ML22138A174
| ML22138A174 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/27/2022 |
| From: | Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML22138A174 (14) | |
Text
)
DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 04/28/22 t{_,_:"_:_:,i~iit::
\\.
CNTRL> DESK---a fnss -
- f'fiKE*
r
'R L,;;*.::.
- Media: 8 1/2 X 11 PAGE 1
DTC TMTRM Doc. Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status TRM VOL I 132 1
IR 04/27/22 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: u33920
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQillREMENTS MANUAL - VOL I Revision 132 dated 04/27/2022 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 131 has been inserted prior to inserting these pages.
SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 131 03/08/2022 Title Page Rev 132 04/27/2022 Immediately following I
List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 131 LEP-1 through LEP-4 Rev 132 03/08/2022 04/27/2022 3.3 Instrumentation TRM 3.3-5 Rev 31 10/99 TRM 3.3-5 Rev 132 04/22 TRM 3.3-27 Rev 125 04/21 TRM 3.3-27 Rev 132 04/22 TRM 3.3-33 Rev 125 04/21 TRM 3.3-33 Rev 132 04/22 TRM 3.3-44 Rev 72 12/04 TRM 3.3-44 Rev 132 04/22 TRM 3.3-48 Rev 125 04/21 TRM 3.3-48 Rev 132 04/22 3.4 Reactor C.oolant System (RCS)
TRM 3.4-3 Rev 125 04/21 TRM 3.4-3 Rev 132 04/22 3.6 Containment Systems TRM 3.6-35 Rev 31 10/99 TRM 3.6-35 Rev 132 04/22 Note: The changes above reflect those justified and described in LCR#s 21-040-TRM, 21-041-TRM, 22-008-TRM, 22-009-TRM, 22-010-TRM, 22-011-TRM, 22-012-TRM, and 22-013-TRM.
END
DTC: TMTRM I File: 1754 I
Date 04/27/2022 ARMS -INFORMATION Fermi 2 Technical Requirements Manual Volume I DTE Electric I DSN: TRM VOL I I Rev: 132 I Recipient Of~C,
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 106 TRM 3.3-30 Revision 31 TRM ii Revision 107 TRM 3.3-31 Revision 31 TRM iii Revision 105 TRM 3.3-32 Revision 31 TRM iv Revision 106 TRM 3.3-33 Revision 132 TRM V Revision 107 TRM 3.3-34 Revision 31 TRM vi Revision 31 TRM 3.3-34a Revision 106 TRM 1.0-a Revision 31 '
TRM 3.3-35 Revision 60 TRM 1. 0 Revision 31 TRM 3.3-36 Revision 104 TRM 2.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 3.0-a Revision 31 TRM 3.3-38 Revision 127 TRM 3.0-1 Revision 130 TRM 3.3-39 Revision 31
)
TRM 3.0-2 Revision 72 TRM 3.3-40 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-41 Revision 56 TRM 3.0-4 Revision 72 TRM 3.3-42 Revision 45 TRM 3.1-a Revision* 31 TRM 3.3-43 Revision 62 TRM 3.1-1 Revision 31 TRM 3.3-44 Revision 132 TRM 3.2-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-c Revision 106 TRM 3.3-48 Revision 132 TRM 3.3-d Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-a Revision 31 TRM 3.3-:-2 Revision 116 TRM 3.4-1 Revision 36 TRM 3.3-3 Revision 31 TRM 3.4-la Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-5 Revision 132 TRM 3.4-2 Revision 125 TRM 3.3-6 Revision 125 TRM 3.4-3 Revision 132 TRM 3.3-7 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-5 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-7 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-12 Revision 67
. TRM 3.4-9 Revision 31 T~ 3.3-13 Revision 74 TRM 3.4-10 Revision 125 TRM 3.3-13a Revision 125 TRM 3.5-1 Revision 31 TRM 3.3-14 Revision 67 TRM 3.6-a Revision 70 TRM 3.3-15 Revision 31 TRM 3.6-1 Revision 125 TRM 3.3-16 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-17 Revision 31 TRM 3.6-3 Revision 123 TRM 3.3-18 Revision 100 TRM 3.6-4 Revision 123 TRM 3.3-19 Revision 31 TRM 3.6-5 Revision 123 TRM 3.3-20 Revision 31 TRM 3.6-6 Revision 123 TRM 3.3-21 Revision 124 TRM 3.6-7 Revision 123 TRM 3.3-22 Revision 124 TRM 3.6-8 Revision 123 TRM 3.3-23 Revision 124 TRM 3.6-9 Revision 123 TRM 3.. 3-24 Revision 31 TRM 3.6-10 Revision 123 TRM 3.3-25 Revision 31 TRM 3.6-11 Revision 123 TRM 3.3-26 Revision 31 TRM 3.6-12 Revision 123 TRM 3.3-27 Revision 132 TRM 3.6-13 Revision 123 TRM 3.3-28 Revision 76 TRM 3.6-14 Revision 123 TRM 3.3-29 Revision 125 TRM 3.6-14a Revision 123 TRM Vol. I LEP-1 REV 132 04/27/2022
