ML20024D825
| ML20024D825 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/07/2019 |
| From: | DTE Electric Company |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML20024D825 (8) | |
Text
To: 00935 US NRC DOCUMENT ~NTRD DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 12/27/19 I
PAGE 1
DTC Doc. Serial Number Number Cnt Issue Page Rev Copies Lvl Date Sec Status
====================================================================
TMTRM TRM VOL I 121 1
IR 12/27/19 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
====================================================================
Detroit Edison EF2, C/0 Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: ul8400
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 121 dated 12/27/2019 Immediately, upon receipt of the item(s) below, please insert and/or i:emove the pages indicated.
Destroy the removed pages. Be sure that Revision 120 has been inserted prior to inserting these pages.
SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Title Page Rev 120 12/20/2019 Title Page Rev 121 12/27/2019 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP-4 Rev 120 LEP-1 through LEP-4 Rev 121 12/20/2019 TR 3. 7 Plant Systems TRM 3.7-14 Rev 31 10/99 TRM 3.7-14 Rev 121 12/19 Note: The changes above reflect those justified and described in LCR# 19-064-TRM END
(
12/27/2019 I
\\,.-
DTC: TMTRM I File: 1754 Date 12127/2019
/
ARMS - INFORMATION
(
Fermi 2 Technical Requirements Manual Volume I DTE Electric I DSN: TRMVOLI I Rev: 121 _
I Recipient
'-/ '2.. 5 CONTROLLED,
.r FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Paga Revision Paga Revision TRM i Revision 106 TRM 3.3-31 Revision 31 TRM ii Revision 107 TRM 3.3-32 Revision 31 TRM iii Revision 105 TRM 3.3-33 Revision 31 TRM iv Revision 106 TRM 3.3-34 Revision 31 TRM V Revision 107 TRM 3.3-34a Revision 106 TRM vi Revision 31 TRM 3.3-35 Revision 60 TRM 1.0-a Revision 31 TRM 3.3-36 Revision 104 TRM 1. 0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 2.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-40 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-41 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-42 Revision 45 TRM 3.0-4 Revision 72 TRM 3.3-43 Revision 62 TRM 3.1-a Revision 31 TRM 3.3-44 Revision 72 TRM 3.1-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-o Revision 106 TRM 3.3-49 Revision 31 TRM 3.3-d Revision 31 TRM 3.4-a Revision 31 TRM 3.3-1 Revision 120 TRM 3.4-1 Revision 36 TRM 3.3-2 Revision 116 TRM 3.4-la Revision 71--,
TRM 3.3-3 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-7 Revision 31 TRM I
3.4-5 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-6 Revision 31 TRM 3.3-9
.Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-10 Revision 106 TRM 3.4-8 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-12 Revision 67 TRM 3.4-10 Revision 31 TRM 3.3-13 Revi'sion 74 TRM 3.5-1 Revision 31 TRM 3.3-13a Revision 67 TRM 3.6-a Revision 70 TRM 3.3-14 Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-15 Revision 31 TRM 3.6-2 Revision 67 TRM 3.3-16 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-17 Revision 31 TRM 3.6-4 Revision 109 TRM 3.3-18 Revision 100 TRM 3.6-5 Revision 87 TRM 3.3-19 Revision 31 TRM 3.6-6 Revision 33 TRM 3.3-20 Revision\\31 TRM 3.6-7 Revisiion 31 TRM 3.3-21 Rev:ision 116 TRM 3.6-8 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-9 Revision 85 TRM 3.3-23 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-26 Rl:ivision 31 TRM 3.6-13 Revision 71 TRM 3.3-27 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-28 Ravisi<,>n 76 TRM 3.6-15 Rlvision 31
/1.
TRM 3.3-29 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-17 Revision 31 TRM Vol. I LEP-1 REV 121 12/27/2019
-~
FERMI 2 -.TECHNICAL REQUIREMENTS MANUAL VOL r LIST OF EFFECTIVE PAGES Paqe Revision Page Revision TRM 3.6-18 Revision 31 TRM 3.8-12 Revision 31 TRM 3.6-19 Revision 31 TRM 3-. 8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 ITRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 116 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43
~
3.6-24 Revision 115 TRM 3.8-18 Revision 33 TRM 3.6-25 r Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80
~
3.6-29 Revision 31 TRM 3.9-4 Revision 88
' TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 b
TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60
' TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6 Revis.ion 53 TRM 3.7-5 Revision 31
'TRM 3.12:-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 121 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 115 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 115 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 115 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 120 TRM 3.12-20 Revision 75 TRM 3.7-19
'Revision 31 TRM 3.._12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision '31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 113 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision so TRM 3.12-29 R61vision 78 TRM 3.8-7 Revision 114 TRM 3.12-30 Revision 31 TRM 3.8-8 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-a Revision 105 TRM 3.8-10 Revision 50 TRM 5.0-1 Revision 119 TRM 3.8-11 Revision 50 TRM 5.0-2 Revision 105 TRM Vol. I LEP-2 REV 121 12/27/2019
.)
