Revision 31 TRM B3.3.6-4 Revision 31 TRM B3.10-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.11.1-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.12.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.2-1 Revision 44 TRM B3.3.7-2 Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.8-1 Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.5-1 Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.6-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.7-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.8-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 96 03/15/10

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 14, Revision 1 Page Revision Notation Page 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 TRM Vol. I LEP-4 REV 96 03/15/10

AC Sources TR 3.8.3 TR 3.8 ELECTRICAL POWER SYSTEMS TR 3.8.3 AC Sources TRLCO 3.8.3 Emergency Diesel Generator (EDG) surveillance requirements TRSR, 3.8.3.2, 3.8.3.3, and 3.8.3.4 shall be met.

APPLICABILITY: MODES 1, 2, 3, 4, and 5, During movement of recently irradiated fuel assemblies in the secondary containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. TRSR 3.8.3.2 not met. A.1 Perform OPERABILITY Immediately assessment on the OR affected EDG(s).

TRSR 3.8.3.3 not met.

OR TRSR 3.8.3.4 not met.

TRM Vol. I TRM 3.8-3 REV 96 03/10

AC Sources TR 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRSR 3.8.3.1 DELETED TRSR 3.8.3.2 Verify that the following diesel generator 18 months lockout features prevent diesel generator starting only when required:

a. 4160-volt ESF bus lockout;
b. Differential trip; and
c. Shutdown relay trip.

TRSR 3.8.3.3 Verify that the auto-connected loads to 18 months each diesel generator do not exceed the 2000-hour rating of 3100 kW.

TRSR 3.8.3.4 Drain each fuel oil storage tank, remove 10 years the accumulated sediment and clean the tank using sodium hypochlorite solution.

TRM Vol. I TRM 3.8-4 REV 96 03/10

AC Sources TR B3.8.3 TR B3.8 ELECTRICAL POWER SYSTEMS TR B3.8.3 AC Sources BASES See Bases for Technical Specification 3.8.1, AC Sources - Operating and 3.8.2, AC Sources - Shutdown.

TRM Vol. I TRM B3.8.3-1 REV. 96 03/10