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-15 Revision 123 TRM 3.8-9 Revision 125 TRM 3.6-16 Revision 123 TRM 3.8-10 Revision 125 TRM 3.6-17 Revision 123 TRM 3.8-11 Revision 123 TRM 3.6-18 Revision 123 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 123 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 123 TRM 3.8-14 Revision 129 TRM 3.6-21 Revision 123 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision.123 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 123 TRM 3.8-17 Revision 125 TRM 3.6-24 Revision 123 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 125 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 125 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 132 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revision 53 TRM 3.7-5 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 127 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 130 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 127 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 127 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 130 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 125 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 125 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 125 TRM 3.12-30 Revision 127 TRM 3.8-8 Revision 125 TRM 4.0-1 Revision 31 TRM Vol. I LEP-2 REV 132 04/27/2022
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-a Revision 105 TRM B3.4.6-1 Revision 31 TRM 5.0-1 Revision 119 TRM B3.4.7-1 Revision 31 TRM 5.0-2 Revision 105 TRM B3.5-1 Revision 31 TRM Bl.0-1 Revision 31 TRM B3.6.l-l Revision 31 TRM B2.0-1 Revision 31 TRM B3.6.2-1 Revision 67 TRM B3.0-l Revision 63 TRM B3.6.3-1 Revision 87 TRM B3.0-2 Revision 63 TRM B3.6.4-1 Revision 31 TRM B3.0-2a Revision 72 TRM B3.6.5-1 Revision 31 TRM B3.0-2b Revision 72 TRM B3.6.6-1 Revision 70 TRM B3.0-2c Revision 130 TRM B3.6.7-l Revision,31 TRM B3.0-3 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.1-1 Revision 31 TRM B3.0-5 Revision 54 TRM B3.7.2-l Revision 107 TRM B3.0-6 Revision 72 TRM B3.7.3-1 Revision 73 TRM B3.0-7 Revision 72 TRM B3.7.4-1 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.4-2 Revision 31 TRM B3.2-l Revision 31 TRM B3.7.5-l Revision 31 TRM B3.3.l-1 Revision 31 TRM B3.7.6-l Revision 31 TRM B3.3.l-2 Revision 31 TRMB3.7.7-1 Revision 99 TRM B3.3.2-l Revision 31 TRM B3.7.8-1 Revision 31 TRM B3.3.2-2 Revision 31 TRM B3.7.9-1 Revision 79 TRM B3.3.3-l Revision 67 TRM B3.8.l-l Revision 31 TRM B3.3.4-l Revision 31 TRM B3.8.2-1 Revision 31 TRM B3.3.4-2 Revision 126 TRM B3.8.3-1 Revision 96 TRM B3.3.5-l Revision 31 TRM B3.8.4-l Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.5-l Revision 31 TRM B3.3.6-1 Revision 116 TRM B3.8.6-1 Revision 125 TRM B3.3.6-2 Revision 31 TRM B3.9.l-1 Revision 31 TRM B3.3.6-3 Revision 31 TRM B3.9.2-1 Revision 65 TRM B3.3.6-4 Revision 31 TRM B3.9.3-1 Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.9.4-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3.10-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.ll.l-l Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.1-1 Revision 31 TRM B3.3.7-3 Revision 106
- TRM B3.12.2-1 Revision 127 TRM B3.3.8-l Revision 31 TRM B3.12.3-1 Revision 31 TRM B3.3.9-l Revision 31 TRM B3.12.4-1 Revision 31 TRM B3.3.10-l Revision 56 TRM B3.12.5-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.6-1 Revision 31 TRM B3.3.12-l Revision 62 TRM B3.12.7-1 Revision 31 TRM B3.3.13-l Revision 31 TRM B3.12.8-1 Revision 118 TRM B3.3.14-1 Revision 31 TRM B3.4.l-l Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.l-3 Revision 71 TRM B3.4.l-4 Revision 71 TRM B3.4.l-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM B3.4.5-1 Revision 31 TRM Vol. I LEP-3 REV 132 04/27/2022
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I CORE OPERATING LIMITS REPORT COLR 22, Revision 0 LIST OF EFFECTIVE PAGES Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 TRM Vol. I
(
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
LEP-4 REV 132 04/27/2022
Control Rod Block Instrumentation TR 3.3.2.l SURVEILLANCE REQUIREMENTS
NOTES-------------------------------------
- 1.
Refer to Table TR3.3.2.1-1 to determine which SRs apply to each Control Rod Block Function.
- 2.
When a Control Rod Block Instrument channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains control rod block capability.
TRSR 3.3.2.1.1 TRSR 3.3.2.1.2 TRSR 3.3.2.1.3 TRSR 3.3.2.1.4 TRM Vol. I SURVEILLANCE Perform CHANNEL CHECK.
NOTES-------------------
- 1.
For Function 1, not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after IRMs on Range 2 or below.
- 2.
For Function 2, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.
Perform CHANNEL FUNCTIONAL TEST.
Perform CHANNEL FUNCTIONAL TEST.
NOTE--------------------
For Function 3.d, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.
Perform CHANNEL FUNCTIONAL TEST.