1,,,
(
- TRM Bl. 0-1 TRM B2.0-1 TRM B3.0-1 TRM B3.0-2 TRM B3.0-2a TRM B3.0-2b TRM B3.0-2o TRM B3.0-3 TRM B3.0-4 TRM B3.0-5 TRM B3.0-6 TRM B3.0-7 TRM B3.1-1 TRM B3.2-1 TRM B3.3.1-1 TRM B3.3.1-2 TRM B3.3.2-1 TRM B3.3.2-2 TRM B3.3.3-1 TRM B3.3.4-1 TRM B3.3.4-2 TRM B3.3.5-1 TRM B3.3.5-2 TRM B3.3.6-1 TRM B3.3.6-2 TRM B3.3.6-3 TRM B3.. 3. 6-4 TRM B3.3.6-5 TRM B3.3.6-6 TRM B3.3.7-1 TRM B3.3.7-2 TRM B3.3.7-3 TRM B3.3.8-1 TRM B3.3.9-1 TRM B3.3.10-1 TRM B3.3.11-1 TRM B3.3.12-1 TRM B3.3.13-1 TRM B3.3.14-1 TRM B3.4.1-1 TRM B3.4.1-2 TRM B3.4.1-3 TRM B3.4.1-4 TRM B3.4.1-5 TRM B3.4.4-l TRM B3.4.3-1 TRM B3.4.4-1 TRM B3.4.5-1 TRM B3.4.6-1 TRM B3.4.7-1 TRM B3.5-1 TRM B3.6.1-1 TRM Vol. I FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Re:vision Revision 31 Revision 31 Revision 63 Revision 63 Revision 72 Revision *72 Ravision 72 Revision 31 Revision 31 Revision 54 Revision 72 Revision 72 Rev1s1on 31 Revision 31 Revision 31 Revision 31 Revision 31.
Revision 31 Revision 67 Revision 31 Rav1s1on 84 Ra.vision -31 Revision 31 Revision 116 Revision 31 Revision 31-Rav1s1on 31 Revision 76 Revision 76 Revision 31 Revision 31 Revision 106
~vision 31 Revision 31 Revision 56 Revision 45 Revision 62 Revision 31 Revision 31 Revision 31 Revision 71 Rev1sion 71 Revi.sion 71 Revision 71 Revisi.on 31 Revision 31 Revi.sion 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 LEP-3 TRM B3.6.2-1 TRM B3.6.3-1 TRM_ B3. 6. 4-1 TRM B3.6.5-1 TRM B3.6.6-1 TRM B3.6.7-1 TRM B3.6.8-1 TRM B3.7.1-1 TRM B3.7.2-1 TRM B3.7.3-1 TRM B3.7.4-1 TRM B3.7.4-2 TRM B3.7.5-1 TRM B3.7.6-1 TRM B3.7.7-1 TRM B3.7.8-1 TRM B3.7.9-1 TRM B3.8.1-1 TRM B3.8.2-1 TRM B3.8.3-1 TRM B3.8.4-1, TRM B3.8.5-1 TRM B3.8.6-1 TRM B3.9.1-1 TRM B3.9.2-1 TRM B3.9.3-1 TRM B3.9.4-1 TRM B3.10-1 TRM B3.11.1-1 TRM B3.12.'1-1 TRM B3.12.2-1 TRM B3.12.3-1 TRM B3.12.4-1 TRM B3.12.5-1 TRM B3.12.6-1 TRM B3.12.7-1 TRM B3.12.8-1 Revision Revision 67 Revision 87 Revision 31 Revision 31 Revision 70 Revi.sion 31 Revision 31 Revision 31 Revision 107 Revision 73 Revision 31 Revision 31 Revision 31 Revision 31 Revisic;m 99 Ravision 31 Revision 79 Ravision 31 Ravision 31 Revision 96 Revision 31 Revision 31 Revision 43 Revi.sion 31 Revision 65 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 112 Revision 31 Revision 31 Revision 31 Revision 31 Revision 3;L Revision 118 REV 121 12/27/2019
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE, PAGES CORE OPERATING LIMITS REPORT COLR 20, Revision 1
~
Page Notation Page 1
2 3 -
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 TRM Vol. I Revision 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
LEP-4 REV 121 12/27/2019
J Appendix R Alternative Shutdown Auxiliary Systems TR 3°. 7. 7 SURVEILLANCE REQUIREMENTS TRSR 3.7.7.1 TRSR 3.7.7.2 TRSR 3.7.7.3 TRSR 3.7.7.4
\\
TRSR 3.7.7.5 TRSR 3.7.7.6 SURVEILLANCE FREQUENCY For the SBFW system, verify by venting at 31 days the high point vents that the system piping from the pump discharge to the system isolation valves is. filled with water.
For the SBFW system, verify that each valve 31 days (manual, power-operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in PfSition, is in the correct position.
For CTG 11 Unit 1, start and supply load of 31 days at least 10 MW to the Peaker Bus.
Verify that each SBFW pump develops a flow of> 600 gpm in a test flow path with a system head corresponding to the reactor vessel operating pressure including injection line losses.
For the drywell cooling units, operate the unit for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with the fan in "HIGH" speed.
Verify each required alternative shutdown system control circuit in Table TR3.7.7-1 is capable of performing its intended function(s).
46 days on a STAGGERED TEST BASIS 46 days on a STAGGERED TEST BASIS 18 months*
- A one-time change extended the FREQUENCY from 18 months to 26 months for Table TR3.7.7-l Functions 1 through 17 and 90 tested by 24.321.06.
This one-time FREQUENCY change is applicable for the.duration of Cycle 20.
See LCR 19-064-TRM.