TRM 3.3-5 FREQUENCY 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 7 days 184 days 184 days (continued)
REV 132 04/22
Suppression Pool Water Temperature Instrumentation.
ACTIONS (Continued)
CONDITION REQUIRED ACTION B.
Two or more B.1 Restore at least suppression pool water seven temperature temperature instrumentation instrumentation channels to OPERABLE channels inoperable.
status.
C.
Required Action and C.1 Perform OPERABILITY associated Completion assessment on Time of Condition B Technical not met.
Specification LCO 3. 6. 2.1, Suppression Pool Average Temperature.
SURVEILLANCE REQUIREMENTS SURVEILLANCE TRSR 3.3.6.4.1 TRSR 3.3.6.4.2 TRSR 3.3.6.4.3 TRM Vol. I Perform CHANNEL CHECK.
Perform CHANNEL FUNCTIONAL TEST.
Perform CHANNEL CALIBRATION.
The water high temperature alarm setpoint is< 105°F.
TRM 3.3-27 TR 3.3.6.4 COMPLETION TIME 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Immediately FREQUENCY 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 92 days 24 months REV 132 04/22
Seismic Monitoring Instrumentation TR 3.3.7.2 SURVEILLANCE REQUIREMENTS
NOTE--------------------------------------
Refer to Table TR3.3.7.2-1 to determine which TRSRs apply for each Seismic Monitoring Instrumentation Function.
SURVEILLANCE TRSR 3.3.7.2.1
NOTE--------------------
For Function 1.b.l, CHANNEL CHECK does not include seismic trigger.
Perform CHANNEL CHECK.
TRSR 3.3.7.2.2 Perform CHANNEL FUNCTIONAL TEST.
TRSR 3.3.7.2.3 Perform CHANNEL CALIBRATION.
TRM Vol. I TRM 3.3-33 FREQUENCY 92 days 184 days 24 months REV 132 04/22
Explosive Gas Monitoring Instrumentation TR 3.3.12 ACTIONS (continued CONDITION REQUIRED ACTION COMPLETION TIME C.
Required Action and associated Completion Time of Required Action A.3 not met.
C.1 Submit a Corrective Immediately D.
Offgas hydrogen concentration not within limit.
SURVEILLANCE REQUIREMENTS D.1 SURVEILLANCE Action Document explaining why the inoperability was not corrected in a timely manner.
Restore hydrogen concentration to within the limit.
TRSR 3.3.12.1 Perform CHANNEL CHECK of the hydrogen monitor.
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> FREQUENCY 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRSR 3.3.12.2 Perform CHANNEL FUNCTIONAL TEST of the 92 days TRSR 3.3.12.3 TRM Vol. I hydrogen monitor.
Perform CHANNEL CALIBRATION of the hydrogen 92 days monitor.
The alarm setpoint shall be< 4%
hydrogen by volume.
Include the use of standard gas samples containing a nominal:
- a.
One volume percent hydrogen, balance nitrogen, and
- b.
Four volume percent hydrogen, balance nitrogen~
TRM 3.3-44 REV 132 04/22
Radiation Monitoring Instrumentation TR 3.3.14 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
For Function l.b, both C.l required channels inoperable while Implement the Immediately moving fuel.
SURVEILLANCE REQUIREMENTS OR C.2 preplanned alternate method for monitoring using a continuous monitor.
Suspend fuel movement.
Immediately
NOTE--------------------------------------
These SRs apply to each Function in Table TR3.3.14-l.
SURVEILLANCE FREQUENCY TRSR 3.3.14.1 Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRSR 3.3.14.2 Perform CHANNEL FUNCTIONAL TEST.
92 days TRSR 3.3.14.3 Perform CHANNEL CALIBRATION.
24 months TRM Vol. I TRM 3.3-48 REV 132 04/22
RCS Leakage Detection System TR 3.4.3 TR 3.4 REACTOR COOLANT SYSTEM (RCS)
TR 3.4.3 Reactor Coolant System (RCS) Leakage Detection System TRLCO 3.4.3 The drywell equipment drain sump level, flow and pump-run-time system shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS A.
CONDITION The drywell equipment A.l drain sump level, flow or pump-run-time system inoperable.
REQUIRED ACTION Restore the inoperable detection system to OPERABLE status.
COMPLETION TIME 30 days B.
Required Action and associated Completion Time not met.
B.l Initiate a Corrective Immediately Action Document outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE TRSR 3.4.3.1 Perform CHANNEL FUNCTIONAL TEST.
TRSR 3.4.3.2 Perform CHANNEL CALIBRATION.
TRM Vol. I TRM 3.4-3 FREQUENCY 92 days 48 months REV 132 04/22
SURVEILLANCE REQUIREMENTS Drywell Spray TR 3.6.8
====================;======
TRSR 3.6.8.1 TRSR 3.6.8.2 TRM Vol. I SURVEILLANCE Verify eacp valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secure in position, is in its correct position Verify that each spray nozzle is unobstructed by performance of an air or smoke flow test of the drywell spray nozzles.
TRM 3.6-35 FREQUENCY 92 days 5 years REV 132 04/22